Preview only show first 10 pages with watermark. For full document please download

Capital Improvement Projects - Bexar County

   EMBED


Share

Transcript

PUBLIC WORKS DEPARTMENT Project: Benton City Road Drainage Structure / Low Water Crossing Precinct: 1 Location / Limits: Benton City Rd between Von Ormy Rd and Jackel Rd, Elm Creek.. Scope: Structure replacement will provide for an improved conveyance of storm water runoff while having no adverse impact to the existing 100-years level of Water Surface Elevation Status: Complete Additional Information: Consultant: HDR Engineering Bid Opening: Feb. 14, 2014 Contractor: D Plata Construction LLC Construction Start : 2 Q 2014 Construction Cost: $ 356,906.24 Construction End Date: 4 Q 2014 Joint Bid: None With Flood Control Component January 30, 2015 PUBLIC WORKS DEPARTMENT Project: Big Country Phase V Precinct: 1 Location / Limits: Blue Mesa, Fort Wayne, Black River, Hatchet Pass, Jarbo Pass, Cache Path, Yurba Trail, Two Wells, Fish Springs, Olney Springs, Potter Valley, Muddy Peak, Crescent Peak and Mud Lake. Scope: The main purpose of the project is to reconstruct 14 residential streets with curb & gutter section, 4-foot sidewalk including ADA complaint ramps and driveway approaches. SAWS joint bid with Bexar County to replace existing service service lines within the project. Status: Construction Additional Information: Consultants: LNV / In TEC Bid Opening: May 3, 2013 Contractor: Olmos Equipment, Inc. Construction Start : 3 Q 2013 Roadway Construction Cost: $ 5,729,172.71 Construction End Date: 2 Q 2015 Joint Bid : SAWS January 30, 2015 PUBLIC WORKS DEPARTMENT Project: FM 1957 Potranco Rd Precinct: 1 Location / Limits: Loop 1604 to just west of SH 211 Scope: Construction will provide for enhanced connection between two western relief routes of SH 211 and Loop 1604. The proposed improvements will expand the existing two-lane rural roadway section to an urban roadway section consisting of two 11-foot lanes, and two 14-foot shared use lanes, continuous left turn lane or 14-foot raised center median within an 80’ ROW (Minimum). Status: Final Design , Utility Relocation / Adjustments Additional Information: Consultants: Pape-Dawson / Jacobs Advertise Date: 1 Q 2015 Contractor: TBD Construction Start Date: 2 Q 2015 Construction Cost: $ 34,226,011 Construction End Date: 3 Q 2018 Joint Bid: CPS , SAWS Pass Thru Project (TX DOT) January 30, 2015 PUBLIC WORKS DEPARTMENT Project: FM 471 Culebra Rd Precinct: 1 & 2 Location / Limits: From FM 1560 to Old FM 471. Scope: The construction will complete the capacity gap that currently exists on FM 471 from FM 1560 to Old FM 471. The proposed improvements will widen Culebra Road from its existing two-lane configuration to a four-lane divided roadway with anticipated bicycle and pedestrian amenities. Status: Final Design Additional Information: Consultants: CP&Y / Atkins Advertise Date: 2 Q 2015 Contractor: TBD Construction Start Date: 2 Q 2015 Construction Cost: $ 14,719,463 Construction End Date: 4 Q 2016 Joint Bid: SAWS, CPS Gas. Pass Thru Project (TX DOT) January 30, 2015 PUBLIC WORKS DEPARTMENT Project: Fischer Rd Phase I Precinct: 1 Location / Limits: From Quintana Rd to IH 35 S Scope: Project will expand the existing twolane rural roadway section to an urban roadway section consisting of two 16-foot travel lanes in each direction with 6 ft. shoulders, curbs and sidewalks within an 86’ ROW (typical). - 2,100 L.F. No in flood plain. One culvert (pipe). Medio Creek Watershed. Status: Preliminary. Additional Information: Consultants: Garzabury LLC Advertise Date: TBD Contractor: TBD Construction Start Date: TBD Construction Cost: $ 1,890,000 Construction End Date: TBD Joint Bid: TBD Economic Development Project January 30, 2015 PUBLIC WORKS DEPARTMENT Project: Macdona Streets Reconstruction Precinct: 1 Location / Limits: Macdona Subdivision in Southwest Bexar County, including next streets: Commerce St, Rockport St, Main St and 3, 4, 5, 6 & 7th St. , Scope: Reconstruction of 24’ rural roadway section and reestablishing positive drainage (9 streets). Status: Complete Additional Information: Consultants: CP & Y / Prof Serv. Ind. Bid Opening: January 10, 2014 Contractor: Tropical