Preview only show first 10 pages with watermark. For full document please download

Scour Depth Calculation

Scour Depth Calculation

   EMBED


Share

Transcript

Job No. PECS2016001 Project Title including Pumping Machineries with all related Accessories, Raw Water Transmission Main for drawing 35 MGD Raw Water from The River Hooghly Owner Owner's Consultant Executing Agency Consultanct to EA Name of Unit Drawing Ref. Designed by: Reference Doc No. PECS/201601/APPROACH JETTY/007 Survey, Design, Construction, Supply, Erection & Commissioning of Raw Water Intake Structure (Fixed type), Pump House on Intake structure and Delivering to Water Treatment Plant on EPC Turnkey Basis Superintending Engineer, Eastern Circle, Public Health Engineering Dte., Govt. of WB WAPCOS LIMITED (A Govt. of India Undertaking) Simplex Infrastructures Limited Structural Analysis & Design of Approach Jetty (Calculation of Scour Depth) Checked by: G Chakraborty 0 Design of Approach Jetty for Intake Pump House (Habra Gaighata Intake Project) Projectscape Engineering Consultancy Services Private Limited Shubhajit Barik Rev. No. Approved by: CALCULATIONS G Chakraborty Date: 9/6/2016 CALCULATION OF MAXIMUM SCOUR DEPTH VIS-A-VIS SCOUR DEPTH CALCULATED BY KoPT FOR HABRA-GAIGHATA INTAKE PROJECT : CALCULATION OF SILT FACTOR ( Ksf ) : Ksf = 1.76√dm ( As per clause No. 703.2.2 of IRC:78-2014) dm = weighted mean diameter of bed material in millimetre (The recommendation of KoPT as per letter no: Hyd/ 12029/Jubilee bridge/PHED/862 on Dated: 02.08.2016 the value of dm along the region has been considered as 0.119 mm for the purpose of scour depth calculation.) dm = 0.119 mm So, Ksf = 0.607 CALCULATION OF SCOUR DEPTH 40.0M FROM HIGH BANK LINE W.R.T.HHWL (for 1000Ø Pile) (Refer Sketch No. PECS/SIL/1601/003/SK-01 (Recommendation of KoPT as per Letter No. Maxm Discharge Velocity, V = 1.50 m/sec High Bank line has been considered as wetted line where HHWL merges with the River Bed profile near bank Hyd/ 12029/Jubilee bridge/PHED/862) Discharge per M width of waterway (Db) =(A x V) = 3.76 cumecs Depth of Water considered for unit discharge from HHWL = 2.508 m (at centre of farthest pile nearly 40.0 m away from High Bank Line, 4.67m - 2.162m) So, Design Discharge per M Increase of 30% over Design Discharge, as per width of waterway = 4.89 cumecs clause No. 703.1.1 of IRC:78-2014, Catchment area less than 3000 km2 MEAN SCOUR DEPTH (dsm): As per IRC: 78-2014 the mean scour Depth below Hight Flood Level (HHWL) can be calculated theoritically from the following equation: dsm = 1.34 (Db /Ksf) dsm= Mean depth of Scour 1/3 Db = The design discharge for foundation per metre width of effective Waterway Ksf = Silt factor for a representative sample of bed material obtained uptothe level of anticipated deepest scour. Here, Mean Scour Depth, dsm= 1.a) 1.b) 2.686 m (From HHWL) Maxm Deoth of Scour from HHWL (2dsm) = 5.372 m Max Scour Depth From river Bed Level = 2.180 m m Maxm Scour Depth From HHWL = Calculated Maxm Scour Depth From HHWL (2.18+2.508) = 5.372 m 4.688 m So, for Design purpose we would consider the Maximum Value = Page 1 of 2 ( As per clause No. 703.3.1.1 of IRC:78-2014) (As calculated above) (The recommendation of KoPT as per Letter No. Hyd/ 12029/Jubilee bridge/PHED/862 on Dated: 02.08.2016 5.372 m from HHWL Job No. PECS2016001 Project Title including Pumping Machineries with all related Accessories, Raw Water Transmission Main for drawing 35 MGD Raw Water from The River Hooghly Owner Owner's Consultant Executing Agency Consultanct to EA Name of Unit Drawing Ref. Designed by: Reference Doc No. PECS/201601/APPROACH JETTY/007 Survey, Design, Construction, Supply, Erection & Commissioning of Raw Water Intake Structure (Fixed type), Pump House on Intake structure and Delivering to Water Treatment Plant on EPC Turnkey Basis Superintending Engineer, Eastern Circle, Public Health Engineering Dte., Govt. of WB WAPCOS LIMITED (A Govt. of India Undertaking) Simplex Infrastructures Limited Structural Analysis & Design of Approach Jetty (Calculation of Scour Depth) Checked by: G Chakraborty Design of Approach Jetty for Intake Pump House (Habra Gaighata Intake Approved by: CALCULATIONS G Chakraborty CALCULATION OF SCOUR DEPTH BEYOND 40.0M HIGH BANK LINE W.R.T.HHWL (for1200Ø Pile) (Refer Sketch No. PECS/SIL/1601/003/SK-01 Max Discharge Velocity, V = 3.00 m/sec ( Recommendation of KoPT as per Letter No. m Date: 9/6/2016 High Bank line has been considered as wetted line where HHWL merges with the River Bed profile near bank Hyd/ 12029/Jubilee bridge/PHED/1597) Discharge per M width of waterway (Db) =(A x V) = 15.41 cumecs Depth of Water considered for unit discharge from HHWL = 5.138 m (at centre of farthest pile nearly 40.0 m away from High Bank Line, 4.67m + 0.468m) So, Design Discharge per M width of waterway = 20.04 cumecs Increase of 30% over Design Discharge, as per clause No. 703.1.1 of IRC:78-2014, Catchment area less than 3000 km2 MEAN SCOUR DEPTH (dsm): As per IRC: 78-2014 the mean scour Depth below Hight Flood Level (HHWL) can be calculated theoritically from the following equation: dsm = 1.34 (Db /Ksf) dsm= Mean depth of Scour 1/3 Db = The design discharge for foundation per metre width of effective Waterway Ksf = Silt factor for a representative sample of bed material obtained uptothe level of anticipated deepest scour. Here, Mean Scour Depth, dsm= 2.a) 2.b) 4.298 m (From HHWL) Maxm Deoth of Scour from HHWL (2dsm)= 8.597 m ( As per clause No. 703.3.1.1 of IRC:78-2014) Maxm Scour Depth From HHWL= 8.597 m (As calculated above) Max Scour Depth From river Bed Level= m Calculated Maxm Scour Depth From HHWL (8.400+5.138)= 0 Project) Projectscape Engineering Consultancy Services Private Limited Shubhajit Barik Rev. No. 8.400 m 13.538 m So, for Design purpose we would consider the Maximum Value = Page 2 of 2 (The recommendation of KoPT as per Letter No. Hyd/ 12029/Jubilee bridge/PHED/1597 on Dated: 11.12.2015 13.538 m from HHWL