Preview only show first 10 pages with watermark. For full document please download

Esr-2008-09-en

   EMBED


Share

Transcript

Government of Bihar

Finance Department

Economic Survey 2008 - 09

fcgkj ljdkj

February 2009

Government of Bihar
Finance Department

Economic Survey 2008 - 09

February 2009

Contents
Chapter Title Glossary of Technical Terms and Abbreviations Index of Tables Executive Summary Chapter I : Macro Overview 1.1 State Domestic Product 1.2 Regional Disparity 1.3 Consumer Price Indices 1.4 Governance 1.5 Disaster Management Appendices Agriculture and Allied Sectors 2.1 Rainfall 2.2 Land Utilisation 2.3 Production and Productivity 2.4 Irrigation 2.5 Agricultural Inputs 2.6 Agricultural Credit 2.7 Animal Husbandry 2.8 Road Map for Agriculture Industry and Allied Sectors 3.1 Structure of Industries 3.2 Large and Medium Industries 3.3 Small Scale Industries 3.4 Agro-based Industries 3.5 Non-Agro-based Industries 3.6 Industrial Sickness 3.7 Support Institutions 3.8 Udyog Mitra 3.9 Bihar Industrial Areas Development Authority (BIADA) 3.10 District Industries Centres (DIC) 3.11 Prime Minister Rojgar Yojana (PMRY) 3.12 Information Technology 3.13 Investment Proposals 3.14 Tourism 3.15 Problems and Prospects of Industrialisation in Bihar Appendices I i-v vi-xiii xiv-xxxii 1-55 1-9 10-13 13-14 14-36 36-46 47-55 56-87 57-59 60 61-69 69-70 70-74 74-80 80-83 83-87 88-115 88-89 89-90 90-91 91-95 95-98 99 99 100 100-101 101-102 102 102-105 106-107 107-108 108-109 110-115

Chapter II

:

Chapter III

:

Chapter IV

:

Physical Infrastructure 4.1 Roads and Bridges 4.2 Motor Vehicles 4.3 Bihar Police Building Construction Corporation 4.4 Energy Sector 4.5 Irrigation 4.6 Airways 4.7 Telecommunication 4.8 Postal Facilities Appendices Social Sectors 5.1 Literacy and Education 5.2 Demography and Health 5.3 Labour, Employment and Poverty 5.4 Interventions for Marginalised Sections Appendices Banking and Allied Sectors 6.1 Banking Infrastructure 6.2 Deposits, Credits and Credit-Deposit Ratio 6.3 CD Ratio of Different SCBs 6.4 CD Ratio of Different Districts 6.5 Investment Plus Credit to Deposit (ICD) Ratio 6.6 Regional Rural Banks (RRB) 6.7 Industry Share in Total Bank Credit 6.8 Advances under Annual Credit Plan (ACP) 6.9 Primary Agricultural Credit Societies 6.10 State Cooperative Banks 6.11 State Cooperative Agricultural and Rural Development Banks (SCARDB) 6.12 Kisan Credit Cards (KCC) 6.13 National Bank for Agriculture and Rural Development (NABARD) 6.14 Micro Finance 6.15 Evaluation of Selected Government Schemes 6.16 Summing Up Appendices

116-145 117-120 120-124 124-125 125-132 133-137 137 138 138-140 141-145 146-206 146-158 158-170 170-184 184-192 193-206 207-238 208-211 211-217 217-218 218-219 219-221 221-222 222-223 224-225 225 226 226-227 227-228 229-231 231-232 232-235 235-236 237-238

Chapter V

:

Chapter VI

:

II

Chapter VII :

Public Finance 7.1 Introduction 7.2 Overall Financial Position 7.3 Fiscal Performance 7.4 Sustainability, Flexibility and Vulnerability of State Finances 7.5 Deficit Management 7.6 Receipt and Expenditure of Bihar Government: Revenue Account 7.7 Debt Management 7.8 FRBM Act and Fiscal Correction Path 7.9 Resource Mobilisation 7.10 Performance Analysis of State Tax Departments 7.11 Expenditure Management 7.12 Revenue Expenditure 7.13 Expenditure on Salary and Pension 7.14 Quality of Expenditure 7.15 Sectoral Expenditure 7.16 Per Capita Expenditure on Social and Economic Services 7.17 State Budget for 2008-09 7.18 Central Funds Bypassing the State Budget 7.19 Plan and Non-Plan Expenditure in Districts 7.20 Centrally Sponsored Schemes 7.21 State Public Sector Undertakings and Corporations 7.22 Disparity in Government Expenditure on Social Sectors across the Districts 7.23 Panchayati Raj Institutions Appendices

239-340 239-241 241-244 244-249 250-253 254-257 258-263 263-265 265-266 266-278 278-283 284-287 287-288 288-290 290-291 291-294 295-296 297-300 300-302 302-304 305-306 306-311 311-320 320-325 326-340

III

Glossary of Technical Terms and Abbreviations ACP ADB ADV AIBP AICTE ANM APDRP APHC APMB APMC AREP ASHA ASI ATMA AWC AWW B2C BADP BAPMC BCR BDRM BHEL BIADA BISCICO BISWAN BPSM BRAIN DC BREDA BSEB BSFC Annual Credit Programme Asian Development Bank Advertisement Tax Accelerated Irrigation Benefit Programme All India Council of Technical Education Auxiliary Nurse-cum-Midwife Accelerated Power Development and Reforms Programme Additional Primary Health Centre Agricultural Produce Marketing Board Agricultural Produce Marketing Cooperative Accelerated Rural Electrification Programme Accredited Social Health Activist Annual Survey of Industries Agricultural Technology Management Agency Anganwadi Centre Anganwadi Worker Business to Citizen Border Area Development Programme Bihar Agricultural Produce Marketing Corporation Balance of Current Revenue Bihar Disaster Risk Management Bharat Heavy Electricals Limited Bihar Industrial Area Development Authority Bihar State Credit and Investment Corporation Bihar State Wide Area Network Bihar Prashashanik Sudhar Mission Bihar Revenue and Integrated Data Centre Bihar Renewable Energy Development Agency Bihar State Electricity Board Bihar State Financial Corporation i .

PC CRF CRF CSO CSS DDG DFID DIC DME EBC ED ENT EOC ET FCP Bihar State Hydro Electric Power Corporation Bihar State Industrial Development Corporation Bihar State Leather Industry Development Corporation Bihar State Sugar Corporation Bihar State Tourism Development Corporation Crude Birth Rate Central Cooperative Bank Credit Deposit Child Development Project Officer Crude Death Rate Central Electrical Authority Continuing Education Centre Continuing Education Programme Central Sales Tax Centre for Good Governance Cooperative Milk Producers Federation Limited Consumer Price Index Criminal Procedure Code Calamity Relief Fund Central Road Fund Central Statistical Organisation Common Service Centre Dicentralised Distribution and Generation Department for International Development District Industries Centre Directorate of Mass Education Extremely Backward Caste Electricity Duty Entry Tax Emergency Operation Centre Entertainment Tax Fiscal Correlation Path ii .BSHPC BSIDC BSLIDC BSSC BSTDC CBR CCB CD CDPO CDR CEA CEC CEP CST CGG COMFED CPI Cr.

FRBMA G2C GDDP GFD GP GSDP HDI HLT IAY ICD ICDS ICICI ID IDBI IFCI IMFL IMR IPD IT ITI IWAI IWDMS JBSY KCC KSY KVK LAN MDMS MMR MMSNY NABARD NCEC Fiscal Responsibility and Budget Management Act Government to Citizen Gross District Domestic Product Gross Fiscal Deficit Gram Panchayat Gross State Domestic Product Human Development Index Hotel Luxury Tax Indira Awas Yojna Investment Plus Credit to Deposit Integrated Child Development Services Industrial Credit and investment Corporation of India Investment : Deposit Industrial Development Bank of India Infrastructure Finance Corporation of India Indian Made Foreign Liquor Infant Mortality Rate In-patient Department Information Technology Industrial Training Institute Inland Waterways Authority of India Integrated Work Flow and Document Management Software Janani Evam Bal Suraksha Yojna Kisan Credit Cards Kisan Samman Yojna Krishi Vigyan Kendra Local Area Network Mid Day Meal Scheme Maternal Mortality Rate Mukhya Mantri Setu Nirman Yojna National Bank of Agricultural and Rural Development Nodal Continuing Education Centre iii .

NDMA NDRF NHDP NHM NHPC NLM NPA NREGS NRHM NSDP NSSO NTPC OFPPC OPD PACS PCRDB PDS PGCIL PHC PIM PLF PLP PMRY PPP PQLI PRD PRI PS QE RGGVY RIDF RRB National Disaster Management Authority National Disaster Relief Fund National Highways Development Project National Horticulture Mission National Hydro Power Corporation National Literacy Mission Non Performing Assets National Rural Employment Guarantee Scheme National Rural Health Mission Net State Domestic Product National Sample Survey Organisation National Thermal Power Corporation On Farm Primary Processing Centre Out Patient Departments Primary Agricultural Cooperative Societies Primary Cooperative Agricultural and Rural Development Bank Public Distribution Shop Power Grid Corporation of India Limited Primary Health Centre Participatory Irrigation Management Plant Load Factor Post Literacy Programme Prime Minister’s Rozgar Yojana Public Private Partnership Physical Quality of Life Index Panchayati Raj Department Panchayati Raj Institution Panchayat Samiti Quick Estimates Rajeev Gandhi Gramin Vidyutikarn Yojna Rural Infrastructure Development Fund Regional Rural Bank iv .

Training Institution Special Auxiliary Police Service Centre Agency State Cooperative Agricultural and Rural Development Bank Schedule Commercial Bank State Data Centre State Disaster Relief Fund State Food Corporation State Finance Commission Sampoorna Gramin Rojgar Yojana Swarnajayanti Gramin Swarojgar Yojana Self Help Groups Small Industries Development Bank of India State Investment Promotion Board Seed Replacement Ratio Sarva Shiksha Abhiyan Small Scale Industry State Wide Area Network Twelfth Finance Commission Tax Information Exchange System Total Literacy Campaign United Nations’ Development Programme Value Added Tax Variable Dearness Allowance Vaishali Power Generating Company Village Task Force Wholesale Price Index Work Participation Ratio Water Users' Association Zila Parisad v .RSVY RUDSETI SAP SCA SCARDB SCB SDC SDRF SFC SFC SGRY SGSY SHGs SIDBI SIPB SRR SSA SSI SWAN TFC TINXSYS TLC UNDP VAT VDA VPGCL VTF WPI WPR WUA ZP Rashtriya Sam Vikas Yojna Rural Development and Self .

17 1.5 1. 1.15 1.2 1.12 1.11 1.9 1.13 1.4 1.3 1.23 Page No.7 1. 2008) Crime against Scheduled Castes & Tribes Manpower in Jail Administration Earthquakes in Bihar Overview of 2002 Floods in Bihar vi .Index of Tables Table No.20 1.18 1.6 1.16 1.22 1.1 1.14 1.19 1.21 1.10 1. 2 3 4 5 6 8 9 10 11 12 14 16-17 18-19 20 21-22 25 26 27 28 29 34 38 39 Content Gross State Domestic Product (GSDP) at Factor Cost at Current Prices Gross State Domestic Product (GSDP) at Factor Cost at Constant (1999-00) Prices Net State Domestic Product (NSDP) at Factor Cost at Current (1999-00) Prices Net State Domestic Product (NSDP) at Factor Cost at Constant Prices Per Capita Net State Domestic Product at Current Prices for Major Indian States Percentage Distribution of Sectoral Composition of Gross State Domestic Product at Factor Cost at Constant (1999-00) Prices Yearly Growth Rate of Gross State Domestic Product at Constant (1999-00) Prices Gross District Domestic Product (GDDP) and Per Capita GDDP in Bihar Districtwise Consumption of Petroleum Products (2007-08) Districtwise Small Saving in Post offices and Publics Provident Fund Wholesale and Consumer Price Indices in Bihar and India Sanctioned Strength of Different Departments in State Government Working Strength of Different Departments in State Government (In Percentage) Distribution of Departments of the State Government by Percentage of Post Filled Up Gradewise Sanctioned and Working Strength in Different Departments of State Government Statewide IPC Crime Rate During 2007 Number of IPC Crimes in Bihar (2001-2008) Overview of Naxal Violence in Bihar Convictions of Criminals (January 2006 to November.8 1.

40 41 42 42 44 44 58 59 60 62-63 64 65 66 67 68 70 71 72 73 75 76 77 78 79 81 82 87 Distribution of Kisan Credit Cards (KCC) in Bihar Districtwise Achievement of Kisan Credit Card (KCC) Extent of Crop Insurance in Bihar Districtwise Livestock Wealth in Bihar (2003) Districtwise Breakup of Achievement of Livestock Breading and Health in Bihar (2003) Financial Requirement for Road Map of Agriculture and Allied Sector in Bihar vii .19 2.24 1.21 Content Overview of 2004 Floods in Bihar Overview of 2007 Floods in Bihar Overview of 2008 Floods in Bihar Overview of Kosi Floods 2008 Highlight of Relief Work for Kosi Floods Overview of Flood Relief Work in Bihar Annual Districtwise Rainfall in Bihar Districtwise Rainfall in Bihar for Different Seassions (2007 and 2008) Land Utilisation Pattern in Bihar Area and Production of Major Crops in Bihar (2000-01 to 2003-04) Average Area Production and Yield of Major Crops (for the Period 2002-03 to 2006-07) Productivity of Major Crops in Bihar (2000-01 to 2007-08) Area.3 2.7 2.28 1.12 2.1 2.25 1.11 2.8 2. Production and Yield of Miscellaneous Crops in Bihar (2004-05 to 2007-08) Districtwise Area.10 2. 1.27 1.26 1.4 2.Table No.16 2.14 2.5 2.17 2. Production and Yield of Major Crops in Bihar for 2008-09 Sourcewise Irrigated Area in Bihar Distribution of Certified Seeds and Seed Replacement Rate (SRR) for Important Crops in Bihar (2006-07 to 2008-09) Cosumption of Fertilizer in Bihar (2004-05 to 2007-08) Minikit Demonstration in Bihar (2006-07 to 2008-09) Credit Flow to Agricultural Sector in Bihar (2003-04 to 2008-09) Distribution of Cooperative Credit in Bihar Page No.9 2.18 2.29 2.2 2.15 2.13 2.20 2. Production and Yield of Major Crops in 2006-07 Advance Estimates of Area.6 2.

17 Content Size of Selected Agro-Based Industries in Bihar and India (2004-05) Large and Medium Industry Units in Bihar (2008-09) Permanent Registered SSI Units in Bihar Percentage of Small. 2008) Status of Proposals Approved by SIPB (upto December.2 3.11 4.5 4.8 3.4 3.5 3.9 3.Table No.15 4.14 4. Turnover and Profit for BRPNN Expenditure and Income of the Bihar Police Building construction Corporation Installed Capacity of Power in India and Bihar (2008) Installed Capacity of Power Station in Bihar Power from Central Power Stations for Bihar Consumption of Power in Bihar and India (2005) Supply-Consumption Pattern of Energy in Bihar Statement Showing Categorywise Number of Consumers Energy Requirement : Forecasts Implementation of Bihar Sub-Transmission Scheme in Phases Financial Status of Sub-Transmission Scheme (December.10 3. 2007) viii Page No.10 4.12 3.7 3.13 3.3 3.1 3.6 4. 3.2 4.8 4.9 4.16 4.3 4.1 4.6 3.13 4.14 4. 88 90 90 91 92 94 96 98 98 100 103 104 106 107 116 117 118 120 121 122 123 125 125 126 126 127 128 128 129 130 130 .11 3. Tiny and Artisan-based Industries in Bihar Area and Production of Vegetables and Fruits in Bihar (2006-07) Livestock Population in Bihar (2003) Status of Debt Waiver Scheme for Weavers Proposed Physical Target during the Eleventh Five Year Plan Reserve of Important Minerals in Bihar (2005-06) Physical and Financial Achievement of Udyog Mitra (2004-05 to 2007-08) Outlay for BSWAN Project ( 2009-10) Plan Outlay for Information Technology Department (2009-10) Details of SIPB Approved Proposals (upto December. 2008) Ranking of States According to Infrastructure Index Road Density in Selected States and India Length of Roads in Bihar (2008) Number of Vehicles Registered Revenue Collected by Transport Department Important Corridors to be Upgraded Fixed Assets.12 4.4 4.7 4.

4 5.12 5.22 4. 4.26 4.18 4.2 5.19 4.27 4.11 5.Table No.15 5.20 4.16 5.24 4.21 4. Upper Primary and Secondary Levels Expenditure on Education Districtwise Coverage of MDMS (Class I-V ) (2008-09) Districtwise Coverage of MDMS (Class VI-VIII) (2008-09) Fund Utilisation in MDMS Gorss Enrolment Ratio in Higher Education (18-24 Years) Percentage of Reserved Seats for Various Social Groups in Universities and Colleges in Bihar Institutions of Higher Education in Bihar Coursewise Enrolment is Higher Education in Bihar Coursewise Enrolment of SC Students in Higher Education in Bihar Coursewise Enrolment of ST Students in Higher Education in Bihar Districtwise Demographic Profile of Bihar Work Participation Rates in Bihar Status of Health Infrastructure (as on December 2008) Financial Overview of Health Expenditure ICDS – Districtwise Projects ICDS – Number of Projects ix .17 5.7 5.3 5. 2008) GSM Subscribers in Bihar Companywise Revenue Collection in Bihar Postal Facilities in Bihar Postal Traffic in Bihar Post Office Accounts in Bihar Districtwise Literacy Rates in Bihar (2001) Total Enrolment By Education Levels in Bihar Dropout Rates at Primary.28 4. 131 133 135 135 136 137 137 138 138 139 139 140 147 148 149 149 151 152 153 154 154 155 155 156 157 159 160 162 166 167 167 Status of AIBP Schemes in Bihar Details of Expenditure of On-going Projects under AIBP Potential and Utilisation of Minor Irrigation in Bihar Progress on Transfer of Maintenance to WUAs Air Passenger Traffic from Patna (January – December.9 5.10 5.19 New Proposed Power Plants Sourcewise Irrigated Area Content Page No.18 5.13 5.8 5.6 5.14 5.29 5.1 5.5 5.25 4.23 4.

24 5.Table No.13 6.32 5.11 6.27 5.9 6.12 6.2 6.20 ICDS – Staffing Position 5.10 6.25 5.26 5.5 6.2007-08 (New + Upgraded + Credit & Subsidy) Overview of Public Distribution System Allotment and Lifting of Rice and Wheat under PDS (2007-08) Demographic Profile of Dalits District Demographic Overview of Mahadalit Population Districtwise Composition of Population based on Religion Distribution of Branches of SCBs in Bihar Distribution of Branches of SCBs among States (2007-08) Distribution of Employees of SCBs ( March. 167 168 169 170 172 173 175 176 178 179 181 183 185 186 191 209 209 210 210 211 212 213 215 216 217 218 219 220 220 Districtwise Coverage Achieved for NC and PC Habitations Poverty Ratios in Bihar and India SGSY – Physical and Financial Overview (2007-08) SGSY – Training and Economic Assistance (2007-08) Employment Generation under NREGS (2007-08) NREGS – Physical and Financial Overview (2007-08) Overview of IAY Upto 2007-08 IAY – Physical and Financial Overview .23 5.3 6.7 6.4 6.29 5.31 5.28 5.1 6.33 5.14 ICDS — Resource Utilisation Content Page No.21 5.30 5. 2007) Number of Branches of RRBs Number of Branches of State and District Central Cooperative Banks (As on March 31) Statewise Deposits and Credit of SCBs Statewise Per Capita Deposits and Credit of Scheduled Commercial Banks Deposits and Credits of Different Bank Groups by Branch Locations in Bihar (2007-08) Credit Deposit Ratio in Bihar for All Banks (2007-08) Credit Deposit Ratio of SCBs CD Ratio of Different Commercial Banks in Bihar Districtwise CD Ratios in Bihar Statewise Distribution of Investments of SCBs ICD Ratios of Scheduled Commercial Banks x .8 6.6 6.22 5.34 6. 5.

5 7.8 7.27 6.11 7.9 7.26 6.19 6.16 6.2 7.17 6.32 6.24 6.4 7.28 6.12 Loans Disbursed by RRBs Content Page No.31 6.33 7.10 7.1 7. 2007) Working Results of State Cooperative Banks Working Results of SCARDBs (end March) Number of Kisan Credit Card Issued by Banks Cumulative Disbursements under RIDF till March 2008 Sectorwise Refinancing by NABARD in Bihar Sanctions and Disbursements in Bihar under RIDF till March.20 6.29 6.21 6.All Banks Agencywise Analysis of ACP Achievement (March 2008) Sectoral Share of Advances (2006-07) Selected Indicators on Primary Agricultural Credit Societies (March 31.6 7.7 7.22 6.18 6.Table No. 6. 2008 Microfinancing in Bihar Microfinancing by RRBs (2007-08) Target and Achievement under PMRY Performance of Banks Under SGSY: Individuals Performance of Banks Under SGSY (SHGs) Receipts and Expenditure of the Bihar Government Major Fiscal Indicators Fiscal and Financial Performance Indicators Deficit/Surplus position of States Gross Fiscal Deficit Decomposition of Gross Fiscal Deficit of Bihar Financing of Gross Fiscal Deficit of Bihar Revenue Account of Bihar Expenditure of Bihar Government Interest Payment and Receipt Cash Balance of Bihar Other Parameters of Expenditure xi .15 CD and ID Ratios of RRBs 6.23 6.25 6.3 7. 221 222 222 223 224 224 225 225 226 227 228 229 230 231 232 232 233 234 234 243 246-247 253 254 255 256 257 258 259 261 261 262 Sectoral Share in the Credit of Scheduled Commercial Banks in Bihar Outstanding Agricultural Advances ACP Achievement .30 6.

34 7.28 7.Table Content No.16 7.33 7.21 7.27 7.14 7.36 7.30 7.24 7.25 7.13 Transfer of Resources from Centre to Bihar 7.42 7.38 7.40 7.29 7.19 7.37 7. 7. Roads and Bridges and Irrigation Facilities Revenue Expenditure Expenditure on Salaries and Pensions Quality Parameters of Expenditure Expenditure on Social Services Page No.30 A Comparative Commoditywise Collection of Sales Tax xii .18 7.35 7.26 7.41 7.31 7.39 7.15 7.43 Outstanding Liabilities Net Debt Received Repayment Liabilities Targets and Achievement under Fiscal Correction path (2007-08) Revenue Receipts of the State Tax Revenue of Bihar Government Composition of Tax Revenue of Bihar Government Growth of Tax Revenue of Bihar Government Structure of Taxation in Bihar Major Non-Tax Revenues of Bihar Composition of Non-Tax Revenues of Bihar Variation between the Estimated and Actual Realisation of Tax and Non-Tax Revenue (2007-08) Cost of Collection of Taxes Tax and Non-tax Revenue as Percentage of GSDP Tax : GSDP Ratio of States (2007-08) Buoyancy of Important Tax and Non-Tax Revenue Sources Grants and Contributions from the Central Government Actwwise Comparative Collection (2003-04 to 2008-09) Yearwise Percentage share of Commercial Taxes in Total Revenue Revenue from Excise Revenue from Stamp Duty and Registration Fees Districtwise Revenue from Stamp Duty and Registration Fees Expenditure from Consolidated Fund Structure of Expenditure from the Consolidated Fund Growth of Expenditure from Consolidated Fund Expenditure on Repair and Maintenance of Buildings.17 7.20 7.23 7.32 7. 263 263 264 264 266 268 268 269 269 270 271 272 273 274 275 275 276 276 277-278 279 279 281 282 283 284 285 286 287 288 289 291 292 7.22 7.

62 7.68 Expenditure on Economic Services Per Capita Expenditure on Social and Economic Services Summary of Budget.53 7. 2007-08 District wise expenditure on Some Other Social Sectors during 2007-2008 (Rs.65 7.48 7.67 7.63 7.54 7.51 7. 293 294 295 298 299 301 303 304 305 306 307 307 308 Summarised Results of Public Sector in Bihar as per Their Latest 310-311 Accounts Government Revenue Expenditure on Education and Health Per capita Expenditure on Social Sectors (Rs).55 7.Table Content No.52 7.47 7.56 7.49 7.59 7.66 7.58 7. Deficit +) Structure of Receipts and Expenditure of Consolidated Fund (%) Details of Central Funds Bypassing the State Budget 2006-07 and 2007-08 Districtwise Expenditure (2007-08) Districtwise Per Capita Expenditure (2007-08) Financial Performance under SSA Financial Performance of : Schemes under DRDA (2007-08) Sectorwise State Government Companies and Corporations Consolidated Financial Results of Public Sector in Bihar.61 7.60 7.57 7.44 Achievements against TFC Projections in respect of Non-Plan Revenue Expenditure 7. 7.Crore) Districtwise Per Capita Expenditure during 2007-08 (Rupees) Per Capita Minimum and Maximum District Expenditure during (2007-08) Financial Assistance to PRIs and ULBs Receipts and Expenditure of PRIs till 2005-06 Summary of Total Works executed by PRIs till 2005-06 Grants for 12 Zila Parishads : 1996-97 to 2005-06 Grants for 65 Panchayat Samities: 2001-02 to 2005-06 (Rs Crore) Grants for 195 Gram Panchayats : 2001-02 to 2005-06 (Rs Crore) 312 313 317 318 320 321 321 322 324 325 325 xiii . 2005-06 and 2006-07 Financial Results of BSEB Page No. 2008-09 (Surplus -.46 7.64 7.50 7.45 7.

has grown at a slower rate of only 1. because of two consecutive severe floods. between (-)2.61 percent. is estimated to be 5. the yearly growth rate varies from (-) 4. In the last three years. For the aggregate GSDP. Bihar suffers not only from its comparatively lower trend growth rates. the Chief Minister has started the innovative practice of direct feedback by organizing the weekly ‘Janta Ke Darbar Me Mukhyamantri’.38 percent. the CPI has been increasing at a slower pace in Bihar.482. 4. After completion of the three year tenure of the present government. The growth rate for NSDP at constant prices has been very good for at least three sectors — Construction (21. During the past decade.EXECUTIVE SUMMARY Macro Overview 1. 5. The medium term growth rate of NSDP at constant prices. the growth rate has varied between (-) 21.73 percent to 11. However. .53 percent).92 to 37. the Chief Minister has also started 'Vikash Yatra' in select districts to understand the impact of governance in rural Bihar. xiv 3. The per capita NSDP of Bihar has grown at 3. There is a concerted effort to make the work atmosphere congenial to both staff and as well as visitors. it indicates an improved growth performance compared to the recent past when the state economy managed to grow at barely 3-4 percent.08 percent). one again notices that CPI in Bihar has been rising faster than in the country as a whole. Although this growth rate is lower than the national gowth rate of about 6-7 percent. in the rural areas. 29.57 percent. Patna appears at the top with a figure of Rs. but from substantial year-to-year variation in growth rates as well. it is observed that Consumer Price Index for industrial labourers has increased more in Bihar than in the country as whole. Bihar like most other states also suffers from regional disparities within the State.01 percent) and Trade.03 to 18.44 percent in Tertiary sectors. there has been a paradigm shift in the quality of governance. Hotels and Restaurants (12.80 percent in Secondary sectors.31 percent. and between 2. during the period 1999-00 to 2008-09.26 to 22. For urban nonmanual employees (for which indices for 2008-09 are not available). Agriculture. In 2007-08 and first eight months of 2008-09. Communications (16.22 percent in Primary sectors. 2. In the ranking of the districts with respect to Per Capita GDDP. To understand the travails and trauma of the people.

Similarly. there were 108 trap cases and 126 arrests.10 percent). kidnapping. The IPC cases against women at the national level have recorded an increase of 7.1 percent in the state. In 2007. As against 382 cases reported in 2004. the numbers were 78 and 92 respectively.99 percent). the security apparatus of the state administration was strengthened by deployment of para-military and special training to police personnel. a total of only 47 trap cases were registered. The Bihar Prashasnik Sudhar Mission (BPSM) is an initiative of the State Government to strengthen its administrative machinery. 2008.4 percent during the five year period (2002-2006). a drop in crime from 1. This mission will encompass the entire state. 9. 'Ap Ki Sarkar Ap Ke Dwar' (government at your door step) programme.03 percent). Apart from social cooption. only 79 cases have been reported in 2008. Bihar with a crime rate of 118 stood at 28th position in the country. The Mission enables the state government to deliver better quality services to all its citizens. particularly the poorest and the excluded. Through vigorous publicity of mobile phone numbers. the Bureau could catch hold of a number of corrupt public servants. during the period 2001-08. During 2007. There has been a sharp decline of around 50 percent or more in the cases of dacoity.6. There has also been an appreciable drop in the major cases of extremism in the state over the last 3-4 years. and in 2008 (upto November). the Bihar Vigilance Investigation Bureau is functioning in heightened manner. Among all States and union territories. with the rate of total cognizable crimes at 8. from the state capital to the districts. the crimes against scheduled castes has declined from 9.3 percent in 2006 to 7. Most of the districts reported a drop in murder. 10. The BPSM was launched by the Chief Minister on November.2 percent). dacoity (-10. bank robbery (-15. etc. road dacoity and bank robbery in 2008 over 2001. Bihar's rank was 28th among the major states.5 percent in 2007. 8.2 percent to 1. kidnapping for ransom (-23 percent).0 percent has also been recorded in the case of tribal population 7. Due to State initiatives. The drop in the number of cases is largely due to holistic development programme. There has been a decline in major crimes including murder (-3. xv . In order to have an effective control over corruption in the state. robbery (-4. During 1995-2005.

There has not been any change in the share of net sown area in the recent years. Consequently. For the pulses.3 lakh tonnes.9 lakh tonnes (maize). the average productivity is 1287 kgs/hectare. Among the remaining miscellaneous crops grown of farmers in Bihar. The category of fruits also include a number of species. cauliflower.2 lakh tonnes (tomato) and 11. 9. the share of area under pulses has decreased from 8. Nearly 95 percent of the area under major crops is devoted to foodgrains. the total production of cereals is 95. Further. 36. tomato and brinjal.57 percent.42 percent in 2006-07. That the soil of Bihar is very fertile is revealed by the high share of net sown area in the total geographical area (60 percent). The productivity of wheat is higher and stands at 1749 kgs/ hectare. This implies that.21 percent in 2000-01 to 94. every piece of agricultural land is double-cropped in Bihar. Taking the five-year period of 2003-04 to 2007-08. because of which the share of fallow land in total geographical area has recorded a small decline.77 percent in 2000-01 to only 1.7 lakh tonnes (rice). which implies that an additional 10 thousand hectares of land is under the trees. but the four most important xvi 3. 5.20 percent in 2007-08.2 lakh tonnes (brinjal). The most satisfactory levels of productivity is attained by maize (2367 kgs/ hectare) and here again rabi maize (the most important among the three varieties of maize) has an even higher productivity at 3030 kgs/hectare. the total production of foodgrains is 100. During the period 2000-01 to 2005-06. the productivity is a little higher at 1327 kgs/ hectare. 4. the productivity of kharif pulses (929 kgs/hectare) is found be higher than the productivity of rabi pulses (738 kgs/hectare).1 lakh tonnes (cauliflower). For rice. 10. Within that category. taking into consideration the total production of pulses at 4. It is most likely that the fallow land is being gradually converted into tree-bearing land. the share of land under tree crops increased from 2. . those which are important under the category of vegetables include potato. the production of other cereals (which are all considered as coarse cereals). for a population of about 99. the average levels of production of major crops in Bihar are — 43.Agriculture and Allied Sectors 1.4 lakh tonnes.0 million.0 lakh tonnes (wheat).8 lakh tonnes (potato).06. The production level of these vegetables in 2006-07 were — 11. the share of cereals production has been increasing — it was 87. and 14. 2. Adding to this. but the gross sown area has increased much during the period and the cropping intensity for the agricultural economy now stands at 2.9 lakh tonnes.47 to 2. on an average. although for aghani rice (the most important among three rice varieties).

Bhojpur (2. These losses are expected for all the crops for which advanced estimates are available. .0 percent) and rape/mustard (from 40. Mainly because of limited staff strength of the concerned department. except aghani rice and jowar. Between the two important crop seasons. Among the extension services xvii 7.5 lakh tonnes (guava) and 11. 10. Similarly. wheat and maize. Rohtas (4. The top five districts in terms of productivity are — Bhojpur (2654 kgs/hectare).2 percent which shows the eagerness of the farmers in Bihar to utilize this valuable input.1 lakh tonnes) and Aurangabad (4. Sheikhpura (2399 kgs/hectare) and Banka (2595 kgs/hectare). Nalanda (2382 kgs/ hectare). In case of kharif maize. the use of urea is the widest. the two extreme levels of productivity are 4108 kgs/hectare (Khagaria) and 115 kgs/hectare (Jamui).ones are — mango. in 2007-08.0 percent. Among the different types of fertilisers. 6. Over a four-year period. The Seed Replacement Rate (SRR) is one of the lowest in Bihar Among the important kharif crops.1 lakh tonnes (mango). the two extreme levels of productivity are 2789 kgs/hectare (Samastipur) and 698 kgs/hectare (Araria). 9.7 lakh tonnes). the state is expected to face a considerable loss of crop production in 2008-09. there has been a modest increase in SRR from 50. 2. Finally. Among the important rabi crops. The per hectare consumption of fertiliser stands at 155. The top five districts in terms of rice production are Nalanda (2. as it alone accounts for about half the fertilisers consumption.3 lakh tonnes).0 percent in 2006-07. the two extreme levels of productivity are 2808 kgs/hectare (Bhabhua) and 522 kgs/hectare (Sheohar).80 kgs/ha) which is more than one and a half times the consumption in kharif season (120.10 kgs/ha). compared to only 12. for wheat. the extension services for agricultural development has been rather limited in Bihar. 2.0 percent in 2006-07 to 57. litchi.0 percent in 2008-09. consumption has increased by 62. for maize. For rice.4 lakh tonnes). The consumption of chemical fertiliser in Bihar has been rising steadily in recent years.0 percent). guava and banana. because of the devastating floods in the Kosi region of Bihar.60 kgs.0 to 73. the SRR is available only for 2006-07 and 2007-08. The production levels of these fruits in 2006-07 were — 13. the use of fertiliser is higher in rabi season (195. The highest and the lowest levels of productivity in the districts is very large for all the crops — rice.1 lakh tonnes (litchi). Bhabhua (3.3 lakh tonnes (banana). Aurangabad (2598 kgs/ hectare).3 lakh tonnes). Between these two years. the SRR for two crops has gone up substantially — maize (from 60.0 to 74. the SRR for paddy in 2008-09 was 19.

but it has increased to 85. . Muzaffarpur.24 percent). There is considerable variation in the districtwise endowment of livestock wealth. the commercial banks are most important. it is a matter of concern that the achievement rates for these banks have also shown a declining trend. for rabi season.8 thousand next year. Among the districts where more than 50 thousand farmers avail crop insurance are included — Patna. Among the three principal sources of credit. regional rural banks (47.7 thousand in 2006-07. The strength of poultry in the state is quite large at 139. The total livestock population in the state. 39.6 thousand in 2008-09. over the years. 14. there were only 9. 13. the achievement rate for the three types of banks were — 81. There is not much difference among the achievement rates for three sources of credit — commercial banks (48. the achievement rate for KCC is only 46. Samastipur and Begusarai. as on September.8 percent are milch animals with population of cows being 104. With such a huge livestock wealth. 11. The state also has a substantive number of goats (96.83 lakh.60 lakh farmers. which account for about 65 percent of the total credit disbursement. 75.13 lakh farmers who were able to insure their crops. The cooperative banks presently account for only 10 percent of the agricultural credit in Bihar.49 percent) and central commercial banks (44. according to Census 2003. However.7 lakhs. this implies a coverage of less than 10 percent of the farmers under crop insurance. In 2007-08.80 percent (regional rural banks) and 57.68 lakhs. the shares of regional rural banks and central cooperative banks are about 25 and 10 percent respectively. is 407. By the end of 2007-08.06 lakhs). Similarly.88 lakh farmers in Bihar who were issued KCCs.3 thousand in 2006-07.66 lakhs. the scheme for Kisan Credit Card (KCC).that the state government is presently providing at a large scale is the Minikit Demonstrations for important crops. In kharif season. By a broad calculation. Compared to the target of 44. East Champaran. such demonstrations were 17.42 percent (central commercial banks). there were 20. the practice of crop insurance is increasing in the state. To strengthen the xviii 12. and that of buffaloes being 57. Sitamarhi.40 percent). Since the commercial banks are the most important source of credit. Of this. such demonstrations were only 27.47 percent (commercial banks). One of the main reason for such limited reach of cooperative banks is that such banks are absent in no less than 16 districts of Bihar As regards. which has increased to 43.81 percent. 2008. Nalanda. there is abundant growth potential of livestock products in the state.

but also by the predominance of unregistered units which account for one-third of the total units. The industrial sector of present Bihar is characterised not only by the small size units. Industry and Allied Sectors 1.664 crore (5. was around 48 percent. does not report any large or medium industries. there are only less than 5 units in each. as many as 10 districts do not have any large/ medium industrial unit and in another 11 districts.68 lakh workers. The total investment in these units was to the tune of Rs. 1.489 crore. tiny and artisan-based industries play a crucial role in providing employment opportunities outside agriculture. . Out of 38 districts in the state.48 percent in the total production of agro-based industries at the all-India level.5 percent). 2. 1. Bihar constituted a very nominal share of 0. The state government has prepared a Road Map of Agriculture and Allied Sectors in Bihar which identifies a number of development interventions during the period of 2008-12. the concerned department of the state government provides a number of useful services like breeding. The highest concentration of these units was in Tirhut division (20 xix 3.animal husbandry sector in Bihar.278 permanent registered units in Bihar. The Net State Domestic Product (NSDP) at current prices for the present Bihar in 2007-08 was Rs. sterilisation. The Kosi division. As on December. there were 1.16 percent). The pattern of concentration of small.74. wood and paper accounted for nearly 43 percent of the gross value added. 4. tiny and artisan-based industries remained similar to large/ medium units.02.3 percent respectively as their share. however.5 percent and 7. immunization and free distribution of fooder seeds. which consisted of 1502 small scale units.62 crore and it provided employment to 5. The share of gross value added of petroleum and atomic fuel. The Road Map has identified a number of programmes that together cover all aspect of agriculture and its allied sectors. The small industries sector is dominated by tiny and artisan-based units. There are practically no mineral based industries left in Bihar and the agrobased industries including textiles.017. Of the total of 263 large and medium industrial units. 94. Magadh and Darbhanga divisions have only 9. 15. 2008. the small scale.100 artisan-based units. the highest concentration (38 percent) is in Patna division with Tirhut division ranking a distant second (22. leather. of which manufacturing sector accounted for only Rs. 4. Although not highly productive.676 tiny units and 70.

. It generates employment in the farm sector. It may generate additional employment to atleast 5 lakh persons. Out of these. Bihar had 12 support institutions. the two financial support institutions are in the process of revival. The long term goal is to gradually increase its area to 4. 8. There are around 1071 weavers' cooperative societies in the state.4 percent). the reorganisation of Udyog Mitra is on anvil. Nalanda. BIADA is responsible for xx 6. Arwal.503 handlooms exist outside the cooperative sector. 7.6 lakh hectares. Gaya. The state government has introduced welfare schemes for weavers in the form of marketing assistance. Magadh and Purnea divisions reported around 10 percent share each. The efforts are also continuing to expand horticulture in Bihar through the National Horticulture Mission. with Bhagalpur (4. launched by the central government in half of its districts. The objectives during the Eleventh Plan are to enhance the sugarcane production by augmenting the area under cultivation as also its productivity. great potential remains to be tapped in fruits and vegetables. Madhubani and Siwan. The handloom industry is primarily concentrated in the districts of Patna. Bhagalpur.percent). Besides processing of cereals. the Industries Department has planned a Rs. Among the agro-based industries. The revival of BSIDC has also been initiated. 5. Darbhanga. Around 1. followed by Patna (17. Aurangabad. Nawada. milk and eggs are very important for employment generation.817 handlooms. 9.33 lakh weavers are engaged in this sector. BSFC and BISCICO. of which nearly a lakh are outside the cooperative sector. The sugar has a significant position in the agro-based industry of the state. Jehanabad. Similarly. Bhabua. An estimated 5 lakh farmers are engaged in the cultivation of sugarcane and another half a lakh skilled and unskilled persons in sugar industries. Besides. The food processing industry has a great potential in the state. 23. The Chief Minister's Horticulture Mission has been launched in the remaining 19 districts which were not covered under the National Horticulture Mission. In view of huge potential for development of food processing industry in Bihar. Khagaria.8 percent) reporting the least share. with 10. Banka. modernisation of training centres and repair of shed-cumhousing. 1760 crore project for development of food processing infrastructure and other facilities in the state.9 percent) and Kosi (5. along with the fruits and vegetables. directly as well as through ancillaries and related activities.

Being a densely populated state.81 percent). 11. 12.91 thousand crore are in the advanced stage of implementation. is planned on a public-private partnership basis with Beltron as an important player. Physical Infrastructure 1.60 percent) and xxi . Computerisation of treasury. finance. 10.44 lakh in 2005 to 107. etc. 91. A beginning has been made in the state to exploit the great potential in the field of Information and Communication Technology (ICT) with a view to expand knowledge base and employment in various sectors of the economy. The existing low level of infrastructure facilities are the major bottleneck in accelerating the process of development in the state. one is ready for production. It also provides information and assistance to prospective entrepreneurs to set up industry. Out of 164 approved proposals. the state government has already begun to explore and introduce the option of Public-Private Partnership (PPP) in some sectors and is planning to expand these initiatives. the cumulative total of proposals approved by the State Industrial Promotion Board (SIPB) has gone upto 164 with an aggregate investment of Rs. the total road length in 2008 was 82. The proportion of the villages connected through roads is only 57 percent as against 62 percent for all-India and 99 percent for Gujarat. electricity bills.75 thousand crore and employment potential of 1. the number of both foreign and domestic tourists has recorded an increase from 69. 2. 15 proposals have already been implemented and are working. 22..959 kms. The remaining 99 proposals are.providing developed infrastructure in industrial estates like water. With improvement in law and order as well as infrastructural facilities at various tourist destinations. under different stages of implementation. registration of properties. Video-conferencing in all the 38 districts has already been in operation.65 lakh in 2006 and to 105. roads. In pursuance of the Bihar Infrastructure Development Enabling Act. while for the country as a whole this density is more than three times (360 kms. electricity. tax collection. The State Tourism Development Corporation (STDC) has taken a number of measurers to develop tourism. the road density per lakh population in Bihar stands at only 111 kms.23 lakh persons. however. provident fund. and as many as 49 with a total investment of Rs. which constituted National Highways (4. etc. Major District Roads (9.). 2008). drainage.83 percent).30 lakh in 2007. e-governance.50 percent). In Bihar. State Highways (4. In 2008-09 (upto December. Other District Roads (4.

