BOQ

   EMBED


Share

Transcript

AS PER CONTRACT Item Description Unit Quantity Rate Amount PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS Section 6.8 - Street Lighting Work Supply and Install Road Lighting and Luminaries complete including brackets, lanterns, lamps, cut-outs, flexible cable and termination, winch system, grouting to base plate, foundation, accessories and commissioning as specified on drawings and specifications 6.8.1 30.5M High Mast complete for 4xI000W No 100   39,516.00 3,951,600.00 6.8.2 30.5M High Mast complete for 6xI000W No 30   44,084.00 1,322,520.00 Lanterns and Lamps 6.8.4 Supply and Install Lanterns and Lamps for 1000W High Pressure Sodium, cut-off, type V, Max Candela 55 deg. and with symmetrical distribution pattern (Installation included in items 6.8.1 & 6.8.2) No 322   1,770.00 569,940.00 6.8.5 Supply and Install Lanterns and Lamps for 1000W High Pressure Sodium, cut-off, type V and with asymmetrical distribution pattern (Installation included in items 6.8.1 & 6.8.2) No 258   1,770.00 456,660.00 6.8.6 Supply and Install Ceiling Mounted Flood Light under bridge with 150W High Pressure Sodium Lamps (Supply & installation complete with accessories included) No 84   3,916.00 328,944.00 6.8.6a Laying of Conduit work (15% of Total Rate) No 134   587.40 78,711.60 Section 6.8 Total Carried Forward Main Contractor  - Larsen and Toubro Limited Page 1 of 7 254607073.xlsx.ms_office_BOQ 6,629,664.00 Sub Contractor  - Danway EME AS PER CONTRACT Item Description Unit Quantity Rate Amount Total Brought to Forward 6,629,664.00 PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd) 6.8.7 Supply and Install Vehicular Underpass Lighting System excluding Ceiling mounted Flood Light for Underpass D1.1 with 150W High Pressure Sodium Lamps (Supply & installation complete with accessories included) No 8   3,283.00 26,264.00 6.8.7a Laying of Conduit work (15% of Total Rate) No 14   492.45 6,894.30 6.8.8 Supply and Install Lighting System Complete for Each Overhead Gantry Signs (Power supply cables measured in item 6.8.15) No 5   33,563.00 167,815.00 Supply Spare Lanterns and Lamps 6.8.9 Lantern 1000W High Pressure Sodium, cut-off, type V, Max Candela 55 deg. and with symmetrical distribution pattern No 10   1,770.00 17,700.00 6.8.10 Lantern 1000W High Pressure Sodium, cut-off, type V, with asymmetrical distribution pattern No 10   1,770.00 17,700.00 6.8.11 Lantern 150W HPSL No 10   1,418.00 14,180.00 Section 6.8 Total Carried Forward Main Contractor  - Larsen and Toubro Limited Page 2 of 7 254607073.xlsx.ms_office_BOQ 6,873,323.00 Sub Contractor  - Danway EME AS PER CONTRACT Item Description Unit Quantity Rate Amount Total Brought to Forward 6,873,323.00 PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd) Ducts UPVC Cable Road Crossings ducts laid and jointed in trench including end caps, draw chords, warning tape and duct markers as per specifications and as shown on drawings Lighting Control Cabinet 6.8.13 Supply and Install 6-way control cabinet including excavation, backfilling all complete as per specifications and as shown on drawings No 13   13,577.00 176,501.00 Item 1   91,218.00 91,218.00 m 12798   80.00 1,023,840.00 Earthing 6.8.14 Supply and Install earthing system to the whole street lighting network, including light poles, feeder pillar, control cabinet, etc. complete with earth pits, earth rods and the like (considered as shown in street light drawings) Cables for Street Lighting Supply and Install the following Cables in trench including excavation and backfilling of trench and warning tapes, termination and commissioning complete as per specifications and as shown on drawings 6.8.15 2 4Cx25mm XLPE/SWA/PVC Copper Cable Section 6.8 Total Carried Forward to Summary Main Contractor  - Larsen and Toubro Limited Page 3 of 7 254607073.xlsx.ms_office_BOQ 8,164,882.00 Sub Contractor  - Danway EME AS PER CONTRACT Item Description Unit Quantity Rate Amount PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd) Section 6.9 - Power (11kV) System Cables and Ducts 11kV XLPE/SWA/PVC Cable including earth wire pulled in cable sleeves, including ducting, excavation, backfilling surround, warning tapes, and any other accessories in accordance with drawings and specifications 6.9.2 6.9.3 Main Contractor  - 2 3 Core, 300mm  XLPE Cable Supply - 3 Core, 300mm2 XLPE Cable Laying - 3 Core, 300mm2 XLPE Cable m m 2,219 2,219     551.00 47.00 1,222,669.00 104,293.00 Fibre Optic Cable in 100mm PVC Duct Supply - Fibre Optic Cable Laying - Fibre Optic Cable m m 2,219 2,219     36.00 12.00 79,884.00 26,628.00 Section 6.9 Total Carried Forward 1,433,474.00 Larsen and Toubro Limited Page 4 of 7 254607073.xlsx.ms_office_BOQ Sub Contractor  - Danway EME AS PER CONTRACT Item Description Unit Quantity Rate Amount Total Brought to Forward 1,433,474.00 PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd) Substation Works 6.9.6 Furnish and Install 500 KVA, 11/0.4 KV Package unit substation including Oil Type Transformer, RMU, LV Switchgear, cables and other accessories in accordance with drawings and specifications. (DMS not included) No 1   264,648.00 264,648.00 6.9.7 Relocate the existing 11/0.4 KV substation in accordance with drawings and specifications and as directed by the ADDC engineer (Only existing material used) No 3   173,037.00 57,679.00 Section 6.9 Total Carried Forward to Summary 1,871,159.00 Section 6.10 -Power(400V) Network Cables and Ducts 400V XLPE/SWA/PVC Cable including earth wire pulled in cable sleeves, including ducting, excavation, backfilling sorround, warning tapes, and any other accessories in accordance with drawings and specifications 6.10.2 6.10.3 6.10.4 2 4Cx70mm  XLPE/SWA/PVC Copper Cable Supply - 4Cx70mm2 XLPE/SWA/PVC Copper Cable m 1,061   137.00 145,357.00 Laying - 4Cx70mm2 XLPE/SWA/PVC Copper Cable m 1,061   24.00 25,464.00 4Cx120mm  XLPE/SWA/PVC Copper Cable Supply - 4Cx120mm2 XLPE/SWA/PVC Copper Cable m 823   235.00 193,405.00 Laying - 4Cx120mm2 XLPE/SWA/PVC Copper Cable m 823   30.00 24,690.00 2 2 - 4Cx240mm  XLPE/SWA/PVC Copper Cable Supply - 4Cx240mm2 XLPE/SWA/PVC Copper Cable m 823 461.00 379,403.00 m 823 41.00 33,743.00 Section 6.10 Total Carried Forward 802,062.00 Laying - 4Cx240mm2 XLPE/SWA/PVC Copper Cable Main Contractor  - Larsen and Toubro Limited Page 5 of 7 254607073.xlsx.ms_office_BOQ Sub Contractor  - Danway EME AS PER CONTRACT Item Description Unit Quantity Rate Amount Total Brought to Forward 802,062.00 PART - 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd) LV Feeder Pillar  6.10.5 6.10.6 Supply and Install Street Lighting Feeder Pillar with accessories including concrete foundations, e xcavation, anchor bolts, complete in accordance with drawings and specifications No 6   12,696.00 76,176.00 No 9   12,470.00 112,230.00 LV Service Cabinet Supply and Install LV Service Cabinet including excavation, backfilling all complete in accordance with drawings and specifications Section 6.10 Total Carried Forward to Summary 990,468.00 Section 6.11 -Existing Works: 6.11.1 6.11.2 Remove, Salvage Existing 30.5M Light Poles complete with all Lanterns, Foundations, Cables, Cable Tiles, Control Cabinets and all associated equipment and transport it to ADDC store or as directed by ADDC as shown in the specifications. Remove, Salvage Existing Lighting Control Cabinets, Feeder Pillars, Service Turret, including foundations and any associated equipment and transport it to ADDC store or as directed by ADDC as shown in the specifications. No 100   4,435.00 443,500.00 No 15   1,034.00 15,510.00 Section 6.11 Total Carried Forward Main Contractor  - Larsen and Toubro Limited Page 6 of 7 254607073.xlsx.ms_office_BOQ 459,010.00 Sub Contractor  - Danway EME AS PER CONTRACT Item Description Unit Quantity Rate Amount Total Brought to Forward 459,010.00 PART- 6 LIGHTING AND ELECTRICAL DISTRIBUTION WORKS (Cont'd) Remove, Salvage Existing POLE-MOUNTED 11/0.4kV Transformer substation and any associated equipment by ADDC as shown in the specifications. No 10   17,734.00 177,340.00 6.11.4 Remove and Salvage Existing HV Cable m 2,000   20.00 40,000.00 6.11.5 Remove and Salvage Existing MV/LV Cable m 1,500   15.00 22,500.00 6.11.7 Raising or Lowering Existing MV/LV Cable m 1,000   15.00 15,000.00 6.11.8 Raising or Lowering Existing HV Cable m 800   20.00 16,000.00 6.11.9 Divert 11kV OHL as shown in the Drawing m 1,000   396.00 396,000.00 6.11.3 Section 6.11 Total Carried Forward to Summary Main Contractor  - Larsen and Toubro Limited Page 7 of 7 254607073.xlsx.ms_office_BOQ 1,125,850.00 Sub Contractor  - Danway EME