Transcript
JOB SAFETY ANALYSIS Organization :
Job title:
Loading ,Shifting, Fabricating , lowering and fittup of Pipes
Title of Person
Supervisor :
Plant / Location :
Department :
Date: Analysis by : Reviewed by : Approved by :
REQUIRED AND RECOMMEND PPE : SAFETY HELMET, SAFETY GOGGLES, SAFETY SHOES, HAND GLOVES,APRON , Site briefing to be conducted before starting the job. WELDING FACE SHIELD. S.No
1
2
BASIC JOB STEPS
load loadin ing g & Shif Shifti ting ng of Pipe Pipe
Acce Access sssi sibi bili lity ty to the the wor work k spo spott
HAZARDS Stricking object
Topple of hydracrane,Failure of h drac dracra rane ne.. Falling object. Fall of personnel.
*
PRECAUTION TO BE TAKEN * Only Rigger will be allowed allowed for rigging rigging operation. * Only third party certified lifting lifting tools and tackles will be allowed . * Licenced & authoriesed operator to be confirmed. * Marching of hydra hydra will be done slowly. * Signaling to be done by experienced supervisor supervisor only * No one will be allowed under suspended load. * Ladder to be used & supported with vertical pipes .Proper width to be maintained for movement of personals . * Slop/benching to be maintain if depth exceeding 1.2 mtr.Only required person will go inside the trench.
3
Welding of pipes
4
Grinding of pipes
5
Cutting of pipes
Stability of the side wall. Fire & shock Fire & shock Fire, Burn
Leakage of Gas. 6 7
Fittup o off p piipes Hot works at the time of Monsoon Season.
Pinch Electrocution Slip & Trip
* Regular inspection to be done to find out signs o f cracks.
*Welders should used Welding Helmets, Sleeves, Apron, leather hand Gloves, All the combustible materials materials near near b should should be cleared before before starts over. over. * All cables must be in good condition condition . * Wheel guard is must for grinding machine. machine. * ELCB to be checked checked before before startin startin the ob. * Fire extinguisher are placed near the working area ( welding , cutiing & grinding ) . * Worker will wear hand gloves for cutting job. * The area will be free from Paper, Woods etc to be removed before start the work. * The hose pipes are properly checked and if it is damaged that will be replaced before starts the work.
* Pipe fittup to be done by only only experienced people like Fitter. * Inspect all electrical equipments DBs and extension boards. * Proper earthing should be provided. * Protect the machines and cables from water ingress. * Ensure that electrical cables are not in damaged and proper joints are provided in all cables. * Ensure that work area and personnel protective equipment are not wet. * Electricians are checked all machines, switch boards and cables before starts the work and ensure that all in well condition, then starts the work.
8
Wra Wraping ping & Coat oating ing
Fire & Burn, Smoke
CALCULATION :
Work in night
Loaing , Shifting , Fabricating & lowering of Pipes.
* Fire extinguisher will placed placed near working area. Area will will be free from paper,wood etc. * Worker will wear special nose mask * Proper light will be there for working in night shift.
Web siling Cap. - 3MT , 6 mtr or 3 mtr web siling require . Full fitting line -02 Sets D -Shackle -Shackle -5 MT (2 Nos.) One end fittup fittup line -01 Sets.
Sheet 1 of 1