Preview only show first 10 pages with watermark. For full document please download

1 5 Pq Inspections

   EMBED


Share

Transcript

Good Manufacturing Practices: WHO Inspections Tony Gould (Slides provided by Dr Andre van Zyl) Inspections To get started:  Risk assessment (SOP)  Scheduling  Preparation   Announce inspection inspection  Provide tentative inspection plan  Inspect, prepare inspection report  Review corrective action 2 | PQ Workshop, Abu Dhabi | October 2010 Inspections To get started:  Risk assessment (SOP)  Scheduling  Preparation   Announce inspection inspection  Provide tentative inspection plan  Inspect, prepare inspection report  Review corrective action 2 | PQ Workshop, Abu Dhabi | October 2010 Inspections Inspections  Done by teams of inspectors  WHO inspector plus appointed from DRA (PICS member)  Invite local inspector (DRA)  Some cases observers and technical advisors  Technical assistance (independent, no conflict of interest) 3 | PQ Workshop, Abu Dhabi | October 2010 Current trends in Inspections RELATIVE RISK CATEGORY Guide to Manufacturer Risk Classification PRODUCT TYPE / ACTIVITY CRITICAL HIGH MEDIUM LOW Finished Products: Sterile finished products Non-sterile finished products X X APIs: Sterile APIs Nonsterile APIs where there is a special risk (e.g. isomerism, polymorphism, special risk of harmful impurities, etc) X X Other nonsterile APIs QC Laboratories CROs 4 | PQ Workshop, Abu Dhabi | October 2010 X X X APIs Why inspect?  Quality  – Heparin Baxter  2008, more than 80 deaths in USA Investigated  FDA (GMP  sourcing of starting material, lack of control)  – Nelfinavir, Lopinavir /Ritonavir Roche  2008, global recall of batches genotoxic substance (GMP, cleaning of tanks) Morphic forms •  – • •  –  –  – • •  European law – FPP manufacturer's responsibility  – Self, contracted party, DRA  Rationalization, economy  – Initially mostly in Europe – now Asia (India and China) – control? 5 | PQ Workshop, Abu Dhabi | October 2010  API Parameters considered: • Polymorphism • Solubility in water • Route of Synthesis • Solvents used • Impurities • Sterile API • Fermentation • Toxicity •  Activity/potency • Particle size • Other properties to be considered • Site compliance information (WHO/EDQM/Other) 6 | PQ Workshop, Abu Dhabi | October 2010 WHO GMP for APIs – ICH Q7  II. QUALITY MANAGEMENT  III. PERSONNEL  IV. BUILDINGS AND FACILITIES  V. PROCESS EQUIPMENT   7 | VI. DOCUMENTATION  AND RECORDS VII. MATERIALS MANAGEMENT PQ Workshop, Abu Dhabi | October 2010  VIII. PRODUCTION AND IN-PROCESS CONTROLS  IX. PACKAGING AND IDENTIFICATION LABELING OF APIs AND INTERMEDIATES  X. STORAGE AND DISTRIBUTION  XI. LABORATORY CONTROLS  XII. VALIDATION  API  XIII. CHANGE CONTROL  XIV. REJECTION AND RE-USE OF MATERIALS  XV. COMPLAINTS AND RECALLS  XVI. CONTRACT MANUFACTURERS  XVII. AGENTS, BROKERS, TRADERS, DISTRIBUTORS, REPACKERS, AND RELABELLERS 8 | PQ Workshop, Abu Dhabi | October 2010 Increasing GMP requirem ents  WHO GMP and Inspection of API manufacturers 9 | PQ Workshop, Abu Dhabi | October 2010 APIs Why inspect?  Variations  Change manufacturers and suppliers  Different specifications, route of synthesis, impurity profile  Stability, re-test dates vs expiry dates  Incomplete dossier, DMF, APIMF 10 | PQ Workshop Abu Dhabi | October 2010  API Examples of observations of non-compliance in 2007 Batch records and SOPs  Before steps were processed… a complete centrifugation operation before actual operation;  BMR was not completed, although the step was already in progress... No start time of the cooling process … no records of the temperature … for every 30 minute as required in the BMR… equipment logbook no entry…  The SOP “cleaning of centrifuge bag” was incomplete…No evidence of:  – dedicated bags  – labeling of storage drums   11 |  Also for fluid bed bags Risk of cross contamination PQ Workshop, Abu Dhabi | October 2010  API Examples of major non-compliances (2009)  Quality management  – Lack of knowledge and experience  – Deviations not reported  – Change control incomplete  Documentation  – Recording of operations, also not reflecting all steps and full of errors  – Incomplete process validation  Materials management  – Sampling (number of samples, release date before manufacturing date)  – Storage and use - FIFO  Buildings and facilities  – Water systems; HVAC – poor design and controls  – equipment cleaning – show product residue after cleaning, equipment cleaned in outside environment 12 | PQ Workshop Abu Dhabi | October 2010 Inspection of API manufacturers 35 30 25 Number of sites 20 15 Ave number  observations 10 5 0 2002 13 | 2004 2005 PQ Workshop Abu Dhabi | October 2010 2006 2007 2008 2009 Inspection of API manufacturers 2007 -2009. Inspec tion s (dis ease areas) a n d n u m b e r o f o b s e r v a t io n s A r e as o f n o n - c o m p l i a n c e 40 10 35 9 30 8 SOPs 7 25 