But the rural areas were mostly serviced by extra-departmental post offices (92 percent). Gaya has also an international airport. small and big. airways in Bihar are yet to develop. The total number of GSM subscribers in November 2008 registered a phenomenal increase to 1. Regular air services from Patna are also available for Ranchi and Lucknow. The number of motor vehicles in Bihar has increased by 239 percent in 2007. Post offices have been playing the role of providing connectivity to the remotest places in rural areas. there is a need of a bridge at a distance of every 50 kms.26 percent).057 post offices in the state. Keeping in view the phenomenal increase in the motor vehicles. either departmental or extra departmental. on of the important rivers in the state. ABTL (IDEA). Bharati Airtel reported the highest number of subscribers (64. Presently. Kingfisher and Jet Airways also operate from Patna airport. Jetlite. there were as many as 9. Besides Indian Airlines. being the capital of the state. part of the roads under the last two categories are unpaved. Bharti Airtel. is on the air route from Delhi to Kolkata. on the state highways and 3049 on the major district roads. Practically.70 lakh subscribers in 2004-05. For maintaining the connectivity. xxii . 3. the state highways and major district roads are also to be upgraded. Reliance. under the Mukhya Mantri Setu Nirman Yojana. Patna. of which around 95 percent were in rural areas. all the important corridors in the state are to be upgraded to four lanes under NHDP.19 lakh). 2008. there are various players — BSNL. It is also connected with Mumbai by air. besides the national highways. 7. Besides. Among different operators. In the field of telecommunication. 4. Vodaphone Essar and Dishnet wireless. Nearly all the post offices. There is vast inter-district variation in terms of the road length in the state. Among the districts. were granted permanent status. However. bridges are proposed to be constructed on smaller rivers too. Upto March. 6. During the Eleventh Five year Plan. There is a target to complete 1844 schemes during the year 2008-09.Village Roads (76. 5. there are 1055 bridges.24 crore. compared to only 9. This is indicative of the fact that the increase in road network was not commensurate with the increase in transport in the state.

out of a total of 5556 state tubewells.8. 1991 and 2001. The peak availability is about 950 MW. of which 53. There still remains a substantial energy shortage in the state. the irrigation potential of 80 thousand hectares will be added by completing surface schemes under RIDF (Phase XII).10. maintenance and upkeep of 32 distributaries to Water Users Associations (WUAs).549 hectares of command area. Bihar has a total irrigation capacity of 98.97 lakh private tubewells.53 lakh hectares are under major and medium irrigation and 49. The state government has made significant progress in transferring the operation. generation from its own thermal power stations is negligible. Among the different components of minor irrigation. causing a peak shortfall of 550 MW. it is the private tubewells which are very important as an irrigation source in Bihar. Under the Bharat Nirman Programme. The overall strategy is to decentralise the delivery system of all the irrigation system to the WUAs by the end of the Eleventh Plan period. Social Sectors 1.56 lakh hectares are under minor irrigation. of which 540 MW is thermal and the remaining 47 MW is hydel and 5 MW is renewable energy. In 2006-07. To meet the irrigation needs. the shortage was 1049 MU (15.55 lakh were operational. Since state tubewells are less in number. it is the area irrigated thorough tubewells that has registered a steady increase over the years.50 percent) in the next year. out of a total of 10. The same pattern is replete in its ranking with respect to Per Capita Income.38 lakh hectares. There is severe power shortage in the state and only 41 percent of its villages and 10 percent of the households are electrified. and most of the power requirement is met by purchases from the central generating plants. In 2006-07. While more than half the area gets irrigation through minor sources. Bihar has only 592 MW of installed capacity. Bihar has been at the lowest position among the major states in India in 1981. 10. about 1. Such schemes will also include rennovation and restoration of Ahars and Pynes. In Bihar. the twin challenges of economic growth and human development are further accentuated by xxiii . which results in widespread shortage in supply to all categories of consumers. 9. around 98 percent of minor irrigation is through tubewells. 5130 state tubewells were in operation. Again.65 thousand hectare of additional potential will be created and 4 lakh hectares of lost potential will be restored through minor irrigation schemes.31 percent) and it stepped upto 1471 MU (11. The annual per capita consumption of electricity in Bihar is only 76 units. However. The area under major/medium sources of irrigation has fluctuated much over the years. 9. involving 1.

0 and 61. For SCs. among all female students in general streams like arts. it is well below the national average of 9. it has increased by 126.4 percent while in Bihar it was 47. While male GER is close to the national average. it still lags behind in the number of medical colleges (23) and engineering and technical colleges (7).71 percent in Bihar.65 percent). as compared to girls.8 percent and 45. The male literacy rate is also the lowest in Kishanganj. Bhojpur and Rohtas are relatively high on the literacy indicator with literacy rates at 59. the enrolment in upper primary has increased by 97. xxiv . it is much higher at 11-15 percent.0 percent. In Kishanganj. Patna is the only district in Bihar where 50 percent of the female population is literate. there is a huge gap once again in female GER between Bihar (3. The dropout rates in Bihar in primary education level have declined by 5 percentage points between 2004-05 and 2005-06. as against a national average of 54.21 percent. science and commerce. there was a very modest decline by just 1 percentage point.its high poverty ratios and low per capita income. There has been a 41. for STs.4 percent while. 6.50 percent) and the national average (7. 5.7 percent increase for ST communities.6 percent. the enrolments are the same for male and female SC students. less than 20 percent of the women are literate. the female literacy rates in the two districts are 41. With a Gross Enrolment Ratio (GER) in higher education at 6. for males.7 percent respectively. Among ST students. the rate of decline of poverty has been higher in Bihar compared to the national average.2 percent.0 percent. one open university and 504 colleges and institutes in Bihar for higher education. In medicine and engineering. The overall enrolment at the primary and upper primary level has increased by 34. Though there are 12 universities. At the secondary level. The overall literacy rate in India in 2001 was 65.5 percent increase in enrolment of children from SC communities and 80. However. The decline has been higher in the case of boys. However. male and 3. the position has deteriorated with a marginal increase of dropout rate by 0.01 percent.3 percent respectively. The enrolment of female SC students.5 percent. However. 4. 2. The enrolment has significantly improved in upper primary level with an overall increase of 72.8 percent. at upper primary level. is low at 5-6 percent. The female literacy rate in Bihar in 2001 was much lower at 33. however.

There are 4643 regular and 2369 contractual posts sanctioned for doctors in the state. Munger.4 percent of the regular and 58. there is only 1 doctor available per lakh population in Arwal. For every lakh of population.3 percent.8 percent of the contractual posts have been filled up. The gender gap is stark with the female WPR for the state at 18. Vaishali. The total number of referral hospitals in the state is 70.1 percent.1 percent of the regular 26.9 percent for Bihar. Saran. For such nurses. from 12 percent to 33 percent while there was only a 2 percent increase in the national average in the same period. the remaining 10 have none. Siwan. no district has more than 19 centres for every lakh of population. Of Bihar’s total population. 57. Jamui and Madhepura and higher than 35 percent in another 14 districts. There are 11. At present. 89. While 28 districts have atleast one rural referral hospital. there are 13 health centres. There are districtwise differences in availability of doctors. The WPR is higher than 40 percent in Supaul. The average rate of work participation is 32. Apart from Goplaganj and Khagaria. Infant mortality in Bihar decreased from 72 to 68 per 1000 live births in the same period. This was mainly attributable to rise in institutional deliveries from 15 to 22 percent in the same period. 7.4 percent. There are 5 doctors in position and working for every lakh of population in the state. Vaccination coverage increased in Bihar between 1998-99 and 2004-05. While Khagaria has 153 health centres and Gopalganj has 89 centres for every lakh of population.107 health centres of all types in Bihar. 58. . Bhojpur and Gopalganj have Work Participation Ratio (WPR) below 30 percent. making the state the least urbanized. 9. Munger comes next at 72. While 49 doctors are available per lakh of population in Khagaria and 38 in Gopalganj.4 percent while the male WPR is 46. 11. Patna is the most urbanized district with a rural population of 58. with 7 districts having a rural population of over 95 percent. The total share of SC in the population is 15. The sex ratio in Bihar at 919 females per thousand males is slightly lower than the national ratio at 933. Buxar. There are only 2 Grade A staff nurses in position and working for every lakh of population. 10.female enrolment in percentage terms are almost equal in all courses measured within the same population cohorts. All other districts have a rural population of over 80 percent. There are wide variations in coverage at the district level.4 percent of the xxv 8. Nawada has only 8.5 per cent live in rural area.7 percent.

The same pattern is replete in the availability of ANMs. There are 16 ANMs working for every lakh of population in the state. 13. a Mukhya Mantri Nari Shakti Yojana is being implemented to sensitise.contractual posts have been filled up.3 percent) and urban (25.945 households) of total number of households were provided with 100 days of employment in 2007-08. The Indira Awas Yojana is an important intervention for affordable housing for people below the poverty line. a total of 85. The necessary welfare measures are also being taken up for the overall development of the backwards. 15.3 percent to 34. Commercial Banks (SCB). 12. xxvi .205 individual swarojgaris were given assistance for economic activities under SGSY. Likewise NREGS is a demand based guaranteed employment programme. Only 1.6 percent during the same period. whereas. (ii) Regional Rural Banks (RRB) and (iii) Cooperative Banks their numbers being 3769. Annapurna provides homeless senior citizens with free foodgrains.355 swarojgari members of SHGs and 18. Nevertheless. A total of 14. BPL families are provided foodgrains at the very nominal price. 1465 and 293 respectively.3 percent (49. The incidence of rural poverty in Bihar has come down from a level of 64.7 percent). Similarly. The job cards were issued to 81.7 percent in 2004-05. the poverty ratio for 2004-05 is still quite high compared to the corresponding ratios at the national level — rural (28. 14.036 SHGs were formed in 2007-08 under SGSY compared to 8324 in the pervious year. New initiatives through the Bihar Mahadalit Development Mission have been taken to benefit the extremely deprived Mahadalits among the Dalits. The Public Distribution System (PDS) for essential commodities has been an important part of the measures to promote food security in the state.997 households in 2007-08 under this programme. SGSY is a scheme to promote self-employment among the communities through SHGs as well as individual self-employment programmes.4 percent in 198384 to 45.24. Banking and Allied Sectors There are three kinds of financial institutions functioning in the state: (i) Scheduled 1. Under Antyodaya. Urban poverty has declined from 47. In 2007-08. extremely backwards and minorities of the state. empower and assist women to lead a life based on self-respect and confidence through strengthening their economic states.

it means that if the current CD ratio of about 32 percent in the state were to increase to the national level of around 72 percent. poor basic infrastructure. In absolute terms.4 percent). During 2007-08.21 percent in the previous year. The poor CD ratio of the state can be attributed to a number of factors such as poor credit absorption capacity.35 percent.59 percent in Katihar. down from 41. For some banks. Nevertheless. 4. compared to its CD ratio of 32. the high CD ratios in many districts are related to high accumulated interests on previous loans. which is more than the current annual plan outlay of the state and would provide the much-needed impetus to economic activities. Rajasthan (82 percent).5 percent).9 percent. It is less than 25 percent in Bhojpur.78 percent.4 percent) and Orissa (82.2. 5. While the per capita deposit of Bihar has increased significantly in 2007-08.681 crore. Among the Lead Banks. It is above 50 percent in Araria. However. like the Corporation Bank (6. xxvii . investments in the state would go up by Rs. the credit expanded by only Rs 3.80 percent.000 crore.95 percent) or the Indian Overseas Bank (12.99 percent in neighbouring West Champaran to 55. Saran and Siwan. Bihar had an ICD ratio of 57.4 percent) as well as a national average of 79. But Bihar’s share in the total credit of scheduled commercial banks has remained practically the same at 0. Bihar ranks the lowest among the major Indian states.6 percent) and Madhya Pradesh (61. Madhya Pradesh (74.8 percent. The total involvement of the banks in the economic activities of a state is truly reflected not by the Credit-Deposit ratios alone. Munger. The CD ratio of Bihar currently stands at 32. Katihar. but by the Investment plus Credit to Deposit (ICD) ratios. UCO Bank has the highest CD ratio of nearly 38. the increase in per capita credit has not been appreciable. from 20. far below the national average of 72.05 percent). Lakhisarai.2 percent). As of March 2007. Purnea and West Champaran. Syndicate Bank has the highest CD ratio of nearly 53. While there has been significant growth in total deposits in Bihar in 2007-08 over the previous year by Rs 11. the CD ratios were very low. West Bengal (62.35 percent. even the ICD ratio of Bihar is much lower as compared to that of states like Rajasthan (104. and way behind the CD ratios of states like Maharastra (102. 6.9 percent over the years. 3. Among others. 27.4 percent. the CD ratios across the districts showed wide variations.66 percent in Siwan to 48. In terms of both per capita deposit and credit. apart from higher incidence of NPA (Non Performing Assets) accounts.712 crore. Kishanganj.

377 SHGs were credit-linked to banks and the total credit flow to these SHGs was Rs. The advances made to the small scale industries were very low. or 31. Public Finance 1. Pradhan Mantri Rojgar Yojana (PMRY) and Swarnjayanti Grammeen Swarojgar Yojana (SGSY) are important anti-poverty programmes in the state.19 percent of the sanctioned amount leaving a huge shortfall between sanction and disbursement. 10. the total credit flow in Bihar has gone up from Rs.372 projects in the state under the RIDF. from Rs 82 crore in 2005-06 to Rs 4647 crore in 2007-08. Under the Annual Credit Plan of banks in Bihar. In 2006-07. of which as many as 7. 11. however. Bihar had a revenue surplus of more than Rs 1000 crore. have emerged as the major microfinance programme in the country. Bihar is gradually catching up with other states in SHG-Bank Linkages. For SGSY and PMRY schemes. The total credit disbursed by NABARD by way of refinancing the banks amounted to Rs 184 crore during 2007-08. The cooperative banks. Overall. the achievement figures for Kisan Credit Cards were consistently high during the entire period from 1999-00 through 2008-09. the achievement in the state has been only around 45. 8.12 crore. 9. NABARD had sanctioned 9. 8738 crore in 2006-07 to Rs 10763 crore in 2007-08.951 are related to minor irrigation. the priority sector advances constituted 62 percent of the total advances. This surplus has been increasing continuously. Among different rural poverty alleviation schemes. registering a growth of 23 percent growth. 296. of which agriculture accounted for nearly half the total priority sector advances and more than one third of the total advances within the state. The Self-Help Groups (SHGs) and the SHG-Bank Linkage Programme. While for the commercial banks. are yet to gear up fully for the job.07 percent of the target for the entire period. the recovery rates are only around 31 percent and 25 percent respectively in 2006-07. implemented by commercial banks. RRBs and cooperative banks. As on March 31. The total disbursements made by NABARD under the various tranches of the RIDF till March. the state government projected to keep it xxviii . 2008 in Bihar is only Rs 747 crore out of total sanctioned amount of Rs 2309 crore. an impressive cumulative number of 141. 2008. Till December 2007. for the first time.7. In 2004-05. In the budget estimates of 2008-09 also. the RRBs have been showing higher performance of late.

With receipts outgrowing the expenditure during the last 4 years. revenue receipts and expenditure grew at nearly the same rate. well within the FRBMA target of 3 percent. for meeting its own expenditure needs. . and the rest has to come from its share of taxes and grants from the central government.612 crore in 2007-08.. Tax revenues were buoyant. As a percentage of Gross State Domestic Product (GSDP). while the total debt stock in the economy has not been allowed to increase.64 to 1. from Rs 5.653 crore in 2003-04 to Rs 1. tax and non-tax combined. though non-tax revenues showed no responsiveness to increasing the state income. the non-plan expenditure was less than twice the plan expenditure. the interest payments have also been contained at nearly the same level by reducing borrowings.700 crore in 2005-06 to Rs 1. 4. 2. The state government's own revenue. compared to three times 4 years ago. from 2006-07 onwards. As on March 2008. largely due to surplus on revenue account. it has resulted in a revenue surplus. In the budget estimates of 2008-09. The state government still remains overwhelmingly dependent on external resources. While the total revenue of the state government has grown nearly threefold during the period 2003-2009. In the combined revenue and capital accounts of Bihar.456 crore to Rs 33. barely meets 20 percent of its revenue expenditure needs. The year 2005-06 also marks the beginning of a declining Gross Fiscal Deficit (GFD).62 percent. The sustainability parameters had improved significantly. the GFD will be contained at 2.96 percent of the GSDP. 6. All key fiscal indicators pointed to a marked improvement in the fiscal position of the state government. the budget deficit could also be reduced from Rs 1724 crore in 2007-08 to only Rs 501 crore in the 2008-09. The gap between plan and non-plan expenditure has also been closing since 2005-06. At the end of 2007-08. 5.at almost the same level. central funds.703 crore in 2007-08. from Rs 12. i. though the tax potential remains substantially untapped and the tax efforts leave much scope for improvement. but by increasing the revenue (especially since 2005-06) and efficient debt management. This has been made possible not by squeezing the expenditure necessary for maintaining the pace of development. it came down from 4. from Rs 3.551 xxix 3. From 2003-04 to 2008-09. The revenue deficit of Bihar was contained effectively and as a result. Its debt management. the finances of the state government were on a much stronger footing than ever before in the past.e. there was a growing surplus in the revenue account.

crore. While the own tax revenue of the state government has grown by 80 percent from Rs 2919 crore in 2003-04 to Rs 5256 crore in 2008-09. the state government's own total revenue.. The developmental expenditure in Bihar has constituted about 60 -70 percent of the total expenditure during all the years under consideration. as a percentage of GSDP. it has nearly doubled over the years and. have grown at a much slower rate. growing at an average annual rate of about 5. i. had decreased from 51 percent to 42 percent during the period from 2003-04 to 2008-09 and it reflects the state government's ability to contain the debt burden. 5678 crore during the same period. stamp and registration fees. The non-developmental expenditure. the non-tax revenue has grown by 32 percent. About 20 percent of the total expenditure of the state government has been plan expenditure till 2005-06. 7. This large figure is the accumulated effect of past borrowings. and about 16 percent is from the central government. xxx . except for a marginal decline in 2004-05. 320 crore to Rs.045 crore at the end of 2007-08. These taxes are highly buoyant and their yields increase automatically with the general increase in the income level as reflected by the GSDP. 3239 crore to Rs. The most important element of the state government’s non-tax revenue is the royalty from mines and minerals. from Rs.e. tax and non-tax combined. sales tax alone comprises 56 percent of the total tax receipts. In absolute terms. 422 crore during the same period. 9. The total public debt of the state government was Rs 35. followed by Stamp and Registration Fees (16 percent). taxes and duties on electricity and taxes on vehicles. and nearly a quarter is solely due to interest payment on outstanding loans and payments on account of pension and gratuity. has increased at a slower rate. 8. These five taxes together made up as much as 98 percent of the total tax receipts of the state government in 2008-09. The major part of this huge debt (about 60 percent) is due to the internal loans raised by the state government from the market. 10. During 2003-04 to 2008-09 about 80 percent of the total receipts of the state government came from the central government by way of grants-in-aid and state’s share of divisible pool of taxes. after which the share of plan expenditure has increased steadily to about 40 percent in 2008-09. the pace of growth has been very high. The major sources of taxes are sales tax. The outstanding liability of the state government. state excise duty. from Rs. which is 33 percent of the State’s GSDP. by 75 percent. Of these. Nearly half of the non-plan expenditure is non-developmental in nature.5 percent since 2003-04. on the other hand.

mostly incurred on running the day-to-day administration of the state government. The salary component of developmental revenue expenditure has declined from 54 percent to only 23 percent during this period. the expenditure on General Services. The quality of expenditure in Bihar has undergone significant improvement over these 5 years. With a 75 percent share. The share of plan expenditure in total expenditure has also increased from 23 percent to 34 percent. Since 2007-08. down from more than 66 percent the year before. due to a substantial drop in the interest receipts. used to account for the bulk of expenditure from the Consolidated Fund. The salary of the state government employees alone accounted for more than one quarter of the state government's revenue expenditure at 28 percent 12. sales tax. while revenue expenditure has practically remained the same at 75 percent of total expenditure. Now Social Services account for the bulk of the expenditure which reflects the state government’s changed priority. 14. but not faster than revenue receipts. 13. whereas the non-salary component has gone up from 46 percent to 77 percent of total developmental expenditure. revenue expenditure constitutes the bulk of total expenditure. stamp and registration fees. it can be seen that revenue expenditure is increasing much faster than GSDP. Prior to 2007-08. In 2007-08. taxes on goods and passengers. health and social development. The receipt from these two together was about 46 percent of the total non-tax receipts in 2008-09. From the buoyancy ratios. The capital outlay has increased from a meager 7 percent to nearly a fifth of total expenditure. The per capita capital outlay has been continuously rising since 2005-06 and now stands at Rs 770 compared to the per capita expenditure on social services at Rs 1374 and on xxxi . The total expenditure and the revenue expenditure respectively are at 34 percent and 19 percent of GSDP for Bihar. taxes on vehicles and state excise were far more buoyant than the total tax revenues of the state government. followed by Social Services and Economic Services. There has been a change in the structure of expenditure of the state government since 200708. General Services no longer holds that predominant position. Capital expenditure that has the potential of generating income and employment has also been accorded high priority and accounts for a quarter of the total expenditure of the state government. The remaining components of expenditure is accounted for by discharge of public debt and loans and advances made by the state government. in view of the importance accorded to education. 11.the other important source being the interest receipts.

15. The per capita expenditure on general education (i. xxxii . the low level of per capita expenditure on medical and public health as well as drinking water supply and sanitation are matters of concern. 67 percent of the total state government revenue expenditure on education were made on primary education. secondary and higher education) increased from 2004-05 and stood at Rs 726 at the end of 2008-09. In medical and public health. followed by 30 percent on urban areas and 10 percent on medical training and research and the rest 6 percent on public health.economic services at Rs 1193. However. 50 percent of the total expenditure were made on rural areas. In 2007-08.e. primary. compared to only Rs 143 for medical and public health and only Rs 97 for water supply and sanitation. followed by 17 percent in secondary education and 14 percent on university and higher education. This signifies the priorities the state government places upon primary education. as compared to 46 percent last year.

3 and 1. This Economic Survey presents the details of the current status of the state's economy and the progress made in different sectors in the recent past. about 50 lakh people were marooned and nearly all their houses and assets were destroyed. similarly. Physical Infrastructure.1 State Domestic Product Following the national pattern. fortunately. however. has not deterred the state government from continuing its efforts to strengthen the economy through higher levels of expenditure in infrastructure and social sectors. For rescue operations alone. implying higher levels of development in social sector and improved delivery of social services. the State Domestic Product of Bihar is now estimated both at current and constant (1999-00) prices. Tables 1. 1. the population of Bihar is estimated to be 99. the survey is divided into six chapters — Agriculture. finally. Public Finances. But. 1 .2 present the estimates of GSDP in current and constant prices respectively. In 2008-09. Essentially. Industry and Allied Sectors. Tables 1. devastating a large part of its population in the north-eastern region. In this flood.CHAPTER I MACRO OVERVIEW Bihar's economy is now set on a development path which would ensure that it reaches its targets under the Eleventh Five Year Plan period (2007-12). Social Sector.1 and 1.0 million. km. This. Apart from the Macro Overview.4 present the estimates of NSDP again in current and constant prices respectively. These estimates are also prepared separately for both Gross State Domestic Product (GSDP) and Net State Domestic Product (NSDP). the state government had to spend a huge amount. Although a number of crucial steps have been taken to accelerate the growth process in Bihar. these targets include an accelerated growth which is inclusive as well. in spite of such high demographic pressure on land. the present Bihar has abundant natural resources in the form of its fertile land and plentiful water to pursue its development goals. implying a population density of 951 persons per sq. it has had to face a major challenge this year in the form of an unprecedented flood. Banking and Allied Sectors and.

71 2586.03 4190.17 3904.00 6995.63 8.35 112424.90 3969.82 63026.34 1837.33 7189.37 1126.31 1722.97 -4.77 916.44 1007.28 1413.90 17.00 7596.72 15555.45 19732.2 Other Trans.52 6261.59 4251.17 7115.09 13.58 5973.37 1082.48 8200.94 28335.27 1080.44 1819.14 2228.) 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 (P) 2007-08 (Q) 23470. 2.59 23473.30 2775.22 6291.76 11858.99 910.92 3614.50 3567.25 1465.48 Growth Rate 4.3 Comm.37 12761.16 9.37 42169.15 1863.89 57058.94 1711.78 33168.93 1167.94 7721.81 14306.61 696.00 11298.44 4113.61 4.18 727.14 2372.60 19947.53 19404.31 8.88 19717.99 31540.96 1563.05 3834.68 81. Ownership of Dwelling & Business 2 .60 Note : REODB = Real Estate.89 3401.37 7. REODB Sub Total (10&11) 12.32 4084.56 3686. Mining / Quarrying Sub Total (Primary) 5.66 7187.07 2889.58 11.61 8059.41 50199.35 1929.35 6304.31 1388.82 8614.48 4831.70 22303.00 1150.27 16844.52 12016.41 5970.47 8. Hus.56 8130.43 871.73 8127.48 5514.66 40. Forestry / Logging 3.65 7.2 Un-registered 6.29 1589.23 2. Fishing 4.23 3719.32 1129.99 34411. Banking / Insurance 11.60 37163.46 2688. Construction 7.94 20384.32 2053.16 24597.26 14.59 1334.19 718.41 2056.38 21144.37 1008.29 2908.03 1189.37 4290.80 22244.44 4414.13 1496.36 7.07 73220.31 5319.50 37333.16 21674.20 1448.93 57269.46 1135. Storage/ Comm.07 3171.15 1399.10 65000.12 6.57 7.01 3545.82 80156.76 25441.48 16127.34 1163.52 3898.09 3916.76 57688.30 1330.54 19040.95 61.95 4868.36 1159.71 3723.09 8806.05 1025.27 1243.74 1720.67 51.87 2938.59 4077. /Wat.85 3470. 9.60 1756.15 1892.00 11917.17 686. / Storage 8.76 7.68 906.05 6238.94 1119.00 4540. Other Services Sub Total (Tertiary) Total GSDP Per Capita GSDP (Rs.78 1822.1 : Gross State Domestic Product (GSDP) at Factor Cost at Current Prices (Rs.27 31599.42 81. Trans.95 1351.44 4338.14 5623.82 27591.06 29174.66 94.86 9582.89 12.23 3793.86 27612.59 2660.76 6895.96 9725.29 7.34 16904.28 1299.28 1941.32 109.01 22.60 7540.68 3603.60 45835.39 5.00 6836.33 15202.33 2981.08 2488. 8.76 11264. Public Administration 13.18 2900.32 6910.18 9081.69 1151.17 15399.94 44.37 5891.17 835.17 1323.05 1472.65 2463.82 825.18 6199.37 6420.38 66254.05 3237.73 1031. Sup/ Gas Sub Total (Secondary) 8.96 8576.63 738.08 1083.15 16730.1 Registered 5.03 9408.91 27034.44 95.92 5542.15 2032.77 105148.10 3567.88 10. Trade/ Hotel / Restaurant Sub Total (8&9) 10.1 Railways 8.79 165.33 19575.60 5555.14 2097. Manufacturing 5.00 7604.68 1129.76 13588.88 5425.18 1965.67 746.99 13481.30 9771.38 17666.08 2235.34 2008-09 Advance 22231.11 4903. Agriculture/ An.18 5411.66 16045.21 4879. crore) Sector 1.99 1591.76 5367.55 6645.15 2599.81 740.00 8890.24 7767. Elec.14 21712.18 7.62 11936.25 2450.59 7401.21 3737.07 721.03 2723.11 7.88 1621.61 767.00 2358.69 2583.34 22923.83 2735.Table 1.87 3433.85 21518.86 1716.87 1558.52 98956.16 749.22 26722.00 8258.42 70066.68 2053.00 10799.53 13428.83 11390.75 1392.81 12518.19 4533.28 8398.

12 1582.85 3389.61 696. Forestry / Logging 3.21 81053.54 1603.69 21673.52 1.42 987.54 1023.62 2782.25 1836.56 677.45 65563.) 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 (P) 2007-08 (Q) 19083.15 5.98 4461.80 8700.45 20861.24 2466.59 1802.52 12754.99 1249.53 1.63 6304 7115 6576 7253 6760 7395 7475 8846 Note : REODB = Real Estate.3 Comm.99 3199.33 727.99 4431.77 2295.25 1859.84 58899.66 32655.1 Registered 5.43 19112.28 24078.87 1613.14 5396.17 3317.05 12.37 11148.2 : Gross State Domestic Product (GSDP) at Factor Cost at Constant (1999-00) Prices (Rs.59 2424.98 27034.17 1503.86 3236.61 8059.55 4183.00 6120.01 5.19 771.04 16899.35 3846.54 2602.02 1144. Trade/ Hotel / Restaurant Sub Total (8&9) 10.54 1145.60 7540. Storage/ Comm.2 Un-registered 6.80 21729.98 7285.53 8663.32 36605.60 18461.27 20943.68 -10. Manufacturing 5. Public Administration 13.66 13880.63 4390.00 2.31 37809.01 10215.67 15490.70 74. Sup/ Gas Sub Total (Secondary) 8.19 1674.58 15714.23 50199.39 8295.77 3614.72 4890.32 2159.76 2947.20 1655.09 3916.76 1216.17 1069.56 1148.44 4070.55 48907.84 1755.42 11419.41 2014.81 1859.59 2304.50 778. Hus.52 631.09 4050. Elec.94 3143. 9.1 Railways 8.91 2637.58 790.39 20198.73 615. 8.55 2917.44 3789.78 13580.95 18502.71 6576.61 767.47 871.99 5210.87 8703 2008-09 Advance 17804.18 3103.65 2463.81 5.82 1166.18 821.04 1091.96 3199.71 984.95 1066. Fishing 4.52 8267. / Storage 8.87 4362. Ownership of Dwelling & Business 3 .00 1150.10 4129.49 5.52 6261.87 1573.16 22726.31 44781.22 621.97 828. Mining / Quarrying Sub Total (Primary) 5.91 1485.91 10910.63 5623.74 3.07 3.42 6.14 5905.06 2473.73 3.88 750.94 769.71 3723.79 242.00 21563.02 8328.93 58250.39 62058.48 16983.69 0.33 31087.50 3526.69 2399.81 33320.83 5149. Agriculture/ An.89 785.35 16287.68 25025.43 3203.33 18271.05 1105. Construction 7.39 4777.53 2574.77 4.97 6.72 4.45 3.39 4053.60 10.37 26494.32 2508.06 29403.72 67394.71 5425.72 1758.04 17413.78 4224.55 1778.62 10229.60 20666.61 80993.27 67.90 15662.46 945.63 8683.81 12754.66 4766.55 4803.96 2506.69 13571.70 1116.58 5091. REODB Sub Total (10&11) 12. crore) Sector 1.55 1806.40 2736.44 962.63 5062.19 16904. /Wat.28 1758.82 4002.05 1313.16 841.47 55.99 11357.14 2097.52 8794 Growth Rate 1.34 43.25 1267.84 2604.33 2.Table 1.92 5698.37 5384.40 9530.76 3128.77 15202.39 602.2 Other Trans.02 4524.99 654.60 4357.01 1061.03 1069.81 2695.33 3121.96 1563.44 1497.35 1929.32 2209.41 2517.91 22809.68 7750.82 6328.67 55495.23 3793. 2.43 1828.06 64.85 7419.62 1575.66 94.05 1952.58 2366.24 133. Banking / Insurance 11.86 1819.34 82947.23 6146.02 9.92 19600.40 19369.48 19417.62 12193.14 11264.67 1383.08 21.87 794.46 963. Trans.74 64.75 1392.09 35.70 6466.40 6467.76 1095.42 10613.64 22826.25 1283.83 3257.92 9529.19 718. Other Services Sub Total (Tertiary) Total GSDP Per Capita GSDP (Rs.49 910.63 2544.54 4587.07 14.22 3.45 46675.61 3038.27 3386.

11 2656.86 574.33 3153.07 6.76 4047.29 5. Elec.17 3217.89 1241.68 3828.77 4.99 131.06 5897. Hus. Agriculture/ An.31 1207.87 571.11 6054.83 3050.45 1102.20 10975.00 6.92 5805.58 2947.10 4419.45 1632.98 12319.00 7930.40 1593.04 1239.65 1206.07 31721. Construction 7. 2.58 5688.1 Railways 8.2 Un-registered 6.26 7504.04 1132.26 407.77 -3.27 33.25 51488.77 592.32 14.19 1890.42 557.79 4727.03 878.53 6439.61 20533.24 10197.28 68.00 9702.15 56986.87 20281.86 3228.92 9.62 2960.37 7.95 17. Manufacturing 5.75 12611.78 4453.08 3238.41 888.72 7902.92 19918.33 1319.49 1768.61 1931.64 469.80 19266.70 901. 8.12 Growth Rate 3.63 628.61 1501.93 5402. / Storage 8.49 22.22 818.97 1919.92 22023.52 2430.89 1447.12 2168.36 80.83 2231.10 1738.58 15793.96 568.67 1360.50 7427.86 1197.20 3401.90 3438.54 6241.60 68.3 Comm.84 973.47 3817.67 22387.46 6.51 849.82 20483.99 3182.97 3124.30 2099.84 3776.31 5789.51 547.73 1501.19 699.2 Other Trans.50 19896.57 384.28 88897.71 6428.32 1885.07 26610.41 11559.69 26962.96 37892.59 4538.44 2008-09 Advance 19898.95 52546. Storage/ Comm.34 9454.00 6934.Table 1.05 8.44 4.86 4145.75 33711.00 7.73 28604.98 20425.54 1766.95 7. REODB Sub Total (10&11) 12.52 2773.83 1446.35 31257. /Wat.54 1499.78 52354.78 1021.27 3039.97 14322.75 4742.89 14921.00 6418.45 1314.44 7920. Fishing 4.00 6204.28 9430.06 24741.61 3508.25 2688.92 18735.49 737.94 9.88 12940. Public Administration 13.75 16958.55 4278.36 322.80 22665.66 566.39 2620.00 7400.19 6.50 3445.97 16522.88 1988. Forestry / Logging 3.91 1412.) 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 (P) 2007-08 (Q) 21360.08 6.89 13208.58 1492.3 : Net State Domestic Product (NSDP) at Factor Cost at Current (1999-00) Prices (Rs.84 9142.48 1073.02 15876.17 2645.33 1531.51 573.98 1495.03 31274.79 7289.84 8483.00 2848.55 13094.39 4572.54 675. Trade/ Hotel / Restaurant Sub Total (8&9) 10.29 10.06 5929.56 1.37 59336.77 13.99 2178. Mining / Quarrying Sub Total (Primary) 5.97 100138.17 87.65 15242.05 2797.59 5.04 662.00 3385.53 888.65 52.02 974.56 2821.60 3026.13 1301.86 1216.10 3227.47 24295.49 510.32 640.96 35420.05 938.00 94489.34 1046.05 25089.80 1350.33 62998.91 12682.03 3483.26 577.14 999.92 3481.00 10616.69 7999.89 1357.63 2649.55 2807.64 17815.10 1085.69 7961.57 15904.43 4664.24 2480.57 59779.96 22773.86 2029.73 1110.00 6861.05 17671.26 18152.93 65607.35 4986.32 5147.87 5451.98 11803.57 2990.71 1659.40 723. Trans.34 27302.30 Note : REODB = Real Estate.80 41018.88 37.71 1012.29 3467.81 10466. Other Services Sub Total (Tertiary) Total NSDP Per Capita NSDP (Rs.62 8351.87 2247.04 3321.03 1921.97 1020.97 18602.1 Registered 5.07 2548.50 1342.91 71497.28 4296.11 853.35 5325.86 6148.86 1906.68 3467. crore) Sector 1.22 74.95 2153.72 8.52 3390.69 972.00 1415.15 4242.99 42. Sup/ Gas Sub Total (Secondary) 8.04 2138. 9. Ownership of Dwelling & Business 4 .89 11721.46 46096.36 10153. Banking / Insurance 11.51 7.34 16654.

61 14322.10 40922.13 17821. Storage/ Comm.92 1333.30 1266.19 9898.45 4238.15 2823.71 4488.77 592. Sup/ Gas Sub Total (Secondary) 8.81 867.34 6.51 8864.01 29857.84 1445.53 3413.4 : Net State Domestic Product (NSDP) at Factor Cost at Constant Prices (Rs.26 3179.06 9221.95 15220. Trans.04 1383.41 2441.30 20018.02 21515.00 6724.12 3014.62 1.44 4151.22 3598.00 6557.89 17252.03 2166.09 53366.20 2484.29 11289.50 1529.13 2513.03 25372.44 932.70 921.72 2.64 981.2 Un-registered 6.70 3618.21 3. Trade/ Hotel / Restaurant Sub Total (8&9) 10.55 4337.38 46096.22 74.95 2153.68 695.75 38.62 75112.98 7928.44 10514.00 8056.73 10929.51 1662.69 3317.39 298.28 1545.60 243.07 21826.16 657.12 2701.33 1432.96 8128.53 -2.17 15646.99 30255. 8.72 17712.61 21608.07 11238.90 765.11 1490. 9.30 2592.00 2395.53 1276.24 1424.17 3500.78 2277.39 19847.55 15904.48 7247.62 623.70 2552.45 985.42 18157.57 320.84 3141.01 12.79 2533. 2.25 301.03 11.83 5635.39 8136.12 18380.28 1521.17 8084.32 42723.84 1361.20 7570.73 48.00 6125.30 -0.00 6662.21 4.09 21.19 959.3 Comm.00 2008-09 Advance 16202.54 3818.02 13426.23 3327.83 2098.36 1766.) 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 (P) 2007-08 (Q) 17580.38 4.02 8436.19 423.92 19882.92 10728.29 3424.31 3153.27 3039. Fishing 4.34 952.80 34308.31 1207.50 7427. Agriculture/ An.50 1335.57 112.96 1075.60 3410.42 3631.08 10.33 211.58 1276. Other Services Sub Total (Tertiary) Total GSDP Per Capita NSDP (Rs.43 4531.30 574.29 29.43 19537.89 1357.14 999. Construction 7.33 4623.71 232.86 3228.96 73780.58 2890.84 929.44 7920.20 60994.94 1415. Forestry / Logging 3.37 624.38 3675.99 3689.98 12838.14 2255.03 14093.12 3126.Table 1.26 407.94 1662.03 684.59 652.13 5.00 4289.99 17424.86 11209. / Storage 8.89 20204.27 3679.20 6.00 3848. Elec.02 63.51 8576.57 3.42 503.27 284.00 1354.67 4598.39 990.04 60.52 1068.60 0.62 2835. Ownership of Dwelling & Business 5 .47 987.06 0.53 1172.02 2261.30 17227.70 20729.24 2.15 5.95 53684.71 1387.96 1.04 1239.21 3. /Wat.36 3542.08 -9.24 339.92 10270. Public Administration 13.92 5143.88 2618.61 5566.32 3754.41 24741.41 1222.42 10466.78 2385.13 5789.37 6090.00 5997. REODB Sub Total (10&11) 12.05 Growth Rate 1.1 Railways 8.41 8414.33 50607.00 Note : REODB = Real Estate.22 1097.89 59613.14 7963.78 935.34 73818.47 13745. crore) Sector 1. Banking / Insurance 11.07 26931.48 1025.31 1377.17 937.60 17578.33 932.45 4737.19 1890.40 33318.26 878.00 3126.40 3729.09 14913.43 2297.69 2354.80 54.53 1233.99 352.61 4572.32 22167.76 5.89 11989.58 1158.34 2267. Mining / Quarrying Sub Total (Primary) 5.77 1124.06 2224.63 5398.15 19391.45 1285.97 3124.10 1406.37 1415.32 57009.50 54.43 44593.1 Registered 5.87 5451.35 1301.40 14699.28 1899. Manufacturing 5.88 1950.63 24015.28 797.02 1464.28 3011.91 28406.54 3478.63 628.00 6765. Hus.77 1286.39 628.36 16.78 255.15 9414.2 Other Trans.16 4949.87 15702.77 1432.71 1382.57 3217.59 2114.

is estimated to be 5. one can see from Table 1.61 percent.5 : Per Capita Net State Domestic Product at Current Prices for Major Indian States (Rupees) State Andhra Pradesh Assam Bihar Chhattisgarh Gujarat Haryana Himachal Pradesh Jharkhand Karnataka Kerala Madhya Pradesh Maharashtra Orissa Punjab Rajasthan Tamil Nadu Uttar Pradesh West Bengal India 1999-00 15507 12269 5766 11761 18864 21966 20806 12747 16758 19294 12384 23340 10567 25615 13477 19378 9405 15826 15839 2000-01 17243 12797 6396 10985 18392 24138 22795 10294 17464 19917 11862 22992 10452 27863 12897 20927 9541 16521 16648 2001-02 18630 13153 6197 12443 19823 26077 24608 10972 17776 21047 12697 24450 11075 28949 14165 20924 9781 17826 17800 2002-03 19568 14600 6928 13145 22683 28259 26627 11865 19041 23207 12303 26697 11788 29443 13126 21813 10435 18746 18899 2003-04 22041 15687 6913 16098 26922 31509 28333 12941 20515 25645 14306 29770 14252 31192 16704 24106 11250 20806 20936 2004-05 23729 16825 7464 18068 29468 35044 31140 17493 24199 27864 14534 32979 16306 32945 16800 27137 11941 22522 22946 2005-06 26211 18598 7875 20151 34157 38832 33805 19066 27291 30668 15647 37081 17299 34929 17863 29958 13262 25223 25716 Source : Economic Survey. 2007-08. Government of India 6 . the per capita NSDP in Bihar has grown at 3. taking the period 1999-00 to 2008-09.5 that. in 2005-06. Although this growth rate is lower than the national gowth rate of about 6-7 percent. Table 1.96 percent for Bihar. For the comparative position of Bihar. With the current population growth rate of about 1.6 percent of the national average.716. the figure for Bihar was Rs. 7.The medium term growth rate of NSDP at constant prices.57 percent.875 which was barely 30. 25. while the per capital NSDP for the whole country at current prices stood at Rs. it indicates an improved growth performance compared to the recent past when the state economy had managed to grow at barely 3-4 percent.

the registered Manufacturing sector is also estimated to grow at 20.44 percent in Tertiary sectors. the yearly growth rate varies from (-) 4.Among the major sectors.80 percent in Secondary sectors.6). but many other sectors too are not free from this structural weakness (Table 1. Agriculture with a growth rate of only 1. agricultural growth rate would have been much higher. But two buoyant sectors of the state economy are estimated to grow at an even higher rate this year — Construction (43.26 to 22. At present. In the beginning of the current decade.08 percent).73 percent to 11. Communications (16.38 percent appears as one of the lagging sectors.75 percent). as revealed by the advance estimate of GSDP (Table 1. The disadvantaged economy of Bihar suffers not only from its comparatively lower growth rates.97 percent in 2008-09.85 percent) and Communications (34. resulting in a low growth rate of NSDP from the sector. Hotels and Restaurants (12.03 to 18. the medium term growth rate for NSDP at constant prices has been satisfactory for at least three sectors — Construction (21. between (-)2. During the past decade. Agricultural growth is possibly the most important source of this variation. For the aggregate GSDP. but it should be noted that the two consecutive floods in 2007-08 and 2008-09 had caused substantial loss of agricultural income in both the years.53 percent). Apparently. Secondary (11 percent) and Tertiary (54 percent). the growth rate has varied between (-) 21. This is largely because of the unprecedented floods in 2008 which has badly affected the agricultural sector. 7 . and between 2. the changed composition stands at — Agriculture (27 percent). In the absence of this calamity. the sectoral composition of the NSDP has been undergoing a slow but steady change over the years (Table 1.92 to 37. Because of strong policy interventions. Because of lower growth rate of the primary sectors.7). but from substantial year-to-year variation in growth rates as well.2). it might be noted that this year the estimated growth rate is lower than the average.01 percent) and Trade.22 percent in Primary sectors. As regards the performance of the state economy in 2008-09. the sectoral composition of NSDP was as follows — Primary (35 percent). Secondary (17 Percent) and Tertiary (56 percent).31 percent.

