Transcript
Page 1 of 57 Effective from Feb, 2010 Master List No. TIM 0003 Revision 7 RESEARCH DESIGNS AND STANDARDS ORGANISATION TRACTION INSTALLATION DIRECTORATE 1.0 TITLE : MASTER LIST OF DRAWINGS OF EQUIPMENTSAND MATERIALS FOR TRACTION INSTALLATION .PREPARED BY SE/DOC.APPROVED BY DTI-P&S Page 2 of 57 Effective from Feb, 2010 Master List No. TIM 0003 Revision 7 SIZESl.No.DRAWINGNO.REVDESCRIPTIONDATEOFISSUE I N D E X SlNoDESCRIPTION PAGE NO. CHAPTER - I - OVERHEAD EQUIPMENT 1 GENERAL ARRANGEMENT FOR CONVENTIONAL OHE 032 ATD series 093 COMPONENTS , FITTINGS, EQUIPMENTS AND SMALL PART STEEL WORKS 104 GENERAL ARRANGEMENT AND FITTINGS FOR COMPOSITE OHE(ALUMINIUM ALLOY CATENARY AND COPPER CONTACT WIRE)21 CHAPTER - II - POWER SUPPLY INSTALLATION 1 GENERAL ARRANGEMENT OF SUB STATION LAYOUT ,SWITCHINGSTATION, BT, REMOTE CONTROL AND EARTHING ARRANGEMENT. 232 GENERAL ARRANGEMENT OF SUB STATION LAYOUT ,SWITCHINGSTATION, BT, REMOTE CONTROL AND EARTHING ARRANGEMENT FOR 2X 25 kV ‘AT’ SYSTEM.283 SHUNT CAPACITORS AND PROTECTION FOR 25 kV ac TRACTION SYSTEM 294 PROTECTION FOR 2 X 25 kV ac ‘AT’ SYSTEM 305 COMPONENTS AND FITTINGS 316 HIGHER CAPACITY CONNECTORS FOR 220 kV AND 25 kV (50 mm O/DALUMINIUM BUS BAR) SYSTEM33 CHAPTER - III - CIVIL 1 OHE MAST (STEEL) 352 OHE PORTALS, TTC, DROPARMS AND SPS 363 STRUCTURAL LAYOUT, STRUCTURES AND FOUNDATION FOR TRACTIONSUB STATION394 STRUCTURES, FENCING AND SPS FOR SWS AND BT 415 OHE SUPERMAST AND SPS 436 EMPLOYMENT SCHEDULE OF OHE MAST 457 OHE FOUNDATIONS 538 MISCELLANEOUS 549 SPUN PRESTRESS CEMENT CONCRETE (PSC) OHE MAST 54 Page 3 of 57 Effective from Feb, 2010 Master List No. TIM 0003 Revision 7 SSl.No.DRAWING NO. REVDESCRIPTION DATEOFISSUEIZE Chapter - I - OVERHEAD EQUIPMENT 1. GENERAL ARRANGEMENT FOR CONVENTIONAL OHE A1 ETI/OHE/G/00111 Sh.1 C Extra allowance for setting of structures on curves(broad gauge)20.10.05 22 RE/33/G/00111 Sh.2 - Extra allowance for setting of structures on curves(metre gauge)17.05.62 33 ETI/OHE/G/00112 D Standard setting of structures in the vicinity of signals(broad gauge)20.10.05 14 ETI/OHE/G/00131 - Typical design of side bearing foundation 21.08.71 25 ETI/OHE/G/00144 Sh.3 C Standard drilling schedule of OHE mast 9.5 m long(RSJ and BFB)24.12.97 26 ETI/OHE/G/00158 Sh-1 - Employment schedule of bracket tubes regulatedconventional OHE (Cd Cu catenary and Cu contactwire 1000 kgf. tension each for wind pressure 75kgf /.m228.06.84 27 ETI/OHE/G/00158 Sh-2 - Employment schedule of bracket tubes regulatedconventional OHE (Cd Cu catenary and Cu contactwire 1000 kgf tension each) for wind pressure112.5kgf /sq.m.28.06.84 28 ETI/OHE/G/00158 Sh- 3 - Employment schedule of bracket tubes regulatedconventional OHE (Cd Cu catenary and cu contactwire 1000 kgf tension each) for wind pressure 150 kgf / sq.m.28.06.84 29 ETI/OHE/G/00159 Sh-1 - Employment schedule of bracket tubes unregulatedconventional OHE (Cd Cu catenary and Cu contactwire 1000 kgf tension each for wind pressure 75kgf /sq.m.28.06.84 210 ETI/OHE/G/00159 Sh-2 - Employment schedule of bracket tubes unregulatedconventional OHE (Cd Cu catenary and Cu contactwire 1000 kgf tension each) for wind pressure112.5kgf /sq.m.28.06.84 211 ETI/OHE/G/00159 Sh- 3 - Employment schedule of bracket tubes unregulatedconventional OHE (Cd Cu catenary and Cu contactwire 1000 kgf tension each) for wind pressure 150 kgf /sq.m.28.06.84 212 ETI/OHE/G/00161 - General distribution of droppers. 