TB 20 HIV/AIDS 15 MAL 6 5 2 0 1 PQ Workshop Abu Dhabi | October 2010 Batch records 4 3 Ave (Major) Cleaning 5 10 Ave (total) obs per  site 14 | Materials Management Labeling Cross contamination 0 Major deficiencies Inspection of API manufacturers Summary of trends  Number of inspections between '05 and '09  – 9 to 12. Low number in 2007  Highest number of inspections in India, followed by China  Observations range between 20 and 28 (low number in 2007)  Lower number of observations in ARV manufacturers, but lower number of major non compliances at malaria manufacturers  Observations relating to material management, SOPs and documents, cleaning 15 | PQ Workshop Abu Dhabi | October 2010 Inspection of FPP manufacturers To get started (FPP manufacturer):  Product dossier submitted  Listed as a manufacturer in a product dossier   Assessment in progress  Risk assessment  Submit a SMF   Announce inspection  Provide tentative inspection plan  Inspect, prepare inspection report – corrective action 16 | PQ Workshop Abu Dhabi | October 2010 Inspection of FPP manufacturers Manufacturers: Normally over 4 days  Covers all aspects of GMP  – Quality management, Quality assurance, Premises, Equipment, Documentation, Validation, Materials, Personnel  – Utilities (e.g. HVAC, water) . . .   Also data verification (dossier) including stability data, validation (process), development batches and bio batches  Quality control laboratory – specifications, reference standards, methods of analysis, validation and qualification 17 | PQ Workshop Abu Dhabi | October 2010 FPP Findings  Validation and qualification work was often incomplete  Validation Master Plans (VMP) lacked details  Validation policies as defined in the VMPs were not implemented  Process validation was lacking  Validated procedures (e.g. environmental monitoring) were lacking  Incomplete (not detailed) qualification of HVAC, water and computer systems 18 | PQ Workshop Abu Dhabi | October 2010 FPP Findings  Insufficient filtration of air to production areas  – No prevention of possible cross-contamination and contamination.  "As built" AHUs lacked components reflected in the schematic drawings, including filters  No qualification of sampling areas and reverse unidirectional air flow units  Temperature and RH mapping studies incomplete, or results not applied  HVAC systems not controlled or monitored, start up, shut down  Filters:  – not planned, classified, tested (including installed filter leakage test), monitored  19 | Pressure differential gauges not controlled, including calibration and zero checks PQ Workshop Abu Dhabi | October 2010 GMP ...  PQR  – Not done annually  – Not all data reported including starting materials, commitments, variations  – Trends not reviewed / discussed – results merely reported  Deviations  – Not reported, some are opened, new deviations opened on a deviation  – Not authorized by production manager or QA prior to implementation  – No assessment on impact, not additional testing  Change control procedures not followed  – No assessment on impact, no routing to responsible persons  – No qualification or validation  – Wrong materials used (e.g. MOC extension of PW loop) 20 | PQ Workshop Abu Dhabi | October 2010 GMP ...  In process controls  – Some less critical ones reported  – Wrong results represented  – Even though "fail" – reported as "pass"  Qualification  –  –  –  – Often incomplete Wrong sequence Unreliable data "approved" and signed off despite non compliance with specifications, errors not picked up  – Computers, software, excel calculations  Process validation  – Lacking  – Unreliable results 21 | PQ Workshop Abu Dhabi | October 2010 FPP OOS  SOP for the reporting and investigation of Out of Specification (OOS) results not implemented  No record of OOS results  In case of an OOS, re-testing was done, however, the results were recorded on a loose piece of paper, other sheets were not appropriately completed e.g. method number, no of samples, LIMS number 22 | PQ Workshop Abu Dhabi | October 2010 FPP Reworking materials / products:  GMP allows in exceptional cases - reworks were done on a routine basis.  Inappropriate authorization for the reworks including no prior authorization by QA, authorization by production supervisors up to 7 weeks after the rework was initiated.   A rework was even initiated prior to the conclusion of the OOS investigation.  