98 6.21 4.88 6.09 14.12 2.39 3.81 3.05 53.53 1.04 6.17 2.48 100.58 1.94 21.02 5.81 1.46 3.15 8.51 6.39 2.06 4.63 57.74 5.02 22.00 2007-08 (Q) 23.20 30.68 6.35 17.30 25.25 31.65 1.67 7.53 15.70 0. Agriculture/ An.42 52.16 7.33 8.58 14.29 12. Ownership of Dwelling & Business 8 .00 Sector 1.85 100. Storage/ Comm.36 14.48 28.94 1.17 2.52 18.01 15.80 6.30 1.09 32.09 10.04 24.30 3.13 7.60 7. Manufacturing 5. Trans.90 13.75 9.00 2001-02 29.95 3.77 0.75 6.00 2002-03 33. Banking / Insurance 11.36 4.85 9. Construction 7.06 5.56 16.27 2.70 2.00 11.43 13.2 Un-registered 6.21 13.62 5.58 1.20 3.16 7.35 1.00 2004-05 29.1 Registered 5.6 : Percentage Distribution of Sectoral Composition of Gross State Domestic Product at Factor Cost at Constant (1999-00) Prices 2006-07 (P) 26.88 19.48 2. Hus.78 5.08 15.Table 1.28 1.54 1.62 4. Elec. Fishing 4.80 7.27 1. Forestry / Logging 3.04 14.42 3.45 1.61 8.44 33.20 13.44 3.20 2.66 1.17 27.71 56.19 33. Trade/ Hotel / Restaurant Sub Total (8&9) 10.86 3.3 Comm.90 56.10 4.35 1.38 1.26 2.77 1.44 3.87 7.23 2.69 1.63 100.29 4. Other Services Sub Total (Tertiary) Total GSDP 1999-00 30.90 2.20 1.34 10.83 100. 9.81 1.46 1.14 3. Sup/ Gas Sub Total (Secondary) 8.17 4.63 1.87 3.90 3.96 100.57 100.70 1.72 0.62 1.72 7.11 6.70 1.38 20.02 100.10 100.31 3.00 13.57 1. 8.91 3.81 1.89 1.19 3.00 2008-09 Advance 21.73 1.67 0.70 2.91 2.50 1.35 5.02 2.78 1.22 4.17 24.58 4.19 2.95 15.99 6.11 36.02 7. /Wat. 2.16 1.95 3.47 7.62 100.26 8.15 0.1 Railways 8. Public Administration 13.24 55.15 0.90 4.32 0.42 0.62 1.39 26.00 2003-04 28.15 58.08 26.39 0.00 2000-01 35.64 7.14 27.56 1.02 25.71 4.86 7.46 1.79 7.07 10.11 28.25 7.34 5.66 2.55 3.44 1.78 1.2 Other Trans.64 7.93 7.99 10.01 2. / Storage 8.43 12.00 Note : REODB = Real Estate.23 39.90 3.08 29.70 4.47 3.96 2.94 3.84 1.14 56.32 0.00 2005-06 25.32 3.35 4.29 4.25 2. Mining / Quarrying Sub Total (Primary) 5.69 1.47 4.00 18.30 24.38 0.30 3.85 0.65 1.29 21.10 55.58 6.35 2.25 100.41 14.45 5.96 3.73 1. REODB Sub Total (10&11) 12.07 33.46 1.57 1.81 1.18 7.46 4.24 50.82 1.81 6.91 21.86 4.

66 4.23 9.56 6.42 41.13 -0.85 13.02 81.95 -2.49 6.62 4. / Storage 8.25 11.04 7.72 24.33 13.21 8.11 8.04 4.39 5.79 1.08 7.18 4.3 Comm.45 -0.27 6.66 12. Hus.54 0.37 7.76 2005-06 -12.73 0.16 5.86 8.03 -16.60 -1.55 13.55 22.57 2002-03 26.73 6.16 2.22 5.36 10. /Wat.40 4.02 28. Manufacturing 5.16 20.52 -0.14 2.95 5.33 5.31 9.58 11. Elec.30 -10.72 0.7 : Yearly Growth Rate of Gross State Domestic Product at Constant (1999-00) Prices 2006-07 (P) 27.60 -22.1 Registered 5.37 2.90 5.53 1.2 Un-registered 6. Construction 7.22 2.71 1.92 8.17 19.45 10.56 34.70 3.78 2.64 83.38 -5.80 15.27 -13.37 18.08 -18.14 24.51 70.88 3.59 2003-04 -18. Trade/ Hotel / Restaurant Sub Total (8&9) 10.31 0.39 5.60 0.14 2. 2.08 20.18 -24.97 3.43 -3.12 5.29 10.26 8.58 6.94 9.93 -2. Fishing 4.80 4.55 28.43 5.85 0.75 2001-02 -21.12 9.51 23.11 1.34 Note : REODB = Real Estate.07 19.75 6.62 1.62 6.86 -7.30 -5.63 Sector 1.96 0. Ownership of Dwelling & Business 9 .23 10.01 6.35 -21.62 10.2 Other Trans.71 -4.14 30.66 7.15 5.23 -0.73 -7.98 23.20 6.04 12.41 10.30 3.60 9.23 16. 9. Mining / Quarrying Sub Total (Primary) 5.80 3.63 -6.18 16.24 7.45 -0. Public Administration 13.51 10.57 -2.90 22.13 5.31 27.80 11.15 17.20 -31.02 17.24 -13.58 11.53 4.54 15. Sup/ Gas Sub Total (Secondary) 8. Forestry / Logging 3.79 13.42 4.38 5.29 2007-08 (Q) -12.40 1.99 2.61 -10.27 34.28 4.00 5.47 22.27 18.53 8.85 4.69 -0.19 2004-05 14.75 3.94 4.04 -26.21 40.20 1.60 -3.76 -0.58 -71.65 1.23 3.29 11.70 5.74 5.23 11.38 4.37 -3.24 2008-09 Advance -6.07 -1.67 43.00 12.11 2.33 23.70 -6.09 -6.42 7.19 0.93 14.04 4.03 0.Table 1.37 7.86 -4.32 -1.79 -18.68 -6. Agriculture/ An.92 2.28 -2. Banking / Insurance 11.73 4.67 8.44 -3.05 21.27 3. Storage/ Comm.83 10. Other Services Sub Total (Tertiary) Total GSDP Per Capita GSDP 2000-01 37.56 4.98 19.1 Railways 8.41 1.59 8.39 2.61 -14.31 7.60 12.87 7.32 -44.28 -2.86 9.69 0.82 -5.87 0.45 28.90 4.61 -10. Trans.33 -6.00 1.23 2.27 0.53 25.46 6. 8. REODB Sub Total (10&11) 12.23 4.04 16.34 4.02 2.28 13.

763. 29. The two districts at the bottom the ranking are Sitamarhi (Rs.) 29842 (1) 9763 (2) 8525 (3) 8059 (4) 7225 (5) 7056 (6) 6784 (7) 6474 (8) 6405 (9) 6163 (10) 5986 (11) 5970 (12) 5876 (13) 5766 (14) 5673 (15) 5664 (16) 5639 (17) 5488 (18) 5463 (19) 5425 (20) GDDP (1999-00 Prices) (Rs. has a Per Capita GDDP figure of Rs.2 Regional Disparity Besides being the state with the lowest per capita income. appearing as the second most prosperous district.392) and Sheohar (Rs. (Table 1.482. Taking the average of the GDDP estimates of two years.) 5365 (21) 5355 (22) 5322 (23) 5301 (24) 5255 (25) 5172 (26) 5138 (27) 5124 (28) 5050 (29) 5039 (30) 5031 (31) 4920 (32) 4879 (33) 4857 (34) 4699 (35) 4613 (36) 4392 (37) 3967 (38) 7168 GDDP (1999-00 Prices) (Rs. crore) 20032004Average 04 05 793 795 794 699 763 731 1757 2075 1916 306 297 302 804 886 845 1716 1831 1774 532 522 527 854 1032 943 1123 1167 1145 285 274 279 805 903 854 1371 1440 1405 695 743 719 942 911 927 1901 1997 1949 997 1071 1034 1210 1263 1237 226 205 215 59386 65913 62650 Per Capita GDDP (Rs. Champaran Araria Sitamarhi Sheohar Total Source : Directorate of Statistics and Evaluation.8 also presents the average Per Capita GDDP in 38 districts of Bihar. 9.8 : Gross District Domestic Product (GDDP) and Per Capita GDDP in Bihar Per Capita GDDP (Rs. 3. the Directorate of Statistics and Evaluation of the state government has estimated Gross District Domestic Product (GDDP) for 2003-04 and 2004-05. Table 1. the Per Capita GDDP figures indicate that the districts in south Bihar are relatively more prosperous than those in the north. Broadly speaking.967). In the ranking of the districts with respect to Per Capita GDDP. Table 1. Government of Bihar 10 . Bihar also suffers from high regional disparities within the state.8). Munger. 4.2004Average 04 05 Patna 13721 15924 14823 Munger 1141 1198 1169 Begusarai 1871 2342 2106 Bhagalpur 2002 2129 2066 Muzaffarpur 2674 3031 2852 Rohtas 1780 1864 1822 East Champaran 2067 2287 2177 Katihar 1519 1744 1632 Saharsa 972 1064 1018 Gaya 2259 2245 2252 Lakhisarai 495 516 506 Khagaria 758 850 804 Bhojpur 1395 1373 1384 Kaimur 807 756 781 Nalanda 1425 1409 1417 Purnea 1486 1550 1518 Madhubani 1648 2599 2124 Vaishali 1402 1738 1570 Aurangabad 1167 1143 1155 Darbhanga 1783 1976 1880 Division / District Buxar Kishanganj Samastipur Arwal Madhepura Saran Jehanabad Supaul Gopalganj Sekhpura Banka Siwan Jamui Nawada W.1. crore) Division / District 2003. To obtain an idea of about such disparity. Patna appears at the top with a figure of Rs.

3) 56.3) 156.1) 5.87 (3.7) 6.7) 10.00 (1.56 100.14 (2.5) 4.6) 5.64 (3.69 (3.63 2.08 (2.7) 14.28 (5.92 (3.03(1.75 (3.18 (4.5) 15.60 2.1) 7.4) 1.98 (1.91 (3.4) 6.21(1.51 3.10 (0.07 (6.8) 21.0) 4.66 (1.6) 1.40 (1.6) 18.05 (0.99 (2.87 (2.13 (1.3) 19.33 (1.5) 1.32 (2.28 (2.9) 20.2) 5.1) 4.9) 60.0) 7.7) 10.7) 5.06 (0.43 (0.84 (1.91 3.7) 35.66 (0.2) 27.52 (100) 103.2) 29.28 (1.06 (3.5) 6.9) 6.2) 1.6) 28.36 (0.2) 0.03 (4.31 4.41 (3.01 (3.0) 0.92 1.8) 41.23 0.29 (2. Champaran W.00 Consumption ( '000 tonne) Petrol Diesel Retail LPG 29.9) 9.26 (0.0) 4.9) 15.37 (1.73 (1.02 (0.15 (3.90 (19.79 (3.0) 1.48 (1.1) 32.9) 3.20 0.16 (0.1) 21.87 (21.1) 3.21 (3.3) 34.5) 32.5) 4.75 (1.28 (0.7) 5.85 (2.84 (4.43 (4.99 (3.44 (100) Sources : Indian Oil Corporation Kerosene 39.70 (2.07 2.8) 40.84 (1.7) 15.09 3.29 (2.9) 4.4) 26.5) 6.3) 29.69 0.0) 8.2) 19.0) 9.60 (0.95 (3.08 (1.13 (3.08 (3.03 (2.2) 2.69 2.99 (3.9) 10.04 (0.7) 29.83 4.5) 662.82 (1.35 (2.48 (2.76 (1.4) 10.52 (6.Table 1.6) 2.98 (1.7) 1.2) 2.96 (3.00 (1.6) 11.97 1.0) 7.23 (2.28 3.6) 55.0) 11.73 (1.22 (0.9 : Districtwise Consumption of Petroleum Products (2007-08) District Patna Nalanda Bhojpur Buxar Rohtas Kaimur Gaya Jahanabad Arwal Nawada Aurangabad Bhagalpur Banka Munger Sheikhpura Jamui Lakhisarai Khagaria Begusarai Muzaffarpur Sitamarhi Sheohar VaishaliI E.9) .69 2.5) 5.81 (1.27 2.80 (4.90 (1.79 (3.0) 16.70 (2.7) 5.8) 9.9) 9.83 (2.4) 9.96 (0.8) 32.88 (2.18 2.8) 0.0) 7.52 (5.46 (1.5) 3.3) 1.94 1.75 3.8) 17.2) 8.74 (3.70 1.44 (100) 266.1) 15.04 (2.7) 0.18 1.88 1.5) 19.1) 19.62 (2.89 (100) 11 .9) 3.7) 19.65 (0.89 (1.5) 0.27 (11.59 1.9) 25.65 (4.29 (2.2) 4.37 (1.63 1.9) 8.97 4.62 3.3) 1.52 (1.22 (2.42 (0.2) 1.5) 2.02 (3.67 4.58 (3.92 (0.87 (2.8) 11.3) 2.09 1.1) 7.02 (4.14 (2.1) 51.4) 22.9) 1.2) 4.51 (2.56 (2.3) 21.1) 1.0) 10.36 (3.82 2.8) 1.1) 8.51 (5.31 (0.89 (0.1) 25.9) 21.9) 14.64 (2.84 3.228 (4.10 (1.79 (0.95 (5.3) 4.2) 27.86 2.0) 1.92 (0.99 (1.4) 8.52 (1.0) 1.17 (2.54 2.1) 120.92 (3.0) 7.7) 61.28 (0.67 (2.33 (1.4) 0.7) 4.95 (2.45 (2.1) 2.0) 28.78 (2.0) 2.4) 2.1) 27.9) 1.0) 18.22 (3.89 (3.9) 6.39 (0.3) 3.94 (1.4) 6.95 1.62 (1.15 (4.9) 25.00 (1.39 (5.2) 16.76 (3.0) 3.35 (3.48 (3.47 (0.4) 8.98 (0.7) 9.76 (2.43 2.7) 34.5) 12.78 (0.76 (0.55 4.21 (3.4) 27.0) 3.25 (2.3) 32. Champaran Darbhanga Madhubani Samastipur Saran Siwan Gopalganj Saharsa Supaul Madhepura Purnea Araria Katihar Kishanganj Grand Total Share of Population 5.74 (1.6) 0.8) 10.9) 5.50 (4.17 (1.8) 9.4) 9.25 (2.37 0.99 (2.6) 14.1) 20.55 (2.6) 10.59 (3.69 (1.2) 10.4) 5.17 (3.6) 3.8) 1.

42 30.00 Kaimur 35.65 59.00 Kishanganj 15.00 Supaul 15.87 81.76 48.00 Madhubani 55.18 75.08 Per Capita Saving (Rs.00 Vaishali 70.11 25.82 125.39 29. Crore) 111.96 17.01 35.00 Sheikhpura 10.41 35.00 29.86 8.95 8. 10 : Districtwise Small Saving in Post offices and Publics Provident Fund 2007-08 Target District in (In crore) Patna 400.75 36.47 17.96 9.91 50.00 26.37 45.34 25.12 5.32 38.40 51.60 22.79 77.93 40.68 83.00 38.54 815.00 7.87 22.00 23.87 2008-09 (upto November) Target Per Capita Achievement (In Saving (In Crore) Crore) (Rs.14 220.15 13.Table 1.53 17.66 33.00 10.34 27.00 9.63 66.95 53.17 74.57 7.48 47.74 4.02 85.20 76.80 84.00 100.29 8.94 31.00 4.00 2.58 61.00 9.94 53.00 13.95 216.97 28.00 Muzaffarpur 80.42 63.00 29.00 Gaya 75.33 77.00 91.02 58.00 Begusarai 55.30 93.36 40.00 14.69 1.11 29.06 110.69 2.63 76.96 38.15 20. Champaran 25.00 Bhagalpur 60.08 4.00 15.00 14.00 58.37 49.97 8.97 3.92 10.74 9.39 31.73 55.98 45.00 Arwal 10.28 62.00 23.00 Siwan 70.00 19.00 Rohtas 90.68 70.00 4.00 Madhepura 15.00 Katihar 30.00 Jahanabad 15.66 8.00 2.16 45.00 Darbhanga 70.24 7.55 32.88 5.00 23.18 27.47 68.60 124.00 Achievement (Rs.97 7.08 16.00 Chhapra 140.00 Sitamarhi 25.00 21.72 13.04 85.23 37.00 Buxar 50.98 30.67 12.86 5.00 Purnea 40.00 Nawada 40.00 21.10 20.01 25.00 735.51 54.27 107.10 35.16 15.27 18.95 103.85 1000.00 Banka 15.62 10.56 69.00 Munger 35.39 53.00 10.08 29.03 89.80 86.27 37.52 37.60 30.55 20.00 24.00 7.00 Samastipur 50.58 10.40 49.00 9.01 12 .54 2.31 7.19 8.06 52.80 28.12 119.00 2.80 102.48 18.65 5.71 67.00 Aurangabad 45.00 24.46 30.00 Lakhisarai 10.75 23.00 62.68 32.07 107.00 Sheohar 5.79 168.00 Jamui 15.43 94.00 23.66 13.00 5.00 Saharsa 25.76 207.88 83.25 25.00 Total 2000.00 Bhojpur 90.97 27.00 Araria 15.80 5.56 168.88 7.00 Khagaria 10.00 9.00 Nalanda 100.00 Gopalganj 45.17 45.78 30.65 3.) 208.) 200.00 14.97 29.75 21.98 49.19 9.00 6.67 50.00 2.28 38.11 48.82 100.57 22.03 93.51 13.99 76.23 13.00 W.70 24. Champaran 50.00 E.07 48.00 13.86 150.54 94.

Other districts whose share in petroleum consumption is substantially higher than their share in population are — Rohtas. 17). the CPI has been increasing at a slower pace in Bihar. followed by Patna (Rs. 168).10).As further indicators of regional disparity. separately for different states. have different base years — 1993-94 for Wholesale Price Indices. 216). one notices that Patna accounts for 19. 31). the month for which the latest indices are available. Araria (Rs. 1984-85 for Urban Non-manual workers and 1986-87 for both for Agricultural and Rural Labourers. Nawada (Rs. Arwal. in the rural areas. 100). 169). Vaishali. 103). Urban Nonmanual Employees. however. Taking into account petroleum consumption only. the CPI stood at — 148 (Bihar) and 144 (India) for industrial labourers.3 Consumer Price Indices Apart from computing an index of wholesale prices for the whole of the country.1 percent of total petroleum consumption in Bihar. 23) and Khagaria (Rs. These indices. the central government also prepares consumer price indices (CPI) for Industrial Labourers. 200001 for Industrial Labourers. Khagaria and Sheohar. the per capita savings in 2008-09 was the highest in Nalanda (Rs.11 presents these Indices. 1. 13 . This is true for CPI of both agricultural labourers as well as rural labourers. 101) and Gopalganj (Rs. and 444 (Bihar) and 460 (India) for rural labourers. it is observed that CPI for industrial labourers has increased more in Bihar than in the country as whole. As regards the small savings in post-office and public provident fund. Saran and Gopalganj. The four districts with the lowest per capita saving in 2008-09 are — Sitamarhi (Rs. Begusarai. In November. two more tables present the districtwise data on — consumption of petroleum products (Table 1. The districts with very low consumption of petroleum are — Jehanabad. Bhagalpur. Jamui. Aurangabad (Rs. Lakhisarai. In 2007-08 and first eight months of 2008-09. However. Darbhanga. Darbhanga (Rs. For urban non-manual employees (for which indices for 2008-09 are not available). Nawada. Agricultural Labourers and Rural Labourers. Table 1. 444 (Bihar) and 460 (India) for agricultural labourers.9) and small savings in post-office and public provident funds (Table 1. one again notices that CPI in Bihar has been rising faster in Bihar than in the country as a whole. Chhapra (Rs. 2009. 102). Sheikhpura.

4 240.3 213.5 228.05 2005. reform and development are being strengthened either by technological upgradation or by massive training of the personnel.3 238. The various recommendations of the Administrative Reform Commission.5 212.4 241.6 206.1 238.2 215.5 (P) 233. there has been a paradigm shift in the quality of governance.11 : Wholesale and Consumer Price Indices in Bihar and India Wholesale Price Index (Base : 199394=100) India 161. Most of the government offices.8 211. are now being 14 . are being implemented gradually.9 225.3 212.1 215.0 187.2 215. after years of neglect.5 231.9 216.8 180.6 (P) Industrial Labourers (Base : 2000-2001=100 ) Bihar 98 102 109 112 120 128 136 130 128 130 134 138 141 142 142 139 136 136 140 140 140 141 145 151 151 155 154 India 100 104 108 112 117 125 133 128 129 130 132 133 133 134 134 134 134 135 137 138 139 140 143 145 146 148 148 Urban NonManual Employees (Base : 198485=100) Bihar India 359 390 366 382 396 418 451 484 464 461 463 475 482 490 494 495 492 496 496 501 405 420 436 456 486 515 501 503 506 514 515 516 520 519 518 520 523 528 Agricultural Labourers (Base : 19861987=100) Bihar 290 299 311 324 347 376 403 391 385 385 390 400 408 415 413 411 409 413 416 422 419 421 433 440 443 446 444 India 311 323 322 342 358 380 409 394 395 399 404 408 410 413 414 413 413 417 423 429 431 434 442 450 455 459 460 Rural Labourers (Base : 19861987=100) Bihar 292 301 313 326 348 377 403 391 386 385 391 400 408 415 413 411 409 413 417 422 419 421 433 440 444 446 444 India 313 325 335 344 360 382 409 395 396 400 404 408 410 413 414 413 414 417 423 429 431 435 442 450 455 459 460 Year 2001-02 2002-03 2003-04 2004.2 219.3 195.Table 1. All the instruments of the state which facilitate social justice.06 2006-07 2007-08 Apr May Jun Jul 2007.7 241.8 215.3 166. constituted earlier.6 213.4 218.4 Governance In the last three years.08 2008-09 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 1.

The offices are being furnished appropriately and its exterior is getting the necessary facelifts to make them presentable. the extent of filling up posts is not uniform across the departments.40 lakh state government employees.5 percent) and Tourism (39. To understand the travails and trauma of the people. so that there is inbuilt mechanism for inclusive governance.12 and 1.8 percent). There is a concerted effort to make the work atmosphere congenial to both staff and as well as visitors. During the last six years (2002-03 to 2007-08). but later these 'Durbars' were organized around specific issues.14 presents the distribution of departments of the 15 . but it is being tested on a concurrent basis to assess its fructification on ground. there are several departments where the ratio is close to 100 percent. Flood Control and Damage (38. to understand the impact of governance in rural Bihar.3 percent). Over the years. The 'Yatra' would also reveal whether a bridge has been built between the state machinery and the people. implying about 4.4 percent) and Water Supply and Sanitation (190.3 percent). just as others have faced shrinkage. Treasury Administration (270. Family Welfare (1074. it was 76.technologically equipped. An immediate fallout of this process is that this process is now being duplicated by District Magistrates on a weekly or fortnightly basis. Earlier. Table 1. the total strength of the state administration in terms of sanctioned posts has increased only marginally (1. (Tables 1. but only 76. the interactions were on general topic. Structure of Public Administration In 2007-08. Among the departments that have faced substantial shrinkage are included — Large/Medium Irrigation (82. as some departments have experienced expansion. this ratio of filled up posts has varied between 80.7 percent in 2002-03 to 76.0 percent of the sanctioned strength in 2007-08. thereby helping to alleviate miseries of a vast majority of the public After completion of the three year tenure of the present government. However.0 percent of these post were filled up. the total sanctioned strength of the state administration was 5.79 lakh employees.8 percent). As regards the actual strength of public administration. the Chief Minister has also started 'Vikash Yatra' in select districts.3 percent). On the other hand. the departments that have experienced substantial expansion include — Vehicle Tax (25. Industry (35.4 percent). While only 21.7 posts of the Department of Urban Development is filled up.13). but their composition has changed.2 percent). the Chief Minister has started the innovative practice of direct feedback by organizing the weekly ‘Janta Ke Darbar Me Mukhyamantri’. The governance in Bihar is no more considered as an esoteric concept.0 percent in 2007-08.

4 190.3 -10..8 5.7 2.2 -15.3 12.9 -7.0 100.0 10.) Department State Legislative Governor office Administration (Judiciary) Election Commission Land Revenue Stamp and Registration State Excise Sale Tax Vehicle tax Other Tax Other Fiscal Services Public Service Commission Secretariat General Services District Administration Treasury Administration Police Prison Stationary and Printing Public Work Other Administrative Services General Education Technical Education Sports and Youth Services Art and Culture Medical and Public Health Family Welfare Water Supply and Sanitation Urban Development Information / Advertisement Welfare of SC/ ST/ OBC Labour and Employment Social Security and Welfare Disaster management Other Social Services Secretariat Social Services 2002-03 2026 158 11686 401 14520 1960 1883 2291 364 59 252 285 4116 7711 452 105176 2989 1417 6797 4530 230480 1442 1117 492 44617 172 3799 284 854 3026 3927 1502 0 68 776 2003-04 2784 154 11467 398 14519 2005 1877 2275 364 60 252 318 4146 8142 452 104884 2989 1508 6781 4519 230966 1442 1118 512 44600 172 9458 339 849 3026 3929 1508 154 71 855 2004-05 2851 154 11470 397 15076 2010 1877 2299 364 60 252 315 4388 8142 452 104920 2989 1508 6673 4526 230966 1442 1109 512 44602 172 9217 284 849 3026 3839 1544 150 70 935 2005-06 2228 155 11480 397 15045 1915 1876 2298 478 62 233 351 2741 8027 1782 110536 2989 1549 6503 3838 218410 1475 1115 506 52943 2020 8859 247 829 3596 3852 1597 150 54 887 2006-07 1822 155 11689 397 15041 1915 1876 2266 456 68 237 339 3444 8027 1670 110977 2989 1551 6499 4008 221992 1475 1114 493 53013 2020 8847 253 794 3596 3862 1371 150 54 937 2007-08 1925 155 11687 397 15042 1916 1876 2266 456 67 237 351 3475 8027 1676 110793 2989 1551 6493 3993 221945 1475 1114 472 56303 2020 11030 253 790 3596 3860 1292 150 75 875 16 .0 3.3 -4.5 -4.6 -6.8 ….3 0.7 -14.5 18.1 25.0 23.6 -2.1 270.2 -0.9 -3.3 13.0 9.8 -1.(Contd.0 -1.5 -11.0 -1.6 4.4 -1.12 : Sanctioned Strength of Different Departments in State Government Increase/ Decrease (%) -5.2 1074.Table 1.1 26.9 0.3 -0.

12 : (Contd.9 0. Some of the department whose role in governance and development is very important.0 1.1 24.2 (Concluded) state government by percentage of posts filled up.7 2.4 percent).2 17.5 -0.9 1. 17 .4 percent).6 17.0 -4. Survey and Statistics (55.Table 1.9 6. Labour and Employment (54.9 -35.3 percent). Census. but suffer from inadequate strength are — Agriculture (43.0 1.4 0.3 -3.9 -82. Civil Supply (53.8 0.8 -3.3 14.0 2.5 -2.3 percent).2 percent) and Medical and Public Health (57.) Department Agriculture Soil and Water Protection Animal Husbandry Dairy Development Pisciculture Horticulture / Wild Life Agricultural Research and Extension Cooperative Other Agricultural Programme Other Rural Development Work Major Irrigation Large/ Medium Irrigation Minor Irrigation Flood Control and Drainage Rural / Small Scale Industry Industry Non-Ferous Mining / Industry Civil Aviation Roads and Bridges Other Transport Services Secretariat Economic Services Tourism Census/ survey/ Statistics Civil Supply Other General Economic Services Total Increase/ 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 Decrease (%) 13479 373 8492 328 991 2248 271 3485 112 24403 20189 10711 4723 1321 1265 576 55 12819 31 979 277 1438 1725 492 572412 12809 377 8479 328 990 2453 462 3813 106 24389 17154 10711 4212 1296 1285 578 55 12820 32 1044 277 1546 1739 500 576348 12802 377 8191 348 987 2453 462 3687 106 24389 10656 10361 3313 1295 1295 576 55 12820 32 1082 277 1546 1803 500 568853 12480 379 7916 351 1158 2528 271 3553 107 23709 6318 6857 10366 3078 1256 956 579 54 12864 31 1076 240 1439 2145 488 571222 12268 379 7905 316 1158 2528 271 3556 107 23709 6415 6847 10366 2913 1518 956 570 56 12939 31 1161 221 1439 2146 492 575664 12267 379 9998 335 1158 2401 271 3556 107 23696 6415 3471 10366 2913 1518 816 571 56 12860 30 1150 168 1439 2155 492 579210 -9.5 -39.1 16.2 -38.8 0.

2 86.0 59.3 98.6 2006-07 82.3 76.4 99.8 70.8 54.8 80.7 40.6 50.4 98.0 74.1 66.5 72.3 ….2 57.6 82.6 59.4 93.3 51.0 98.6 70.5 89.9 98.8 78.4 74.) 18 .5 77.0 85.1 69.9 62.8 92.1 8.8 51.9 66.3 70.6 77.7 94.1 97.7 64.3 67.4 99.2 86.6 21.6 46.0 69.1 59.7 50.7 66.8 57.5 62.0 66.3 74.3 51.8 57.1 86.9 81.1 66.0 69.6 2003-04 56.0 84.Table 1.8 80.9 91.0 95.9 64.5 76.6 81.4 84.2 80.3 59.9 72.0 86.0 92.6 47.1 70.13 : Working Strength of Different Departments in State Government (In Percentage) Department State Legislative Governor office Administration (Judiciary) Election Commission Land Revenue Stamp and Registration State Excise Sale Tax Vehicle tax Other Tax Other Fiscal Services Public Service Commission Secretariat General Services District Administration Treasury Administration Police Prison Stationary and Printing Public Work Other Administrative Services General Education Technical Education Sports and Youth Services Art and Culture Medical and Public Health Family Welfare Water Supply and Sanitation Urban Development Information / Advertisement Welfare of SC/ ST/ OBC Labour and Employment Social Security and Welfare Disaster management Other Social Services Secretariat Social Services 2002-03 63.0 66.6 85.4 74.5 68.6 65.2 61.7 47.1 51.8 59.2 59.5 70.0 60.6 78.6 68.8 74.2 75.7 77.5 74.3 90.4 71.8 66.7 93.8 66.7 1.7 95.0 74.3 81.6 37.0 69.8 66.7 58.5 99.3 49.0 77.3 67.0 85.8 77.4 88.5 2004-05 57.6 65.5 87.1 80.0 83.8 78.4 67.(Contd.8 79.1 78.0 57.7 72.3 84.0 50.3 66.1 78.7 67.8 70.2 86.4 78.3 80.1 81.5 67.5 58.8 2007-08 82.4 84.1 71.7 57..3 67.2 66.4 21.9 77.8 74.5 61.9 63.3 76.1 70.7 100.6 78.2 81.5 79.7 52.7 70.8 81.7 23.8 72.9 80.7 47.0 88.4 67.5 88.6 71.7 59.0 67.1 78.2 51.4 56.6 70.9 68.8 41.7 2005-06 67.5 83.2 69.3 63.5 80.7 75.6 79.7 59.9 36.0 41.7 64.4 89.5 99.5 67.2 69.6 55.7 15.9 57.5 98.3 18.0 83.4 89.5 54.6 81.5 81.0 100.0 89.7 62.0 75.2 43.9 59.3 55.8 64.0 67.5 64.5 78.5 89.

0 63.7 92.6 66.13 : (Contd.6 80.4 13.9 69.7 89.7 66.2 52.4 73.9 58.0 56.3 66.4 53.3 101.Table 1.4 56.6 40.4 79.2 51.7 70.8 68.0 (Concluded) 19 .4 80.3 48.0 80.8 62.2 65.2 79.9 68.6 75.3 78.8 73.8 55.2 43.2 58.1 73.4 60.3 56.9 51.2 56.3 46.2 85.5 73.4 51.5 61.8 61.0 66.5 62.5 79.7 47.6 58.2 65.2 76.8 73.2 56.7 61.1 91.9 43.3 51.2 65.0 47.5 61.7 52.8 73.3 64.3 60.3 56.4 51.5 115.8 80.) Department Agriculture Soil and Water Protection Animal Husbandry Dairy Development Pisciculture Horticulture / Wild Life Agricultural Research and Extension Cooperative Other Agricultural Programme Other Rural Development Work Major Irrigation Large/ Medium Irrigation Minor Irrigation Flood Control and Drainage Rural / Small Scale Industry Industry Non-Ferous Mining / Industry Civil Aviation Roads and Bridges Other Transport Services Secretariat Economic Services Tourism Census/ survey/ Statistics Civil Supply Other General Economic Services Total 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 16.0 95.8 81.5 82.8 70.7 68.8 66.1 83.8 48.6 73.5 71.5 56.8 118.5 77.5 87.0 76.2 79.5 50.2 79.5 87.3 50.0 77.4 73.4 53.7 85.9 71.8 78.7 96.3 50.3 71.3 76.8 52.3 48.1 74.3 78.8 75.6 92.5 56.2 65.9 84.9 80.7 59.5 81.0 93.2 68.3 64.8 75.8 119.1 97.1 84.6 79.2 61.0 66.5 73.7 77.1 100.0 0.0 46.5 75.3 53.8 0.2 46.8 58.5 78.8 74.1 49.0 86.9 70.1 87.0 81.5 61.1 61.2 53.8 68.8 55.5 129.9 43.5 73.3 71.2 52.7 54.8 93.1 78.7 51.

Grade 3 (64. comprise more than onefourth of state government employees.6 percent).1 percent). whose productivity is rather low. the share of Grade 4 employees is even higher at 33. the state government employees are also divided into four major grades.0 percent. the working employees.9 percent) and Grade 4 (29.Table 1. If one takes into account.14 : Distribution of Departments of the State Government by Percentage of Post Filled Up Percentage of No of post filled up Department Less than 40 Percent 41 to 50 Percent 1 3 Urban Development Other Tax/ Agriculture/ Stationary and Printing Treasury and A G Administration/ Civil Aviation/ Other Social Services/ Other Fiscal Services/ Pisciculture/ Technical Education/ Statistics (Census/ survey) / Labour and Employment/ Civil Supply/ Industry/ Tourism/ Rural / Small Scale Industry/ Soil and Water Protection/ Other Administrative Services/ Medical and Public Health/ Other Transport Services/ Other General Economic Services/Cooperative Welfare (SC/ ST/ OBC) /Secretariat Economic Services /Family Welfare/ Public Work/ Sale Tax /Secretariat General Services /Information and Advertisement /Dairy Development/ Prison /Animal Husbandry Land Revenue/ Minor Irrigation/ Horticulture and Wild Life/ Election Commission/ Art and Culture/ Agricultural Research and Extension/ Secretariat Social Services/ Sports and Youth Services/ Industry (NonFerous Mining) / Police/ Vehicle tax/ Other Rural Development Work/ Disaster management Other Agricultural Programme/ State Excise/ District Administration/ State Legislative/ General Education/ Social Security and Welfare/ Public Service Commission/ Roads and Bridges Major Irrigation/ Flood Control and Drainage/ Governor office/ Irrigation (Large/ Medium) / Stamp and Registration/ Water Supply and Sanitation/ Administration (Judiciary) Name of Departments 50 to 60 Percent 18 51 to 60 Percent 10 70 to 80 Percent 13 80 to 90 Percent Above 90 Percent 8 7 Apart from being distributed among the various departments.4 percent).15. the distribution of posts is as follows — Grade 1 (1. The percentage distribution of the employees among these grades in various departments is presented in Table 1. Grade 2 (4. For the entire state government employees. 20 . This indicates that Grade 4 employees. taking into account the sanctioned post.

5) 99 (13.8) 2902 (2.9) 80 (67.3) 1344 (2.0) 119 (100.0) 199294 (97.2) 4257 (11.6) 73 (39.4) 136 (59.3) 211 (38.7) 477 (64.6) 3266 (54.1) 1248 (84.2) 81 (2.0) 2544 (42.1) 44 (8.1) 53 (6.3) 30 (100.7) 6 (0.4) 4247 (41.1) 7 (0.0) 34 (32.9) 32 (6.0) Sanctioned Working Sanctioned Parliamentary Work Working Sanctioned Personnel & Administrative Reforms Working Sanctioned Governor office Working Sanctioned Patna High Court Working Sanctioned Finance Working Sanctioned Legal Working Sanctioned Election Commission Working Sanctioned Planning and Development Working Sanctioned Land Revenue Working Sanctioned Stamp and Registration Working Sanctioned Commercial Tax Working Sanctioned Bihar Public Service Commission Working Sanctioned Secretariat Working Sanctioned Panchayati Raj Working Sanctioned Art and Culture Working Sanctioned Health Working Sanctioned Public Health Engineering Working Sanctioned Home Working Sanctioned Urban Development Working Sanctioned Human Resource Development Working Sanctioned Information / Public Relation Working Sanctioned Information Technology Working Sanctioned Science and Technology Working 139 (18.4) 204054 (100.0) 204 (100.8) 1 (3.8) 119 (18.5) 2 (0.9) 5728 (10.0) 1 (4.9) 244 (49.) 21 .5) 12 (50.9) 150 (10.4) 7708 (100.15 : Gradewise Sanctioned and Working Strength in Different Departments of State Government Department State Legislative Sanctioned/ Working Grade 1 45 (6.1) 1285 (93.9) 57166 (100.1) 744 (100.0) 8 (3.0) 276 (50.1) 308 (9.1) 0 (0.3) 139197 (100.0) 135614 (97.0) 3738 (100.0) 493 (100.7) 1 (3.3) 13 (3.6) 219 (2.0) 3504 (45.0) 127 (8.8) 928 (6.0) 24 (100.0) 399 (63.0) 3729 (1.8) 2 (0.0) 4868 (47.10) 689 (87.9) 36748 (100.2) 13 (100.5) 101 (3.9) 3253 (27.0) 10 (100.0) 141 (42.7) 34 (39.2) 65 (61.0) 3 (10.0) 456 (100.4) 1339 (35.8) 7453 (62.0) 4238 (100.0) 0 (0.0) 11490 (100.0) 630 (100.0) 1 (0.4) 1847 (56.2) 233 (24.0) 14947 (26.8) 0 (0.1) 234 (0.2) 1088 (45.5) 58 (2.9) 4 (2.8) 22 (0.7) 726 (0.1) 9 (0.7) 811 (34.5) 64 (0.0) 550 (57.1) 613 (5.2) 46 (1.9) 2370 (86.9) Number of employees Grade 2 Grade 3 129 (19.7) 2221 (59.4) 75 (5.7) 1 (1.9) 25 (11.0) 205 (100.5) 1364 (1.0) 10348 (100.0) 1705 (92.8) 33 (27.4) 776 (2.0) 11886 (100.1) 64 (28.1) 24301 (43.0) 20 (66.1) 247 (4.0) 19 (100.9) 2 (1.6) 275 (10.0) 9148 (100.2) 18 (3.0) 1 (4.0) 187 (100.4) — 5 (50.0) 24776 (44.0) — 3 (0.7) 54 (11.0) 784 (100.0) 15136 (100.2) 465 (19.7) 9 (47.9) 4 (4.4) 549 (100.4) 106 (52.0) 2386 (100.0) 3260 (100.0) 1376 (100.1) 16 (48.6) 155 (46.5) 3885 (50.0) 227 (100.1) 5944 (95.6) 6 (20..1) 839 (19.8) 125 (100.0) 4 (2.0) 3 (100.0) 14865 (40.6) 1233 (11.0) 16 (48.0) 3214 (100.8) 132 (3.0) 1484 (100.0) 2794 (86.0) 105 (100.8) 985 (1.7) 110 (11.2) 5 (4.3) 102 (20.8) 4074 (26.3) 101 (16.2) 217 (0.2) 115 (23.4) 46 (52.2) 55 (4.2) 5 (4.3) 148 (0.0) 22 (6.0) 330 (72.7) 5969 (100.5) 16850 (45.0) 87 (100.3) 20 (16.9) 1564 (13.5) 74481 (100.6) 7 (53.0) 6 (46.7) 34 (1.9) 9361 (61.1) 100 (1.8) 331 (100.4) 8696 (95.8) 87 (42.0) 6243 (100.7) 31 (1.Table 1.8) 1272 (39.0) 379 (4.6) 11 (0.6) Total 648 (100.6) 5 (50.0) 1207 (78.1) 36 (4.6) 773 (5.0) 7 (3.0) 32 (0.8) 87 (1.4) Grade 4 317 (48.0) 2731 (100.0) 305 (0.9) 182 (11.0) 3 (3.5) 10 (52.8) 1832 (43.2) 1548 (100.3) 72 (1.1) 62 (6.9) 21 (1.2) 36 (1.0) 87 (42.9) 157 (24.2) 40 (1.7) 42 (33.0) ….0) 955 (100.5) 29 (3.3) 56149 (100.0) 1852 (100.6) 4985 (43.0) 62 (49.5) — — 69 (15.4) 51011 (68.0) 33 (100.6) 1 (0.5) 10 (41.0) 3 (100.4) 447 (0.0) 108 (52.4) 7 (3.0) 28 (1.7) 103 (55.0) 32 (2.1) 11 (1.2) 77 (4.7) 45 (0.8) 15 (1.0) 21889 (29.0) 4939 (43.1) 567 (4.1) 41086 (71.1) 1535 (36.(Contd.

