Preview only show first 10 pages with watermark. For full document please download

Analisa Harga Satuan Pekerjaan Kota Cimahi

ANALISA HARGA SATUAN PEKERJAAN KOTA CIMAHI NO URAIAN SAT. KOEF 50 1 M3 PEKERJAAN PASIR URUG Pasir Urug M³ 1,200 Pekerja Org 0, M2 URUGAN PASIR T.10cm Pasir Pasang M³ 1,200 Pekerja Org 0,215 52

   EMBED

  • Rating

  • Date

    May 2018
  • Size

    56.1KB
  • Views

    5,732
  • Categories


Share

Transcript

ANALISA HARGA SATUAN PEKERJAAN KOTA CIMAHI NO URAIAN SAT. KOEF 50 1 M3 PEKERJAAN PASIR URUG Pasir Urug M³ 1,200 Pekerja Org 0, M2 URUGAN PASIR T.10cm Pasir Pasang M³ 1,200 Pekerja Org 0, M3 URUGAN PASIR + BATU (SIRTU) Pasir sirtu M³ 1,200 Pekerja Org 0, M3 COR BETON SITE MIX K-225 PC (50 Kg) Zak 7,890 Split pecah mesin 1/2 M³ 0,815 Pasir beton M³ 0,490 Peralatan Lot 0, M3 COR BETON SITE MIX K-175 PC (50 Kg) Zak 5,300 Split pecah mesin 1/2 M³ 0,730 Pasir beton M³ 0,540 Peralatan Lot 0, M3 COR BETON K-300 READY MIX MIN 6 M3 BERIKUT SLANG Adukan K-300 Readymix m³ 1,0000 P e k e r j a org 2,5000 Tukang Batu org 0,2500 Kepala Tukang batu org 0,1000 M a n d o r org 0,0100 Alat bantu ( Slang + Tes Lab ) lot 0, M2 RABAT LANTAI BETON TEBAL 8 CM PC (50 Kg) Zak 0,360 Pasir beton M³ 0,050 Batu Pecah 1/2 M³ 0,085 Pekerja Org 1,200 PEMBANGUNAN WC SMPN 1 KOTA CIMHAI Page 1 57 1 Kg BESI BETON TERPASANG U-39 Pekerja Org 0,035 Tukang Besi Beton Org 0, Kg BESI BETON TERPASANG U-32 Pekerja Org 0,035 Tukang Besi Beton Org 0, Kg BESI BETON TERPASANG U-24 Pekerja Org 0,025 Tukang Besi Beton Org 0,015 Kepala Tukang Besi Beton Org 0, M2 BESI WIREMESH M8 Besi Wiremesh M8 m2 1,100 Kawat Las Kg 0,055 Pekerja terampil Org 0,035 Tukang besi beton Org 0, M2 BEKISTING DENGAN DINDING BATAKO (UNTUK SLOOF & POER) Batako bh 8,000 PC (50 Kg) Zak 0,350 Pasir Pasang m3 0, M2 BEKISTING DENGAN MULTIPLEK U/ PELAT (BAHAN 2 X PAKAI ) Multiplek 9 mm lb 0,260 Kaso 5/7 Borneo M³ 0,008 Paku kg 0,400 Pekerja Org 0,120 Tukang Kayu Org 0,270 Kepala Tukang Kayu Org 0,120 Mandor Org 0,012 PEMBANGUNAN WC SMPN 1 KOTA CIMHAI Page 2 63 1 M² BEKISTING DENGAN MULTIPLEK U/ KOLOM & BALOK ( BAHAN 2 x PAKAI ) Multiplek 9 mm lb 0,260 Kaso 5/7 Borneo M³ 0,016 Paku Kg 0,400 Pekerja Org 0,120 Tukang Kayu Org 0,270 Kepala Tukang Kayu Org 0, M3 PASANGAN BATU KALI 1 Pc : 5 Psr Batu belah M³ 1,200 PC (50 Kg) Zak 1,700 Pasir pasang M³ 0,420 Pekerja Org 3,000 Tukang Batu Org 1,200 Kepala Tukang Batu Org 0, M³ PAS. ANSTAMPING BATU KALI Batu belah M³ 1,200 Tukang batu setengah terampil Org 1,200 Kepala tukang batu Org 0, M2 'PEKERJAAN WATERPROFING ATAP (DAK BETON) PROOFEX TORCHEAL 3P Ex FOSROC m2 1,000 Alat Bantu Bh 0,050 Pekerja Org 0,200 Tukang Cat Org 0,300 Kepala Tukang Cat Org 0, M3 COR LANTAI KERJA PC (50 Kg) Zak 3,780 Split pecah mesin 2/3 M³ 0,552 Pasir beton M³ 0,365 Alat bantu ls 1,000 Pekerja Org 3,000 Tukang Batu Org 0,500 Kepala Tukang Batu Org 0, M² PEKERJAAN FLOOR HARDENER Bahan Hardener Kg 0,341 Alat bantu ls 1, M² PAS. SCREED 1 : 2 TEBAL 5 CM PC (50 Kg) Zak 0,433 Pasir pasang M³ 0,070 keuntungan max 10 % Total Harga PEMBANGUNAN WC SMPN 1 KOTA CIMHAI Page 3 70 1 M3 PEK. KOLOM BETON 40/60 ( K.1 ) BESI 158 KG Tulangan Kg 158,000 Beqisting Multiplek T.12 mm m2 4, M3 PEK. KOLOM BETON 40/40 ( K.2 ) BESI 210 KG Tulangan Kg 210, M3 PEK. KOLOM BETON 20/40 ( K.3 ) BESI 97,4 KG Tulangan Kg 97,457 Beqisting Multiplek T.12 mm m2 7, M3 PEK. BALOK BETON 20/50 ( B.1 ) BESI 157 KG Tulangan Kg 157, M3 PEK. BALOK BETON 20/40 ( B.2 ) BESI 129,4 KG Tulangan Kg 129, M3 PEK. KOLOM PRAKTIS 12/12 BESI 232,4 KG Tulangan Kg 232,473 Beqisting Multiplek T.12 mm m2 8,333 Beton Ready Mix K.175 m3 1, M3 PEK. BALOK LINTEL 10/10 BESI 193,5 KG Tulangan Kg 193,550 Beqisting Multiplek T.12 mm m2 10,000 Beton Ready Mix K.175 m3 1, M3 PEK. PLAT LANTAI T.12cm (2RANGKAP) Tulangan Kg 91,221 Beqisting Multiplek T.9 mm m2 8,330 Beton Ready Mix K.300 m3 1, M2 MENGERJAKAN WIREMESH M 8 Bahan : Wiremesh M8 M2 1,1000 Kawat Las Kg 0,100 Tenaga Kerja : Pekerja Oh 0,100 Kepala Tukang Oh 0,075 Mandor Oh 0,010 Keuntungan maksimal 10% PEMBANGUNAN WC SMPN 1 KOTA CIMHAI Page 4 79 1 M2 MENGERJAKAN BONDEX Bahan : Bondex M2 1,1000 Kawat Las Kg 0,100 Tenaga Kerja : Pekerja Oh 0,050 Kepala Tukang Oh 0,030 Mandor Oh 0,010 Shear Connector Ls 1,000 Keuntungan maksimal 10% PEMBANGUNAN WC SMPN 1 KOTA CIMHAI Page 5