28.04.72 313 ETI/OHE/G/00166 A Dropper schedule for unregulated OHE with equalencumbrance (1.40/1.40).02.08.74 214 ETI/OHE/G/00167 A Dropper schedule for unregulated OHE with unequalencumbrance (1.40/0.90).02.08.74 215 ETI/OHE/G/00168 A Dropper schedule for unregulated OHE with unequalencumbrance (1.40/0.75).02.08.74 216 ETI/OHE/G/00169 A Dropper schedule for uninsulated overlap span. 01.12.94 217 ETI/OHE/G/00170 A Dropper schedule for insulated overlap span. 02.08.74 218 ETI/OHE/G/00173 B Dropper schedule for compensated OHE with equalencumbrance (1.40/1.40) for speed upto 160km/h.02.08.74 1 Page 4 of 57 Effective from Feb, 2010 Master List No. TIM 0003 Revision 7 SIZESl.No.DRAWINGNO.REVDESCRIPTIONDATEOFISSUEA19 ETI/OHE/G/00173-1 - Dropper schedule for regulated OHE in worn outcondition of 107 sqmm contact wire (9.75mm thickness)09.10.95 120 ETI/OHE/G/00174 B Dropper schedule for compensated OHE with unequalencumbrance (1.40/0.90) for speed upto 160km/h03.04.80 221 ETI/OHE/G/00175 A Dropper schedule for compensated OHE with unequalencumbrance (1.40/0.75) for speed upto 160km/h02.08.74 222 ETI/OHE/G/00176 D Dropper schedule for compensated OHE with unequalencumbrance (1.75/1.40) for speed upto 160km/h02.08.74 223 ETI/OHE/G/00177 A Dropper schedule for conventional regulated OHE withzero presage (1400/1400)05.09.94 224 RE/33/G/00181 A Outline of pantograph (BG & MG) 05.03.62 325 RE/33/G/00182 C Arrangement of pantograph multiple headed train BG 04.08.66 226 RE/33/G/00183 Sh. 1 B General clearance diagram on BG tracks (tangent and flatcurves )09.08.67 227 RE/33/G/00183 Sh. 2 - General clearance diagram on MG tracks (tangent andflat curves )06.06.62 228 RE/33/G/00184 Sh. 1 A General clearance diagram on BG tracks (sharp curves ) 10.04.62 329 RE/33/G/00184 Sh. 2 - General clearance diagram on MG tracks (sharp curves ) 06.06.62 230 RE/33/G/00185 Sh. 1 A Restricted clearance diagram on tangent tracks BG 16.04.64 231 RE/33/G/00185 Sh. 2 - Restricted clearance diagram on MG tracks (tangent andflat curves)06.06.62 232 ETI/OHE/G/00186 Sh.1- Restricted clearance diagram on curved track on BG 14.01.83 233 RE/33/G/00186 Sh. 2 - Restricted clearance diagram on MG tracks (sharpcurves)06.06.82 234 ETI/OHE/G/00187 A Chart showing the blow off, push up and oscillations of the standard a.c. OHE25.08.76 235 RE/33/G/00193 - Adjustment chart of regulating equipment winch type &pulley block type27.01.67 136 ETI/OHE/G/00195 A Adjustment chart of regulating equipment three pulleytype 3:1 ratio28.06.94 237 RE/33/G/00197 A Cantilever adjustment chart at mean temperature 35 0 C 31.01.61 138 ETI/OHE/G/00202 - Span and stagger chart (conventional OHE Cd coppercatenary and Cu contact wire) for wind pressure 75,112.5& 150 kgf/sq. m27.03.85 139 ETI/OHE/G/00222Sh. 1- Sag and tension chart for loaded catenary 11.09.72 140 RE/33/G/01101 Sh. 1 A General formation of single track in embankments andcuttings BG07.09.62 341 RE/33/G/01101 Sh. 2 - General formation of single track in embankments andcuttings MG06.04.62 342 RE/33/G/01102 Sh. 1 A General formation of double track in embankments andcuttings BG07.04.62 243 RE/33/G/01102 Sh. 2 - General formation of double track in embankments andcuttings MG06.04.62 244 RE/33/G/01103 Sh. 1 A General formation of multiple tracks BG 07.04.60 245 RE/33/G/01103 Sh. 2 - General formation of multiple tracks MG 06.04.62 246 RE/33/G/01104 Sh. 1 - Leading dimensions of turnouts BG 20.04.62 347 RE/33/G/01104 Sh. 2 - Leading dimensions of turnouts MG 17.05.62 2