3) 18 (3.0) 63 (100.0) 1598 (100.Table 1.0) 5 (2.3) 131 (8.0) 371 (100.2) 1541 (38.5) 1610 (39.15 : (Contd.4) 172 (1.9) 56 (71.0) 1126 (4.6) 18 (2.4) Number of employees Grade 2 Grade 3 168 (6.0) 19 (1.2) 1389 (8.0) 814 (100.5) 1273 (45.6) 47 (0.0) 4034 (100.7) 230 (62.5) 53 (1.1) 18 (0.1) 35 (2.2) 1865 (68.4) 202 (12.7) 790 (32.0) 34 (100.0) 6240 (100.9) 43 (2.0) 2401 (100.0) 1519 (100.4) 4483 (100.7) Grade 4 645 (23.9) 21 (0.2) 58 (59.6) 95 (11.7) 91 (48.1) 21 (26.8) 1207 (60.6) 435 (23.0) 2084 (100.1) 29 (0.0) 8496 (14.6) 869 (21.0) (Concluded) 22 .5) 9915 (86.4) 979 (71.6) 37 (2.2) 5701 (73.5) 681 (15.3) 562 (35.6) 560603 (100.0) 177 (1.1) 6116 (100.0) 1890 (100.0) 1489 (8.1) 3 (4.6) 14 (50.8) 1 (0.6) 1609 (71.1) 3 (0.8) 1070 (38.0) 88 (100.8) 17 (3.3) 12 (0.) Department Welfare of SC/ ST/ OBC Welfare of BC/ EBC Welfare of BC/ EBC Labour Resource Social Welfare Disaster management Food & Consumer Protection Agriculture Animal Husbandry /Pisciculture Energy Environment / Forestry Cooperative Rural Development Rural Work Water Resource Minor Irrigation Industry Sugarcane Industry Non-Ferous Mining / Industry Building Construction Roads Construction Transport Services Tourism Vigilance Total Sanctioned/ Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Sanctioned Working Grade 1 52 (1.0) 28 (100.6) 7763 (1.0) 2240 (100.4) 136 (0.1) 0 (0.0) 198 (4.0) 5019 (100.3) 1 (2.0) 189 (100.6) 8 (1.0) 78 (100.9) 1 (1.4) 1445 (18.1) 15 (7.9) 672 (42.4) 25 (6.5) 77 (40.0) 3 (4.8) 1303 (85.0) 50785 (100.9) 9 (23.5) 11 (0.1) 623 (27.8) 7 (20.1) 22 (56.0) 878 (100.5) 1251 (66.5) 157 (56.9) 85 (1.8) 2089 (27.5) 8942 (88.3) 0 (0.3) 9 (14.0) 3266 (100.6) 20179 (82.0) 97 (100.0) 2282 (69.7) 881 (56.8) 961 (9.8) 22929 (4.8) 1963 (25.8) 1 (0.3) 58 (77.0) 59 (1.0) 502 (100.0) 1077 (51.4) 42 (1.6) 411 (67.4) 66 (13.0) 831 (100.2) 3025 (49.8) 27 (1.0) 96 (34.7) 8 (2.0) 1 (0.1) 6 (15.0) 1193 (16.3) 87 (5.8) 4123 (53.8) 636 (78.1) 4582 (73.2) 947 (29.9) 78 (1.1) 715 (86.1) 22 (3.6) 29 (0.0) 15729 (100.0) 1374 (100.0) 10127 (100.8) 5 (0.0) 6401 (100.0) 246205 (61.8) 13 (17.2) 1382 (57.0) 51 (81.0) 166046 (29.3) 2 (5.0) 75 (100.4) 8 (28.0) 606 (100.0) 2802 (100.2) 2360 (47.6) 3099 (48.9) 1786 (29.6) 13 (7.0) 7424 (100.4) 6 (21.1) 363865 (65.2) 1238 (27.0) 7686 (100.70) 10 (1.8) 1595 (69.6) 27 (0.5) 69 (8.4) 1626 (26.0) 11533 (100.3) 3139 (49.8) 20 (2.0) 11 (0.0) 39 (100.4) 24 (0.0) 131737 (33.9) 43069 (84.2) 771 (87.5) 101 (12.1) 52325 (85.2) 31 (2.0) 12 (1.0) 180 (100.0) 17356 (100.1) 46 (0.0) 58 (3.6) 26 (76.1) 99 (13.7) 28 (1.2) Total 2730 (100.9) 14 (0.4) 13(3.4) 208 (8.3) 7 (0.6) 125 (69.5) 10 (0.4) 5454 (1.9) 6 (3.1) 50 (0.6) 94 (0.2) 2366 (52.0) 1574 (100.6) 662 (4.0) 1599 (100.0) 1 (1.0) 964 (60.1) 20 (1.4) 2991 (12.0) 7728 (100.2) 36 (1.4) 736 (36.0) 2311 (100.0) 15807 (4.0) 278 (100.0) 2013 (100.0) 60894 (100.8) 37 (20.0) 7676 (15.0) 406 (14.0) 399203 (100.0) 49 (0.4) 51 (2.3) 1 (0.2) 13584 (86.1) 6206 (83.0) 250 (4.5) 1055 (17.4) 22 (0.2) 146 (29.2) 30(34.1) 79 (9.2) 57 (1.7) 1299 (81.4) 2543 (50.0) 1561 (13.0) 736 (100.3) 536 (72.6) 15592 (89.4) 14 (0.8) 58 (65.1) 17 (6.3) 155 (25.0) 24432 (100.3) 161 (8.0) 103 (0.0) 345 (25.5) 42 (2.1) 103 (27.2) 605 (27.6) 89 (12.1) 273 (54.0) 39 (40.0) 996 (47.

(vi) speedy disposal of files through e-file movement at selected collectorates on pilot basis. commercial taxes etc. Some of the important measures are (i) modernization of district collectorates. initially in land revenue and land registration. (vii) modern and comprehensive HR policy. score cards. (b) 23 . particularly the poorest and the excluded.Bihar Prashasanik Sudhar Mission (BPSM) The BPSM is an initiative of the government to strengthen the state administrative machinery. through improved procedures. oriented to Bihar's specific needs and situation. personnel. more transparent and more efficient government administration to serve the people better. These objectives are to be achieved through a series of reforms so as to benefit citizens with increased efficiency in government functioning and motivation among the public servants. The Mission enables the government to deliver better quality services to all its citizens. (v) better records management. (iv) digitization of old registration records. by providing technical expertise and finance. In order to make administrative reform effective. 2008. This mission will encompass the entire state. education. it will first be started at the departmental level and the identified departments are : (a) Department of Personnel and Administrative Reforms. (iii) online access to different certificates. (ii) Better trained and motivated public servants to work with a citizen-oriented approach. (ii) land registration information on internet. better staff structure and e-governance. from the state capital to the districts. It is now supported by DFID. The major objectives of the Mission are : (i) Faster. (ix) better management of litigations. a development agency of the British Government. (iv) Establish a 'Centre for Good Governance' (CGG). public information dissemination and more responsive public grievance systems. (viii) greater and better compliance of RTI requests. (iii) Better delivery of government services which is measurable. The Mission is a public commitment to deliver tangible improvements in the delivery of services at all levels of governance through people-centered tools including citizen's charters. and (x) strengthening of training institutions. The BPSM was launched by the Chief Minister on November.

ISO certification of collectorates. the all-India average crime rate (number of crime per lakh of population) was 175 with Pondicherry (475) at the top. The Department of Information Technology will execute e-governance related activities and for expansion of Information Technology in the state. and Delhi (335). followed by Chandigarh (348). and (iii) support department head in implementing reform strategy. Comparative Crime Rates : During the year 2007. Bihar with a crime rate of 118 stood at 28th position in the country. The dedicated Reform Support Units (RSU) are proposed to be created within focal departments to : (i) design a departmental reform strategy with target. particularly the poor and the excluded. Uttar Pradesh (80) and Nagaland (54). both domestic as well as foreign.16. Law and Order Governance and development are directly correlated. thereby bringing about overall economic growth and socio-cultural development. the law and order situation of any state is an important indicator of governance. The states which reported crime rate of less than 100 during the reference year were West Bengal (93). If law and order is maintained properly and crime is controlled. etc. senior decision makers in the state government. closely followed by Madhya Pradesh (296) and Tamilnadu (262). and the state government employees benefiting from better skills and motivation. (e) Human Resource Development (Education). provision of modern storage of records. (d) Registration and Prohibition. From the table. In particular. (f) Home (Police and Jail) and (g) Transport department. it creates a conducive atmosphere for investments. filling up of vacancies. etc. Meghalaya (83).. adoption of suitable e-governance. timeline. monitoring and communicating with public. Lakhshadweep (82). The details may be obtained from the Table 1. The district collectorates will be modernized in terms of EPABX facilities. Responsive governance is important for speedy development of the state and its economy. it is derived that Bihar has come a long way 24 . Among the major states. The key beneficiaries will include the citizens of the state.Revenue and Land Reforms (including District Collectorates). simplification of procedures. the highest crime rate of 319 was reported from Kerala (319). (ii) identify the existing bottlenecks with plans to overcome them. Among all the 35 states and union territories. (c) Commercial Taxes.

50 Andhra Pradesh 214.16 : Statewide IPC Crime Rate During 2007 Sl.10 Kerala 319.90 102.70 .50 135.40 125.70 Jammu & Kashmir 177.10 122.30 152.in improving its law and order situation and consequently lowering of the crime rates as compared to other states.40 79.50 135.60 Tamil Nadu 261.60 300.10 122.70 A & N Islands 199.00 475.70 232.20 93.50 219.10 184. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 States & Uts D & N Haveli Goa Assam Daman & Diu Orissa Punjab Jharkhand Manipur Tripura Bihar Sikkim Uttarakhand West Bengal Meghalaya Lakshadweep Uttar Pradesh Nagaland All India Average Crime Rate & Ranking 165.30 152.30 138.10 Madhya Pradesh 295.30 Himachal Pradesh 218.80 117.90 200.30 138.30 Karnataka 211.40 Chandigarh 348.00 261.40 155.70 100.40 141.90 Gujarat 220. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Crime Rate & Ranking Pondicherry 475.90 113.60 214.00 400.20 102.90 220.70 177.10 93.00 335.10 Maharastra 184.90 141.10 Statewise IPC Crime Rate During 2007 500.50 Haryana 219.30 Delhi 335. No.00 Arunachal Pradesh 192.20 States & Uts Sl.70 Rajasthan 232.60 129.00 295.00 82.10 319.40 175.00 0. Table 1.30 450.30 250.60 129.70 54.80 117.70 196.00 Jammu & Kashmir Arunachal Pradesh Andhra Pradesh Himachal Pradesh Madhya Pradesh A & N Islands Daman & Diu Lakshadweep Pondicherry Tamil Nadu Chandigarh Sikkim Chhattisgarh Uttarakhand West Bengal Assam Jharkhand Manipur Meghalaya Uttar Pradesh Mizoram Punjab Delhi Tripura D & N Haveli Rajasthan Karnataka Maharastra Nagaland Haryana Gujarat Kerala Orissa Bihar Goa 25 54.00 165.30 218.00 211.10 150.10 350.70 82.50 214.00 113.40 Crime Rate & R ki 82.40 125.00 50. No.30 199.40 348.00 82.40 79.60 Mizoram 214.00 192.30 Chhattisgarh 196.20 155.

dacoity (-10. 26 . bank robbery (-15. kidnapping for ransom (-22.23 -10.26 -4.75 -37. The details of extremist scenario can be obtained from Table 1.33 -14.99 percent). there has been a decline in major crimes including murder (-3.90 -4. The drop in the number of cases is largely due to the holistic development programme 'Apke Sarkar Apke Dwar' and other initiatives of the state government aimed at employment and income generation in the affected areas. It was the sharpest in the case of kidnapping for ransom.14 -14. These endeavors have brought positive results and there has been an appreciable improvement in law and order.17 : Number of IPC Crimes in Bihar from 2001-2008 Number of Crime Name of Crime 2001 Murder Dacoity Robbery Kidnapping for Ransom Road Dacoity Road Robbery Bank Dacoity Bank Robbery 3619 1293 2175 385 257 1296 22 18 2002 3634 1259 2236 396 252 1323 28 15 2003 3652 1203 2425 335 247 1430 14 15 2004 3861 1297 2909 411 287 1875 30 27 2005 3423 1191 2379 251 224 1310 26 8 2006 3225 967 2138 194 211 1251 15 5 2007 2963 646 1729 89 151 1109 19 9 2008 2001-08 2004-08 3029 640 1536 66 146 897 16 7 -3.9 percent). etc.03 percent). police organisation has strengthened with provisions of required basic infrastructure.02 -15. No significant caste or communal clash has been reported. Table 1.99 -22.03 -6.16 -4. As against 382 cases reported in 2004. Apart from social cooption. only 79 cases have been reported in 2008. The decline became very sharp since 2004. robbery (-4.77 -15.With the present government coming to power.47 -16.17. one of its priorities in governance was improvement in law and order and.10 -18.16 percent). accordingly. special training to police personnel and strengthened police infrastructure etc. As may be discerned from Table 1.99 -8.2 percent).76 CAGR Extremism: There has also been an appreciable drop in the cases of extremism in the state over the years.18. the security apparatus of the state administration was strengthened by deployment of para-military.54 -22. during 2001-08.

However.39 -73. whereas their quick conviction acts as a major deterrent. road dacoity and road robbery were reported from some of the districts and that too had recorded a decline. Samastipur and Sheohar reported an increase in robbery cases over the period. of arrested Naxalites No. of seized ammunition No.5 percent in West Champaran. Most of the districts reported a drop in murder. only a few stray cases of kidnapping. of seized bullets Amount of seized explosives (kgs. of civilian deaths No. road robbery. 3695 (2007) and 4461 (Upto November. This 27 . of seized cane bomb/ landmines Levy Money seized 2004 382 199 19 3 107 1 6 85 1050 2005 210 114 14 15 277 74 14 275 2125 80 2006 63 49 7 6 446 21 9 146 1193 49 480 17 30470 2007 73 39 10 10 579 29 21 162 4810 2500 2916 65 591131 2008 79 43 5 31 450 20 18 133 17098 7459 24147 192 729700 7401 - 472 19 70820 Crime Rates in Districts: The lowering of crime rate is also reflected at nearly all the districts. From this perspective. while the districts like West Champaran.) No. Other crimes like dacoity.00 200.47 1528. As may be seen. also registered a uniform drop in 2008 over 2005.00 56. robbery.27 - Description No. Darbhanga and Saharsa recorded an increase of around 76 percent each during the period.32 -78.18 : Overview of Naxal Violence in Bihar Drop(-) / Increase(+) in 2008 over 2004 -79. of seized police arms No. The improvement in 2008 over 2005 is almost uniformly visible in all the districts (Appendix I to VI). of Naxalites surrendered No. of Violent attacks No.Table 1. Conviction: It is an admitted fact that the crime rate is directly related to the conviction of criminals. the districts of West Champaran. it is noticed that the total number of IPC cases were 2178 (2006). 2008). Saharsa. Railway Katihar and Saharsa showed higher increase in dacoity cases. The districts of Vaishali.56 1900.38 226. kidnapping.33 320. of killed extremists (encounter attack on police) No. ranging from the highest of 42 percent in Sheikhpura to the lowest of 1. The absence of conviction tends to embolden the criminals to commit more crimes. of seized Detonators No.68 933. etc. of attacks on Police No.

08 366 680 610 1656 85.3 percent) are related to assault on them by their husbands and relations.10 21.implied a growth of 70 percent (between 2006 and 2007) and 20 percent (between 2007 and 2008).19 : Convictions of Criminals (January 2006 to November.28 129.65 -30. Bihar's rank was 28th among the major states. the growth rate in number was actually negative. of Convicted Criminals IPC 5230 8774 10994 24998 67. 28 . The conviction rates have been very high in all the three years of 2006.07 69.79 5067 6966 9063 21096 37. it is gathered that the IPC cases against women at the national level has recorded an increase of 7. Again. Uttar Pradesh and Maharashtra ranked high. 2007 and 2008.19) Table 1.41 20.79 -30.86 Crime against Women : From the data of NCRB. 1609 1154 1018 3781 17 39 27 83 1389 2168 2307 5864 56. 2008) No. whereas the rape and kidnappings were on the third and fourth position respectively. with the rate of total cognizable crimes at 8.80 -28. Infact. During 2007. except in the years 2002 and 2003. of Cases Month IPC 2006 2007 2008 Grand Total % Change from 2006 to 2007 % Change from 2007 to 2008 2178 3695 4461 10334 Arms Act 1156 800 706 2662 No.1 percent in the state (Appendix VII).73 -11.41 -10. the growth rate in number of criminals convicted has been 68 percent (between 2006 and 2007) and 25 percent (between 2007 and 2008) (Table 1. In cases relating to the Arms Act. For IPC cases. Conviction yrs.4 percent during the five years period (2002-2006).29 30. Analysis of crime data relating to women reveals that a sizeable proportion of cases (38.76 Category of Punishment More Arms Death Life Less than Total than 10 Act sentence Imprisonment 10 yrs.48 6839 9853 12007 28699 44. there has been a continuous increase in the cases against women since 1996.77 6.75 25.30 -11. a glance through the national data on crime against women reveals that the states of Andhra Pradesh.

5 14. Similarly.9 4.8 2006 1.0 percent has also been recorded in the case of tribal population.5 3. Madhya Pradesh.9 16.20 : Crime against Scheduled Castes & Tribes Crime in percentage State Bihar Andhra Pradesh Madhya Pradesh Rajasthan Uttar Pradesh Gujarat Maharashtra Orissa Tamil Nadu Karnataka Jharkhand Chhattisgarh Kerala Other States 2006 9.7 2.3 3.5 3. more cases of crime against scheduled castes / tribes were reported both in 2006 and 2007 from the states of Uttar Pradesh.3 7.1 1. In this regard. Madhya Pradesh.5 SCs 2007 7. Table 1.7 4. Rajasthan and Gujarat have all recorded an increase in crime rate against the scheduled castes. Creation of Women Atrocities Cell is being planned in each district in the office of Superintendent of Police. all Superintendents of Police have been suitably sensitised to focus their efforts against such crime. the crime against scheduled castes has declined from 9.5 percent in 2007. it becomes imperative to check crimes committed against them.3 13. It may also be seen that the states of Andhra Pradesh.1 7. Therefore. 29 .7 10.1 1. Specifically.3 percent in 2006 to 7.1 3.8 4.3 3.8 11.4 18.7 6.6 14.6 6. and due to some initiatives. to meet the demands of social justice.7 3.4 15. The state government is committed towards this end.8 6. a drop in crime from 1.0 3.4 7.1 20.5 5.5 As may be observed from Table 1.9 20.9 4.6 2.The state government is quite serious with regard to atrocities against women. Crime against Scheduled Castes / Tribes: Both the scheduled castes and scheduled tribes are quite vulnerable.3 8.6 27.7 5.2 percent to 1.2 13.3 11. The CID is working in consultation with United Nations Organisation on Drugs and Crime (UNODC) to curb the women trafficking under the programme Anti Human Trafficking (AHT).20.7 25.8 4.6 STs 2007 1.1 2. Rajasthan and Andhra Pradesh.0 13.7 13.

7% Maharashtra.0% Other States.9%/14.4% Gujarat.6% Andhra Pradesh.5% Kerala.8% Rajasthan. 7. a helpline has been established at the SC/ST police station at Patna with its 30 .6%/1. 3.8%/2.1%/25.3%/4.7%/3. 3.4% Other States.5% Jharkhand. 9. 7.1%/6.4% Bihar. 13.3%/14.9% Gujarat.0% Madhya Pradesh. 13.6%/8.7% Karnataka. 1. 5. 4.5%/4.6% In order to ensure that all the crimes committed against scheduled castes / tribes are reported fearlessly to the police. 2.3% Tamil Nadu.3% Chhattisgarh.5%/18. 6. 13.7% Orissa.7%/15. 20. 4.9% Orissa. 20. 4. 1.8%/3.6%/13.2% / 1.7% Andhra Pradesh.5%/3.7% Karnataka.1%/10.5%/7.9%/3. 11. 27.7% Maharashtra.8%/5.1%/16.8% Madhya Pradesh.1%/6. 2.1% Bihar.3%/7. 3.Uttar Pradesh. 11.3% Rajasthan.

In 2006-07. 2650 uniform allowance has been sanctioned for police personnel. Rs. To Meet the terrorist attacks. Through vigorous publicity of mobile phone 31 .jurisdiction throughout the state. office of SDPOs and two posts of city SP in Patna have been created to stream line the police administration in the capital. which takes into account the promotion of Human Rights and redefines the role of the police. This is being monitored by a Superintendent of Police at the Police Headquarters. The police are also actively cooperating with the state government in undertaking various development programmes in the state. A Bihar Police Academy is being established on 133. 84. Many new police stations.28 acres of land being acquired at Rajgir (Nalanda) for the purpose. the Bihar Vigilance Investigation Bureau is functioning in heightened manner. With the active cooperation of the police. The daily allowances of home guards have also been enhanced and 20. The Bihar Police Building Construction Corporation. Police Administration The Bihar Police Act. the state government has created an ATS (Anti Terrorist Squad) which is being equipped with modern gadgets to fight in the difficult situations. Besides.987 poor and orphaned children have been admitted to schools.4 percent over 2005-06. the expenditure on police administration recorded a substantial growth of 27. The state government has taken adequate steps to modernize the police force. Officials have been deputed at this police station for 24 hours duty and they have been directed to take immediate action on any information about crime against SC/ST. a total of 1. 2007 is an important initiative taken by the state government. This endeavor by the police has made them popular among the people and they are now called 'Police uncle' by the children. has been revived. The state government is committed to zero tolerance as far as corruption cases are concerned. The state government has recruited over 7000 ex-servicemen to help the police administration. In order to have an effective control over corruption in the state.000 new volunteers have been enrolled. so far non-functional.

and also grant one rank promotion to them.5 60 Cases 2006 (ARST. during 2006 alone. creation of additional posts is under consideration. upto 31/12/08 Based on the trap cases of corruption. the numbers were 78 and 92 respectively. 10 core worth of wealth were identified and cases filed. and in 2008 (upto November). For speedy trial of trap cases. a total of only 47 trap cases were reported. various irregularities have been unearthed by the Bureau which related to State Food Corporation and its transporters. In 2007. 103 cases were registered in 2006. 277 in 2007 and 89 in 2008 (upto December). a campaign was launched to investigate cases pending since 1985. The complainants will be compensated for the amount given as bribes immediately. 133 in 2007 and 110 in 2008 (upto December). 20.92. As a result. in the cases relating to disproportionate assets. grant them 15 percent of special pay during the deputation period. The state government has decided to appoint officials in the Bureau through proper screening.1262008 (Arst. But.68) 2007 (ARSt.00 lakh has been made available to the Bureau for the purpose.numbers. The number of corruption cases investigated were 99 in 2006. In 2007. and a fund of Rs. Comparative Data on Trap Cases 120 100 108 78 80 60 40 20 0 Annual Average (19962005) 4. For strengthening of the Bihar Vigilance Investigation Bureau. more than Rs. a special court has been newly constituted. Similarly. During 1995-2005. there were 60 trap cases and 68 public servants were arrested. the Bureau could catch hold of a number of corrupt public servants based on the information obtained on these mobile phones. there were 108 trap cases and 126 arrests. 32 .

33 district jails and 17 sub-jails in Bihar (Table 1.of Cases Investigated 89 15 2007 2008 (upto 31/12/2008 Jail Administration There are 6 central jails. The jails.312) is less than capacity (12. The sub-jail at UdaKishanganj is not functional.of Corruption Cases Investigated 300 250 200 150 99 100 50 0 Annual Average (1996-2005 2006 277 No. by and large. figures reveal that the number of prisoners lodged (11.349). However. were housing much higher number of prisoners than their capacity.21). in case of the central jails.5 103 Number of Cases 2007 2008 (upto 31/12/2008 No. An examination of figures of the individual central jails brings out that the model central jail at Patna and the central jail at Gaya are having 33 .Number of Cases Registered under Corruption 133 110 140 120 100 80 60 40 20 0 Annual Average (1996-2005 2006 28.

58 68.67 26.75 Medical Related Designation 64 64 58 51 173 0 0 0 15 117 0 22 154 3200 43 43 9 10 11 12 Account Officer 13 Accountant 14 Account Clerk 15 Lower Division Clerk 16 Jail Clerk 17 Barber 18 Safai Mazdoor Total Grand Total 43 101 50 101 136 309 Other Designation 6 6 32 32 23 23 21 36 0 117 105 105 503 525 690 844 4861 8061 Source: Department of Home.11 25.74 61.00 75.11 25.00 61.16 89. Designation Vacant Vacancy in Percent Security Related Designation 57 (Including 2 Head Offices) 31 108 7 266 2247 157 0 2873 1 2 3 4 5 6 7 8 Jail Superintendent Jailor Assistant Jailor Chief Head Warder Head Warder Warder Ex.35 100.860.56 100. No. Table 1.00 100.00 100.10 87.78 — 33.00 90.13 77.64 100. But the 33 district jails taken together were having 23. Muzaffarpur and Buxar central jails were having the number of prisoners almost in accordance with the capacity.21 : Manpower in Jail Administration Already Sanctioned Post New Sanctioned Post Total Functioning Sanctioned Force Post Sl.43 76.105 prisoners. The special central jail and the central jail at Bhagalpur were having inmates much less than their capacity. Another noteworthy feature relates to the female prisoners whose number was more (885) against the capacity of only 587. (Appendix VIII).prisoners more than their capacities. Servicemen working against Warder Lady warder Special Auxiliary Police Total (A) Jail Doctor (B) Jail Doctor (Out Source) Compounder (Misrak) Dresser (Paridhapak) Total 12 93 32 284 2844 0 770 4035 57 43 201 39 550 5091 157 770 6908 33 31 64 4 210 1233 74 105 0 1754 47 0 10 13 75 0 0 0 14 87 0 22 123 1947 24 11 137 35 340 3858 52 770 5227 17 43 91 88 239 6 32 23 22 30 105 503 721 6187 42.00 95. as against the capacity of 15. Government of Bihar 34 .82 75.81 85.12 100.

the central and state contributions are in the ratio of 75 and 25. some new posts of security personnel were also created. toilets. thereby increasing the total number of sanctioned posts from 2873 to 6908. Besides the state government's contribution to the Fund. In this backdrop. there were 85. 35 . some contribution from inmates' own earnings inside jail is also planned. 32 posts of accountants and 23 posts of accounts clerks have been created. For 2005-06 and 2006-07. number of prisoners in jail is expected to rise. 75 posts were filled up (24. the personnel for security and medical care are posted at the jails. etc. a sum of Rs. out of the total sanctioned posts of 8061 in all the categories. 63. (iv) For regular monitoring and checking of the jail accounts. Even though the number of sanctioned posts has increased. 5227 posts (75.13 crore have been approved respectively. Beur. 103. In view of more convictions.43 crore has been allotted against centrally sponsored scheme of jail reforms for 5 years beginning from 2002-03. a total of 6187 posts were vacant (77 percent). (ii) Under non-plan scheme. Similarly. A number of initiatives is planned by the state government towards reforming the jail administration. watch towers. (v) A Prisoners Welfare Fund is planned to be established for providing financial help to prisoners for health care and proper treatment in the case of serious diseases like cancer and kidney failures. The amounts were meant for construction of district jails/ sub-jails. (iii) For maintaining sanitation inside the jails. a total of Rs. modern kitchens in 50 jails.67 percent) of security personnel remained vacant.86 crore and Rs.27 percent) against the total sanctioned posts of 309. 503 posts of sanitation personnel have been created. Some of these initiatives are : (i) In order to make the jail administration more effective.43 percent vacant posts against the total sanctioned post of 844. Thus. One Jail Reforms Institute has been established at the Model Central Jail. For the scheme. installation of hand pumps. 6 posts of accounts officers. measures are being taken to appoint/ depute officers and staff against the existing vacancies.For proper security and care of the jail inmates. In the accounts and other sections. 179. prisoners cells. under medical posts. Patna. warden and guard barracks.

provisions have been made for video conferencing. (xi) The prisoners are also imparted training in the art of living. Patna is also underway. (xii) For the children living with women prisoners. 10 and Rs. The prisoners are imparted training in the trades and they are paid @ Rs. yoga. (xiii) There is also a Public Grievances Cell for the jails and one officer has been nominated for the purpose. etc. In 2007-08. scanner. the Jails Department had a revenue of Rs. and security equipments like metal detector. In the remaining jails. this is being taken up in 200809. tripoline. there are workshops for manufacturing of prisoners' clothes. medium and hard work rendered by them. in collaboration with Yoga School at Munger for their physical and moral development. 1. (x) In all the central and in a few of the district jails. blankets. 12 per day depending upon the light. walki-talkies. soaps. The printing machines. 9. The state is particularly vulnerable to two kinds of disasters – floods and earthquakes. masala grinding machines. (vii) In order to ensure the security of jails. tents. handloom for blanket weaving. there is a provision for separate utensils and bottles for milk feeding. 36 . The establishment of a Bakery Plant in Beur jail.(vi) The recommendations of Women and Children Development Committee of the Bihar Legislative Assembly are being implemented for prevention of exploitation and torture of female and child prisoners. The children are also given vaccines. etc. (ix) An open jail is planned to be constructed at Buxar and for this a sum of Rs. black and white TVs have been installed in the jails and. 4. etc. Rs. in 12 jails. carpets. etc..35 crore from the sale of the items prepared by jail inmates.10 crore has been approved. close circuit TVs. (viii) Electric fans. LPG cooking system has been introduced.5 Disaster Management Bihar has been historically prone to many disasters. are being introduced in some of the jails and necessary training for skill development is are imparted to the prisoners. 8.

Earthquake Bihar is bounded on the north by the Himalayan Frontal Thrust. Gopalganj. Madhepura and Darbhanga). Bhagalpur. The earthquake on January 15. Patna lies in Zone IV and has a population more than 17 lakhs. Lakhisarai. Jamui. Samastipur. Supual. Muzaffarpur. Tremors were felt all over the Indian subcontinent. Any earthquake striking this city can turn into a major disaster. Munger. as far as Mumbai and even Kerala. 20 in Zone IV (East Champaran. 37 . Purnea. Saran. Dharbhanga and Munger. 1934 which affected both India and Nepal had an intensity of 8.22. Sheohar. Siwan. Katihar. Khagaria. Sheikhpura. Madhubani. Eight districts lies in Zone V (Sitamarhi. Motihari. Close to 10.0 on Richter scale. Saharsa. Banka. Patna and Nalanda) and the rest in Zone III. Araria. Other earthquakes which occurred in the state are listed in Table 1. Begusarai. Vaishali. West Champaran.700 people were killed in north Bihar and caused heavy damage in the towns of Muzaffarpur. Some of the major earthquakes of India have occurred in Bihar which lies in a high seismic zone.

though of varying intensity.10.5 5.23).014 houses were damaged.0 7.490 sq. 2004. 1450 animals died. 2002. 1998.7 5. The total area affected by floods has also increased over the years.800 sq. Bihar witnessed high magnitudes of floods.8 Floods Floods are a regular annual calamitous event in Bihar. 1987.0 6. with about 73.382 were in Madhubani (Table 1. A total of 489 persons died in the floods while 160.0 6. This area has recorded the highest number of floods during the last 30 years.) being flood prone. kms. The highest number of deaths were in Darbhanga (74).22 : Earthquakes in Bihar Intensity Date Affected Area in Richter Scale 04 June 1764 23 Aug 1833 23 May 1866 23 May 1866 30 Sept 1868 07 Oct 1920 15 Jan 1934 11 Jan 1962 21 Aug 1988 Bihar WB Border Nepal Border Nepal Border Jharkhand Bihar Border Hazaribagh Bihar –UP Border Indo – Nepal Border Indo – Nepal Border Bihar Nepal Border 6. when a vast area of 23. In the years 1978. In 2002. In addition. A total of 9. In this flood. 2007 and 2008.11 lakh persons were affected by it.26 lakh hectares of cropped area was affected. the floods in Bihar had affected 25 districts.06 percent of its area (68. The plains of north Bihar are particularly vulnerable to floods and 76 percent of its population is flood prone.0 5. out of which 671 died in Samastipur alone.7 7. 38 .Table 1.19. The flood of 2004 demonstrated the increasing intensity of the problem in the state. out of which 2.5 8. kms. Bihar is India’s most flood-prone state. 4. in 20 districts of north Bihar were affected by flooding of Bagmati.

19 lakh persons were affected by it.47 3.96 26.02 0.23 : Overview of 2002 Floods in Bihar District Muzaffarpur W.44 0. Table 1.31 24.11 Cropped Area (In lakh hec.02 1.25 0:15 1.3 0.07 0 0.37 0.500 were in Araria (Table 1.93 2.32 0. The highest number of deaths were again in Darbhanga (251).7 5.01 0.04 0.99 lakh hectares of cropped area was affected.26 0.Kamala and Adhwara group of rivers.99 3.52 0 0.79 6.02 0.05 0.23 0. A total of 885 persons died in the floods while 213.18 0. A total of 13.63 1.09 0. Out of a total of 9. Champaran Sitamarhi Sheohar Saran Siwan Gopalganj Darbhanga Samastipur Madhubani Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Begusarai Khagaria Lakhisarai Bhagalpur Patna Nalanda Sheikhpura Total Persons (In lakh) 10. 2.85 2. Champaran E.53 4.53 0.24).3 0.06 0.23 0.7 22.8 0.13 6.39 6.98 2.259417 Houses damaged 4108 4200 2861 30812 30456 36 4109 8161 36235 38676 210382 8072 4406 37 3139 7332 3135 9746 1006 7207 479 322 0 685 3412 419014 Lives lost Human 41 0 1 47 20 15 4 42 74 86 35 20 5 2 6 22 0 5 10 47 0 0 0 7 0 489 Animal 85 152 0 15 55 22 2 56 23 671 102 2 2 0 0 1 0 252 6 4 0 0 0 0 0 1450 39 .19.48 0.26 12.773 houses that were damaged. Further.41 0.004 0.66 160.98 5.) 0.005 9.4 0.71 0.29.15 7. 3292 animals died in the floods out of which 718 died in Sitamarhi alone.83 2.

6 0.44 28.58 213.61 0.45.45 0.09 9. 40 . Champaran W.31 1.56 0. the entire north Bihar was hit by severe floods due to heavy rainfall in catchments of nearly all the rivers.47 0.Table 1. Champaran Vaishali Darbhanga Madhubani Samastipur Shaharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Khagaria Begusarai Bhagalpur Gopalganj Total Persons (In lakh) 16. 1287 persons had died with the highest death toll in Samastipur (201).12 29.29 18.89 32.35 1.5 2.45 0. There were 28 breaches at different locations of the embankments during 2007 flood season.21 5.17 20.28 0.9 0.25 0.19 Cropped Area (In lakh hec.517 house damages in Madhubani (Table 1.05 13.89 0.04 0.14 6.02 0. and 22 districts were affected.34 1.06 16.74 4.) 0.94 2.22 3.48 6.06 6.73 0.99 In 2007.24 : Overview of 2004 Floods in Bihar Number of Houses damaged 40103 118903 41300 52365 652 1093 117202 122205 70999 5996 15131 4790 2245 219500 9690 2830 68500 27257 9012 0 929773 Lives lost Human 91 102 25 15 0 0 251 93 161 8 7 18 6 14 4 19 39 10 20 2 885 Animal 168 718 33 534 0 0 664 579 350 0 3 42 8 32 0 0 125 8 28 0 3292 District Muzaffarpur Sitamarhi Sheohar E. The scale of human deaths has also been increasing with every flood in Bihar. The number of houses damaged was 742330 with 1. In 2007 floods.25).2 0.01 0.67 0.49 1.18 0. The loss to cropped area was 10.60 lakh hectares.59 5.81 0.

Table 1. This covered 928 Panchayats and 2. 608 persons died with the highest death toll in Madhepura (270).207 houses damaged in Supaul (Table 1.01 19. In this flood.69 0.37 0.65 2.54 37.00 0.60 In 2008.27 0.08 7.04 10.41 0.8 0. 41 .5 1.19 0.25 : Overview of 2007 Floods in Bihar District Muzaffarpur Sitamarhi Shaohar E.7 0.50 10.88 0.07 14.81 0.01 5.14 0.47 3.70 lakh hectares.78 0.14 6.13 0.42 0. In all.12 0.26).) 0. there were 19 districts affected by floods.1 246.95.041 with 1.534 villages. The number of houses damaged was 2.12 0.37 33.31 0.48 6.61 18.4 1.00 Houses damaged 37450 90318 50728 71564 21201 4 l998 83489 145517 56397 14024 11671 2100 716 99 2312 3701 0 55457 16760 36720 18385 23721 742330 Lives lost Human 154 59 10 122 22 47 158 89 201 42 1 19 0 0 37 13 0 5 20 155 92 41 1287 Animal 882 201 4 151 4 78 378 59 64 0 0 0 0 0 2 0 0 0 21 290 289 0 2423 7. Champaran Vaishali Darbhanga Madhubani Samastipur Shaharsa Supaul Madhepura Purnea Araria Katihar Gopalganj Siwan Patna Nalanda Khagaria Begusarai Bhagalpur Total Persons (In lakh) 32.79 1. Champaran W.73 0.63 28.05 0.27 0.39 3.58 6. 117 out of 533 blocks were inundated.25 0.30. The loss to cropped area was 2.003 0.64 Cropped (In lakh hec.

Kuchha =& Jhopadi) No of Persons Evacuated No of Human Death No.274 Cropped Area (In lakh hec.0002 0.43 0. Five districts in the state bore the brunt of the floods with severe damages that led to the declaration of the flood as a National Calamity.49 6.005 0.) 0.64 6.06 0. the Kosi unleashed its destructive powers as the river breached its left embankment at Kusaha.58 0.78 4.37 0. of Villages Affected Population Affected No. on August 18. 2008.00 0.2 1.58 0. of Families Affected Livestock Affected Area Affected (Lakh Ha) No.29 0. Champaran Khagaria Seikhpura Saran Begusarai Bhagalpur Vaishali Kishanganj Bhojpur Saharsa Supaul Madhepura Purnea Araria Sitamarhi Total Kosi Flood 2008 While the state was yet to recover from the 2007 floods.00 1.00 50. of Panchayats Affected No.00 0.49 0.69655 Houses damaged 4 1243 206 1571 74 1626 3 441 0 1536 1279 428 0 26124 130207 114545 7682 8439 0 295401 Lives lost Human 12 3 23 2 0 5 14 0 0 16 3 3 3 40 211 270 1 2 0 608 Animal 0 0 0 0 0 24 0 0 0 0 0 0 0 0 0 0 0 0 4 28 District Muzaffarpur Patna Katihar Nalanda W.75 1.30 0.00 0.06 0.02 0.28 0. Table 1.83 6.71 14. of Livestock Death Supaul 5 65 178 670709 186661 132500 1 130207 370000 211 97 Madhepura 11 140 370 1419856 374798 303640 2 114545 335110 272 3322 Araria 4 71 141 626062 140895 80000 0 8439 107937 2 0 Saharsa 6 59 169 448796 130000 161000 0 26124 115945 44 22 Purnea 9 77 140 164000 41645 35000 0 7562 65000 1 0 Total 35 412 998 3329423 873999 712140 3 286877 993992 530 3441 42 . of House Damage (Pucca.12 0.99 0.00 2.20 0.10 0.00 0.40 0.Table 1.00 0. twelve kilometers upstream the barrage.26 : Overview of 2008 Floods in Bihar Persons (In lakh) 1.14 0.27 : Overview of Kosi Floods 2008 Detail No of Blocks Affected No.41 1.39 0.15 0.2 1.

Health Services. Likewise. Supaul. the state is set to face a major output loss.69 lakh hectares is agricultural land (Table 1. About 251 kms. even more significant aspect of damage is the indirect damage done to the economy of the affected region. This loss of output. out of 782. An area of 3 lakh hectares has been affected while about 2.29 million people have been affected. Kosi Floods : Relief Measures  855 volunteers with boats from the local administration and the National Disaster Response Force was deployed along with 35 columns of military and 11 Air Force Helicopters 1000 boats were deployed for rescue and relief work 350 mega camps were established lodging 4.28 provides an overview of foodgrain. with the numbers likely to go up. Similarly. About 92 percent of the existing rural road network of the five affected districts (721. is of immediate importance to the lives of millions affected. massive damage has been done to power infrastructure in those five districts. as well as adjoining districts of Katihar. 351 bridges/ culverts have been completely damaged in the affected districts. as people return to their villages.5 kms.93.) has been damaged.The resulting floods have affected 35 blocks of five districts of the state (Saharsa.877 houses have been damaged.27). The financial damage done by the Kosi floods is not limited to loss of infrastructure and cost of relief and rehabilitation alone. 43    . cash and kits distributed in the aftermath of the Kosi disaster for immediate relief. Anganwadi centres. of state highways and major district roads and 61 kms of national highways in these districts have also been damaged. Araria and Purnea). In fact.84 lakh hectares has suffered siltation. The deluge has so far taken 530 human lives. drowning 412 panchayats and 998 villages. A total of about 33. Table 1.5 lakh flood victims Holistic convergence of services for a full and normal life in camps ensured through schools. Madhepura. Kishanganj and Bhagalpur. Likewise. Vocational Training & Sports and Cultural activities. Due to severely damaged infrastructural capacity. of which about 9.2 kms.992 had to be evacuated. An area of about 2. as their basic existence was threatened because of these losses. educational and health infrastructure in the affected areas too has been severely damaged. of which 2. while important for the state’s overall economy.86. and a badly dented agricultural production capacity (due to sandy-silt deposition on the fields).

605 44 . repair and reconstruction of public buildings.00 2002 634992 6757.50 3550 305.05 0.50 4982.00 5777. Supaul 145157 3283 53844 Madhepura 353877 8351 66435 Araria 168282 3357 42541 Saharsa 111020 2493 20804 Purnea 87955 1609 14412 Total 866292 19095 198036 Kosi Calamity : Rehabilitation and Reconstruction Policy Kosi Rehabilitaion and Reconstruction Project is a comprehensive multi-sectoral project for the people affected by the calamity to      reconstruct the houses provide community facilities restore and develop infrastructure provide livelihood support based on sustainable economy and environment ensure social development and empowerment The main components of the project are housing.28 : Highlight of Relief Work for Kosi Floods Detail Foodgrain Distributed (In Qntl) Cash Distributed (In Lakh) No.15 93364.50 2008 upto (22-12-08) 1098344.03 15582.79 3604.22 11355.29 : Overview of Flood Relief Work in Bihar Detail Foodgrains distributed (quintals) Total Allocation for Flood Relief (Rs Lakh) of which Foodgrains Cash Grants Agricultural Input Subsidy Ex-gratia payment for human deaths Compensation for house damage 1998 794475 17817 9647. social and physical infrastructure.86 35079.74 4505. temporary shelter construction.16 87 2007 4685707.00 225 263 2004 843145 23132.50 22442.00 926. social and community development. livelihood programmes.M. of Kits Distributed from C. removal of debris.F. Table 1.R.00 786.68 0 169.35 596 276.Table 1.00 11123.75 7500.81 14000.25 57353.

Since only little control is there over the first two options. It is estimated that desilting/ dredging would cost Rs. 5098 crores over five years. the immediate measures within the control of the state government are dredging of rivers and inter-basin transfers. these will be provided with proper search and rescue equipments at a cost of Rs. One battalion of Bihar Home guards is also to be trained for disaster management. The emphasis on agricultural input subsidy and compensation of house damage in 2007 and 2008 shows that. 2000 ex-service men (SAP) are to be recruited and trained. masons. there will also be IEC (information. One battalion of NDRF should be stationed at Patna. and the cost of interlinking rivers will be Rs. at a cost of Rs. the concern of rehabilitation of lives and livelihood underlines the allocations.47 acres of land at a cost of Rs. Over the years embankments have been constructed alongside the above river systems. short films. but the continuous load of silt being carried down has reduced the sustainability of these embankments. but spread over fewer districts than in 2007. Further.Table 1. 75 crore. The allocation in 2008 is in proportion to the scale of floods which was much more intense. Preparing for the Future As regards floods.29 provides an overview of flood relief allocation in the state since 1998. Saharsa and Darbhanga.3580 crore over five years. In addition. education and communication) materials like pamphlets.60 crore. documentary. hoardings. In addition. for which 74. 27 crore has been acquired. etc for self-constructed houses. There will also be fire-fighting support in each block (439) at a cost of Rs. Finally. Other measures for effective disaster management include : 45 . Sustainability is planned to be improved by (a) treatment of the catchments area in Nepal. For earthquake. (c) dredging of rivers. (b) dams across the rivers in the higher reaches. builders. four battalions of State Disaster Response Force (SDRF) would be constituted at Begusarai. 511 crore (as per NDRF norms). and (d) inter-basin transfers. the proposed measures are training of engineers. going beyond immediate relief. 560. since the Fire Stations will be the nodal agency for rescue during earthquake and fire. officials of urban local bodies in earthquake resistant construction. several measures have been planned to mitigate the situation. Muzaffarpur. The state government also proposes to raise a specialist response team for different kinds of disasters. architects.