Contracting Inc. Construction Start: 3 Q 2014 Construction Cost: $ 2,464,000.00 Construction End Date: 1 Q 2015 Joint Bid: None January 30, 2015 PUBLIC WORKS DEPARTMENT Project: Precinct: Old FM 471 & Talley Rd 1 Location / Limits: Old FM 471 starting and ending on FM 471 (Culebra Rd) and Talley Rd from FM 471 (Culebra Rd) to Old Talley Rd. (South End). Scope: Roadway expansion from 2 lanes to 3 lanes with curbs, sidewalks and drainage improvements due to new schools and development in the area. Status: Preliminary Additional Information: Consultant: Dannenbaum Advertise Date: Contractor: TBD Construction Start Date: Construction Cost: $ 10,000,000 Construction End Date: TBD Joint Bid: TBD January 30, 2015 TBD TBD PUBLIC WORKS DEPARTMENT Project: Roft Rd Precinct: 1 Location / Limits: From Culebra Rd to Rockwall Mill Rd. (5,100 L.F.) Scope: This project will expand the existing two-lane rural roadway section to a mixed rural/urban roadway section with curb & sidewalks on the east side of the roadway and drainage improvements. Status: Intermediate Design Additional Information: Consultant: ARCADIS Advertise Date: 3 Q 2016 Contractor: TBD Construction Start Date: 4 Q 2016 Construction Cost: $ 3,100,000 Construction End Date: 4 Q 2017 Joint Bid: TBD January 30, 2015 PUBLIC WORKS DEPARTMENT Project: SH 211 Precinct: 1 Location / Limits: From FM 1957 (Potranco Rd) to FM 471 (Culebra Rd) Scope: The proposed project would construct a new two-lane roadway connecting the existing sections of SH 211 from FM 471 (Culebra Road) to FM 1957 (Potranco Road). The purpose of the proposed project is to improve connectivity and mobility, and provide residents a through alternative between FM 1957 and FM 471. The total length of the project is 7.6 miles. Status: Alternatives Analysis / Environmental. Additional Information: Consultant: Pape-Dawson Advertise Date: 3 Q 2015 Contractor: TBD Construction Start Date: 4 Q 2015 Construction Cost: $ 18,100,000 Construction End Date: 3 Q 2017 Joint Bid: N/A Pass Thru Project (TX DOT) January 30, 2015 PUBLIC WORKS DEPARTMENT Project: Talley Rd – FM 957 (Potranco Rd) to Wiseman Blvd. Precinct: 1 Location / Limits: From FM 1957 (Potranco Rd) to Wiseman Blvd. Scope: Roadway expansion from 2 to 4 lanes with curbs, sidewalks, bike lanes, turn lanes and drainage improvements. Some ROW acquisition will be required. Status: Preliminary. Additional Information: Consultant: CP & Y Advertise Date: Contractor: TBD Construction Start Date: Construction Cost: $ 12,500,000 Construction End Date: TBD Joint Bid: TBD January 30, 2015 TBD TBD PUBLIC WORKS DEPARTMENT Project: West Military Bridge Ext Precinct: 1 Location / Limits: West Military Bridge Extension Scope: Project consist of construction of mirror image of existing 32 ft. X 400 ft. bridge parallel over Medio Creek stripping to accommodate bike lanes and travel lane each direction and 5 foot sidewalk. The project included the adjustment / relocate / replacement of CPS gas within the project limits.  Status: Complete. Additional Information: Consultants: SEA / HJV Assoc / Arias Bid Opening: Aug 6, 2012 Contractor: Relmco Construction Start: 3 Q 2012 Construction Cost: $ 1,589,168 Construction End Date: 2 Q 2014 Joint Bid: CPS. January 30, 2015 PUBLIC WORKS DEPARTMENT Project: Watson Rd Phase I Precinct: 1 Location / Limits: From Somerset Road to SWISD Scope: Watson Rd is currently a 2 lane roadway and will be reconstructed to include 4-12’ travel lanes, drainage improvements and pedestrian amenities. Status: Planning. Additional Information: Consultants: TBD Bid Opening: TBD Contractor: TBD Construction Start: TBD Construction Cost: $ 6,800,000 Construction End Date: TBD Joint Bid: TBD MPO Project January 30, 2015 PUBLIC WORKS DEPARTMENT Project: WT Montgomery Road Phase I Precinct: 1 Location / Limits: IH 90 West to Lucas Creek bridge. Scope: The main purpose of the project is to provide much needed drainage improvements and road reconstruction to the WT Montgomery Road. Status: Final Design Additional Information: Consultant: IDC, Inc. Advertise Date: 2 Q 2015 Contractor: TBD Construction Start Date: 2 Q 2015 Construction Cost: $ 5,671,000 Construction End Date: 4 Q 2016 Joint Bid: TBD January 30, 2015