Preview only show first 10 pages with watermark. For full document please download

Benoni / Daveyton

Download Benoni / Daveyton

   EMBED


Share

Transcript

Benoni / Daveyton Load Shedding Schedule 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 00h00 - 03h00 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B2 B3 B4 B5 B6 B2 02h30 - 05h30 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 05h00 - 08h00 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 07h30 - 10h30 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 10h00 - 13h00 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 12h30 - 15h30 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 15h00 - 18h00 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 17h30 - 20h30 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 20h00 - 23h00 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 22h30 - 24h00 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B6 B2 B3 B4 B5 B1 AREAS B2 AREAS B3 AREAS B4 AREAS B5 AREAS B6 AREAS 114, Earlston Complex), Rynpark, Drum Drive, Benoni Agricultural Holdings, Petit, Marister, Benoni Orchards, Fairleads, Boat Lake Village, Country View. Farramere, Alphen Park, Lakefield Ext 21, Lakefield, Westdene, Rynfield Agricultural Holdings (President Steyn, President Brand, President Boshoff , President Hoffman, Hull Str, Barbet Str, Uys Str & Robin Str), Brentwood Park, Northville, Northmead Ext 4, Benoni North Agricultural Holdings, Norton Home Estates, Brentwood Park Agricultural Holdings, Goedeburg, Benoni Small Farms. Please take note Consumers may be affected by load shedding as per schedule above depending on how much load must be shed. The request from Eskom range from 10 MW to 300 MW and depending on how much must we shed, the affected Areas in a block may be equitably reduced. DAY TIME DAYS OF THE MONTH Ripple Geyser Control Daveyton, Kingsway, Mayfield, Modderbee, New Modderbee Benoni Central & Flats, Western Ext, Mackenzie Park, New Modder, Rynsoord, Dewalt Hattingh Park Actonville, Tamboville, Section of Wattville, Wattville Hostels, Morehille, Portions Rynfield-O’reillymerry/Brodigan Street, Golden Drive, Northmead, Airfield, Main Road - Farrarmere