(iv) Warehouses will be constructed at Patna.00 lakh. Purnea and Darbhanga for storage of relief materials like tent. the estimated cost is Rs.00 lakh per district) and equipment (Rs. 35. (iii) Emergency Operation Centre (EOC) will be established in all the 38 districts. The total cost of 1 warehouse.38 crore.00 crore). The land area of these community centres will also be raised to serve as helipad for emergencies. it will be used for school / community purposes. with 10. 19.00 crore) and training (Rs. The coverage will be extended to all vulnerable districts. 2. 9.50 crore (Rs.00 lakh per district) would be Rs.fts. 35 crore.80 crore. 6. equipment (Rs. 6. distributed among transport (Rs. 46 . At the state level. 45.fts. 5.30 crore (excluding land cost). It is proposed to construct 500 such shelters per year. would be Rs. at a tentative cost Rs.80 crore. (v) The Civil Defense organization will be strengthened. training. (vii) Multi-purpose community hall-cum-shelter will be built in each major habitation. 5. Arrangements will be made for integration of the working of PRIs and Civil Defence organisations.80 crore). 6. The double-storied building will have a floor area of 4000 sq.90 crore per district. and it will be earthquake resistant. 2. equipment etc. The total cost of building (Rs. mock drill. In normal time. Muzaffarpur.(i) 10 motor boats for each district will be provided to 28 flood prone districts.000 ton capacity on an area of 6000 sq. prefabricated shelter. (vi) The PRIs would be provided funds for disaster preparedness like vulnerability mapping. At the district level. it is estimated to cost Rs.00 lakh per helipad). 9. The estimated cost of one shelter is Rs. etc. at a cost of Rs. The state government will also construct 50 helipads in selected places for rescue and relief work. 1. (ii) One helicopter for immediate deployment of NDRF/SDRF as well as for air dropping of relief material and deployment of personnel will be acquired at a tentative cost of Rs.

62 14.89 42.27 -11.00 75.47 -34.02 -16.76 1.13 -10.86 -40.08 -56.56 -42.51 2005 2006 2007 2008 Patna 436 387 320 341 Nalanda 158 137 121 120 Bhojpur 158 127 107 108 Buxar 68 53 35 49 Rohtas 107 102 89 112 Bhabhua 57 59 55 43 Gaya 158 158 157 141 Nawada 78 77 75 79 Aurangabad 58 82 67 70 Jehanabad 52 39 38 35 Arwal 28 22 17 28 Saran 118 106 85 75 Siwan 89 93 74 99 Gopalganj 74 72 48 74 East Champaran 107 119 111 120 Bagha 40 48 34 27 West Champaran 68 72 61 67 Muzaffarpur 130 134 149 138 Vaisali 60 99 120 106 Samastipur 62 45 51 72 Sheohar 10 16 23 9 Darbhanga 41 62 76 72 Sitamarhi 121 102 74 81 Madhubani 69 62 76 56 Saharsa 17 44 50 30 Madhepura 52 60 68 34 Supaul 34 31 36 39 Purnea 113 57 90 71 Katihar 78 59 63 63 Araria 62 63 48 50 Kishanganj 25 18 23 32 Bhagalpur 101 119 92 90 Banka 49 65 46 70 Naugachhia 52 35 30 31 Munger 103 74 74 88 Sheikhpura 33 25 19 19 Lakhisarai 52 47 35 40 Jamui 81 66 44 35 Khagaria 47 53 48 55 Begusarai 121 87 96 101 Railway (Patna) 15 16 15 25 Railway (Jamalpur) 7 5 7 9 Railway (Muzaffarpur) 23 18 10 17 Railway (Katihar) 11 10 6 8 Total 3423 3225 2963 3029 Source: Department of Home.79 -24.00 12.71 -37.23 -19.35 28.65 -27.57 -26.06 -18.24 0. Government of Bihar 47 .69 -32.38 -14.44 11.94 4.15 76.67 -24.Appendix I : Murders in Bihar District No. of Murders Drop (-)/ Increase(+) between 2005 and 2008 -21.05 -31.67 16.50 -1.09 -27.69 0.00 -36.28 20.56 -10.61 -33.42 -23.15 -32.17 -19.53 66.67 28.79 17.00 -10.84 76.47 6.

00 -42.00 -45.33 -68.43 -53.55 -36.00 -81.42 -50.67 -58.79 -41.39 -75.33 -69.25 -73.Appendix II : Dacoity in Bihar No.00 -69.84 Patna 127 Nalanda 41 Bhojpur 32 Buxar 30 Rohtas 23 Bhabhua 18 Gaya 112 Nawada 19 Aurangabad 21 Jehanabad 35 Arwal 10 Saran 50 Siwan 51 Gopalganj 10 East Champaran 52 Bagha 1 West Champaran 26 Muzaffarpur 47 Vaishali 14 Samastipur 20 Sheohar 11 Darbhanga 25 Sitamarhi 19 Madhubani 45 Saharsa 6 Madhepura 17 Supaul 39 Purnea 38 Katihar 19 Araria 37 Kishanganj 15 Bhagalpur 14 Banka 33 Naugachhia 6 Munger 19 Sheikhpura 4 Lakhisarai 8 Jamui 38 Khagaria 12 Begusarai 9 Railway (Patna) 15 Railway (Jamalpur) 10 Railway (Muzaffarpur) 11 Railway (Katihar) 2 Total 1191 48 .23 -27.00 -70.00 -57.89 -51.00 -12.31 -34.46 500.21 -15.67 11. of dacoities District 2005 2006 87 27 32 28 20 30 72 7 23 16 2 41 37 25 42 9 14 50 19 34 2 25 12 50 1 16 7 21 8 43 7 14 17 4 19 5 6 25 14 7 18 7 15 9 967 2007 58 16 10 12 7 7 48 8 30 11 4 33 22 11 25 4 12 31 9 24 1 9 13 17 7 10 9 28 9 40 11 15 20 2 5 3 5 14 8 6 11 10 3 8 646 2008 63 10 14 8 22 3 34 8 23 15 1 29 15 16 32 6 8 34 13 26 5 16 8 22 13 7 3 25 16 49 7 10 14 1 6 2 7 13 7 10 9 8 2 5 645 Drop(-) / Increase (+) between 2005 and 2008 -50.14 -90.33 -28.59 60.79 32.11 -40.00 -54.57 -57.00 -38.50 -65.14 30.82 -92.11 116.89 9.58 -83.64 -57.52 -57.61 -56.66 -7.00 -20.33 -4.82 150.35 -83.

Appendix III : Robbery in Bihar No.88 -32.92 -22.00 125.00 -54.43 -5.29 -36.36 -57.00 -44.64 -24.44 -54.46 -16.35 15.00 -41.05 -32.38 71.67 -6. Government of Bihar 49 .21 -57.77 -35.16 -14.69 140.81 -64.24 275.57 -71.14 -66.00 -13.00 -45.75 -32.41 -13.30 150.35 -25.10 -30.44 Patna 635 Nalanda 91 Bhojpur 46 Buxar 35 Rohtas 26 Bhabhua 18 Gaya 129 Nawada 31 Aurangabad 27 Jehanabad 35 Arwal 14 Saran 60 Siwan 122 Gopalganj 53 East Champaran 66 Bagha 4 West Champaran 30 Muzaffarpur 91 Vaishali 52 Samastipur 15 Sheohar 4 Darbhanga 18 Sitamarhi 61 Madhubani 33 Saharsa 28 Madhepura 38 Supaul 35 Purnea 96 Katihar 34 Araria 44 Kishanganj 10 Bhagalpur 58 Banka 14 Naugachhia 16 Munger 64 Sheikhpura 14 Lakhisarai 33 Jamui 42 Khagaria 39 Begusarai 53 Railway (Patna) 28 Railway (Jamalpur) 9 Railway (Muzaffarpur) 15 Railway (Katihar) 13 Total 2379 Source : Department of Home.29 -71.67 -30.74 -19.91 70. of robberies District 2005 2006 535 56 57 35 37 16 100 24 34 16 7 80 100 40 55 7 38 102 59 33 3 25 50 21 34 40 24 70 14 48 11 50 18 15 47 16 13 60 31 52 30 5 22 8 2138 2007 381 48 42 29 20 19 90 17 26 16 4 82 71 32 41 10 15 70 51 28 0 20 42 16 55 34 36 47 26 50 11 31 27 12 38 11 19 21 26 65 10 10 16 14 1729 2008 311 23 44 25 49 15 70 25 20 18 4 57 55 41 50 15 21 50 35 36 9 10 28 23 70 33 30 27 23 51 17 34 24 5 43 5 21 18 17 46 12 3 14 9 1536 Drop(-)/ Increase(+) between 2005 and 2008 -51.93 -48.35 -28.67 -45.14 -56.57 88.73 -4.00 -30.43 -68.02 -74.

00 -50.00 -100.00 -66. of kidnappings for ransom 2006 28 5 5 10 1 3 9 6 1 2 0 7 8 4 10 27 16 4 2 2 0 4 2 0 1 0 0 1 3 0 0 3 1 1 3 1 4 5 4 7 2 0 2 0 194 2007 14 0 0 1 0 1 1 6 2 0 0 0 7 2 7 5 1 5 6 2 0 1 2 0 2 5 0 0 2 0 0 2 2 1 3 1 1 3 0 2 1 0 0 1 89 2008 13 0 0 4 3 2 2 1 0 0 1 0 5 4 7 3 3 2 0 0 0 1 0 1 2 0 1 0 0 0 0 4 0 0 0 1 1 3 0 2 0 0 0 0 66 Drop(-)/ ncrease(+) between 2005 and 2008 -48.67 -100.00 33.00 -100.00 -33.00 -100.00 -100.00 -83.00 -50.00 -100.00 -100.00 0.00 -100.00 -73. Government of Bihar 50 .00 -50.43 -91.00 -100.67 -100.00 -100.00 0.33 -100.00 -100.42 -83.00 100.00 -75.00 -71.71 Source : Department of Home.00 33.00 -50.33 -77.33 -90.00 -100.00 -66.Appendix IV : Kidnapping for Ransom in Bihar District 2005 Patna Nalanda Bhojpur Buxar Rohtas Bhabhua Gaya Nawada Aurangabad Jehanabad Arwal Saran Siwan Gopalganj East Champaran Bagha West Champaran Muzaffarpur Vaishali Samastipur Sheohar Darbhanga Sitamarhi Madhubani Saharsa Madhepura Supaul Purnea Katihar Araria Kishanganj Bhagalpur Banka Naugachhia Munger Sheikhpura Lakhisarai Jamui Khagaria Begusarai Railway (Patna) Railway (Jamalpur) Railway (Muzaffarpur) Railway (Katihar) Total 25 16 3 8 6 4 7 12 1 3 2 6 5 3 31 18 30 12 3 4 3 3 4 4 1 0 1 6 1 1 1 3 1 1 0 1 3 12 2 3 0 0 1 0 251 No.67 -75.33 -100.33 -100.00 0.00 -100.

of dacoities 51 .00 Nalanda 5 11 6 4 -20.00 Bhagalpur 6 9 5 6 0.44 Khagaria 9 12 3 5 -44.43 Vaishali 7 6 5 2 -71.00 Jamui 9 8 5 5 -44.33 Buxar 13 8 4 5 -61.00 Jehanabad 6 3 4 1 -83.00 Darbhanga 1 2 1 2 100.54 Rohtas 10 7 3 11 10.56 Aurangabad 2 10 13 10 400.00 Gaya 13 16 10 5 -61.00 Bhabhua 7 9 3 0 -100.00 Saran 7 3 5 3 -57.00 Lakhisarai 3 0 2 3 0.00 Araria 2 2 7 7 250.00 Sheikhpura 1 0 0 1 0.44 Begusarai 3 6 3 7 133.00 Banka 9 7 6 1 -88.54 Nawada 9 3 5 4 -55.00 Kishanganj 2 0 0 1 -50.82 Source : Department of Home.00 Bhojpur 12 11 2 5 -58.14 Siwan 5 4 2 4 -20. Government of Bihar District Appendix V : Road Dacoities in Bihar No.00 Madhubani 0 5 1 0 Saharsa 0 0 4 5 Madhepura 0 3 1 3 Supaul 5 3 2 0 -100.Drop(-)/ Increase(+) between 2005 2005 2006 2007 2008 and 2008 Patna 25 21 22 11 -56.86 Bagha 0 2 2 4 West Champaran 1 3 1 1 0.00 Munger 15 12 4 3 -80.33 0 0 0 0 Railway (Patna) 0 0 0 0 Railway (Jamalpur) 0 0 0 0 Railway (Muzaffarpur) 0 0 0 0 Railway (Katihar) Total 224 211 151 146 -34.00 Purnea 9 4 0 4 -55.00 Muzaffarpur 7 7 8 2 -71.00 Gopalganj 1 2 4 5 400.43 Samastipur 0 2 1 1 Sheohar 1 0 0 1 0.56 Katihar 5 0 2 3 -40.33 Arwal 2 0 0 1 -50.00 Sitamarhi 2 1 3 0 -100.89 Naugachhia 3 3 1 0 -100.00 East Champaran 7 6 1 10 42.

73 -3.57 -3.68 -100.75 146.03 116.00 0.78 9.00 -55.00 -48.33 -33.69 18.89 -72.00 -33.00 -100. Government of Bihar Drop(-)/ Increase(+) between 2005 and 2008 -51.56 -5.78 50.65 150.43 20.86 -25.96 -17.00 3.31 -56. of robberies District 2005 2006 2007 2008 Patna 296 229 216 143 Nalanda 28 25 21 8 Bhojpur 29 35 32 35 Buxar 16 20 18 19 Rohtas 13 29 15 32 Bhabhua 10 11 7 10 Gaya 69 69 61 39 Nawada 17 16 8 16 Aurangabad 13 26 20 16 Jehanabad 22 9 5 11 Arwal 9 6 1 4 Saran 40 60 60 38 Siwan 96 87 56 49 Gopalganj 34 32 26 28 East Champaran 46 40 29 25 Bagha 2 2 5 5 West Champaran 15 12 8 10 Muzaffarpur 54 57 47 36 Vaishali 34 47 38 22 Samastipur 9 8 14 2 Sheohar 2 1 0 3 Darbhanga 15 15 15 2 Sitamarhi 36 41 33 15 Madhubani 21 14 8 16 Saharsa 21 23 42 48 Madhepura 26 38 28 25 Supaul 24 23 26 22 Purnea 56 59 30 18 Katihar 20 7 13 15 Araria 33 38 41 34 Kishanganj 6 6 9 13 Bhagalpur 34 17 20 17 Banka 9 7 21 17 Naugachhia 11 10 6 3 Munger 33 20 25 32 Sheikhpura 9 9 7 2 Lakhisarai 11 8 14 12 Jamui 26 38 15 15 Khagaria 23 21 17 10 Begusarai 38 36 48 29 1 0 0 0 Railway (Patna) 0 0 1 0 Railway (Jamalpur) 2 0 2 0 Railway (Muzaffarpur) 1 0 1 1 Railway (Katihar) Total 1310 1251 1109 897 Source : Department of Home.48 -5.00 -31.67 -58.52 -23.69 -71.09 -42.33 -23.65 -45.Appendix VI : Road Robbery in Bihar No.00 -86.81 128.85 -8.88 23.33 -67.53 52 .03 -77.15 0.08 -50.00 88.00 -43.67 -50.33 -35.29 -77.

5 4.7 26.1 5 14.2 8.5 23.2 0.1 25.7 396.6 197.Appendix VII : Incidence & Rate of Crime Committed Against Women In States.2 34.5 18.1 0.0 0.8 340.6 30.3 8.5 1.3 65.9 296.5 7.2 263.3 9.7 7.0 4.1 2.1 2.3 569.2 11. No.7 10.5 2.3 11.0 0.5 23 22.4 10.6 1. UTs (2007) Rank as per Percentage Estimated Rank as Rate Of Total Rate of Contribution Mid-Year per Cognizable total To All-India Population percentage cognizable Crimes Total (In Lakhs) # share crimes 13.9 97.6 1059.0 4.9 16 558.6 8.2 22.1 10.7 15.6 11365.0 816 11.1 5.6 11.1 16.1 11.3 15.4 94 871.1 0.9 639.5 2.0 56 230 18 11 4804 5 179 5303 185312 20 8 31 33 3 29 13 30 23 33 34 14 35 26 # Total Population including women 53 .7 4.2 9.7 11.7 0.6 0.8 3.7 19 16.8 19.1 7.0 0.1 8.3 0.8 30.8 11.4 1.8 26.3 2 16 4 28 14 34 18 10 15 9 24 23 5 6 19 30 32 17 35 12 26 7 27 21 1 25 22 11 1 25 12 10 16 29 7 15 22 19 17 13 8 4 5 24 27 28 32 11 18 6 31 9 21 2 20 3 Sl.7 21.6 20.0 4.1 0.9 1.0 3.4 16.8 15.2 928.0 2.5 1.5 14.9 660.8 22 7 6 28.1 3.3 0.9 100.1 0.8 167.1 0.1 121 297.1 0.1 13. State / UT Incidence States 1 Andhra Pradesh 2 Arunachal Pradesh 3 Assam 4 Bihar 5 Chhattisgarh 6 Goa 7 Gujarat 8 Haryana 9 Himachal Pradesh 10 Jammu & Kashmir 11 Jharkhand 12 Karnataka 13 Kerala 14 Madhya Pradesh 15 Maharashtra 16 Manipur 17 Meghalaya 18 Mizoram 19 Nagaland 20 Orissa 21 Punjab 22 Rajasthan 23 Sikkim 24 Tamilnadu 25 Tripura 26 Uttar Pradesh 27 Uttarakhand 28 West Bengal Total states Union territories: 29 A & N Islands 30 Chandigarh 31 D & N Haveli 32 Daman & Diu 33 Delhi 34 Lakshadweep 35 Pondicherry Total (UTS) Total (all -India) 24738 185 6844 7548 3775 80 8260 4645 1018 2521 3317 6569 7837 15370 14924 188 172 151 32 7304 2694 14270 55 7811 1067 20993 1097 16544 180009.8 16.8 11168.0 0.5 0.3 0.3 233.0 0.1 684.8 235.8 1885.2 6.

Betia D.3 84.6 92.0 13.J.7 72.3 118.3 295. Bhagalpur D.7 404. Sasaram D. to Capacity M F Total 114.4 34.7 301.3 156.0 110.7 485.5 321.6 93.7 91.7 (Contd.8 110.0 131.J.0 130.1 13.J.7 112. Araria D.7 113.6 213. Supaul D.J. Begusarai D.J. Darbhanga D.) M 2260 1992 1126 3288 1962 1464 12092 1388 489 262 728 621 391 860 719 200 639 83 400 150 474 0 700 0 547 662 947 960 211 286 500 126 450 432 160 664 180 184 726 134 15273 54 .5 130.8 266.2 43. Jehanabad Total Capacity F 100 143 0 0 0 14 257 35 20 24 25 25 10 20 40 18 25 2 12 6 25 83 0 0 10 12 10 10 10 23 50 12 32 7 2 20 3 4 6 6 587 No.2 179.J.5 98.7 126.1 383.4 82.0 145. Biharsharif W.J.0 137. Saharsa D.0 625. Munger D.0 82.9 350.J.7 146.J.4 144. Ara D.0 156.9 131. Bhagalpur C.5 850.0 211.J.J.J.0 186.J.J.6 104. Aurangabad D.7 400. J. Jamui D.9 144.1 68. Phulwarisharif D.9 108.J. No.5 108.9 190.7 74.6 275.5 68.0 85.0 146.J.0 75.7 183. J.3 402.J.8 145.4 97.J.3 340. Katihar D.7 138.2 225. Sheikhpura D.0 113.8 290.J.5 441. of Prisoners Total M F Total 2360 2588 89 2677 2135 2066 100 2166 1126 1124 0 1124 3288 2010 0 2010 1962 1344 0 1344 1478 1928 63 1991 12349 11060 252 11312 1423 1290 38 1328 509 766 30 796 286 620 25 645 753 949 36 985 646 519 15 534 401 574 29 603 880 863 68 931 759 686 39 725 218 852 30 882 664 1364 43 1407 85 515 17 532 412 1190 53 1243 156 208 6 214 499 851 27 878 83 0 92 92 700 509 0 509 0 0 0 0 557 1006 35 1041 674 957 33 990 957 1241 40 1281 970 765 39 804 221 272 19 291 309 572 19 591 550 592 17 609 138 392 16 408 482 568 14 582 439 488 6 494 162 514 12 526 684 497 18 515 183 725 8 733 188 625 13 638 732 596 23 619 140 654 25 679 15860 22220 885 23105 % of Nos. Patna C. Hajipur D.0 105.9 297.0 16.J.5 150. Beur.5 89.0 110. Khagaria D.J.J.J. Banka D.5 339.0 82.5 426.7 200.1 416.8 99. Gopalganj D. Kishanganj D. Motihari D. J. Madhepura D.8 61.4 100. Sitamarhi D.9 620. Bhabhua D.5 95.0 176. Madhubani D.0 150.4 236. 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Name of Jail C. Nawada D.D.J.5 99.J.0 339.J.J.1 61.7 325.8 120.8 95.J.7 450. Samastipur D.6 60.7 390. J.6 191.5 172. Muzaffarpur C.5 131.1 91. Bhagalpur C.7 311.0 400.0 324. Buxar C.4 103. Gaya Total D.0 134. J.J.J.9 128.J.6 488.9 101.8 83. Lakhisarai D. Siwan D.8 72.0 82.J.9 79. J. Purnea D.7 69.J.8 90.Appendix VIII : Prisoners Statistics of the State of Bihar (August 2008) Sl. Chhapra D.6 150.3 600.7 100.

0 244.Appendix VIII : (Contd.8 26.0 3.0 300.0 97.5 190.8 10 210 423 19 442 211.7 120.3 23.8 118.2 165 2 167 595 13 608 360.0 210.5 Prisoners shifted to district Jail Supaul 180 13 193 187 4 191 103. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Name of Jail Sub Jail Bagha Sub Jail Benipur Sub Jail Rosera Sub Jail Jhanjharpur Sub Jail Dalsinghsarai Sub Jail Navgachhiya Sub Jail Hilsa Sub Jail Birpur Sub Jail Masaurhi Sub Jail Patna City Sub Jail Barh Sub Jail Danapur Sub Jail Buxar Sub Jail Sherghati Sub Jail Bikramganj Sub Jail Daudnagar Sub Jail Udakishanganj Total Grand Total Capacity No.0 20.4 240 10 250 232 12 244 96.0 62.5 500 60 560 130 2 132 26.1 87 0 87 261 0 261 300.0 364.0 175.0 37 0 37 144 0 144 389.0 15 164 107 4 111 71.7 67.0 141. to Capacity F Total M F Total M F Total 25 481 329 19 348 72.6 0 100 244 0 244 244.0 51 3 54 102 30 132 200.1 30312 1062 31374 36923 1262 38185 121.3 119.0 244.1 76.7 20 220 308 4 312 154.8 121.0 20 120 203 7 210 203.2 389.6 Not in Function 2947 218 3165 3643 125 3768 123.6 282 25 307 188 4 192 66. No.7 16.0 72.0 1000.6 57.8 99. of Inmates % of Nos.6 650.3 15 215 190 7 197 95.0 46.7 91.7 M 456 200 100 100 149 200 200 (Concluded) 55 .0 35.9 30.) Sl.

the agricultural sector also lends a base for the animal husbandry sector of the state's economy which again is an important source of income for its rural population. consequently. In addition. It is against this background that the development of agricultural sector demands the highest attention of the state government. fibres. Sheohar. Saharsa. Araria and Khagaria. Katihar. Kishanganj. The zone receives an annual rainfall of about 10401450 mms. Muzaffarpur. Madhepura.CHAPTER II AGRICULTURE AND ALLIED SECTORS The agricultural sector of Bihar's economy is extremely important not merely because 90 percent of its population earn their livelihood from this sector. Because of its geographical location. the farmers here are capable of growing a large number of crops like foodgrains. (iii) South Zone : This is the largest zone. and its soil is mostly sandy loam and clay loam. which can be categorized in the following three agro-climatic zones : (i) North-West Zone : This zone comprises 13 districts — West Champaran. Samastipur and Begusarai. Saran. and its soil is mostly sandy loam and loam. comprising 17 districts. oilseeds. these are 6 districts — 56 . Gopalganj. Sitamarhi. Vaishali. The annual rainfall in the district ranges between 1200-1700 mms. East Champaran. Bihar is endowed with both extremely fertile soil and abundant water resources. It is generally divided into 2 sub-zones in the eastern and western parts. fruits and vegetables. the state is also endowed with high bio-diversity and. but it is this sector wherein lies the great potential of its economy. Siwan. although its share in the Gross State Domestic Product (GSDP) has decreased over the years and presently stands at about one-fourth only. Madhubani. Being situated in the Gangetic plains. In the eastern sub-zone. Bihar has a geographical area of 93.6 lakh hectares. Purnea. Darbhanga. (ii) North-East Zone : This zone comprises 8 districts — Supaul.

loam and clay. The average annual rainfall per district is 1098 mms.Sheikhpura. Arwal. Araria. West Champaran. there were several districts which had received less than 800 mms. During 2008 (upto September). Darbhanga. Land Utilisation. Supaul. 57 . During 2001 to 2006. This zone receives about 990-1240 mms. West Champaran. Nawadah. in 2001 (about 22 percent more than average) (Table 2. Sitamarhi. Fertiliser and Extensions Services) and Agricultural Credit. The details of the agricultural and allied sectors of the state's economy is presented in this Chapter under the major heads of — Rainfall. (Table 2.2). Gaya. Aurangabad. but because of a breach in a barrage in Kosi river. Purnea. of rainfall in 2008 — Sheohar. Begusarai. Arwal. there are 8 districts (East Champaran. but it shows considerable year-to-year variation. clay loam.. Araria and Kishanganj. Finally. Nalanda. 2. Jehanabad. Buxar. However. of annual rainfall and has a variety of soils — sandy loam.1 Rainfall The average annual rainfall in Bihar is about 1098 mms. the chapter also presents a summary of the Road Map that the state government has recently prepared for the development of the agriculture and its allied sectors. There is also considerable variation among the districts with respect to annual rainfall. Begusarai. Madhepura and Purnea. which is very close to the average of 1098 mms. Rohtas and Bhabhua. The remaining 11 districts in the western sub-zone are — Patna. Jamui. The districts with excess rainfall (more than 1300 mms) were — Buxar.. It may be noted here that the devastating floods in Bihar in 2008 was not caused by excess rainfalls. Arwal and Sheikhpura) where the average annual rainfall is less than 800 mms and. Saran. on the other hand. the total rainfall in Bihar was 1016 mms. Agricultural Inputs (Seed. it has varied between 866 mms in 2005 (about 20 percent less than average) to 1365 mms. Lakhisarai. Bhagalpur and Banka.1). Production and Productivity. Irrigation. located in Nepal. Kishanganj and Katihar) where the annual rainfall exceeds 1300 mms. Bhojpur. Munger. but there are at least 3 districts (Buxar. Supaul. East Champaran.

1 1028.1 1647.2 1743.0 1271.0 1040.1 1504.8 1654.1 654.7 969.3 661. 58 .6 1090.3 1002.2 1611.3 2049.0 685.7 1002. Champaran W.9 1633.8 971.8 835.1 905.9 1297.2 1330.6 1275.0 837.6 1006.3 901.4 1022.3 982.2 1235.4 8136.3 787.2 1503.8 862.3 865.4 1121.9 794.4 1288.0 967.0 835.3 940.5 933.8 1076.6 1102.4 1645.6 1149.6 1236.2 781.5 922.2 710.5 1747.5 1269.6 889.1 1774.7 2006 1065.0 1066.8 493.0 2298.5 608.0 653.3 930.4 764.4 1270.8 1707.7 1365.6 2001 923.6 1342.9 1137.8 1117. Champaran Darbhanga Samastipur Begusarai Munger Lakhisarai Madhubani Sheikhpura Jamui Khagaria Bhagalpur Banka Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Bihar Annual Rainfall (mm) 2003 2004 2005 744.3 1042.9 840.9 703.0 1458.6 940.4 489.1 957.2 956.1 661.6 1497.8 836.4 1243.3 465.2 885.8 694.2 907.2 1010.3 1576.8 2131.3 1512.0 1189.5 816.7 941.4 1089.4 499.0 1026.8 1419.7 1441.5 915.8 454.8 921.2 1139.Table 2.9 767.6 1073.8 1201.8 1801.4 991.8 857.3 994.9 1452.8 959.8 844.8 1031.3 1052.5 1276.6 612.6 1058.4 1022.4 828.9 1211.1 2002 918.0 1053.5 822.5 859.6 1108.2 601.9 1205.8 828.3 731.0 930.1 1046.5 875.0 1363.8 1198.0 992.9 1198.9 1098.0 746.1 1224.7 722.2 966.5 1134.4 499.7 1111.1 1284.9 1457.4 1161.2 1079.3 1136.6 2194.8 1219.6 1079.3 1082.5 832.5 1168.7 886.8 1071.9 1270.4 875.5 1530.3 521.9 639.1 1787.4 737.4 957.1 1344.1 1038.5 805.2 1334.8 1539.2 732.8 1051.9 686.1 1340.9 946.7 Average 828.8 1469.8 1268.8 1027.8 1014.7 953.3 1005.1 867.4 1147.2 776.4 763.1 1386.0 1023.6 804.6 930.7 982.9 1065.6 2938.7 901.6 998.2 1026.6 1177.2 1121.4 848.9 827.7 978.3 1167.9 1791.2 884.8 937.5 845.6 683.5 1581.5 858.7 1416.1 571.9 510.0 1034.8 608.2 944.8 813.9 1197.8 1147.1 1051.6 577.4 1061.8 968.2 1711.3 893.1 1104.3 776.5 968.0 1488.2 724.2 1242.0 1046.4 922.4 1099.7 713.2 974.7 1627.6 1031.3 1324.4 962.0 1146.3 Note : The missing data has been estimated on the base of state average.3 1448.4 777.9 878.5 593.4 896.0 846.8 1118.7 1045.3 1143.0 825.1 1027.0 988.9 1529.4 1448.3 1023.3 1453.8 1508.2 734.8 802.1 : Annual Districtwise Rainfall in Bihar Districts Patna Nalanda Bhojpur Buxar Rohtas Kaimur Gaya Jehanabad Arwal Nawada Auragabad Saran Siwan Gopalganj Muzaffarpur Vaishali Sitamarhi Sheohar E.7 851.0 1211.5 1155.2 811.3 1052.

9 27.8 29.0 76.8 1192.2 2008 (Upto September) HotWether Rain 47.6 1118.9 11.3 878.7 1718.0 882.2 1248.3 132.8 80.9 985.7 1228.8 990.0 1119.1 52.5 1201.5 72.8 1255.8 60.8 12.5 30.8 1.5 41.2 1092.3 1346.7 2175.9 60.0 1299.9 0.9 1161.4 845.1 680.0 735.2 1196.2 27.8 121.0 1308.3 69.9 40.5 86.0 1464.3 883.7 32.6 2022.8 713.5 37.5 40.9 1576.5 55.5 1724.4 180.1 110.4 993.9 50.5 0.8 38.2 1085.7 56. Champaran W.8 1270.0 1345.0 56.0 9.7 1805.4 1605.0 72.8 35.2 9.6 1083.4 11.9 70.8 1618.7 35.1 47.3 0.0 0.8 1253.0 10.2 20.0 0.6 73.1 36.8 1375.8 0.7 1379.3 26.2 38.0 1.9 2.6 32.6 50.2 16.6 5.7 21.5 1484.1 1045.0 682.2 1911.4 1.9 67.2 28.2 35.3 51.5 59 .0 1270.8 618.0 23.8 0.6 238.0 19.3 2085.0 764.8 95.4 1108.3 1239.6 1667.0 50.8 49.9 34.7 1562.5 0.2 1151.0 0.0 50.6 1133.1 25.4 1253.3 626.0 13.7 36.3 HotSouthWether West Rain Monsoon 88.3 0.5 59.9 46.3 8.0 49.6 772.6 798.0 1906.3 949.1 7.0 751.2 36.2 96.2 188.4 1193.4 19.1 718.9 700.4 1360.6 1237.4 36.5 605.9 19.3 6.1 1092.4 26.0 16.7 6.5 1571.5 36.7 1602.2 259.9 868.5 18.7 4.5 1054.4 1617.3 894.7 1927.4 1621.8 67.8 748.3 0.9 66.3 29.2 941.4 1616.7 1506.9 23.1 36.6 106.0 1334.8 884.0 59.4 91.8 0.4 SouthWest Monsoon 1168.5 1345.3 2174.1 919.6 18.0 61.8 443.0 1560.8 1542.5 1234.3 2295.6 31.0 49.0 50.7 10.8 1163.1 Winter Rain 60.3 10.5 Total 1461.7 1006.0 0.8 64.6 0.0 1270.5 1257.5 20.2 36.9 NorthWest Monsoon 24.6 28.6 32.8 47.5 0.0 44.6 142.8 1386.2 964.3 896.2 2042.0 23.9 Total 1276.9 1133.3 801.0 36.7 86.2 61.4 68. Champaran Darbhanga Samastipur Begusarai Munger Lakhisarai Madhubani Sheikhpura Jamui Khagaria Bhagalpur Banka Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Bihar 3.4 27.7 19.4 1345.1 12.6 40.4 1197.0 11.9 856.7 1049.9 58.6 24.2 : Districtwise Rainfall in Bihar for Different Seassions (2007 and 2008) Annual Rainfall (mm) 2007 Districts Winter Rain Patna Nalanda Bhojpur Buxar Rohtas Kaimur Gaya Jehanabad Arwal Nawada Auragabad Saran Siwan Gopalganj Muzaffarpur Vaishali Sitamarhi Sheohar E.1 1359.9 1171.9 101.9 101.9 2009.4 791.2 1435.3 971.0 1723.4 56.5 561.2 62.9 97.9 866.3 122.0 13.0 1197.0 1446.3 803.6 66.8 1195.0 29.4 1280.0 26.9 16.6 1002.6 31.8 931.9 1336.7 20.7 1610.2 101.6 944.9 0.4 48.7 1450.5 1364.6 1434.1 809.4 33.Table 2.0 1571.7 1621.2 0.8 628.6 69.9 38.0 15.4 7.0 56.2 125.8 1202.2 293.7 26.9 53.8 1263.5 38.2 44.1 1822.5 628.9 726.5 64.1 113.4 1136.9 949.3 1370.5 11.0 1407.6 186.9 1233.0 977.3 20.4 9.3 925.1 8.6 916.0 1.9 47.3 1.0 742.5 61.9 831.1 1015.2 757.8 97.7 1959.7 32.0 19.2 96.1 682.6 80.0 6.2 1795.4 18.8 834.7 10.9 0.0 25.7 69.0 153.1 139.9 1452.8 104.5 1737.0 67.1 178.

39 6.49 60.92 40.47 to 2. current fallow) (8) Current Fallow Total Unculturable Land (1 to 8) Net Sown Area Gross Sown Area Cropping Intensity Percentage of Geographical Area Under 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 6.49 0.39 5.3 : Land Utilisation Pattern in Bihar Land use (1) Forests (2) Barren and Unculturable Land (3) Land put to Non-agricultural use Land Area Water Area (4) Culturable Waste (5) Permanent Pastures (6) Land Under Tree Crops (7) Fallow Land (excl.66 17.66 17.64 percent of the total geographical area. because of which the share of fallow land in total geographical area has recorded a small decline.47 59. There has not been any change in the share of net sown area in the recent years.39 6.01 39.97 61.48 38.19 2.33 6.57 1.66 17.53 79.57 percent.6 lakh hectare geographical area of the state among different uses is presented in Table 2. on an average.66 17.84 0.55 13. those under tree crops are important. it is interesting to note that the share of land under tree crops has increased from 2.42 5. During the period 2000-01 to 2005-06.22 1. nearly 60 percent.57 13.88 0. Among other nonagricultural use of land.69 3.71 3.73 3. accounting for barely 6.86 0. as they yield some additional income for the rural people to supplement their income from crop production.53 1.33 38.44 6. From the table.03 84.15 39.64 4.06 60 .06 1.49 0.51 1.88 0.42 6.38 7.59 4.37 122. it is first observed that the forests are very limited in the state.50 60.63 3.19 2.06.39 1.86 0.74 3.44 6.55 1.66 17.19 2. which implies that about an additional 10 thousand hectares of land has been brought under the trees.3.51 84.12 40. That the soil of Bihar is very fertile is revealed by the high share of net sown area in the total geographical area.38 6.64 4.67 3.49 0.50 85.47 1.64 4.19 2.55 13.49 0.19 2.41 6.2.2 Land Utilisation The distribution of the 93.51 13.86 0.81 61. This implies that.19 2.63 59.66 17. Table 2.02 1. every piece of agricultural land is double-cropped in Bihar. but the gross sown area has increased much during the period and the cropping intensity for the agricultural economy now stands at 2.49 0.19 85.64 4.58 13.59 13.37 1.02 2. It is most likely that the fallow land is being gradually converted into treebearing land.49 0.56 1.64 4.

fibre crops.0 million. Table 2.00 Foodgrains Cereals Pulses Oilseeds Fibres Total Since the agricultural economy of Bihar is still basically oriented toward subsistence. it is observed that nearly 95 percent of the area under major crops is devoted to foodgrains. Since the production level varies considerably from year to year. Adding to this.0 lakh tonnes (wheat).20 percent in 2007-08.00 2004-05 53.22 1. the production of other cereals (which are all considered as coarse cereals).28 1.00 2007-08 (2nd Adv Esti) 46. the total production of foodgrains is 100. Consequently.33 1. For fibres.9 lakh tonnes (maize). Further. There is also a small increase in the share of area under oilseeds.3 lakh tonnes.00 2005-06 62. from 1.95 1.4 presents the area and production of major crops in Bihar in last eight years — 2000-01 to 2007-08. fruits and vegetables.99 31.01 87.98 87. the share of area under pulses has decreased from 8. From this table.09 87.21 8. the major crops also include oilseeds and fibres and the average levels of their production are 1. Within that category. the foodgrains account for a very large part of the area under major crops. the share of cereals production has been increasing — it was 87. for a population of about 99.84 28.77 percent in 2000-01 to only 1.97 100.2. the share of area has remained nearly unaltered around 2.21 12. oilseeds.03 percent in 2007-08.3 lakh tonnes (oilseeds) and 13.79 8.78 100.79 6.34 34.64 18.42 percent in 2006-07.5 presents the average figures taking the fiveyear period of 2003-04 to 2007-08.00 2003-04 96.00 2002-03 96.87 100.91 2.07 100.4 lakh tonnes. From the table below.37 40. one can see that the average levels of production of major crops in Bihar are — 43. pulses.14 37.85 2.85 percent in 2000-01 it has increased to 2. Percentage of area Crops 2000-01 95.80 2. 61 .38 12.38 100.09 100. In addition to foodgrains.96 39.97 100.7 lakh tonnes (rice). the total production of cereals is 95. but has reached 94.00 2006-07 49. 36.81 8.3 Production and Productivity Because of its rich bio-diversity. Table 2.12 89.64 23.32 14.77 1.9 lakh tonnes.67 22.60 18.17 100.13 19.20 12.00 2001-02 96. the farmers in Bihar are able to produce a large number of crops — cereals.23 percent.21 percent in 2000-01. taking into consideration the total production of pulses at 4. and 14.1 lakh bales of (fibre crops).69 33.

1 4205.2 780.0 2003-04 Area Prodn 6364.3 22.5 461.5 559.0 196.4 85.7 172.0 3578.6 2130.0 620.4 11.3 81.5 0.8 43.5 256.6 141.6 147.4 2939.0 461.9 25.4 24.1 13.2 181.4 88.2 5202.0 438.3 47.8 694.3 594.3 185.8 76.9 48.1 0.2 96.7 103.3 2.8 68.9 115.1 440.0 120.2 0.2 116.3 4438.0 5.3 2.) 62 .7 0.1 3656.8 15.9 64.4 1.7 553.0 0.9 604.3 3.4 2.5 1.5 1497.6 15.8 2.4 4.0 2126.4 1426.4 52.0 428.6 11495.7 31.6 156.9 125.1 53.3 172.6 19.1 179.3 55.5 0.1 697.6 603.2 547.1 597.7 25.7 7.4 232.6 1349.6 26.6 128.6 593.7 21.8 85.1 594.2 0.0 1.8 157.9 32.0 1288.0 7.2 5.5 57.3 244.2 20.3 104.3 682.2 1605.6 114.7 31.4 38.6 26.5 0.9 431.9 2843.3 139.4 1.9 931.9 246.6 16.2 17.4 17.4 41.2 187.1 191.2 0.0 28.5 1.0 79.4 4.5 613.8 593.4 153.2 0.5 80.1 522.5 93.3 114.1 62.5 1.6 460.2 169.8 0.8 105.9 616.0 129.0 34.6 11037.7 22.9 3552.4 : Area and Production of Major Crops in Bihar (2000-01 to 2003-04) (Area in `000 ha/Production in `000 tonne) Crops Total Cereals Total Rice Aghani Rice Autumn Rice Summer Rice Wheat Total Maize Autumn Maize Rabi Maize Summer Maize Total Coarse Cereals Jowar Bajra Ragi Barley Small Millets Other Coarse Cereals Total Pulses Total Rabi Pulses Gram Lentil Khesari Pea Summer Moong Other Rabi Pulses Total Kharif Pulses Tur Moong Urad Ghaghra Kulthi Other Kharif Pulses Total Oilseeds Groundnut Castor Seeds Seasamum Rape & Mustard Linseed Safflower Sunflower Total Fiber Crops Jute Mesta Sanhemp 2000-01 Area Prodn 6455.1 20.9 3.5 71.4 20.6 1147.2 4.3 1488.7 489.2 0.4 1.3 46.1 0.7 5085.5 24.8 357.8 93.1 156.2 3.0 5.7 131.7 42.7 7.4 4.1 23.5 7.1 110.7 22.3 273.6 163.1 2.7 43.7 786.6 4244.0 82.6 153.1 0.3 23.6 135.9 2076.2 178.1 1.2 41.8 23.4 17.9 9.1 18.5 13.9 0.1 2.6 2881.5 1.8 169.8 5444.2 51.8 3.0 84.3 0.2 32.0 4.2 104.4 14.9 120.7 27.2 3584.2 3. (Contd.6 0.3 0.9 3.7 5.7 4.6 0.6 1.5 0.2 3.9 3.4 106.Table 2.6 137.4 172.3 9964.9 434.1 2.1 2002-03 Area Prodn 6447.8 351.8 83.9 688.4 0.8 2907.0 159.4 0.4 0.1 112.3 20.3 137.9 3.4 13.2 592.2 78.0 477.7 10696.6 11187.7 717.8 133.0 1.1 143.0 5447.2 621.0 583.5 479.8 177.0 10.4 591.8 4444.7 69.2 4589.2 10.2 0.4 197.6 2.2 15.8 185.5 1.7 14.9 160.4 1473.3 4391.2 24.6 58.4 0.2 10.0 21.6 10578.7 0.5 123.9 80.6 259.5 24.2 65.0 29.9 4040.3 213.4 102.8 3688.1 8.8 0.2 2067.5 ….8 28.9 169.2 22.1 102.7 161.5 1.7 0.8 1260.5 2.8 973.4 5.3 78.7 90.8 560.4 37.3 1133.5 88.8 4.4 9.8 97.5 0.8 157.3 0.4 72.8 0.8 736.4 21.1 98.2 18.7 1381.7 1.7 25.8 255.9 222.9 434.8 103.4 140.8 2.3 3.6 20.7 2001-02 Area Prodn 6379.7 154.7 1052.7 23.4 3.1 2.2 0.3 1427.1 10.7 24.9 680.3 11.6 171.7 23.1 1096.3 0.6 0.0 138.0 0.8 7.