Reworked batches were not subjected to additional testing including stability studies  Only one of all the reworked batches was subjected to stability testing according to the stability plan. 23 | PQ Workshop Abu Dhabi | October 2010 Inspection of FPP manufacturers Inspections by country 25   s 20   e    t    i   s    f 15   o   r   e    b 10   m   u    N 5 2008 2009 0 China Egypt India Morocco South Africa Country Co-inspectors by country 14   s 12   e    t    i 10   s    f   o 8   r   e    b 6   m 4   u    N 2008 2009 Total 2 0  Austr CH Es Fr Hu Country 24 | PQ Workshop Abu Dhabi | October 2010 UK WHO SA DEN Inspection of FPP manufacturers Observations 2008 and 2009   s 120   n   o    i    t 100   a   v   r   e 80   s    b   o 60    f   o   r 40   e    b 20   m   u    N 0 2008 Total 2009 Total 2008 Major  2009 Major    1 3 5 7 9   1  1    3   1    5   1    7   1    9   1    2  1    3    2    5    2 Number of sites Non compliant site s 10 8   r   e    b 6   m   u 4    N   2008 2009 Total 2 0 R H T M Disease group 25 | PQ Workshop Abu Dhabi | October 2010 INJ OSD Inspections of Contract Research Organizations (CROs)  Clinical sites: Normally over 2 days  Started 2004 -Covers all aspects of GCP and GLP  – Ethical considerations, Protocol, Volunteers etc New York Times 2007  Data verification – identified misrepresentation of data  Clinical part  – Clinic, Pharmacy and related areas, data verification  Bio-analytical part  – Laboratory and data verification  Statistical analysis 26 | PQ Workshop Abu Dhabi | October 2010 27 | PQ Workshop Abu Dhabi | October 2010 Inspections of Contract Research Organizations (CROs) Also: G u i d a n c e f o r In d u s t r y B i o -an a l y t i c a l M e t h o d Val i d a t i o n U.S. Department of Health and Human Services Food and Drug Administration Center for Drug Evaluation and Research (CDER) Center for Veterinary Medicine (CVM) May 2001 28 | PQ Workshop Abu Dhabi | October 2010 Inspections of Contract Research Organizations (CROs) C l i n i c a l P ar t o f t h e s t u d y  Protocol, Ethics committee  Volunteers  Informed consent  Source data and CRFs B i o -a n al y t i c a l p a r t o f t h e s t u d y  S am p l e m a n ag e m e n t  M et h o d v a l i d a t i o n an d s a m p l e a n al y s i s 29 | PQ Workshop Abu Dhabi | October 2010 Inspections of Contract Research Organizations (CROs) Main problems in some CROs:  Many haven't done studies for "regulated market" submissions  Lack of GCP and GLP regulations, requirements, enforcement and compliance  IEC not independent – set up by sponsors  Manipulation of data  No source data / records available (CRO and Sponsor) 30 | PQ Workshop Abu Dhabi | October 2010 Inspections of Contract Research Organizations (CROs) Examples of observations  Half of the CRFs "missing"  Source data destroyed accidently by fire or "monsoon"  Sponsor claims the data were kept by the CRO, and the CRO claims the data were kept by the sponsor  31 |  All data and retention samples destroyed as the product "expired"  – even though the submission is still under evaluation PQ Workshop Abu Dhabi | October 2010 Inspections of Contract Research Organizations (CROs) Examples  Half of the CRFs "missing" (at sponsor / CRO?), source data destroyed accidently by fire or "monsoon", destroyed as the product "expired"  Out of 95 ECGs copied by the inspectors, 43 appear to have been recorded from the same and single subject during a single session  Manual integration and results not real 32 | PQ Workshop Abu Dhabi | October 2010 Inspections of Contract Research Organizations (CROs) Example: Numerous improper manual integrations were noted by the inspectors for QC samples.  Such integrations were found both for the method validation and for the trial phase. These integrations were corrected during the inspection by one staff member under control of one inspector.  The status of the results of several QC samples was affected by these improper manual integrations  Taking these corrected results into consideration the results of subjects No. 5 and 20 should be rejected:  – subject No. 5: results were only obtained for 4 of the 6 QC samples and the results of 2 of these 4 samples fall out of acceptance limits;  – subject No. 20: the results of both LQC samples fall out of acceptance limits.. 33 | PQ Workshop Abu Dhabi | October 2010 Example discrepancies 34 | PQ Workshop Abu Dhabi | October 2010 35 | PQ Workshop Abu Dhabi | October 2010 Inspections of Contract Research Organizations (CROs) Recent observations included unreliable data such as:  Discrepancies between electronic raw data files and data submitted in study reports for assessment;  Improper manual integration of chromatograms observed during inspections even as "no manual integration" was reported;  Differences in chromatogram peak areas between the electronic raw data files and the printouts submitted to the WHO;  Batches that fail when data is calculated from raw data files during inspections (e.g. for QC samples) even as these batches were presented as "passing" with values different from those actually obtained during subject sample analysis;  Inappropriate bio analytical method validation. 36 | PQ Workshop Abu Dhabi | October 2010 Number of inspections 60 50 40 FPP API 30 CRO QCL 20 total 10 0 2005 37 | 2006 PQ Workshop Abu Dhabi | October 2010 2007 2008 2009