8 0.3 12.1 Total Fiber Crops 160.2 11.5 0.8 30.3 90.6 24.6 56.5 117.6 14.1 29.9 Urad 24.5 46.4 166.4 20.1 162.4 3.2 0.6 7926.9 3.2 2.3 27.7 511.1 4989.7 18.4 203.1 0.9 82.9 Total Maize 626.7 365.5 19.7 3.1 136.8 0.1 14.4 0.1 Tur 35.8 24.6 356.5 25.5 88.5 0.0 443.5 1392.4 2006-07 Area Prodn 6142.2 389.2 0.3 161.1 0.3 49.7 10.7 19.7 12.6 46.0 1298.6 14.5 38.7 Autumn Rice 554.9 Barley 18.8 4.2 4.8 4.4 3.9 147.3 Gram 73.3 93.0 12.9 0.9 Jute 140.1 77.9 35.2 519.5 Other Rabi Pulses 2.4 Total Oilseeds 136.6 14.7 Wheat 2022.9 Pea 23.4 Other Kharif Pulses 0.8 0.1 96.6 45.2 4.3 88.9 1223.7 Summer Rice 114.1 0.2 285.8 502.8 23.7 2.9 116.5 4.4 10.2 87.9 1491.0 168.9 89.4 Total Rabi Pulses 567.5 116.3 0.3 43.8 259.3 269.4 18.4 4.7 1389.4 641.8 431.1 3.1 491.7 2763.0 Bajra 1.2 Autumn Maize 271.5 0.7 3474.3 18.5 0.1 1253.2 505.4 164.4 365.2 277.7 Mesta 16.5 109.3 649.2 2.0 607.0 111.8 147.5 42.2 Sunflower 21.8 25.1 592.8 163.4 5.3 16.8 Total Kharif Pulses 82.3 2.5 18.5 26.5 Total Coarse Cereals 84.8 Linseed 27.5 79.7 35.2 29.2 4.2 0.0 3775.9 3.2 2625.7 4211.9 142.0 84.7 64.3 1.9 0.7 0.4 1.7 1957.7 88.1 147.3 3302.4 447.1 3.2 Moong 6.1 208.1 Aghani Rice 2519.3 23.4 3357.0 Crops 2005-06 Area Prodn 5995.3 14.8 3.0 0.2 2736.9 0.4 2604.9 1714.6 9.2 Khesari 118.4 Jowar 2.1 1.4 28.4 3302.5 10.5 8.7 2.4 131.2 387.9 14.6 2.1 21.7 Total Pulses 649.1 20.1 4.8 1373.4 133.6 24.4 7473.1 78.7 644.5 0.4 2003.4 127.7 35.0 3.0 152.9 62.5 127.2 471.0 2.3 101.3 Ragi 15.9 551.5 11.5 2.8 454.1 3.0 3775.2 83.0 19.2 1.0 3.1 4.8 5.2 55.4 150.3 4.3 61.3 Sanhemp 3.6 382.0 Safflower 0.1 17.9 6.1 0.2 93.7 Rape & Mustard 83.1 74.0 89.2 2.0 (Concluded) 63 .9 Summer Maize 160.0 137.5 397.4 : (Contd.9 1076.7 22.8 3023.5 139.5 174.8 Rabi Maize 195.1 Seasamum 3.6 4333.5 3677.2 472.6 0.2 Other Coarse Cereals 42.6 75.0 8.7 46.9 88.1 1397.0 456.8 7. ) 2004-05 Area Prodn Total Cereals 5922.4 2049.2 22.7 44.0 85.Table 2.1 5.0 1272.5 8411.3 12.6 2007-08(2nd Adv Esti) Area Prodn 5913.1 Ghaghra 0.0 11005.4 1.5 144.9 0.3 59.9 0.0 2049.5 92.1 517.5 114.8 1.5 86.3 Small Millets 5.8 0.5 3.2 33.0 230.9 25.1 133.8 0.4 14.4 0.4 1317.2 142.0 84.9 Summer Moong 171.9 12.2 Kulthi 14.0 Lentil 179.1 22.9 79.2 56.2 432.3 Groundnut 0.4 Castor Seeds 0.5 301.3 2.7 448.0 533.9 78.3 3279.7 80.6 84.5 368.8 3249.9 1415.4 0.9 77.6 44.9 13.4 597.1 43.5 4.6 30.2 0.7 Total Rice 3188.1 14.4 0.2 19.

besides the major crops listed in Table 2. the rabi season is more important as it accounts for more than 80 percent pulse production. 64 .5 : Average Area Production and Yield of Major Crops (for the Period 2002-03 to 2006-07) (Area : '000 hectares. therefore. Since these productivity figures again vary substantially over the years. the farmers in Bihar produce a large number of fruits and vegetables. For the pulses. The most satisfactory levels of productivity is attained by maize (2367 kgs/ hectare) and here again rabi maize (the most important among the three varieties of maize) has an even higher productivity at 3030 kgs/hectare. Production : '000 tonne : Yield: kg/hec) Crops Total Cereals Total Rice Aghani Rice Autumn Rice Summer Rice Wheat Total Maize Autumn Maize Rabi Maize Summer Maize Total Coarse Cereals Jowar Bajra Ragi Barley Small Millets Other Coarse Cereals Total Pulses Total Rabi Pulses Gram Lentil Khesari Area 6174 3392 2730 547 114 2057 628 264 234 161 99 3 2 18 19 7 49 647 560 69 172 117 Prodn 9536 4365 3622 574 169 3597 1485 433 709 429 89 3 3 12 21 6 44 493 413 63 136 96 Yield Crops 1544 Pea 1287 Summer Moong 1327 Other Rabi Pulses 1049 Total Kharif Pulses 1478 Tur 1749 Moong 2367 Urad 1637 Ghaghra 3030 Kulthi 2657 Other Kharif Pulses 900 Total Oilseeds 1021 Groundnut 1064 Castor Seeds 673 Seasamum 1120 Rape & Mustard 770 Linseed 900 Safflower 763 Sunflower 738 Total Fiber Crops 913 Jute 791 Mesta 820 Sanhemp Area 24 176 3 86 36 9 25 1 14 2 139 1 0 4 85 30 0 20 173 141 29 4 Prodn 21 95 2 80 44 5 19 0 11 1 126 0 0 3 71 25 0 26 1308 1179 126 3 Yield 911 539 757 929 1209 548 755 561 822 567 904 493 965 765 839 828 801 1349 7553 8383 4358 755 As regards productivity of different crops.Table 2.6.5. although for aghani rice (the most important among three rice varieties). The productivity of wheat is higher and stands at 1749 kgs/ hectare. the average productivity is 1287 kgs/hectare. For rice. bio-diversity is very wide in Bihar and. they are presented in Table 2. the productivity is a little higher at 1327 kgs/ hectare. As mentioned before.4. it is desirable to consider the average figures which are presented in Table 2. but the productivity of kharif pulses (929 kgs/hectare) is found be higher than the productivity of rabi pulses (738 kgs/hectare).

5 552.6 978.6 771.1 486.6 683.1 593.3 1044.3 802.7 1881.8 4907.2 544.0 704.2 850.1 916.6 796.1 1583.3 989.4 7878.6 9313.0 3161.8 525.1 598.1 1152.7 958.5 704.0 9166.0 20338.4 760.3 1678.2 9655.4 848.8 785.0 741.5 1131.0 747.8 16781.4 13305.7 1240.2 779.8 860.0 6223.5 716.5 1104.0 891.2 5719.6 940.6 633.8 895.2 851.2 6848.2 4256.6 491.3 4704.0 764.1 4588.8 914.4 964.7 1344.8 1336.8 959.6 777.9 797.7 6986.3 1000.4 1075.5 712.4 1067.9 6228.8 864.3 777.0 863./ha) 2005-06 2006-07 2007-08 (2nd Adv Esti) 14904.1 1418.6 672.1 1077.0 65 .6 7422.1 523.4 5763.1 609.4 1349.6 1776.9 2610.6 993.2 4559.4 934.8 872.9 1014.0 705.0 2919.8 750.1 1499.4 2054.3 1238.0 552.5 1372.6 494.4 1154.1 989.7 14620.1 739.8 1030.2 706.0 6941.7 893.6 1578.0 5595.4 563.3 563.7 1140.1 7726.1 1155.1 640.6 716.0 855.6 5027.2 6587.3 9173.5 1637.1 814.0 3029.0 494.7 9292.6 801.3 984.1 838.6 1498.9 1010.5 1024.4 795.0 2386.4 1143.6 1464.2 489.8 799.1 15080.7 4976.6 2575.9 731.2 1628.5 561.2 742.3 1394.9 772.2 3444.6 961.2 2683.7 1242.1 575.0 786.4 825.4 684.0 1097.6 862.6 16596.8 2002-03 15585.8 18625.0 921.2 6268.1 519.4 759.8 4870.9 4312.0 493.0 947.4 940.3 1237.0 722.2 2003-04 16289.7 5604.0 1047.1 939.0 1029.1 2737.1 766.2 934.0 1932.1 829.0 5533.1 494.9 4259.1 1691.5 763.0 831.6 1009.8 717.9 777.2 551.2 6060.6 9126.5 798.6 1532.0 490.9 711.2 6972.7 14281.7 827.7 7622.0 8798.8 704.8 790.0 511.7 521.0 900.3 4465.9 802.5 1399.3 1098.3 5044.2 827.6 2954.8 3398.2 9860.2 1486.7 1104.4 789.8 1329.1 5000.2 914.8 2001-02 16639.7 8379.0 1378.6 823.8 5973.6 3194.3 8686.4 9570.9 7503.4 7717.3 4577.8 1700.2 1058.7 986.9 1646.0 4767.9 1606.2 5297.1 809.7 1459.5 6027.8 1511.0 905.6 965.5 1237.9 1458.3 9078.3 - Crops Total Cereals Total Rice Aghani Rice Autumn Rice Summer Rice Wheat Total Maize Autumn Maize Rabi Maize Summer Maize Total Coarse Cereals Jowar Bajra Ragi Barley Small Millets Other Coarse Cereals Total Pulses Total Rabi Pulses Gram Lentil Khesari Pea Summer Moong Other Rabi Pulses Total Kharif Pulses Tur Moong Urad Ghaghra Kulthi Other Kharif Pulses Total Oilseeds Groundnut Castor Seeds Seasamum Rape & Mustard Linseed Safflower Sunflower Total Fiber Crops Jute Mesta Sanhemp 2000-01 16862.8 1302.2 929.5 826.0 608.4 776.4 800.8 1032.9 551.6 494.3 2650.3 1069.3 720.1 740.4 784.9 5699.5 1415.8 1143.3 1292.4 1028.9 771.1 819.2 952.6 854.6 911.8 559.9 503.4 720.5 2146.7 1160.0 1896.5 1522.2 19125.9 912.1 1374.9 1642.Table 2.6 1488.8 761.5 748.8 557.3 987.1 890.4 765.7 2065.6 822.7 2641.9 2004-05 15544.0 9555.0 865.5 1040.3 581.1 581.4 1453.9 1379.7 1492.1 6673.8 744.7 731.8 5766.5 688.9 6171.7 774.5 496.4 824.9 4445.0 783.7 1173.0 805.8 4519.2 7457.1 1621.6 : Productivity of Major Crops in Bihar (2000-01 to 2007-08) (Productivity in kg.9 3038.3 1748.9 9490.1 807.4 873.5 1170.2 1119.1 1009.6 2827.6 9042.5 1360.5 495.4 1695.8 568.8 5383.9 740.7 869.9 1033.5 9764.5 682.6 917.8 813.3 539.0 536.4 493.

9 2004-2005 Prodn Yield 1110.6 8.0 140.9 42826.1 29.1 7781.1 9257.1 121.0 865.5 29077.5 16.0 959.0 128.1 7044.1 38779.0 56.0 980.0 28.7 : Area.5 4.5 623.5 7988.2 16000.0 108.7 6.0 1073.4 15.3 15.0 735.6 2.7 2.7 3.9 3.3 277.3 12.8 16000.0 7180.5 8.7 28.5 6243.1 120.0 200.3 60.8 19732.2 30.0 199.9 101.7 29.0 14.9 10000.9 1506.2 248.8 3.0 1222.3 2. sugarcane is an extremely important crop in Bihar which had a production level of 53.0 20000.6 1.0 582.3 9.2 59. As can be seen from the table.6 737.8 9952.7 28.8 15.0 267.3 8.2 5.4 2.2 1.8 226.0 2.0 4.6 140.7 10671.0 1048.2 15.3 2006-2007 Prodn Yield 1178.9 3.9 140.7 1009.3 5800.8 18.9 9283.1 11446.5 54.0 69.9 69.6 6178.Table 2.7 740.9 11078.0 Area 151.1 8.2 53.5 1.6 211.0 46.1 1461.0 8857.7 53.3 Table 2.8 19.2 1495.6 11.1 7399.2 2.3 14.5 117.8 0.7 3769.8 217.1 27.0 4. Production : '000 tonne : Yield : kg/hec) Crops Potato Onion Sweet Potato Sugarcane Tobacco Chillies(dry) Ginger(dry) Turmaric Coriander Garlic Cauliflower Cabbage Tomato Bhindi Bringer Pumpkin Cucumber Bittergourd Par wale Bode Pea Radish Carrot Mango Guava lichy Lemon Banana Pineapple Cocunet Others Fruits Area 145.9 3.5 2.6 46.0 3.3 50. tomato and brinjal.5 6000.3 1.4 71.7 724.7 1.1 5.5 31.1 14. Production and Yield of Miscellaneous Crops in Bihar (2004-05 to 2007-08) (Area : '000 hectares.4 6803.1 3.1 0.6 20723.8 122.5 46.0 16.0 122.9 20000.3 Area 142.1 4337.0 104. those which are important in Bihar under the category of vegetables include potato.1 6072.1 86.7 8720.7 7378.8 28.8 28.0 1125.8 15916.6 1161.8 45561.7 7658.3 955.7 1306.8 1551.0 3.5 16849.0 25540.0 45.5 6000.0 47.2 49.9 7219.0 1120.2 2415.0 2.7 presents the list of these fruits and vegetables.0 8615.9 13.3 34210. Among the remaining miscellaneous crops.0 104.5 112.3 15136.3 6670.9 7310.6 121.0 3.0 2005-2006 Prodn Yield 1232.2 15.5 920.7 14.8 10300.4 4.1 1.0 50.0 916.2 31.0 2.6 15178.8 28.1 617.7 8.2 5338.8 16400.0 730.8 17.5 13386. The production level of these 66 .5 8970.0 32872.6 1512.4 lakh tonnes in 2006-07.7 964.3 1160.8 8160. cauliflower.1 123.8 17.9 9331.8 3.0 16778.7 8663.4 4.3 174.1 27179.7 36.0 598.6 11.4 16.2 4.8 150.7 73.4 957. production and productivity in 2004-05.1 11642.1 37.1 1.1 998.0 4.6 0.1 8078.9 7368.5 1.9 9.0 13877.4 291.4 16. 2005-06 and 2006-07.9 1.2 13000.2 728.6 7102.3 204.3 256.6 59.2 27.2 36083.8 2. along with their levels of area.

Table 2. Production : tonne : Yield: kg/hec) Wheat Maize Prodn Yield Area Prodn Yield 123775 2147 11965 28545 2386 157209 1912 4973 7847 1578 190165 2527 3651 7002 1918 123162 2029 4286 4855 1133 330444 2436 591 1010 1709 131927 2160 356 470 1320 156981 2131 6256 11225 1794 72142 2199 1280 3067 2396 97142 2150 2678 5985 2235 124774 2035 591 999 1690 206367 2342 27777 53835 1938 191136 2080 19410 44212 2278 208168 2502 14925 28159 1887 163884 1918 22543 48798 2165 199138 2018 17184 19858 1156 159715 1910 16620 24811 1493 118146 1732 6149 12560 2043 19128 1359 972 3597 3701 120298 2512 34162 69797 2043 126518 1883 13418 36367 2710 131494 1601 1217 3278 2694 143248 2789 44568 161829 3631 114505 2171 63287 131759 2082 33736 1853 7788 15461 1985 74091 2465 8152 12203 1497 41845 2038 1431 1906 1332 17647 1498 5033 5611 1115 47665 1479 54737 224875 4108 73965 1675 44438 104899 2361 53142 1846 12214 29779 2438 82012 1924 30479 110101 3612 94125 1853 11902 54673 4594 53177 1452 39810 114837 2885 62224 1344 42968 150671 3507 27904 1287 1549 4659 3008 40153 698 20765 74704 3598 44389 1257 41090 141705 3449 4155541 2001 641215 1755949 2738 Area Patna 88480 Nalanda 95385 Bhojpur 85454 Buxar 82536 Rohtas 166681 Bhabhua 133136 Gaya 54595 Jahanabad 84720 Nawada 73308 Aurangabad 171133 Saran 86752 Siwan 106790 Gopalgunj 75801 Muzaffarpur 139377 E.Champaran 168920 Sitamarhi 92512 Sheohar 23671 Vaishali 59596 Darbhanga 74855 Madhubani 158929 Samastipur 70238 Begusarai 24451 Munger 30027 Sheikhpura 39302 Lakhisarai 24520 Jamui 50289 Khagaria 22217 Bhagalpur 48200 Banka 99429 Saharsa 87740 Supaul 102061 Madhepura 78281 Purnea 123851 Kishanganj 138639 Araria 82768 Katihar 106491 Total 3364010 Districts Yield 1643 2382 2654 2267 2808 2335 1477 1842 2015 2598 1126 1390 1187 686 780 994 696 522 773 874 890 594 1387 1988 2399 2296 1764 861 2370 2595 985 1183 1146 955 1028 913 1304 1495 Area 57643 82238 75252 60699 135644 61071 73663 32803 45191 61320 88112 91888 83202 85448 98681 83627 68215 14075 47880 67181 82150 51367 52751 18205 30061 20530 11777 32229 44159 28781 42621 50795 36629 46296 21676 57551 35316 2076727 67 .Champaran 212875 W.8 : Districtwise Area. Production and Yield of Major Crops in 2006-07 Rice Prodn 145350 227246 226802 187071 468067 310928 80617 156043 147689 444650 97669 148459 89959 95559 166100 167909 64415 12351 46071 65429 141393 41689 33919 59693 94300 56289 88727 19132 114228 258065 86432 120735 89689 118237 142541 75595 138899 5027947 (Area : hectares.

Sheikhpura (2399 kgs/hectare) and Banka (2595 kgs/hectare).13 569 12.68 2.21 9472 22. The top five districts in terms of productivity are — Bhojpur (2654 kgs/hectare).59 4351.83 933 2.2 lakh tonnes (tomato) and 11. Table 2. Production : `000 tonne : Yield : kg/hec) Crops Rice Bhadai Rice Agahani Jowar Bajara Maize Ragi Small Millets Tur Urad Mung Other Kharif Pulses Groundnut Seasmum Castorseed Nigerseed Soyabean Sunflower Cotton Jute Mesta Sugercane Area Production Yield 546.75 1091 133.71 790 0.53 944 223.59 40446 Note : Production of Cotton in '000 bales of 170 kgs. The category of fruits also include a number of species. 10. guava and banana.33 435.3 lakh tonnes (banana).9 : Advance Estimates of Area.42 691 3. Nalanda (2382 kgs/ hectare). 9.05 1.26 4. wheat and maize) in 2006-07 for all the 38 districts.4 lakh tonnes). the top five districts in terms of production are Nalanda (2.09 3914.33 264.1 lakh tonnes (litchi). 2. Taking into consideration rice.17 4.2 lakh tonnes (brinjal). The production levels of these fruits in 2006-07 were — 13.vegetables in 2006-07 were — 11.1 lakh tonnes (cauliflower). 2. Bhabhua (3. Aurangabad (2598 kgs/ hectare). but the four most important ones are — mango.22 719 7.11 5.87 1186 10.8 presents the area. Production of Jute and Mesta in '000 bales of 180 kgs.04 1260.79 9233 107.49 494 2.8 lakh tonnes (potato). Rohtas (4. It can also be 68 . Table 2.98 666 18.44 3.98 592 2.1 lakh tonnes) and Aurangabad (4.98 0.30 9. Production and Yield of Major Crops in Bihar for 2008-09 (Area : `000 hectares.5 lakh tonnes (guava) and 11. As regards the status of agricultural economy among the districts.98 1.07 203.1 lakh tonnes (mango).43 797 2997.7 lakh tonnes).38 13.3 lakh tonnes).19 1306 5. production and productivity of three most important crops in Bihar (rice. Bhojpur (2. litchi.3 lakh tonnes).

5). because of the devastating floods in the Kosi region of Bihar. an expensive input for the farmers.4 Irrigation To free agriculture from the uncertainities of monsoon. 2.10). For rice. Similarly. These losses are expected for all the crops for which advanced estimates are available. Not only does it provide stability of agricultural production. it is noted that. for wheat. One of the major constraints in the spread of irrigation is that tubewells are now the major source of irrigation and. the two extreme levels of productivity are 4108 kgs/hectare (Khagaria) and 115 kgs/hectare (Jamui). This implies a growth of 14.24 lakh hectares (Table 2. because of recent initiatives of the state government. Finally. over a period of 7 years. only about 60 percent of the cultivated area is endowed with some irrigation facility in the state.3 percent. the state is expected to face a considerable loss of crop production in 2008-09. In view of the abundant water resources in the state.20 lakh hectares to 32. the total irrigation area in Bihar has increased from 28. assured irrigation is also a necessary pre-requisite for adoption of high yielding variety (HYV) seeds. With some expected improvement in the power sector. the provision of adequate irrigation facilities should not be a major challenge in Bihar. wheat and maize. the situation is likely to improve. To help the state government in planning its agricultural strategy. Table 2.9 presents these advanced estimates for the year 2008-09. the tubewells are often run on diesel. the two extreme levels of productivity are 2808 kgs/hectare (Bhabhua) and 522 kgs/hectare (Sheohar). 69 . If one compares these advanced estimates of production with the average levels of production (Table 2. in the absence of adequate supply of electricity. but unfortunately. the Directorate of Statistics and Evaluation prepares advance estimates of area and production of major crops in Bihar. the two extreme levels of productivity are 2789 kgs/hectare (Samastipur) and 698 kgs/hectare (Araria). except aghani rice and jowar. During the period 2000-01 to 2007-08. for maize.observed from the table that the gap between the highest and the lowest levels of productivity in the districts is very large for all the crops — rice. it is extremely important to provide assured irrigation facilities to the sector.

79 (4. Barnar Waterbody.0) 3165. accounting for 83.1) 3.I 29.0) 3224.21 (83. Bateswarnath Ganga Pump Canal (Phase I).0) 23.0) 3169.8) Other Well (irrigation well) 145.56 (11.79 (4. flood control and water drainage. Batane Waterbody.12 (0.50 (83.9) Tank (including Aher & Pyne system) 332.33 (0.6) 29.9) 2650.5 Agricultural Inputs Besides irrigation facilities. tanks. Apart from generating additional irrigation capacity.23 (0.79 (4.56 (10.1) 6.8) 28.01 (100. a river basin will be taken up as a unit and an integrated plan will be made for irrigation.2) 28.8) 332.79 (4.38 (83.8) 332.8 percent of the irrigated area in 2007-08.Table 2.88 (1.3) Tubewell (Private & State) 2310.6) 145.23 (0.0) 3241.52 (100. Uderasthan Barrage and Bagmati Multipurpose Plans. North Koel Waterbody.6) 121.06 (81.9) 23. prepared by the state government visualises creation of additional irrigation capacity through a number of projects.10 : Sourcewise Irrigated Area in Bihar (lakh hectares) Year 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 Canal Surface M. Punpun Barrage.I) 3. Over the years.00 (82.1) 332.95 (0.0) 34.9 percent in 2000-01 to its present level of 83.56 (11.I & Barge L. fertilisers and extension services.6) 2701.1) 17. the Seed 70 . As mentioned later.79 (4. it is observed that tubewell irrigation is the most important source.0) 2474. The state government is also planning the interlinking of rivers in the state as a step towards integrated water management of the state.87 (100.19 (0.25 (0.7) 145.7) 15. 2. this share has increased from 81.21 (13. Seed For realising the full potential of land and irrigation inputs.56 (0.3) 332.5) 431.56 (10.2) 2643.5) 332.80 (0. the project will also alleviate the problems of flood and drought.2) 145.8 percent. particularly seed.3) 332.01 (3.9) 29.9) 2308. agricultural development also requires supply of adequate and quality inputs.5) Total irrigated Area 2820. For various reasons. Durgawati Waterbody. the Raod Map for Agriculture for Bihar. Jamania Pump Canal.19 (83.79 (5.26 (0.69 (1.1) 1. Sone Canal Modernisation.34 (0.2) 145.22 (1.84 (5.56 (10.93 (100. other wells and other sources) has either remained unaltered or decreased marginally.1) 3. The share of other sources of irrigations (canal.65 (100.0) 2813.71 (82.7) 2664.86 (0.56 (100.56 (11.4) 2710.00 (100. availability of quality seeds is extremely important for raising the productivity of cultivation.0) 3240.5) 145. For this.5) Other Sources (L.56 (10.5) 19.45 (100.9) 145. Among these projects are included Western Kosi Canal.0) 2985.77 (82.0) As regards the contribution of different sources towards irrigation facilities.56 (0.

0 34500 75000 8325 3000 6600 2310 342340 74340 6950 1520 3208 4840 15.0 percent in 2008-09. the increase in SRR is moderate.0 8. while the same for peas has recorded a small decrease.0 7.0 percent).0 5.0 56. In case of kharif maize.0 10. the SRR is available only for 2006-07 and 2007-08.0 9.0 470000 80000 9990 3600 7920 2640 207200 41500 3500 1400 420 203977 20880 360 167 325 12. the increase in SRR is only marginal.0 30.0 to 73. While the Bihar State Seed Corporation was revived from a state of liquidation in 2006-07. Between these two years.0 8.0 RequireSupply ment SRR 2007-08 RequireSupply ment SRR 2008-09 RequireSupply ment SRR Realising the importance of supply of quality seeds. However. Among the kharif crops.0 percent in 2006-07. urad and moong. Table 2. gram and masoor).0 to 74.0 5.0 6. the SRR for paddy in 2008-09 was 19.0 50. the state government has taken several steps to improve seed management. there has been a modest increase in SRR from 50.0 57. / SRR in percentage) 2006-07 Year/Crops Kharif Crops Paddy Maize Arhar Urad Moong Rabi Crops Wheat Maize Gram Pea Masoor Rape/ Mustard 320000 55000 13000 2700 6000 1500 265400 54200 5230 1700 4100 3200 11.0 73. compared to only 12. Among the rabi crops.0 6.0 40. This improvement is visible for both Kharif and Rabi crops (Table 2. all the seed multiplication farms were operationalised in 2007-08.0 percent) and rape/mustard (from 40.0 9.0 percent.11).0 222000 40000 1280 600 300 204824 42390 410 550 918 14.0 7.11 : Distribution of Certified Seeds and Seed Replacement Rate (SRR) for Important Crops in Bihar (2006-07 to 2008-09) (Requirement and supply in qntl. the SRR for two crops has gone up substantially — maize (from 60.0 4. For other crops (wheat.0 percent in 2006-07 to 57.0 5.0 10. 71 .0 60.Replacement Rate (SRR) is one of the lowest in Bihar among the major states in India and the state government has made substantial efforts in recent years to improve the situation.0 74.0 282080 41580 1440 720 360 267620 42850 940 610 315 19. in case of arhar.

77 5.69 102.06 Complex 75.11 119. in 2007-08.31 1512. Table 2.37 647.10 MOP 26.48 Complex 15.42 N 290.38 33.16 929.19 thousand tonnes (2004-05).65 154.90 167.) 72 . the use of fertiliser is higher in rabi season (195.Fertiliser The consumption of chemical fertiliser in Bihar has been rising steadily in recent years (Table 2.10 kgs/ha).36 178.66 88.67 618.28 106.36 131. as it alone accounts for about half the fertiliser consumption.52 Total (NPK) 309.03 Total (NPK) 430.11 54.51 931. the use of urea is the widest.81 209.95 SSP 16.24 38.59 1064.) 2006-07 2007-08 Fertiliser Kharif Rabi Total Kharif Rabi Total Urea 666.72 DAP 95.22 103. consumption has increased by 62. 2772.60 Fertiliser (kg/ha.80 495.52 4.10 171.52 90.32 733.58 20.38 123. The consumption levels were — 2250. Among the different types of fertilisers.31 thousand tonnes (2006-07) and.21 634.86 63.80 1067.58 523.79 15.13 328.00 141.32 thousand tonnes (2007-08).75 62.02 K 3.37 4.12).24 710.68 389.12 : Cosumption of Fertilizer in Bihar (2004-05 to 2007-08) (000' tonne) 2004-05 2005-06 Fertiliser Kharif Rabi Total Kharif Rabi Total Urea 616.79 thousand tonnes (2005-06).72 1913.72 73. over a four-year period.90 42.36 42.88 30.61 77.47 N 333.01 62.80 314.96 54.47 84.38 29.91 373.34 Total 968.59 475.59 3225.57 K 26.79 70.96 117. 3225.74 182.26 43.2 percent which shows the eagerness of the farmers in Bihar to utilize this valuable input.59 MOP 1.43 Total 1311.70 120. finally.76 663.81 1281. Thus.15 101.24 1205.15 688.84 913.10 195.48 P 69.86 178.48 422.52 SSP 2.06 P 16.92 51. 3649.38 72.33 94.10 80.14 312.59 1598.92 1851.83 145.71 24.38 2250.16 116.96 9.86 108.15 98.39 3649.65 138.12 808.13 83.80 kgs/ha) which is more than one and a half times the consumption in kharif season (120.10 783. Between the two important crop seasons.61 1280.60 75.40 2.23 68.32 Consumption of 113.02 81.26 DAP 23.94 1381.19 71.34 49.20 731.32 538.76 50.83 26. The per hectare consumption of fertiliser stands at 155.79 Consumption of 92.60 kgs.93 2136.19 1190.56 1582.74 41.23 2772.60 191.71 391.78 Fertiliser (kg/ha.98 32.86 105.32 263.80 155.

Extension Services Mainly because of limited staff strength of the concerned department. the extension services for agricultural development has been rather limited in Bihar. Responding to this need. introduction of new varieties of crops and adoption of new cropping patterns that are likely to raise the income of farmers. Table 2. For several agricultural operations like seed management. it is very necessary to strengthen the extension services in Bihar.13 : Minikit Demonstration in Bihar (2006-07 to 2008-09) Season / Crops Kharif Season Paddy (20 kg) Paddy (HYV) (10 kg) Paddy (5 kg) Paddy (HYV) (2 kg) Maize (2 kg) Arhar (4 kg) Urad (4 kg) Moong (4 kg) Castor (2 kg) Sesamum (1 kg) Rabi Season Wheat (40 kg) Wheat (10 kg) Wheat (5 kg) Maize (2 kg) Gram (8 kg) Masoor (4 kg) Pea (8 kg) Rai/ Tori (2 kg) Rajmah (8 kg) Rajmah (3 kg) Garma Season Maize (2 kg) Urad (4 kg) Moong (4 kg) Sesamum (1 kg) Safflower (2kg) Number of demonstration 2006-07 2007-08 2008-09 15040 2550 1000 5000 900 800 2000 26513 10000 11200 2850 3600 122550 50 9118 7000 2750 7500 5450 500 151500 81900 18100 3767 182289 500 500 7000 13275 1000 1000 35880 10000 5000 30000 2225 2500 20000 23000 37525 1500 - 1000 500 500 73 . the state government has already prepared a document for wider extension services which is expected to reach upto the Panchayat level. optimum mix of different chemical fertilisers.

specially when one bears in mind that the targets themselves are much lower than the actual requirement of the farmers. Similarly. both for its input and output.Among the extension services that the state government is presently providing at a large scale is the Minikit Demonstrations for important crops (Table 2. One can also discern a similar trend for garma crops. This dependence on the market for inputs in an agriculture.96 percent in 2007-08. There has been a steady increase in the number of Minikit Demonstrations over the years.6 thousand in 2008-09. The relevant information on credit flow to the agricultural sector in Bihar is presented in Table 2. and 67. urad. castor and sesamum.13).36 percent of total owned area. moong. Among the three principal sources of credit. in kharif season. the commercial banks are most important. the selected crops are — wheat. For previous years. maize. masoor. While production for market is not yet the predominant characteristic of agriculture in Bihar. This is an extremely serious phenomenon. maize. such demonstrations were 17. these crops include — paddy. the low achievement rates for 2008-09 is not surprising. urad. such demonstrations were only 27. arhar.7 thousand in 2006-07.50 percent of total number of holdings. for rabi season. which account for about 65 percent of the total credit disbursement. Starting from an achievement rate of 82. except for a single year in 2004-05. peas. its dependence on the market for inputs is quite large.3 thousand in 2006-07. it stands 76. for rabi season. cultivation comes to be directly connected with market.8 thousand next year (the data for rabi season of 2008-09 is yet to be compiled). sesamum and safflower. and finally. rai/ tori and rajmah. for garma season.6 Agricultural Credit As modern and scientific methods of production take root in agriculture. gram. the shares of regional rural banks and central cooperative banks are about 25 and 10 percent respectively. In 2007-08. the achievement rate for the three 74 . Since the figures for 2008-09 related to the first six months of the year. For kharif season.01 percent in 2003-04. makes agricultural credit a critical input in agricultural production. For example.14. it is a matter of concern that the achievement rates for these banks have also shown a declining trend. but it has increased to 85. where marginal and small holdings together account for 96. Since the commercial banks are the most important source of credit. the selected crops are — maize. moong. one may first note that the achievement rate for disbursement of credit from all banks has shown a declining trend since 2003-04. which has increased to 43. 2.

76 2005-06 1645.95 28.41 3722.35 1388.57 1489.73 2037. the achievement rate for KCC is only 46.42 4879.04 53.89 1821.25 76.34 1558.04 81. There is not much difference among the achievement rates for three sources of credit — commercial banks (48.19 2007-08 3003.69 552.02 10.58 550.04 80.75 355. as mentioned before.36 75. Unfortunately.06 95.31 898.96 2008-09 4355. 75.80 Note : Value of 2008-09 upto release September Since the commercial banks and even regional rural banks are often reluctant to expand agricultural credit.30 78.55 2697.87 54.88 lakh farmers in Bihar who were issued KCCs (Table 2.21 561. For six districts.03 80.11 185.14 : Credit Flow to Agricultural Sector in Bihar (2003-04 to 2008-09) Bank Groups Target Commercial Bank Achievement Percentage Target RRBs Achievement Percentage Target CCB Achievement Percentage Target All Bank Achievement Percentage 2003-04 1220.44 64.58 2447.33 90. One of the main reason for such limited reach of cooperative banks is that such banks are absent in no less than 16 districts of Bihar (Table 2. the cooperative banks are often regarded as an ideal source of credit for the farmers.34 952. The scheme had started in 1999 and it allows for a maximum credit of Rs.13 30.85 57.37 2985.95 376.types of banks were — 81.07 84. Compared to a target of 44. 50 thousand to farmers. Among the 22 districts where they exist.26 450.86 431.16).01 2004-05 1386.91 509. regional 75 .80 7075.61 57.39 1325.15).93 84.96 2030.65 234.60 lakh farmers.75 67.48 2174. there were 20.34 272.81 percent. the achievement rates are less than 10 percent.51 644.69 97.47 1256. Table 2.30 402.35 303.67 3755.09 69.47 percent (commercial banks).24 938.67 797.59 2006-07 2274.80 31.42 percent (central commercial banks). cooperative banks presently account for only 10 percent of the agricultural credit in Bihar.80 percent (regional rural banks) and 57.71 273.98 2339.86 407. 2008.06 1900.15 792. The scheme for Kisan Credit Card (KCC) is one of the most important efforts of the banking sector for promoting agricultural credit.80 619.98 204.24 percent).11 86. As on September. the achievement rate is often less than 40 percent.36 1915.42 82.

1 15.5 25.4 11.0 14.5 32.0 27.6 25.5 27.5 5.1 24.6 88.0 30.0 15.1 5.3 10.9 13.6 15.9 103.0 25.8 4.9 1.6 16.1 19.9 28.0 31.0 26.4 9.3 4.0 35.4 82.5 85.0 11.0 40.0 55.4 12.0 15.0 23.2 2.9 8.7 24.2 3.0 14.7 44.2 2.0 10.Table 2.5 9.0 27.0 32.5 36.0 13.4 28.5 5.1 97.4 3.2 11.0 17.5 26.5 11.0 19.0 10.5 25.0 35.0 25.7 61.0 17.2 48.0 26.4 59.8 10.5 33.5 4.6 18.1 105.9 9.3 2. Lakh) 2006-07 2007-08 2008-09 26.5 100.9 18.5 41.6 42.0 92.0 77.0 60.4 13.5 132.0 17.6 - 76 .1 49.0 22.5 36.0 57.2 22.0 30.6 6.4 4.Champaran Sitamarhi Sheohar Vaishali Darbhanga Madhubani Samastipur Begusarai Munger Sheikhpura Lakhisarai Jamui Khagaria Bhagalpur Banka Saharsa Supaul Madhepura Purnea Kishanganj Araria Katihar Target (in Rs.0 14.9 19.0 38.6 68.3 4.7 27.3 8.1 0.1 46.1 1.0 12.0 9.0 21.0 147.3 11.2 15.5 3.3 9.2 67.3 89.2 37.8 21.0 13.1 38.6 7.0 20.0 Achievement (Percentage) 2006-07 2007-08 2008-09 69.15 : Distribution of Cooperative Credit in Bihar District Patna Nalanda Bhojpur Buxar Rohtas Bhabhua Gaya Jahanabad Arwal Nawada Aurangabad Saran Siwan Gopalganj Muzaffarpur E.0 21.0 23.7 16.5 25.0 26.5 18.1 71.4 1.Champaran W.4 7.1 9.0 24.0 27.3 10.4 131.8 120.0 27.7 13.9 3.6 6.0 Distribution (in Rs.1 18.0 31.2 0.6 19.0 17.7 37.6 17.3 6.7 13.5 33.1 15.0 26. Lakh) 2006-07 2007-08 2008-09 18.1 86.0 28.7 17.8 3.0 66.0 11.0 127.7 18.6 24.8 53.2 17.3 12.4 11.0 21.3 67.4 11.5 30.5 64.0 36.0 23.0 36.0 28.0 14.6 76.0 9.0 34.0 22.9 7.5 5.6 7.8 23.0 19.7 17.0 35.0 123.7 10.0 11.1 23.7 41.0 30.1 30.4 6.7 13.0 7.6 12.

14 293166 120653 41. Comparing the share of population and the share of KCCs for the different districts. of institutional Finance.90 1831646 883624 48. one might again see a low performance for the entire year of 2008-09.92 160000 75533 47. Among the 38 districts.22 66. in the next two years (2006-07 and 2007-08).44 180000 107094 59.72 160000 55374 34.11 58. These districts are — Nalanda. Bhagalpur.Table 2. Bhabhua. Khagaria.40 percent).16 566751 318603 2006-07 250000 203935 81. If one compares the achievement rates over the years. Aurangabad. the banks have performed better to raise the achievement rate to 66.49 129719 66332 51.56 67.50 310118 186420 2004-05 174850 140793 80. Bhojpur.09 470350 245907 52.24 1205407 572444 47. even when six months were over in September.61 600000 399380 2007-08 300000 222478 74.22 in 2005-06.81 Bank Groups Target Commercial Achievement Banks Percentage Target RRBs Achievement Percentage Target CCB Achievement Percentage Target Total Achievement Percentage 2000-01 101501 65750 64. Purnea and Kishanganj.78 28617 13576 47.28 795700 465744 2005-06 143866 131618 91. Darbhanga. Munger. Rohtas.17).81 Source : Dept.49 1423516 631983 44.82 478571 107045 22.81 percent respectively. West Champaran.56 and 67.21 688000 466540 60.16 : Distribution of Kisan Credit Cards (KCC) in Bihar (No.52 150500 76891 51.57 190000 140071 73.40 4460569 2088051 46.11 percent in 2000-01 and then had gradually decreased to 56. of cards) 2008-09 Total (Sept. rural banks (47. If the distribution of KCC in the next six months is not accelerated.53 56. the achievement rate is only 16. it is observed that there are 14 districts where the distribution of KCCs is relatively wider.14 1500000 253517 16. it is noticed that it was 60.37 160000 27422 17.08) 861429 119050 13. It is interesting to note that there are a few districts (like Patna and Buxar) where the agricultural economy is relatively better and yet the speed of KCC implementation is rather limited. Nawadah. However.49 percent) and central cooperative banks (44. Begusarai. 77 . GoB. In 2008-09.16 228000 168529 73. the achievement of the KCC scheme has been quite varied (Table 2.90 percent.

18 2.86 2.67 0.23 0.70 1.69 2. 78 .59 4.75 3.11 5.18 1.12 3.00 Percentage of population (2001) 5.52 3.89 0. GoB.43 3.07 2.80 6.82 2.97 0.83 1.77 4.53 100.13 3.31 0.62 1.71 0.32 3. Champaran W.95 1.78 1.82 2.34 1. Champaran Darbhanga Samastipur Begusarai Munger Lakhisarai Madhubani Sheikhpura Jamui Khagaria Bhagalpur Banka Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Total Upto 2003 52977 37361 44944 9042 37508 17184 29817 7086 923 36160 23875 21812 33983 16867 19520 23416 37243 508 19812 47373 23831 50512 32333 17492 2439 33458 2047 3823 25820 70632 3433 3696 5350 17651 75725 4175 3115 27923 920866 2004 2005 2006 2007 2008 Total 23113 20036 10801 26204 18048 151179 20562 18229 13266 16297 16175 121890 32437 21830 4833 17683 15918 137645 2862 4279 4051 8824 6775 35833 22363 7777 6674 15272 19590 109184 5685 15015 5205 9624 12094 64807 22998 18865 8601 19716 16371 116368 1807 3818 2381 5681 5348 26121 1275 2058 1052 2698 2932 10938 27525 11264 7668 11281 11217 105115 31358 17569 12707 9272 8638 103419 4677 8845 9190 8881 14127 67532 18995 10809 7074 10551 14545 95957 19734 12938 5413 11205 13396 79553 14331 22390 7517 15170 20050 98978 18707 15312 12409 15141 17144 102129 29720 9027 6814 10883 24403 118090 173 425 1309 1538 2617 6570 19515 19279 14701 21053 26210 120570 26005 27614 31407 35212 32431 200042 1459 6751 3816 7783 8011 51651 38406 20970 21759 14954 22783 169384 24782 35001 21426 9352 14712 137606 19611 10244 2869 3967 5608 59791 1225 2447 2353 3422 4587 16473 29187 25258 12656 9559 15598 125716 880 1503 2216 2317 3532 12495 1828 3352 4113 3777 7382 24275 18483 19707 9028 5528 9296 87862 40851 9366 4726 9223 11477 146275 896 3395 3138 4141 4282 19285 1118 2906 2135 5513 7250 22618 1216 3424 2838 5593 6296 24717 854 2844 2962 4679 6056 35046 39782 25036 11791 12350 13477 178161 1988 6264 13238 9170 8558 43393 1287 4977 8952 5484 7393 31208 26457 23531 12329 9565 12213 112018 594152 474355 315418 398563 466540 3169894 Source : Dept.31 1.37 0.17 : Districtwise Achievement of Kisan Credit Card (KCC) Percentage of cards 4.03 2.77 3.77 2.97 4.98 3.56 2.88 100.55 4.91 3.54 2.22 3.69 1.09 1.37 0.51 3.61 0.82 1.85 4.51 3.Table 2.44 2.84 3.00 District Patna Nalanda Bhojpur Buxar Rohtas Bhabua Gaya Jehanabad Arwal Nawada Aurangabad Saran Siwan Gopalganj Muzaffarpur Vaishali Sitamarhi Sheohar E.39 0.26 2.97 4.82 0.04 3.21 3.73 0.94 1.63 5.92 1.35 3.09 2.34 1.34 4.13 3.69 2. of institutional Finance.63 1.62 4.67 3.27 2.61 0.28 3.60 1.

18 : Extent of Crop Insurance in Bihar District Patna Nalanda Bhojpur Buxar Rohtas Bhabhua Gaya Jahanabad Arwal Nawada Aurangabad Saran Siwan Gopalgunj Muzaffarpur E.Champaran Sitamarhi Sheohar Vaishali Darbhanga Madhubani Samastipur Begusarai Munger Sheikhpura Lakhisarai Jamui Khagaria Bhagalpur Banka Saharsa Supaul Madhepura Purnea Kishanganj Araria Katihar Total 2005-06 No of Farmers Covered Benefited 27548 10395 31574 14908 6524 32 4142 873 6898 2348 9232 3204 19890 16286 3637 2570 1590 658 8624 5325 23074 19631 40 0 5351 2626 2583 1785 16258 9542 33933 21281 16570 5860 14743 9741 1878 637 12475 9292 4215 886 20118 11389 34162 15491 26747 17980 1721 2 1484 670 1849 1115 5691 4422 12476 0 5590 3878 3597 2547 5512 3912 73 36 468 0 4550 3277 4770 1865 16101 15752 14258 8671 409946 228887 2006-07 No of Farmers Covered Benefited 43881 7754 48378 274 22820 34 14787 2125 18673 466 19873 1125 32867 0 7035 0 3150 453 19178 0 22148 1636 683 0 12391 2370 18029 4216 27101 1712 56836 31713 14697 6059 22022 1043 5314 28 21117 13595 6185 243 27610 12 47568 13207 52863 18842 2757 289 2352 0 2508 0 8044 1470 13213 6322 8781 2958 12773 3598 1024 0 1308 0 1179 12 21900 8532 6064 1049 23799 13326 13527 1505 684435 145968 2007-08 No of Farmers Covered Benefited 53496 19461 68109 11977 20856 0 14123 0 16798 2508 22158 2741 38008 0 8025 0 3025 0 15980 0 18752 1178 4197 621 14732 1686 24483 10198 59955 50537 119045 78666 38814 35181 55741 8218 8068 0 21088 8844 11632 4210 40524 3448 69401 45247 52327 40061 2097 0 2580 0 2427 80 8985 2667 26511 22000 8830 1977 4629 0 2585 91 1310 0 1526 1 13756 4604 7348 1291 20576 11511 10511 5975 913008 374979 79 .Table 2.Champaran W.

Gaya. this implies a coverage of less than 10 percent of the farmers under crop insurance. decreasing not only their income.10 lakh farmers opting for crop insurance and. Nalanda.66 lakhs (Table 2. Madhubani and Purnea. Rohtas.7 lakhs. The development of livestock wealth and higher production from this sector can provide a very sound base of economic prosperity in the villages of Bihar As regards the districtwise endowment of livestock wealth (Table 2.13 lakh farmers in 2007-08. Sitamarhi.83 lakh. Bhojpur.19). Sheikhpura. the north-eastern region of the state is seen to be particularly suitable and their concentration in the districts of Purnea.68 lakhs. In this background. The functioning of the KCC scheme is particularly poor in Arwal.7 Animal Husbandry Total livestock population in the state. For bovine population (cows and buffaloes). Araria. the practice of crop insurance is increasing in the state. the districts with relatively larger livestock wealth are — Patna. there is abundant growth potential of livestock products in the state. Kishanganj and Katihar very high. Among the districts where more than 50 thousand farmers avail crop insurance are included — Patna. Lakhisarai. West Champaran. there were only 9. unfortunately. Banka. which are known as the poor man’s cow. Muzaffarpur. 80 . Of this. its character is that of subsistence rather than of prosperity. Samastipur and Begusarai. Saharsa. is 407.06 lakhs). the farmers in Bihar often face unexpected loss of crops.13 lakh farmers who were able to insure their crops (Table 2. By a broad calculation. and that of buffaloes being 57.19). according to Census 2003. Munger. East Champaran. it is heartening to note that. The strength of poultry in the state is quite large at 139. there were only 4. 39. Supaul and Madhepura. 2.7 percent. The state also has a substantive number of goats (96. In 2005-06.Because of uncertain rains and menace of floods. Though livestock income forms an important component of rural income in Bihar. by the end of 2007-08. it can be observed that there is considerable variation among the districts with respect to their respective share in total livestock wealth of the state. their number has increased to 9. However. the expansion of crop insurance is a very necessary step towards helping agricultural growth in Bihar. But. implying a growth of 122. For goats and poultry animals. With such a huge livestock wealth. over the years.18). in two years. Muzaffarpur. but sometimes pushing them towards high levels of debt. Saran.8 percent are milch animals with population of cows being 104.

1) 0.3) 216.6) 9605.9) 53.3) 12.3) 13.1) 126.2(0.0) 161.6(1.9) 255.0(2.6) 20.9(0.0) 199.9(6.7) 15.5) 18.7) 13967.8) 215.6(2.3) 1.7(4. Champaran Darbhanga Samastipur Begusarai Munger Lakhisarai Madhubani Sheikhpura Jamui Khagaria Bhagalpur Banka Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Grand Total Cow 315.4(0.3(0.3(2.8) 529.5(3.4) 212.8) 105.7(1.3(3.7) 345.2) 145.6) 63.8(3.0) 1.3(0.1(3.3) 275.0) Note : Figures in bracket show district share.1) 175.9(4.5(1.5) 26.9(0.8) 52.2) 72.2 (100.1) 411.8) 238.0) 171.4) 226.3) 10.0) 895.7) 101.2) 216.4) 315.2(3.7) 140.6(3.0) 349.8(3.0(0.0) 41.1) 6.4(0.5) 417.9) 445.7(0.5(2.8(2.4(1.0) 4.5) 259.4(1.5(2.9(1.6(12.9(4.4) 118.8(2.5(2.3(2.3(0.5(2.5) 3.9(1.3(3.5(7.5(1.8) 228.6) 180.9) 394.0(2.5) 434.0(5.6(4.8(1.9(2.0(2.7(2.1) 362.3) 120.3(0.1(3.0) 143.4) 2.7(0. 81 .6(1.3(2.0) 230.7(0.2(0.4) 132.9(5.6(8.2(0.3) 58.3) 2.6(12.0) 138.7) 762.0) 2.6(4.7(0.8) 28.2) 12.4) 322.1) 5.4) 188.0) 4.4(1.1(1.7) 121.0) 141.6(5.6(3.4) 6.8) 427.1) 4.3) 197.9) 243.2(1.2(0.4(3.6(2.8(2.1(4.4(8.2(2.0) 360.0) 0.1) 31.2) 82.9(5.8) 248.6(13.0 (100.0) 433.3(2.5(0.2(3.3) 472.9) 8.1(0.2) 12.3) 451.7) 395.4(0.9(2.7) 126.5(1.8 (100.7) 17.7 (100.5(1.5(5.2) 10.6) 191.6) 266.9) 315.9(2.0(2.9) 1051.7(3.0) 7.5) 278.3(2.3(1.5) 886.4(2.0) 7.0) 213.2(0.1) 191.3(3.1(3.3) 0.3) 294.3) 86.6) 219.2(1.0) 7.3) 102.0) Goat 196.2) 4.8) 4.9) 213.7(2.2(1.8(2.2) 16.5) 20.8) 43.1(2.3) 0.4) 227.8(4.6(4.9(5.4(5.2) 0.4(0.3(1.2(6.7) 12.7(0.7(0.2) 5765.3) 6.2(3.3) 75.9(2.4(3.3) 249.7) 45.0) Poultry 383.5(1.7(3.0) 6.2) 149.9) 316.3(2.4) 46.8) 53.6) 1.0) 19.5(2.4) 70.1) 192.7) 195.6) 388.5(1.6(3.5(2.2(0.2(1.8) 0.8) 275.7) 235.5(0.5) 518.7) 5.8(8.2(2.7) 1.2(3.0) 2.4) 827.1(0.6(0.0) 321.9) 181.8(3.7(0.3(1.7(2.1(0.3(3.3 (100.5(1.7) 216.8(0.6(2.0(4.0(1.0(8.5(3.7) 7.3(1.3(3.7(3.3) 124.5(0.9) 25. Champaran W.2(2.6(1.5) 441.8(2.0) 154.0) Buffalo 265.1) 0.0) 21.3(1.8) 321.1(6.0(1.1) 405.6(1.7) 39.1(4.3) 12.5(1.4) 196.5(4.8(0.9(9.9(0.0(5.5) 307.7(2.5) 321.5) 92.9(2.5(1.5) 140.6) 122.4) 0.2) 5.3) 254.0) Pigs 51.6) 6.6(5.7(2.8(2.7(1.6(2.0(2.0(1.5) 169.9) 346.8(4.6) 368.7 (100.9) 130.1) 284.7(1.7) 174.5) 1360.9(2.0(3.5) 399.4(1.1) 442.0) 0.3(3.7(3.3) 278.8) 38.1(19.5(0.9) 395.9) 425.7) 1.2(1.4) 114.8(0.1) 80.6) 237.7(2.3) 29.5(1.4(0.5) 510.Table 2.0(3.8) 267.7) 119.8) 18.7) 57.0) 104.5(4.4(1.0) 6.1(2.3) 1.3) 50.2) 9.1) 216.6(0.3(0.5) 4.3(4.3(0.4(2.1(2.0(0.0) 210.8) 133.1) 285.3(7.6) 187.5(2.3) 155.6(3.5(3.4) 627.3(2.2(1.9) 222.2) 12.6(2.3(3.8(2.8(0.9(1.3) 4.3) 59.5(1.1(1.6(1.1(1.1) 299.7(0.9) 58.7) 47.6(0.8) 69.0) 640.4) 413.20 0.1(4.1) 451.4) 223.0(0.9) 170.3) 365.2(2.8) 10470.8(2.6(1.7) 248.0(0.9(2.1) 2.6) 299.4(2.0(3.0) Lambs 17.6) 401.4(0.8(0.6(3.7(2.1) 23.8) 411.19 : Districtwise Livestock Wealth in Bihar (2003) (Figures in 000') District Patna Nalanda Bhojpur Buxar Rohtas Kaimur Gaya Jehanabad Arwal Nawada Auranqabad Saran Siwan Gopalganj Muzaffarpur Vaishali Sitamarhi Sheohar E.4) 47.3(3.0(3.7) 143.7(1.8) 67.2(0.5(1.6) 282.8) 8.

18 0.1 3.74 5.1 0.03 0.03 0.68 1.85 0.52 5.06 0.06 0.3 0.18 9.8 0.08 0.67 0.07 1.57 0.59 10.31 3.32 1.76 3.90 Sterilisation 0.93 3.34 0 9.11 0.04 0 0.87 6.67 0.98 3.05 2.16 0.04 9.68 0.03 0.8 2.26 12.08 1.39 0.19 9.09 2006-07 District Animals treated 1.75 0.07 0.22 1.2 1.56 9.07 0.15 2 1.55 1.8 2.1 3.95 0.76 0.06 1.7 1.03 0.04 4.18 2.8 2.96 3.05 0.02 2.03 0.45 0.08 2.09 0.55 3.02 1.84 3.9 1.69 0.09 0.39 0.78 0.19 1.83 0.95 3.82 0.69 0.66 2.15 0.72 2.20 : Districtwise Breakup of Achievement of Livestock Breading and Health in Bihar (2003) (Free distribution of fodder seed in Quintal & other figures in lakh) 2007-08 Free Free Immunisa.41 7.41 6.31 0.38 0.35 0.05 1.8 10. Champaran W.22 4.74 1.04 0.06 1.02 0.87 0.52 9.6 3 3.91 3.1 8.05 0.9 1.06 2.83 0.12 0.1 0.95 0.67 6.11 1.55 1.19 0.7 0.05 0.02 2.22 1.12 0.48 3.67 3.85 1.02 0.41 0.09 2.06 0.08 0.45 1.16 0.45 3.33 7.7 1.69 29.13 0.02 0.62 0.07 0.2 0 4.48 0.9 1.02 2.04 0.48 0.18 0.78 0.02 0.DistribuAnimals Sterilisatio Immunisa.06 2.72 0.91 0.13 Patna Nalanda Bhojpur Buxar Rohtas Kaimur Gaya Jehanabad Arwal Nawada Auranqabad Saran Siwan Gopalganj Muzaffarpur Vaishali Sitamarhi Sheohar E.19 5.62 1.67 1.07 0.75 0.67 0.16 7.83 0.03 0.43 0.8 0.1 0.58 0.71 0.19 3.8 0.07 0.2 0.11 9.6 1.42 2.34 1.5 0.02 10.59 0.38 0.49 1.07 1.Table 2.04 2.85 6.63 8.88 0.16 0.24 0.78 3.8 10.72 0.66 24.54 0.48 61.3 177.1 0.94 1.03 2.45 0.Distribution tion of treated n tion tion of fodder seed fodder seed 1.89 1.44 0.1 2.34 0.61 0.09 0.09 0.34 0.53 3.03 0.6 0.12 0. Champaran Darbhanga Samastipur Begusarai Munger Lakhisarai Madhubani Sheikhpura Jamui Khagaria Bhagalpur Banka Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Total 82 .14 0.2 8.5 0.09 2.87 3.67 1.93 3.03 0.36 0.04 0.35 9.91 1.3 3.16 0.74 3.2 0.1 0.16 0.25 1.3 0.34 2 146.09 1.

While a total of 24.95 lakh animals in 2007-08. nor socially expedient. (v) To ensure agricultural growth with justice. the figures are — 2. Finally. there was a drop of about 18 percent in the free distribution of fooder seeds. (ii) To ensure food security through increase in productivity.96 lakh animals were treated in 2006-07. the concerned department of the state government provides a number of useful services like breeding.21 lakh (2006-07) and 1. the state government has prepared a Road Map of Agriculture and Allied Sectors in Bihar which identifies a number of development intervention during the period of 2008-12.41 lakh animals in 2006-07.09 lakh in 2007-08. In this background. immunization and free distribution of fooder seeds (Table 2. especially considering the small size of holdings. and also taking into account the richness of natural resources and high level of people's aspirations. 2.09 quintals in 2007-08. it fell to 146. it was 61.8 Road Map for Agriculture Given the substantial yield gaps in agriculture on one hand and low farmers' income and widespread rural poverty on the other. (iv) To revitalise farming in order to create gainful employment and check migration. with programmes focusing on gender and human aspects. The entire challenge calls for a concerted time-bound development effort that could substantially change the technical base of Bihar's agricultural sector. from 177. but the services has been lower for other two components of sterilisation and free distribution of fooder seeds.To strengthen the animal husbandry sector in Bihar. For sterilisation. it is observed that breeding and immunisation services have increased. The improvement in immunisation services was extremely high — compared to 4. sterilisation. 83 .74 lakh (2007-08). a gradual approach for liberating the people of Bihar from the trap of poverty will neither be economically sound. their number has gone up to 29. combined with profitability.20). (iii) To foster nutritional security through raising levels of productivity as well as raising living standards of rural people. If one compares the extent of these services in 200607 and 2007-08.45 quintals in 2006-07. The five major goals of the road map are : (i) To ensure increase in income of farmers to viable levels.

promotion of bio-fertilisers. finally. Seed Multiplication Farms (SMF) and. The specific programmes for agricultural development have been divided into the following 12 heads : (i) Seed Plan : Achievement of ideal Seed Replacement Rate (SRR) for major crops through strengthening of seed infrastructure in the state — Bihar Rajya Beej Nigam (BRBN). (ii) Horticulture : Provision of quality planting materials and establishment of a Tissue Culture Laboratory. access. (iv) Crop Protection : Prevention of crop losses by promoting Integrated Pest Management. Bihar State Seed Certification Agency (BSSCA). Farmers' Training and Exposure Visits.In order to achieve the above objectives. and use of gypsum/ pyrites in 24 districts where the soil has alkaline reaction. Agriculture The programmes for agricultural sector fall into four major groups — (a) input. the Road Map has identified a number of programmes that together cover all aspect of agriculture and its allied sectors. 84 . (iii) Soil Health Management : Improvement of soil health through use of balanced nutrients (N P and K). Awards to Progressive Farmers and Training of Officers at the Rajendra Agricultural University. Field Demonstration. fully Mechanised Agricultural Farm (MAF). operationalisation of Plant Protection Centres and Bio-Control Laboratory. (b) transfer of technology and extension. (vi) Transfer of Technology : Undertaking measures like Farmer's Field School. there are seven dimensions along which the Road Map presents its agenda and a brief description of them is presented below. supply and quality. (v) Farm Mechanisation : Promotion of mechanised farming through provision of financial subsidy for modern agricultural implements. In all. (c) income generation schemes and (d) marketing.

(viii) Integrated Farming Model : Promotion of integrated farming based on the model of the Indian Council of Agricultural Research (ICAR) through financial support to farmers. block and panchayat level for extension work.(vii) Agricultural Extension : Rejuvenation of the Department of Agriculture through appointment of officials at district. (v) Goat Breeding and Rearing Farm. There will be 5 MTMs (at Patna. Animal Husbandry The schemewise programmes for the development of animal husbandry sector includes — (i) Doorstep Veterinary Service. its potential is not fully utilised for several constraints. (vii) Buffalo development. (vi) Disposal of Carcass. 40 ABCs and 1500 RHs. At the top will be Model Terminal Markets (MTM). Dairy Development With a share of about 5. (ix) Soil and Water Conservation : Promotion of soil and water conservation through construction of Water Harvesting Structures. (ii) Door-to-Door Vaccination and Drenching (iii) Strengthening of Animal Husbandry offices. Muzaffarpur. followed by AgriBusiness Centres (ABC) and Rural Hats (RH). Silt Detention Dams. (xi) Micro-Irrigation Project : Promotion of micro-irrigation through drip and sprinklering methods to about 2 lakh hectares of agricultural land. (xii) Agricultural Marketing : Establishment of a wide agricultural marketing infrastructure having three levels. spread over all the 38 districts. The Road Map visualises the removal of these constrains throng several measures like 85 . Bhagalpur and Gaya). the dairy sector is very important in the state's economy. and (viii) Development of Rural Poultry. (x) Mini Weather Stations : Establishment of Mini Weather Stations which could supply useful weather-related information to the farmers. (iv) Extension services for animal husbandry.6 percent of the total livestock population of the country. Purnea. Earthen Check Dam and also promotion of dryland horticulture and agro-forestry. However.

Fisheries Development Aquaculture and culture-based fisheries are valuable options for enhancing rural income. microcredit and other priority and non-priority sector credit.. credit for investment. and establishment of Fisheries Research Centre. the proposed road map envisages development of fisheries sector through (a) construction of water bodies like ponds and tanks. feed production. building of specialised infrastructure (dairy plants. animal health care and animal nutrition). Financing the Road Map The total financial requirement for all the programmes under the Road Map is Rs. finally. the Road Map visualises a critical role for the cooperative sector in five distinct areas — short term agricultural credit. (b) intensive and semi-intensive fish culture in ponds. Cooperative Sector The cooperative sector will continue to play a major role in the development of agriculture and allied sector in the state. 6135. Institutional Finances Institutional finance is expected to play a major role in promoting agricultural development. The specific programmes for the sector includes arrangement of fingerlings as seed.21. The Road Map plans to reverse this trend so that it could help the agricultural development. In the recent years. chilling centres and bulk coolers) and arrangements for efficient marketing. In particular. agricultural extension services. development of fisheries in water-logged areas. and (c) construction of inlet and outlet for easier passage in mauns (oxbow lakes) for culture-based fisheries. credit for non-farm activities. The details of this amount for different sectors and years are presented in Table 2. 86 . Overall. training and extension services. crop insurance. The Road Map has estimated the total credit requirement for different components like short term credit for production and marketing. storage and marketing and. an analysis of Annual Credit Plans in Bihar reveals that the credit disbursement in only about 80 percent of the target. marketing infrastructure.37 crore. However.animal input programmes (breeding facility. the cooperative sector has been weakened due to their poor financial conditions. spread over five years. even when the absorption capacity is much higher than the target. supply of agricultural inputs.

02 941.63 676.92 139.10 92.45 228.34 471.27 3757.31 199.02 213.12 Animal Husbandry 180.07 114.70 977.18 1504.75 118.99 196.48 411.2 1597.25 1402.97 87 .97 116.13 Total Dairy 115.41 197.38 125.13 916.18 1632.78 Fisheries 122.Table 2.69 Cooperative 60.65 819. crore) Sector Year Agriculture 2008-09 2009-10 2010-11 2011-12 Total 922.21 : Financial Requirement for Road Map of Agriculture and Allied Sector in Bihar (Rs.37 6135.34 157.

That the performance level of agro-based industries in the state is not satisfactory is clear from the fact that such industries in Bihar constituted a very nominal share of only 0.05 19 Leather/ Leather Products 12324 69 0. 4.48 21-22 Paper/ Printing/ Publication 35639 230 0. of which manufacturing sector accounted for only Rs. since most of the large and medium industries and their ancillaries fell in the newly created Jharkhand state. leather. Bihar was not benefited precisely on account of its weak infrastructure and dysfunctional support institutions.664 crore (5. the state lagged much behind other states in respect of industrialisation. as against India's Rs. 94. 3. the situation became worse.489 crore.69 17-18 Textile/ Textile Products 134831 62 0. 4. 000 Crore) NIC Industrial Group Bihar's Code All India Bihar share (%) 15 Food/ Beverages 204255 1209 0. After division.56 20 Wood/ Wood Products 4187 20 0.572 crore (Table 3.48 percent in the total production of agro-based industries at the all-India level. There are practically no mineral based industries left in Bihar and the agrobased industries including textiles.1) Table 3. In absolute terms. was around 48 percent (Appendix I).59 16 Tobacco Products 12336 332 2. The Net State Domestic Product (NSDP) at current prices for the present Bihar in 2007-08 was Rs.922 crore. 2004-05 88 . 1.CHAPTER III INDUSTRY AND ALLIED SECTORS Industrial growth in Bihar has been stunted greatly by severe infrastructural constraints.1 Structure of Industries The vivisection of the state brought about major changes in the overall structure of industries in the present Bihar. Even before bifurcation.65 Total 403572 1922 0. The share of gross value added of petroleum and atomic fuel.16 percent).1 : Size of Selected Agro-Based Industries in Bihar and India (2004-05) Production Value (Rs.03. While the overall industrial sector in the country saw a surge in output and productivity during the economic reform period since 1991-92. This is coupled with non-delivery of services expected of both national and state governments as well as para-statal agencies.48 Source : Annual Survey of Industries. however. Bihar's production value in 2004-05 was only Rs. wood and paper accounted for nearly 43 percent of the gross value added.

These units are also concentrated only in a few divisions of the state and in a few industrial groups only. as many as 10 districts do not have any large/ medium industrial unit and in another 11 districts. Food/Beverages Tobacco Products Textile/Textile Products Leather/Leather Products Wood/Wood Products Paper/Printing/Publication 89 . all the regions including Kosi can have fairly good number of agro-based industries.2 Large and Medium Industries As discussed above. After declaration of the new liberalised Industrial Policy of 2006 by the state government. beverages and tobacco as also cotton. The Kosi division. jute.3 percent respectively as their share. As may be seen from Table 3. there are only less than 5 units in each. the highest concentration (38 percent) is in Patna division with Tirhut division ranking a distant second (22.2. however. leather. of the total of 263 large and medium industrial units. etc. does not report any large or medium industries. as a result of bifurcation of the state.5 percent and 7. most of the large and medium industries fell into the area of Jharkhand. accounted for around 60 percent of the large and medium industries. Bihar is now left with a few large industries along with some medium units. a number of proposals for setting up large and medium industries have been received and they are likely to materialise in near future.5 percent). An examination of districtwise spread of large and medium industrial units reveals that out of 38 districts in the state. With the development of proper and adequate infrastructure. Again. This leaves a large scope for development of agro-based industries in the state. Magadh and Darbhanga divisions have only 9. the agrobased industries including food.Size of Agro-based Industries in Bihar and India (2004-05) 250000 200000 150000 100000 12336 332 12324 1209 62 69 20 50000 0 4187 204255 134831 35639 All-India 230 Bihar 3.

1.3) Cotton.68 lakh workers (Table 3.7) Division Total % share Patna Magadh Bhagalpur Munger Saran Tirhut Darbhanga Kosi Purnea Bihar 100 25 10 18 14 59 19 18 263 (100.0) 38.0 9. Although not highly productive.Table 3. 08) Total SSI 1261 35 31 24 21 17 24 20 46 23 1502 Tiny/ micro 72767 3249 3206 3290 3462 3335 3584 3472 2754 3557 102676 Artisan 44413 2530 3314 2983 2616 2897 3333 3612 4402 70100 Total 118441 5814 6551 6297 6099 6249 6941 7104 7202 3580 174278 Investment (Rs.278 permanent registered units in Bihar.8 6.5 3.100 artisan-based units. GOB 3. The small industries sector is dominated by tiny and artisan-based units.3 Small Scale Industries The industrial sector of present Bihar is characterised not only by the small size units.39 5371. the small scale.) 433808 14015 15283 13622 14346 13346 15732 16738 19963 10739 567592 Source : Department of Industry. Government of Bihar 90 . As on December.017.8 100 Source : Department of Industry. tiny and artisan-based industries play a crucial role in providing employment opportunities outside agriculture. wool. 1.8 5. Leather 18 1 3 3 1 6 9 6 47 (17.9) Rubber.31 7279. Plastic. paper. Beverage.07 5430.3 : Permanent Registered SSI Units in Bihar Year Upto 31-03-2000 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 (Upto to Dec.74.1) Material.14 101762. The total investment in these units was to the tune of Rs. Tabacco 22 6 2 2 12 24 9 8 85 (32.38 3805. lakh) 44701.5 7. 2008. machine.15 4192.0 6.04 Employment (in No.04 4638. Jute. there were 1.79 4697. but also by the predominance of unregistered units which account for one-third of the total units.98 8163.3).02.62 crore and it provided employment to 5.2 : Large and Medium Industry Units in Bihar (2008-09) Food. equipments 53 9 3 1 1 16 3 86 (32. which consisted of 1502 small scale units.3 0. metal. chemicals 7 9 2 12 0 13 1 1 45 (17. Table 3.3 22. Transport.676 tiny units and 70.79 13482.

7 7.8 4.2 3.8 10.5 8.5 7. the share of agro-based industries will be still higher.1 100.9 3.0 12.8 percent) reporting the least share.9 13. In 2006-07.4 5.4 percent).9 9.0 Tiny 26.6 7.4 10. the agro-based industries in Bihar accounted for nearly half of the gross value added.1 1. tiny and artisan based units was in Tirhut division (20 percent).4 3.08 lakh tonne respectively.9 17. followed by Patna (17.8 13.24 lakh hectares respectively. 2008) Percentages Divisions Small Patna Magadh Bhagalpur Munger Saran Tirhut Darbhanga Koshi Purnea Bihar 43. the area under fruits and vegetables was 2.0 Percentage share of Population 17.4 9.4 Agro-based Industries Based on the industrial units covered by Annual Survey of Industries (ASI).79 lakh hectares and 8. Magadh and Purnea reported around 10 percent share each with Bhagalpur (4. 91 .3 4.3 15.8 100. Table 3. GOB 3.0 Artisanbased 22.1 7.5 10.3 7.0 Source : Department of Industry.1 5.8 4.4 14.9 percent) and Kosi (5.6 4.1 4.4 : Percentage of Small. However.9 9.9 8.3 7.0 Total 25.8 17.4 100. the potential of agro-based industries is not fully utilised. If the remaining smaller units are also taken into account.7 11.4 5.2 100. tiny and artisan-based industries reveals that their pattern of concentration remained similar to large/ medium units. Tiny and Artisan-based Industries in Bihar (As on October. The development of agro-based industries is largely dependent on the importance assigned to fruits and vegetables vis-à-vis other crops.26 lakh tonne and 136.0 9.0 100.8 10.8 18.An analysis of the divisionwise dispersal of small. The highest concentration of small. with their total production being 34.8 20.0 3.1 14.

it would be worthwhile to push both area and production much ahead of the present level so as to add to both income and employment to a large number of farmers. The processing of mango. Besides processing of cereals.) 60135 37003 50472 46461 322840 54072 253174 Production (tonne) 1008975 623463 962705 916769 5741290 1120579 3234683 Fruits Mango Guava Lichi Lemon Banana Pineapple Others Area (hect. banana. If developed properly.Tabke 3. etc. storage and retention of their nutritive value. In view of huge 92 . Already a Makhana Processing Plant is successfully functioning at Patna. Makhana is another leading crop that may help to enhance the income and employment of rural people. In honey. Food Processing : The food processing industry has a great potential in the state. apart from providing income and employment. Over one lakh families are directly engaged in the honey sector. GOB The increase in the area and production of vegetables and fruits has not been satisfactory in recent years. litchi. In order to increase the volume of agro-based industries. milk and eggs are very important for employment generation. it may generate additional employment to atleast 5 lakh persons.5 : Area and Production of Vegetables and Fruits in Bihar (2006-07) Vegetables Cauliflower Cabbage Onion Tomato Potato Brinjal Other Total Area (hect.90 thousand hectares in about 10 districts in the north and north-eastern part of the state.) 140786 27994 28758 17122 29013 4454 31284 Production (tonne) 1306944 247960 211905 121601 1125099 121057 291919 3426485 824157 13608464 Total 279411 Source : Department of Agriculture. will also take care of seasonal gluts. Makhana cultivation is spread over an area of 16. launched by the central government in half of its districts. The efforts are also continuing to expand horticulture in Bihar through the National Horticulture Mission. the state's average yield is 60 kgs per box. Along with the fruits and vegetables. The Chief Minister's Horticulture Mission has been launched in the remaining 19 districts which were not covered under the National Horticulture Mission. which is three times more than the national average of 20 kgs. great potential remains to be tapped in fruits and vegetables.

Though Bihar is a milk deficit state producing 54. particularly for women. 93 . The active participation of private sector and non-governmental organisations is encouraged and incentives are provided under the new industrial policy. For fish industry. Further. leather and leather products in Bihar has a small share (0. a food park is being established at Hajipur by the central government with state's contribution in the form of land. 2004-05. there is a provision of Rs. efforts in right direction can yield better results here. There is a growing consensus that the dairy sector has enough potential because of its symbiotic relationship with agriculture. The state government welcomes private investment for comprehensive development of tea industry. The rearing of high milk yielding variety of cows and buffaloes will go a long way in enhancing the employment and income in the farm sector. the Industries Department has planned a Rs. Capital subsidy is available for setting up tea processing units in the area. the potential for development of farming and processing of medicinal.56 percent) in its total production of Rs. Leather and Leather Products : According to Annual Survey of Industries (ASI). Kishanganj area has been identified as an ideal zone for tea plantation. Another Rs. 500 crore would be spent on 100 rural commercial and primary processing centres.50 lakh tonnes of milk in 2006-07. For the entire Eleventh Plan period. there appears to be a good potential for industries relating to leather and leather products in the state. 1922 thousand crore from the agro-based industries.00 crore. However. 1760 crore project for development of food processing infrastructure and other facilities in the state. In order to help the food processing units. Dairy : The dairy industry in the cooperative sector under the brand name 'Sudha' is very successful in Bihar. 250 crore is earmarked for creation of two integrated food zones. As a step towards promoting agro-industries. the plan outlay for the purpose is Rs. remembering the successful performance of COMFED. considering the magnitude and quality of livestock wealth. 200 crore. 4. Under the project. The COMPFED markets milk and milk products and provides opportunities for significant rural employment and income. herbal and aromatic plants in the state is abundant because of its natural environment.potential for development of food processing industry in Bihar. Rs.

Another problem is non-availability of high quality sugarcane for crushing. The long term goal is to gradually increase its area to 4.6 lakh hectares. the area under sugarcane in the state was 117. as they did not modernise their plants and equipments. the productivity per hectare works out to around 46 tonne per hectare which is much below the national average of 70 tonne.) (2005-06) 22025 Annual availability of bones (in MT) (2005-06) Source : Department of Animal Husbandry.6 : Livestock Population in Bihar (2003) Item No.36 percent. Based on this. nor did they reorient their personnel through training in modern techniques. Several sugar mills under the state-run Bihar Sugar Corporation had to be closed.84 thousand tonnes (Appendix II). The state government has also announced incentives like 94 . there exists vast potential to increase the farm as well as the non-farm incomes. In 2006-07. As a result. Again. Bihar has the lowest sugar recovery rate at 9 percent in the country. the crushing duration of the mills is only 122 days in a year. An estimated 5 lakh farmers are engaged in the cultivation of sugarcane and another half a lakh skilled and unskilled persons in sugar industries. The objectives during the Eleventh Plan are to enhance the sugarcane production by augmenting the area under cultivation as also its productivity. Pusa and the Rajendra Agriculture University are engaged in research in developing appropriate varieties for different agro-climatic conditions in the state and also to improve the quality of its yield.18 thousand hectares and the production was 5338. GOB Sugar : Sugar has a significant position in the agro-based industry of the state. compared to the national average of 10. directly as well as through ancillaries and related activities. have far lower capacity rendering them non-viable. In view of favourable agro-climatic conditions for growing sugarcane in the state. It generates employment in the farm sector. Cows 10470230 Buffaloes 5765670 Goat 9605722 Sheep 346325 Pigs 626999 Horses & Ponies 115049 Other livestock 26874 17292 Annual Availability of Hides Skins (in thousand no.Table 3. The Sugarcane Research Institute. Those mills which are functional.

Darbhanga. Theoretically. Nalanda. Under 95 . The state government has introduced welfare schemes for weavers in the form of marketing assistance. (iii) To exempt stamp and registration fees for land transfer.rebates for co-generation of power and manufacture of ethanol from molasses and waivers on administrative charges on molasses consumption by distilleries. the cabinet has agreed to the business plan prepared by the agency. The factors for development of area under jute are establishment of jute park. modernization of looms. They are primarily concentrated in the districts of Patna. There are around 1071 weavers' cooperative societies in the state. Bhagalpur. In order to provide infrastructure and technical assistance to jute producers. Jehanabad. on machinery. Gaya. Banka. modernisation of training centres and repair of shed-cum-housing. there is a proposal to establish a Jute Park. Khagaria. Bhabua. Some reputed companies have been given the responsibility of operation of 11 closed sugar mills in the state. Purnea. Arwal. Jute : Jute is produced chiefly in the districts of Kishanganj. Aurangabad. New Delhi. processing and dying centre. 100 lakh has been planned for the development of jute production during the Eleventh Plan period. Nearly all jute mills in Bihar are closed and the jute producers in the state face acute problems in marketing their products. 3. An outlay of Rs. Katihar and Araria. The state government has already come out with a Sugarcane Policy to help the sugar mills.5 Non-Agro-Based Industries Handloom : The handloom industry assumes great significance in the context of Bihar. Nawada.33 lakh weavers are engaged in this sector. and jute raw material bank. with 10. for which a diagnostic survey and pre-feasibility study report has been prepared by IL&FS. nodal centre for product and design development. of which nearly a lakh are outside the cooperative sector. whichever is less. Besides. To exempt purchase tax on sugarcane for five crushing years.503 handlooms are outside the cooperative sector. 10 crore. Around 1. (iv) To grant 10 percent subsidy on capital investment or a maximum of Rs. 23. modern jute service centre. after completion of first year of commercial production. because of a large number of weavers in the state. Madhubani and Siwan. The new Policy for Sugar Industry also grants the following incentive : (i) (ii) To reimburse central excise duty on sugar for 5 years.817 handlooms.

designing and marketing facilities are extended. Rohtas.88 264.11 93. for door to door marketing of the handloom products in rural and urban areas.7 : Status of Debt Waiver Scheme for Weavers Approved Name of Bank State Bank of India Central Bank of India United Bank of India Koshi Regional Rural Bank Central Bihar Regional Rural Bank Central Cooperative Bank Punjab National Bank UCO Bank Union Bank of India Indian Bank Total Amount (Rs. 47 lakh for 470 weavers of 94 societies in 10 districts of Patna. 300 per month. the weavers in both cooperative and non-cooperative sector are provided Rs. there is a scheme of providing bicycles to the weavers. Siwan. Aurangabad. 1500 each as 100 percent subsidy for purchasing equipments and furnishing the looms. The trainees are paid a stipend of Rs. Under the 20 Points Programme. Gopalganj. of Accounts 4086 4330 128 31 3093 528 595 2056 457 — 15304 Sent to District Magistrate for Payment to bank Amount in Rs.28 — 1224. this sector.48 143.00 32.84 2.the debt waiver scheme.24 crore.89 198. lakh) 108. including the powerloom sector.24 No. and 18 trainees are imparted training in each session. during 2007-08.98 No. Table 3. the state government has approved waiving of loans worth Rs. Nalanda. there has been a provision of Rs. 12.89 0.03 18. Under modernisation scheme.80 206. Gaya. has great potential of providing employment and enhanced income to an appreciable number of families. Patna has been revived to provide the theoretical and practical training to the weavers for preparation of sophisticated and designed clothes. 96 .96 17.38 1. of Account 3331 3279 261 779 3087 7054 248 1748 461 07 20255 If proper training.30 351.15 22.65 982.27 224. Besides. Two training sessions of 6 months each are conducted at the Centre.41 181. Madhubani and Banka. lakh 139. East Champaran. During the Eleventh Five Year Plan. the Central Design Centre at Rajendra Nagar.04 24.86 175.

pre. Of the total cost of this plan. Again. Siwan and Nalanda. a Handloom Park at Bhagalpur is also being planned wherein all the necessary basic infrastructure and other facilities like raw material bank. Sericulture : The tussar and silk units are located mainly in and around Bhagalpur. Gaya. There is also a scheme under the Industrial Policy. 34. for Rs. R& D Centre. New Delhi.5 tonne (Table 3. under which 5 pilot project centres and one marketing centre for tussar will be developed. etc. the state government has planned to establish a Textile Park with public-private partnership. In order to increase production. The physical target for production of raw silk during the Eleventh Plan has been fixed at 162. Under the scheme.03 crore has been submitted and the state government has already transferred 25 acres of land as part of its contribution.65 crore. With training facilities for the technical personnel through the Central Silk Board. 97 . artisan village.00 crore is to be borne by the state government and the remaining by the beneficiaries.Textile : For development of textile and handoom sectors. 24. this will provide tussar silk cocoons to the persons engaged in this industry and also help in its marketing. 40 percent or a maximum of Rs. Darbhanga. Powerloom : There are around 11. besides consolation prizes. information and training centre.8). 68. 120 trainees are imparted training for two months each in one year with a stipend of Rs. a diagnostic study and business plan has been prepared by IL&FS. prepared by IL&FS. there is also a provision of rewarding the best three cocoon rearers and silk producers. The silk weaving and printing works are carried out here. Handloom Cluster Scheme : For the integrated development of weavers in seven districts of Bhagalpur. testing laboratory. 40 crore will be invested by the central government as share money and 9 percent by the state government as subsidy and share money. will be made available for the weavers. One powerloom service centre has been established in the state by the Union Ministry of Textiles. the looms of the weavers within the cluster will be modernized and a handloom park with all its amenities and facilities will be established. A detailed project report. Under this scheme. It recommended the project cost of Rs. Madhubani. 300 each. of which a sum of Rs.36 thousand powerlooms in the state. 2006 to provide generators at 50 percent subsidy to weavers in the powerloom sector. Patna.and post-processing facilities. There is a plan for physical infrastructure development during the Eleventh Plan. There is also a scheme for providing cycles to the cocoon rearers and silk producers.

07 (m. a four-year graduation course was being conducted at Bihar Silk and Textile Institute. as per the standard of All India Council of Technical Education. Now the state is left with only one percent of the total minerals deposits in the country which include limestone.41 Quartz/ Silica sand 9.) Steatite/ Talc/ Soapstone 0.03 Gold ore 128.00 20.033 Fire clay 0. this was suspended in the absence of basic infrastructure like building. slate. stone quartzite. The limestone deposits are located in Rohtas. There is a proposal to develop infrastructure of the Institute as per the standard prescribed by AICTE. moram. Among the minor minerals.Table 3. Bihar is left with only limited number of mineral based industries.9: Table 3.66 Chinaclay 1.8 : Proposed Physical Target during the Eleventh Five Year Plan Type of Silk Mulberry Tussar Castor Total Production (MT) 62. In Bihar.m.m.00 162.9 : Reserve of Important Minerals in Bihar (2005-06) Name of Minerals Reserve in million tonne Limestone 210.11 Magnetite 2.50 80.167 gm. laboratory and library. mica. The pyrite deposit is located at Amjhor in Rohtas district.9 (m. magnesite.85 Pyrite 53. Mineral Based Industries : Consequent upon bifurcation.738 Felspar 4. Nathnager in Bhagalpur district. brick. a vocational course in silk technology has again started. The quartz deposits are located in Jamui and Gaya districts. china clay and saltpeter. However.30 Bauxite 2. pyrite. There is also a proposal to develop research cum training along with courses on fashion designing at the Institute.08 Haemalite 0.50 Earlier.cu. (AICTE). are found in Bihar. From 2005-06.cu.88 (Gold content 0.2 Ornamental Granite 35. equipments. soapstone is produced at Shankarpur in Jamui District. and granite. sand.84 Quartzite 203. Bihar is the sole producer of pyrite in India.) Slate Phylite 4. The reserves of important minerals in the state during the year 2005-06 are presented in Table 3. per tonne) 98 .

2 were meant for providing the financial support to industries. In accordance with the recommendation of the study. BISCICO had financed 273 units. These two financial institutions had practically stopped lending operations. primarily on account of extremely poor recovery of loans.6 Industrial Sickness The industrial sector in Bihar is handicapped not only by its small size. inadequate research and development (R & D) facilities.. 271. on the pattern of the central government.74 crore. The shortage of working capital. These units are — High Tension Insulator Factory. has taken up the responsibility of promotion of industries through establishing various support institutions. Such sick industries include large. for revival of Bihar State Industrial Development Corporation (BSIDC). Out of these. Electrical Equipment Factory.3. Namkum (Ranchi). irregular power supply. The rehabilitation of sick/ closed units is not satisfactory. Bihar has had as many as 12 such institutions. 3. After settling all the liabilities. viz. the seed money will be provided to new units to initiate their operations. Tatisilwai (Ranchi) and Bihar Paper Mills (Saharsa). BSIDC took a decision to lease out the three viable public sector units on 'as is where is basis' by inviting tenders. Again. a study has already been completed in March. The BSFC has repaid the loans obtained from SIDBI. It has also introduced an one-time-settlement (OTS) scheme and. non-availability or inadequacy of raw material. medium as well as small units. it also suffers from the more severe problem of a large number of its industrial units falling sick compared to other states. 2007 and the process of its revival has been initiated. delayed and inadequate bank loans are some of the important factors rendering the units sick. as many as 74 units have opted for this scheme. and steps have been taken to repay the loan to IDBI as well. The state government has now taken up the revival of these two institutions and the process is on to clear most of its liabilities. IDBI and SIDBI have already waived the interest upto the 2003-04 which amounted to Rs.7 Support Institutions The state government. out of which 114 have settled the loan. during 2002-06. 99 . inadequate connectivity. Bihar State Financial Corporation (BSFC) and Bihar State Credit and Investment Corporation (BISCICO). It has already paid most of the loans to IDBI and SIDBI and the process is on to repay the remaining loan amount.

00 Amount spent (Rs.00 25.00 50. etc.10 : Physical and Financial Achievement of Udyog Mitra (2004-05 to 2007-08) Amount Allotted (Rs. 07) The reorganisation of Udyog Mitra is on the anvil through obtaining the services of professional experts on contract basis. 3.3.00 50.9 Bihar Industrial Ares Development Authority (BIADA) The Bihar Industrial Area Development Authority (BIADA) is a statutory body constituted under the Bihar Industrial Area Development Authority Act. A committee has been formed to remove the obstacles that the new units face after the approval of the State Investment Promotion Board (SIPB). in lakh) 11. It also provides information and assistance to prospective entrepreneurs to set up industry. It organises seminars and discussions for the entrepreneurs and also publishes books and bulletins relevant for them. roads.00 27.50 crore. The activity details are : 100 . The committee will. electricity. provides assistance in sorting out the problems faced and makes available the desired data.8 Udyog Mitra Udyog Mitra is an institution established in the state which helps the entrepreneurs to establish industrial units. 2. from time to time. Besides. 1974 with the main objective of promoting and assisting the rapid development of industries in the industrial areas and estates under its jurisdiction. Table 3. guides in preparation of project profiles.00 30.66 No.10. The total outlay for the entire Eleventh Plan period for Udyog Mitra is Rs. assess various stages of works and pursue with different departments to remove the problems. It provides computer training to the employees of the industries department from time to time. it takes part in India International Trade Fair at Delhi as also in the state level industrial fairs. of Entrepreneurs benefited 443 957 717 512 Year 2004-05 2005-06 2006-07 2007-08 (Dec. The physical and financial achievements of Udyog Mitra during the period 2004-08 are given in Table 3. BIADA is responsible for providing developed infrastructure in industrial estates like water. in lakh) 11. drainage.00 25.

These 101 . (iv) To implement District Rural Industries Project through NABARD in Gaya. DICs are functioning in all the 38 districts in the state.43 Acres land at Hajipur with developed infrastructure Biscomaun Bhawan. Muzaffarpur. Gidha. Khagaria At present. consultancy and extension services. in 2006-07. These include identification of local resources. It was thought necessary to provide an integrated administrative framework at district level to support micro. are envisaged to be provided under the single roof of DIC. Vaishali. quality input. These centres are performing regulatory as well as developmental roles on behalf of the state government.to post-investment stages of each project. Bhojpur.85 Acres 94. At present.10 District Industries Centres (DICs) The DICs came into being as a result of recommendations of the central government's Industrial Policy of 1977. Patna Patna With Modern Facilities / Infrastructure at Kahalagaon. provision of raw materials. of Industrial Areas Acquired land Export Promotion Industrial Park Software Technology Park Agri-Export Zone Growth Centres 46 4370. BIADA has plans for extending its activities and the projects include : (i) (ii) Strengthening and upgradation of Fatuha Industrial Area under Integrated Infrastructure Upgradation Scheme (IIUS) Establishment of Food Park in 100 acres at Begusarai and 100 acres at Hazipur. Aurangabad. arrangements for credit facilities. (v) To develop Air Cargo Complex at Patna Airport (vi) To construct an Integrated Textile Park (vii) To construct Inland Container Depot at Shitalpur 3. small and artisan-based industries which are widely dispersed in rural areas and small towns. Nalanda and Purnea.No. marketing. Maranga (Purnia). 11 more were opened in the newly created districts. (iii) Establishment of Mega Industrial Park in 1000 acres at Bihta and 1000 acres at Hazipur. Begusarai. ranging from pre. Upto 2005-06. supply of machinery and equipment. All the services and support required by small entrepreneurs. there were 27 DICs and.

For 2009-10. Under this scheme. The DICs are functioning as nodal agency for the implementation of Prime Minister Rojgar Yojna in the concerned districts. 9522 crore. both male and female. Under this project. guidance and facilities to willing entrepreneurs in setting up the small scale industrial units. The implementation of this project was started in 2007-08. are being given loans from banks for investments in service sector in order to make them self-employed. During 2007-08. The districtwise progress report for the last 5 years is given in Appendix III.12 Information Technology There is an independent Department of Information Technology (IT) to execute e-governance related activities and for expansion of Information Technology in the state. Many basic infrastructures and projects related to IT are being developed by the Department. besides granting provisional/ permanent registration. The basic infrastructure for this network is being set up by a consultancy firm and 2 mbps band width is being provided by BSNL. 3.187 unemployed were granted loans amounting to Rs. ex-serviceman. physically handicapped and women. 102 . only 8. All the DICs are being computerised and necessary approval has already been accorded for purchase of equipments. 3710 crore has been made for SWAN. only 4176 units with an investment of Rs. the provisions for extension of the current projects and the new ones have been made as under : (i) SWAN : This is a centrally sponsored project. 3. an outlay of Rs. against the target of making 15. 8636 lakh and employment potential of 12793 persons were permanently registered through DICs. During 2009-10. During 2007-08.000 youths self-employed. arrangements are being made for vertical network connectivity from state headquarters to all the block headquarters. The purpose is to provide sustainable self-employment opportunities to educated unemployed youths between 18-35 years of age with a relaxation of 10 years for SC/ST.centres provide all initial information. against the target of providing permanent registration to 7000 tiny industries. raw material assistance and sponsoring of loan applications to banks and other financial institutions.11 Prime Minister Rojgar Yojana (PMRY) The PMRY is a scheme of self-employment launched in 1993. the youths.

00 Total 3710. It is proposed to implement horizontal connectivity scheme in 2009-10.00 1500.55 crore has been made for all the components of the Sec-LAN Project for the financial year 2009-10.11). This will result in BSWAN (Bihar SWAN) ensuring implementation of centrally sponsored SWAN Project.00 Vertical Bandwidth Operator QGR Payment State Share Horizontal Bandwidth Horizontal Operator QGR Payment PCs for Horizontal Offices After connectivity of regional offices under BSWAN is completed. 250 printers and EPABX/VoIP in all the government departments up to 103 . all the offices in the secretariat buildings. Under the Sec-LAN Project.11 : Outlay for BSWAN Project for 2009-10 (Rs. Table 3. 30 crore has been made for 2009-10 under this project. it is estimated that 7. An outlay of Rs. (ii) State Data Centre : The centrally sponsored State Data Centre (SDC) Project is to be implemented by the state government. computerization of all the government departments has also been planned. A provision of Rs. including CMs residence and residential offices are being connected through a fibre optic Local Area Network (LAN).00 60. In the last financial year of 2007-08. This will ensure connectivity of all the state government offices.The funds approved for SWAN project are meant to be used for vertical connectivity. an approval was granted for installation of 1100 computers.500 personal computers shall be installed in the regional offices in 2009-10. 15 crore has been earmarked for this. A sum of Rs. The outlays for complete BSWAN project for 2009-10 has been earmarked (Table 3.00 800. whereas there is a need for horizontal connectivity of all the PoPs (Point of Presence) to the local offices also. (iii) Sec-LAN : In the current financial year of 2008-09. 9. in lakh) 1250.00 100.

For the current year (2008-09). etc. is planned on a public-private partnership basis with Beltron as an important player. 4. 104 .70 crore has been made for the financial year 2009-10. IT Park. Computerisation of treasury. in lakh) 3710 3000 955 4000 300 520 50 12535 BSWAN SDC Sec-LAN Knowledge City IT Bhawan Capacity Building DPR Preparation Total A beginning has been made in the state to exploit the great potential in the field of Information and Communication Technology (ICT) with a view to expand knowledge base and employment in various sectors of the economy. IT Bhavan. provident fund. 48.the section level.00 crore has been provided. it has been decided to provide personal computers upto the assessment level for which an outlay of Rs. including knowledge city. Table 3. It will also disseminate very fast the latest technical know-how to the different sectors. an outlay of Rs. (iv) Other projects : For other relevant projects of IT department. finance. registration of properties. Video-conferencing in all the 38 districts has already been in operation. IT Fairs and Conferences and other capacity building measures. IT academy. e-governance. electricity bills. industries and marketing.12 : Plan Outlay for Information Technology Department (2009-10) Projects Amount (Rs. tax collection. particularly agriculture.

The people can seek information under the Right to Information (RTI) Act. IT Industry is also eligible for exemption under Section 87 of Employees State Insurance Act. Women would be able to work between 5 a. which has been given the 'Gold award'. 105 .m. 'Jankari' is developed as an additional mode for seeking information under RTI apart from the conventional way of giving applications to the office concerned.00 crore. IT industry has been added in Schedule 1 of Bihar Shops and Establishment Act.m. Besides computer and printer. The beneficiaries will be provided with computer sets and other accessories through Beltron. to 10 p. The industry would be given exemption in provisions relating to hours of opening and closing of establishment. The handicaps like illiteracy. The hours of work for women employees has been relaxed under Section 66 of the Factory Act. from this centre. geographical remoteness and financial hardships do not come in the way. 1. 1948. The operator. 'Jankari' model is simple and universally accessible. 'Jankari' is the first effort of its kind in the country where technology has been used to bring RTI to the masses. to 7 p. receiving the call.. 20 thousand for encouraging the purchase of machines and equipments to computer trained unemployed women and youth for establishing information technology centre. Under the Prime Minister Rojgar Yojana. telephone and internet facility. photocopier machine. It enables people living in the remotest area of the state to submit applications for information under RTI by using private or public telephone by dialing 155311. there is a provision for giving 20 percent subsidy for an investment. drafts the application under RTI Act and sends the same to the authorities concerned for providing the requisite information to the applicant. instead of 6 a. the applicant is entitled to file the first appeal and later the second appeal to the appellate authority and the State Information Commission respectively. there has been an provision of Rs. 8 and 12(A) are now extended to it. hours of business and weekly closures.m. 1953 and concessions under Sections 7.m. the centres shall have fax machine. In case the information is not provided by the authorities. There was no additional cost and no fresh appointments were made for the project.Bihar's 'Jankari' Simplest and Best Bihar has made its presence felt in e-governance through 'Jankari'. The applicant is provided with a reference number of the application by the call centre. For the financial year 2007-08. 1948. subject to a maximum of Rs.

91. 2008). however. The sectorwise break-up of approved proposals is given in Table 3.75 thousand crore and employment potential of 1. 22. a number of proposals to start new ventures are being received by the state government.13 Investment Proposals With a series of initiatives taken by the state government and improvement in the law and order situation and infrastructural facilities in the state. Table 3. one is ready for production. During 2006-07 (upto January 2007).91 thousand crore are in the advanced stage of implementation.14. 15 proposals have already been implemented and are working.13 : Details of SIPB Approved Proposals (upto December. 2007). and as many as 49 with a total investment of Rs. the cumulative total of proposals approved by SIPB has gone upto 164 with an aggregate investment of Rs. The remaining 99 proposals are. Again in 2008-09 (upto December. The status of approved proposals is presented in Table 3. under different stages of implementation. of Proposals (Approved) 23 14 07 02 14 20 24 16 15 17 35 Total 164 Sector Sugar Mills (a) New (b) Expansion of working Mills (c) Ethanol Plant by working Mills Ethanol Plant Power Plant Food Processing Steel Processing and Cement Plant Technical Institutions (Engineering & Management) Medical Institutions College & Hospital) Others (Medical Out of 164 approved proposals.23 lakh persons. a total of 72 proposals were approved by the SIPB which increased to 115 in 200708 (upto December.3.13. 2008) No. 106 . The State Investment Promotion Board (SIPB) examines the proposals submitted to it and approves for further implementation.

With improvement in law and order as well as infrastructural facilities at various tourist destinations. 'the distance travelled by Bihar tourism has been wonderful'. the number of both foreign and domestic tourists has recorded an increase from 69. However.14 : Status of Proposals Approved by SIPB (upto December. facilitator and infrastructure provider.30 lakh in 2007. the tourism sector remained neglected in the past. Last year. There are various religious destinations in the state which are being developed to attract tourists like Gaya. As may be seen from Appendix IV. both domestic and international. Sonepur fair and Shravani Mela at Sultanganj are favourite destinations of tourists. Bodh Gaya. the department has prepared two and three weeks' packages and tied up with Munger Yogashram. 15 1 49 99 164 3. The tourism department acts not only as a promoter. Rajgir. Bodh Gaya. The third notable package developed 107 .Table 3. besides the capital town of Patna. For the tourists willing to take Yoga course. Vaishali. The tourism department's recent tour packages of Pindadaan and Yoga has been very popular with NRIs during the three-day Pravasi Bharatiya Diwas celebration at Chennai in January. Yoga has become very popular among the NRIs. the sector has not made much impact in Bihar. Rajgir.14 Tourism Despite great potential to emerge as the leading industry in Bihar. civilisation. 2009. Apart from a few places intensely involved with tourism.65 lakh in 2006 and to 105. Due to the lack of better connectivity and coordination among the related departments. but is seriously involved in improving the standards of tourism products and services in Bihar. 2008) Sector Implemented and Working Ready for Production Advanced Stage of Implementation Different Stages of Implementation Total No. The State Tourism Development Corporation (STDC) has taken a number of measurers to develop tourism. No state is as much privileged as Bihar in terms of possessing a variety of treasure of history. Pawapuri. there remains much potential to be exploited. religion and culture to attract tourists.44 lakh in 2005 to 107. as also Patna Sahib Gurudwara. With the UNESCO World Heritage status granted to the Mahabodhi temple complex at Bodh Gaya. tourism has remained neglected all through. places like Gaya. the department introduced a special package 'Pindadaan' during 'Pitripaksh Mela at Gaya'.

major highways. all these factors. the Planning Commission appointed a committee for identification of hundred most backward districts in the country. The Policy of Freight Equalisation introduced immediately after independence stayed for long period and played havoc in de-industrialisation of the state. Industrialisation of any region. waterways. many of them falling in Bihar. Again. both trunk and arterial. Mauritius. these endeavours did not make any significant impact and inter-state and intra-state disparities persisted. Fiji. etc. Similarly. size of market including export markets. growth had decelerated in the state. On the basis of indicators of (a) deprivation. prima facie. Surinam. This had an obvious negative impact on the overall economic growth of the state. This has also become a very popular package among the NRIs. The problems of backward areas in the country and districts within the states have received attention from policy makers and planners which led to specially designed packages for their accelerated development. special packages related to Buddhist and Jain circuits have also been prepared. infrastructural support. for industrialisation of the state.is "Trace Your Roots" to attract tourists from West Indies. The high growth performance of the national economy during the economic reform period also bypassed Bihar and. except natural endowment. local availability of skilled manpower.15 Problems and Prospects of Industrialisation in Bihar Bihar is the victim of apathetic national policies which created constraints. were not favourable for industrial development. the Committee identified 100 districts spread over several states. are very critical for industrial development. Infrastructure. whatever industries worth the name were in the erstwhile Bihar. and industrial policies of the central and state governments. airports and 108 . In 1977. Indonesia. However. The power plants and transmission network. (b) social infrastructure. The de-industrialisation of the state on a large scale led to weak infrastructural development with specific implications for the industrial sector. As a result. went to Jharkhand as a result of bifurcation. depends on natural endowment. in complete contrast with southern and western states. Bihar remained at the bottom in terms of both human development and economic infrastructure. both structural and institutional. railways. 3. and (c) economic infrastructure. In undivided Bihar.

Again. etc. Again. 2006 and grant of pre. The inadequate and irregular power supply forced many of the industrial units to flee out of the state. for better income and employment generation. designing. as a result. However. many of them are either sick or closed due to paucity of fund and proper marketing facilities. the states' economy remained unchanged. For industrial development in any region. The remaining 19 are covered under the National Horticulture Mission. the artisan based industries including handloom have started showing better prospects in the state due to the initiatives of the state government. there remains a great potential in non-agro-based industries too. therefore. agro-based industries have a place of prominence in the overall industrial scenario. Bihar's economy is primarily an agricultural one and. Most of these requirements are being taken care of during the Eleventh Plan period. leather and leather products in the state. new investment proposals have started flowing in Bihar and 164 proposals have already been approved and more are in the pipeline.and post-production subsidies. this trunk infrastructure needs to be supplemented by adequate and well developed arterial infrastructure. rather it became worse. sugarcane. the units which ventured to stay back. 109 . On the other hand. the banks' apathetic attitude and their poor spread played truant and. most of them catering to local demands. dairy. With the adoption of Industrial Incentive Policy. is quite inadequate posing problems in industrialisation in the state. the industry specific special infrastructure like cold storages. 19 districts are covered under the Chief Minister's Horticulture Mission. Over and above.telecommunications are broadly trunk infrastructure. This sector requires support of finance. In order to expand horticulture in Bihar. etc. dry ports. Based on the Annual Survey of Industries too. There are great potentials in food processing. marketing. the credit-deposit (CD) ratio in 200708 remained far below (32 percent) the national average of 73 percent in 2006. The size of non-agro-based industries in the state is very small. training. The poor roads and transport condition served as a major deterrent for private investments. In the absence of their proper network in Bihar. the agro-based industries have a major role in Bihar's industrialisation.

boats. Furniture. Transport Equipment etc.44 0.01 3.20 1.62 0.56 0.10 0.88 77.80 100.76 0. of in Factories operation 280 21 8 119 55 46 51 20 779 88 49 11 4 5 137 251 17 8 105 45 40 46 20 642 72 49 11 3 4 125 1438 15-16 17 19 20 21-22 23 24 25 26 27-28 29 31 35 36 Food / Beverages/ Tobacco Textile/Textile Products Leather/Leather Products Wood/Wood Products Paper/Printing/Publication Coal/Petroleum/Atomic fuel Chemical Rubber/Plastic Products Glass and Glass products Basic Metals/ Metal Products General Purpose Machinery Electric Motors/Generators/ Transformers Building & Repair of Ship.61 0.69 100.78 0.56 7.78 1.09 0.65 5.64 0.Appendix – I Structure of Industries in Bihar (Annual Survey of Industries 2004-05) Total Output (Rs.25 2.89 4.45 0.03 0.18 0.41 0. etc.27 8. Other Total 1673 110 .00 Total Output 12. In Crore) 346 20 16 3 95 543 5 10 45 20 7 1 1 0 9 1121 Percentage share Factories in operation 17.21 0.30 100. Musical instruments/ Export Goods.39 44.45 0.16 1.51 0.78 3.01 1.00 Gross value Added 30.87 1.14 0. In Crore) 1541 62 69 20 230 9495 78 53 275 300 30 17 12 4 37 12223 Grosse value Added (Rs.68 0.45 1.43 2.25 0.47 48.30 3.00 NIC Code Industrial Cluster Factories No.09 0.28 8.43 0.13 2.00 0.

Champaran 6152 W.) Production (M.Champaran 55330 Sitamarhi 2222 Sheohar 1174 Vaishali 122 Darbhanga 152 Madhubani 713 Samastipur 2707 Begusarai 2937 Total 96790 Saharsa 22 Supaul 0 Madhepura 179 Purnea 0 Araria 144 Kisanganj 0 Katihar 39 Khagaria 142 Total 526 Patna 452 Nalanda 169 Bhojpur 233 Buxer 379 Rohtash 118 Bhabhua 359 Gaya 922 Jahanabad 206 Nawada 84 Aurangabad 231 Munger 0 Lakhisarai 0 Sheikhpura 38 Jamui 491 Bhagalpur 2341 Banka 850 Total 6873 Grand Total 104189 10434 283 11965 0 0 189 178224 3775 135391 4190 163135 4318 765619 17759 856202 30634 1515989 22557 28014 354 14017 614 27068 566 246419 6238 206380 6596 206209 6329 2349844 55993 2377461 57227 2678711 56183 77119 2232 120358 2451 108086 2302 40092 1923 76145 2019 76621 1705 4609 114 4514 113 4981 116 2024 105 3068 670 23328 309 9399 586 18392 205 6510 501 36187 2719 78762 2508 88181 2645 79407 2035 77770 1998 79459 2323 3827391 94116 3980425 109225 4978278 100044 1056 29 1291 58 2638 36 0 0 0 0 0 0 6531 273 11353 273 12458 242 0 2 82 0 0 1 5254 0 0 0 0 48 0 0 0 83 3788 28 1423 8 327 168 7621 72 3780 142 5550 0 0 95 521 18044 454 18603 582 26505 17156 422 17445 341 15321 405 7021 182 7651 193 8370 181 9563 126 5278 184 7860 181 15885 370 15580 454 23883 401 4948 178 7485 0 0 99 15046 285 12001 246 6073 297 33154 825 22228 1451 51789 1066 7407 327 8602 275 9769 269 3020 118 3192 142 5045 115 8306 223 5866 216 7673 223 0 0 0 0 0 0 0 0 0 0 0 0 1824 18 234 31 1258 29 23159 287 4747 207 2511 328 84534 2052 82616 2245 122824 2213 35264 1260 48510 1387 71681 1166 266287 6673 241435 7372 334057 6973 4111722 101243 4240463 117179 5338840 107537 Source : Directorate of Statistics & Evaluation.) Production (M. Bihar 111 .) Production (M.Appendix II Area.) 2004-2005 Name of Districts Area (ha.T.) 2005-2006 Area (ha.T.T.T.) Area (ha. Production & Productivity of Sugarcane (Kg / Hec.) 7466 158917 1045937 23033 219669 2468672 101854 64286 4701 9473 11434 67710 78879 4262031 1662 0 10114 27 1751 1263 3124 3110 21051 16641 7681 7567 18449 4144 11040 35724 8593 3752 7282 0 0 1105 10139 96658 51818 280593 4563675 39574 36803 46368 40694 34710 43940 44252 37697 40413 30658 22807 25602 33951 42602 45734 0 41851 41000 36486 45639 43586 32852 40430 41088 42357 41807 46008 42003 37213 33512 31903 32724 32604 0 0 38115 30880 43684 44454 40242 42438 Saran 283 Siwan 4989 Gopalganj 19279 Muzaffarpur 730 E.) 2006-2007 Area (ha.) Average Production Productivity (M.

32 65.02 39.41 74.76 72.81 295 141 115.71 647 131 88.00 125.14 704 199 173.55 53.90 23.00 81.00 78.19 310 122 129 108.80 51. Amount Target (%) 3 4 5 6 184 184. Champaran 502 Gaya 606 Gopalganj 266 Jamui 221 Jahanabad 305 Kaimur 272 Katihar 401 Khagaria 206 Kishanganj 167 Lakhisarai 170 Madhepura 266 Madhubani 486 Munger 243 Muzaffarpur 764 Nalanda 512 Nawada 324 Patna 1257 Purnea 318 Rohtas 372 Saharsa 301 Samastipur 518 Saran 581 Sheikhpura 147 Sheohar 105 Sitamarhi 450 Siwan 439 Supaul 188 Vaishali 443 W.57 80.00 63.80 73.97 93.70 60.26 311.17 929 440 442.54 41.43 83.48 796 446 373.86 68.41 312 413 361.43 58.13 449 140 102.00 575 263 245.91 73.89 44.87 81.21 63.34 67.00 45.60 203.92 997 485 394.50 62.67 47.23 46.38 300 308 263.05 66.05 351 243 232.06 1475 280 243.80 142.69 428.11 15829 2003-04 Disbursement 2004-05 Disbursement No.00 75.62 279.45 61.95 59.77 336 334 303.69 277.41 416 293 260.36 33.49 519 232 192.73 54.44 212 57 48.40 134.35 223.12 2198 1141 1132.60 467 342 285.17 210.54 69.41 318.25 25000 12376 10653.09 69.62 942 507 365.59 74.10 343.70 230 107 81.29 84.71 41.53 57.93 1048 607 527.41 67.94 162.35 642 217 169.97 56.46 71.07 184 124 106.78 327.15 32.46 89.00 358.53 458 181 133.56 330 189 166.67 48.84 270 371 301.34 2005-06 Disbursement Disburs ement against Target No.89 384 254 221.92 Disbur sement against Target (%) 13 31.61 15.51 57.81 445 158 125.24 45.09 680 267 233.63 65.66 420 9520 8014.63 43.06 64.82 65.90 90.23 284.10 541 160 121.84 60.88 60.20 734 393 392.81 45.15 64.26 63.00 468 206 180.28 166.06 68.25 40. 7 236 53 170 177 480 340 278 190 380 430 443 194 169 156 195 303 176 105 116 238 438 213 404 327 156 813 318 304 168 280 433 121 19 371 317 157 339 322 10329 Amount 8 203.30 88.86 76.43 770 322 264.67 66.43 326 337 261.76 457 165 124.80 246 195 140.40 57.64 73. Amount Target (%) 9 10 11 12 76.05 304 197 168.00 52.78 493 320 259.05 53.28 61.84 68.56 858 229 183.88 166.34 146.83 226.28 69.23 37.09 1457 476 383.29 542 262 215.24 76.23 8954.94 190 217 190.01 620 370 296.45 223 318 269.11 52.70 734 354 255.98 298 843 756.33 244 138 116.40 336 168 143.00 277.87 77.70 48.65 56.34 57.03 991 403 244.) 112 .84 44.25 68.80 65.85 60.52 64.15 204.12 165 25 16.04 465.18 26.92 45.00 500 328 302.57 66.12 492 108 90.65 241.79 46.72 19.54 360 316 258.96 46.52 332 210 187.74 40.78 303.12 135.40 70.82 48.58 296 365 310.48 583 405 303.28 61.42 580 250 184.38 50.56 28.71 68.04 65.67 606 491 424.00 54.62 683.01 64.87 66.49 133.00 64.23 67.76 750 344 262.70 72.34 55.71 555 419 348.83 115.06 76.46 74.07 312 180 140.82 50.34 267.50 DIC Target 1 Araria Arwal Aurangabad 280 Banka 293 Begusarai 566 Bhagalpur 523 Bhojpur 413 Buxar 281 Darbhanga 558 E.04 615 229 211.91 140.03 57.58 373.92 36.70 375 197 160.40 393.32 422 204 169.64 47.93 218 186 191.73 572 136 111.80 70.90 498 233 179.90 74. Champaran 378 Total 14400 2 278 (Contd.96 758 440 489.99 48.02 49.27 44.07 306 124 93.81 120 306 286.26 76.20 80.29 990 465 392.59 58.83 246 69 66.33 903 610 532.39 71.Appendix III Progress of Prime Minister Rojgar Yojana (PMRY) (2003-04 to 2007-08) Disburs ement against Target No.

14 107.10 231.64 312.82 69.97 195.57 83.32 183.92 84.30 123.64 63.35 83.01 505.72 56:06 64.50 130.28 55.00 71.63 248.91 66.26 75.85 200.15 54.84 139.46 210.50 82.00 272.64 469.68 65.77 148.30 109.33 61.00 61.11 75.63 58.72 69.45 176.42 312.77 445.) 2006-07 Disbursement Target 15 206 135 230 231 440 405 330 220 430 400 480 210 180 200 230 314 164 134 140 206 385 194 584 394 254 920 255 294 242 397 446 124 100 350 350 176 350 300 11400 DIC 14 Araria Arwal Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga E.87 95.Appendix III : (Contd.50 50.77 Disbursem ent against Target (%) 18 49.52 68. Champaran Total No.00 72.02 2007-08 Disbursement Target 19 270 180 299 300 580 530 440 290 565 527 631 278 239 265 301 415 215 180 185 300 507 257 724 514 329 1204 335 388 350 520 587 164 130 459 459 229 460 394 15000 No.41 63.29 114.59 250.88 49.81 47.22 43.69 269.53 106.54 307.07 42.17 71.00 121.40 428 222.90 54.31 199.10 250.45 55.86 77.29 64.76 82.00 93.99 616.04 68.62 352.46 178.30 51.87 186.33 49.36 65.63 275.00 452.71 72.00 367.55 77.22 59. Champaran Gaya Gopalganj Jamui Jahanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada Patna Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali W.58 69.84 76.00 96.58 (Concluded) 113 .73 62.50 309.00 176.94 99.62 45.71 172.02 325.62 Disbursem ent against Target (%) 22 44.68 192.86 104.17 148.91 273.34 60.85 47.40 105.24 65.77 50.90 135.46 71.86 7002.77 180.62 190.95 223.77 242.00 109.67 71.54 83.30 320. 20 119 76 130 195 295 263 200 161 389 251 367 162 122 173 166 226 153 111 103 195 238 256 340 162 154 569 253 265 180 237 406 117 79 231 226 150 231 236 8187 Amount 21 135.28 230.61 46.00 189.72 188.45 276.78 62.95 115.60 199.27 51.03 53.00 79.28 204. 16 101 72 141 166 342 254 185 142 335 266 398 178 149 125 146 217 123 96 89 171 247 185 382 250 139 638 214 226 230 271 374 130 76 216 253 113 238 218 8096 Amount 17 82.25 445.26 83.20 68.07 9521.05 95.50 63.92 76.41 256.79 253.16 95.16 61.72 120.69 129.16 58.43 45.48 65.10 154.60 123.30 71.00 46.90 87.52 46.00 50.48 69.01 64.05 65.45 54.67 55.00 207.96 31.52 68.48 278.

1 19.0 14.9 348.1 40. 2008) (Figure in 000) 2005 Place Tourist Jan to April to July to March June Sept 427.7 0.2 0.0 6.3 45.2 Oct to Dec 506.3 2008.6 17.5 2.6 8.0 0.0 0.0 2125.5 1.0 890.6 6.0 20.3 0.2 701.5 71.9 10764.0 0.0 0.0 2008.9 0.) 114 .0 0.3 0.8 1.0 0.0 0.0 0.5 0.6 4.1 1.9 18.0 2803.4 2.3 0.5 1.0 0.0 0.8 46.7 0.5 165.0 0.9 Oct to Dec Total 2006 Jan to April to July to March June Sept 634.4 2496.0 0.6 28.0 69.5 0.0 0.1 7.9 0.0 30.3 4.0 24.0 0.0 0.4 12.Appendix IV Statistics of Domestic and Foreign Tourist Visit to the State of Bihar 2005-08 (upto September.5 1.7 1.0 0.9 18.0 18.6 0.0 0.9 68.0 Total 2008.1 0.2 0.7 10.9 0.8 29.0 376.1 18.3 0.4 0.1 77.0 Patna Domestic Foreign 370.0 322.0 481.0 100.1 0.0 0.6 30.5 0.1 0.0 0.0 1155.0 0.7 0.4 77.4 735.3 20.8 1.8 0.7 1.8 52.1 0.0 0.5 3.0 121.0 0.0 0.5 196.0 1487.3 1.0 26.9 0.0 0.0 0.0 0.6 0.2 1.0 0.6 0.6 0.1 6880.0 0.0 89.6 14.9 314.6 14.7 0.5 81.4 2507.1 16.4 64.8 385.5 0.0 297.0 0.0 0.9 4.8 0.7 Bodh Gaya Domestic Foreign Rajgir Domestic Foreign Raxual Domestic Foreign Munger Domestic Foreign Vaishali Domestic Foreign Muzaffarpur Domestic Foreign Sonepur Fair Domestic Foreign 0.8 219.2 37.0 0.8 0.6 5.0 234.3 10.0 1155.8 0.9 0.7 9.0 261.6 705.0 0.7 20.9 180.7 0.7 3.0 170.3 49.7 (Contd.0 730.0 0.5 12.0 0.5 0.0 0.3 8.6 139.2 0.6 30.9 0.1 0.9 4950.7 2125.0 0.0 0.3 3642.2 10.1 0.4 6.6 130.0 19.3 2.7 37.1 188.2 11.2 4.5 48.0 0.4 0.3 870.3 94.6 4.8 1126.6 21.3 8.0 0.6 0.7 6944.0 0.0 0.2 1.5 134.0 0.6 0.0 879.3 0.0 0.8 35.0 10.0 0.6 11.5 65.7 5.0 8.0 Shrawani Mela Domestic Sultanganj Foreign (Bhagalpur) Bhagalpur Domestic Foreign Other Domestic Foreign Total Grand Total Domestic Foreign 0.3 1254.5 41.0 1136.0 0.7 19.5 18.9 Gaya Domestic Foreign 16.2 28.1 13.0 1206.3 464.7 0.8 0.7 4001.0 897.7 0.0 0.0 0.1 215.4 12.5 51.0 0.6 63.9 0.0 0.9 0.6 10670.0 93.0 0.9 141.0 0.5 4967.5 2.0 64.6 0.3 28.0 0.0 0.0 0.2 3.7 39.5 12.9 11.0 4001.6 72.5 3651.0 0.0 0.0 0.0 0.3 2774.2 0.0 0.

0 0.2 0.2 2198.2 292.3 0.0 1.4 0.7 64.0 8.3 4.4 3.0 0.9 7515.4 0.0 5.0 0.9 13.5 1.0 10530.5 50.0 796.1 0.0 Total 718.8 298.6 0.4 21.8 3.7 3.9 79.2 3.1 0.0 17.0 7.6 32.2 4.9 217.7 0.0 1536.0 0.0 13.8 3.5 24.0 0.2 5.9 1660.) (Figure in 000) 2007 Place Tourist Jan to March 167.6 0.5 0.0 4926.7 13.5 12.0 0.5 1.0 0.0 10.3 1.8 7.9 284.2 3.4 58.6 146.0 3807.8 (Concluded) 115 .4 241.7 6.6 0.6 0.6 123.0 0.0 809.8 51.5 291.4 0.1 9.7 4.9 0.5 0.7 6.3 2.0 90.2 5072.2 0.0 1090.6 0.0 36.8 0.2 0.8 21.9 40.0 51.6 2438.8 791.0 0.0 22.3 0.6 7806.5 0.0 23.0 0.2 3821.0 5.4 4725.3 221.4 194.4 0.4 135.3 0.0 0.4 4.7 6.4 1959.8 1052.1 0.3 0.0 2198.0 0.8 1.6 0.0 0.9 0.0 10.0 0.6 71.0 0.0 9.3 0.7 4019.0 6.3 2.6 0.0 0.0 106.0 0.7 0.2 2.0 85.3 2.8 170.0 0.9 0.0 3.0 19.Appendix IV : (Contd.1 Oct to Dec 94.6 888.2 July to Sept 280.5 1.8 0.7 7.3 0.6 66.5 0.0 114.3 79.5 0.9 11.8 284.0 0.7 0.0 0.9 April to June 176.2 1.4 890.8 6.7 2.6 14.1 0.0 43.1 155.4 0.4 43.0 Jan to March 597.4 10352.4 1073.8 1359.4 21.0 21.9 0.2 4019.0 21.0 6.9 120.9 0.1 64.3 105.0 3.1 551.9 0.4 33.5 1.0 Total 2669.0 0.6 177.2 559.9 7.0 94.4 0.1 0.2 0.6 284.3 0.2 482.2 0.0 226.6 170.0 88.5 240.4 83.8 218.5 0.7 0.4 16.8 July to Sept 1541.6 198.1 1.5 0.0 0.6 0.6 8.5 2008 Upto September April to June 530.4 0.7 15.0 22.9 0.0 720.3 46.0 83.0 0.0 0.2 3.7 0.3 Patna Domestic Foreign Gaya Domestic Foreign Bodh Gaya Domestic Foreign Rajgir Domestic Foreign Raxual Domestic Foreign Munger Domestic Foreign Vaishali Domestic Foreign Muzaffarpur Domestic Foreign Sonepur Fair Domestic Foreign Shrawani Mela Domestic Sultanganj Foreign (Bhagalpur) Bhagalpur Domestic Foreign Other Domestic Foreign Total Grand Total Domestic Foreign 4645.5 14.0 1095.5 52.0 0.3 169.0 0.1 16.4 77.2 479.3 3.5 0.3 1.0 0.

Rajasthan Himachal Pradesh. The existing low level of infrastructure facilities are the major bottleneck in accelerating the process of development in the state. However. The private sector. Orissa. are not exploited fully on account of the absence of the adequately developed arteries. Table 4. The infrastructural poverty of Bihar pervades all sectors. there is a growing realization that the dependence on the government alone may not be a good proposition. an appropriate policy framework may have to be evolved so as to attract the private players in this endeavour through Public-Private Partnership (PPP). Assam. in view of the volume of investment and technical efficiency. Madhya Pradesh. In the post independence era too. Kerela. Bihar has the weakest infrastructural base among the major states of India.CHAPTER IV PHYSICAL INFRASTRUCTURE Developed infrastructure is the sine qua non for the growth of an economy. Karnataka Gujarat. Bihar. West Bengal Andhra Pradesh . Maharashtra. Tamil Nadu Goa. there is a consensus that the issue of infrastructure development has to be taken up on a priority basis in Bihar.1).1 : Ranking of States According to Infrastructure Index Category Low Low-medium Medium-medium High-medium High States North Eastern States. During the colonial period. Jammu & Kashmir. Indeed. According to an infrastructure index used by the Twelfth Finance Commission for devolution of funds to states. may fear to tread the underdeveloped remote areas. Uttar Pradesh. Therefore. GOI Thus. Haryana. on the other hand. Whatever trunk infrastructures exists in the state. Punjab Source : Report of Twelfth Finance Commission. nothing concrete has been done to improve and expand the infrastructure in Bihar. Bihar alongwith the north eastern states and Jammu and Kashmir stands at the bottom level (Table 4. the development of infrastructure in a landlocked state like Bihar was entirely oriented towards ensuring better colonial control and exploitation of raw material from rural areas for feeding the British industries. in pursuance 116 .

etc. (Table 4. the road density per lakh population in Bihar stands at only 111 kms. Being a densely populated state. the road network at national level has registered an increase of 99.1 Roads and Bridges Density of Roads : The density of roads in the state determines the extent of links established throughout the area. 4. there are 0. It will also actively encourage direct private investments in large infrastructure projects in power. 117 . of area against the national average of 1.of the Bihar Infrastructure Development Enabling Act. the road infrastructure in Bihar appears very weak in all its dimensions including its riding quality. of roads per sq. km. The length of roads in Bihar has not been at par or even closer to the national average (Appendix I). Since 1990. Major institutional reforms have been undertaken and more have been proposed to increase transparency and reduce the time taken to clear investment proposals. whereas in Bihar this increase was only 27. km. Road length / lakh population Village Connectivity (%) India 1. the state government has already begun to explore and introduce the option of PPP in some sectors and is planning to expand these initiatives.2 : Road Density in Selected States and India Density of Roads Road length / sq.75 275 99 Bihar 0.2). Similarly. Punjab and Haryana. while for the country as a whole this density is more than three times higher (360 kms. road.25 kms. In terms of roads. Table 4. The road density of Bihar vis-à-vis other states in 2001 is given in Appendix I.98 111 57 Length : Connectivity is a cardinal determinant of economic growth and roads capacitate the people of all corners to share the fruits of growth.7 percent.02 185 60 Andhra Pradesh 1. the proportion of the villages connected through roads is only 57 percent as against 62 percent for all-India and 99 percent for Gujarat.02 297 67 Karnatka 0.82 289 59 Gujarat 0.. Presently.25 360 62 Uttar Pradesh 1. Considering from this angle. Over and above. the construction and maintenance of roadways in the flood hit north Bihar poses a great problem.).98 kms. the state always remained far behind the fast growing states like Gujarat. But the difference between Bihar and India in terms of road density is larger when one takes into account the population.6 percent.

Lakhisarai (136 kms. Other District Roads (4. whereas. the quality of roads is judged on the basis of their being surfaced or unsurfaced.00 8156. Patna (395 kms).) and Sheikhpura (152 kms. In terms of the quality of national highways too.00 0. This is despite the fact that density of population being much higher in Bihar. connecting urban areas with rural 118 . the total road length in 2008 was 82.83 percent).In Bihar.63 63261.83 4.) Total Pucca Kutcha (Paved) (Unpaved) 3734. which constituted National Highways (4.57 4. but also with its low quality.). The accessibility of villages in Bihar is poor compared to the national average.00 3989.00 27400.00 3818.26 100. Jamui and Kishanganj are devoid of national highways.63 46107. as compared to all-India (9 percent and 56 percent respectively). On the other hand.63 Percentage share 4.60 percent) and Village Roads (76. at the all-India level.00 0. As may be seen from Appendix II.959 kms.81 percent).00 3734. State Highways (4.00 3989. around 60 percent of the roads come under this category. Type and Quality : Invariably.00 2828. Less than half of state's roads are surfaced. GOB There is vast inter-district variation in terms of the road length in the state.) districts are at the lowest position.00 0. whereas the districts like Patna (915 kms). Bihar stands at the lowest position. Supaul (789 kms). the proportion is even higher. The share of 4-lane and 2-lane national highways is much lower in Bihar (5 percent and 38 percent respectively). It is also discerned that the districts of Banka. Rohtas (450 kms) and Muzaffarpur (704 kms) are higher on road length.3). However. Munger (119 kms. The road infrastructure in Bihar is not only besieged with lower density.60 76. Muzaffarpur (229 kms) and Madhubani (208 kms) are on the higher side of the scale in this regard.00 35861.50 percent). Major District Roads (9.63 82958.00 8156.26 percent) (Table 4.00 Category National Highway (NH) State Highway (SH) Major District Roads (MDR) Other District Roads (ODR) Village Roads (VR) Total Source : Department of Road Construction. The single lane national highways are around 57 percent in the state as against 35 percent for the country.3 : Length of Roads in Bihar (2008) Road Length (kms.00 36851.81 9. part of the roads under the last two categories are unpaved.00 990. Table 4. In the richer states.

Jharkhand and West Bengal. (x) Exploring options for levying a road cess 119 .) and it is nearing completion. In addition. Upgrading Road Network : The poor road network in the state has been a great constraint in the state's development. the smaller habitations suffering most in this regard. Upgrading the road network in the state will involve four laning of NH2 which is part of Golden Quadrilateral (205. During the Eleventh Five year Plan. the state highways and major district roads are also to be upgraded. two-laning all State Highways and upgrading all Major District Roads in intermediate lane. maintenance policy. The strategies to achieve the targets during the Eleventh Plan have also been evolved which interalia includes constitution of a flexible autonomous body for project development. The action points for the Eleventh Plan have been identified as follows : (i) (ii) Developing a road network equal to the best in the country Upgrading. (iv) Implementing the new road maintenance policy like introducing tolls on some stretches and use the revenue for maintenance of the road (v) Setting up a non-lapsable road fund (vi) Setting up a central tribunal for dispute resolution (vii) Setting up a specialised cell to expedite the process of appraisal and approval of detailed project reports (DPR) for roads (viii) Upgrading quality control laboratories at the headquarters and in the division (ix) Monitoring all projects in real time.600 km of National Highways in Bihar to four lanes. In spite of that.7 kms. project management. Normally. The state government is pushing for completion of the Golden Quadrilateral Project within the state. In all. (iii) Providing all-weather connectivity to all unconnected villages with a population of over 500 within five years.population is relatively less costly here.). this constraint is now being gradually removed throughout the state. Four laning of some of the important national highways are also being taken up. 27 National Highways pass through 35 districts of the state and connect international borders of Nepal and adjacent states of Uttar Pradesh.3 kms. online monitoring. besides the national highways. 1. work on the East-West Corridor is in progress (513. quality control laboratories and special project cell. only 57 percent of habitations are connected.) and roads under NHDP-III will be taken up soon (890 kms. the national and state highways are of better quality compared to district and other roads. However.

17. The decline in the revenue was mainly due to reduction in registration charges in 2006.991 in 2008-09 (till December 2008). As compared to 1990. till December. 2500 crore). This upward trend is mainly due to the lowering of the registration charges and other effective measures introduced since 2005-06. for Bihar. As can be noted from Table 4. The total number of motor vehicles registered increased considerably in 2008-09. 4000 crore) and Major District Roads (Rs.5). 11400 crore). 217.4. 202. GOB The highest revenue collected by the Department of Transport was Rs. compared to the previous years.42. The Department has collected Rs. 4. 245. the figures relate upto December.4 : Number of Vehicles Registered Two Tractor Trailer Wheeler 61333 112985 110213 106618 3509 6160 7609 6681 2440 5281 5084 8561 Year 2005-06 2006-07 2007-08 2008-09 Truck 579 1989 2161 2053 Bus 113 921 1276 675 Car 5062 7409 7425 6961 Taxi 427 1326 2744 2131 Jeep 2321 4430 3904 3511 Auto 3273 5027 5523 4791 Other 1306 1781 2563 1009 Total 80363 147309 148502 142991 Note : For 2008-09.08 crore in 2008-09.900 crore. this increase was 239 percent. the number of motor vehicles at the all India level has increased by 197 percent in 2007.72 crore in 2005-06 and it subsequently declined to Rs.363 in 2005-06 to 1. the number of motor vehicles has increased manifold in the last three years. 120 .83 crore in 2007-08 and Rs. Table 4.The state government has also estimated the expenditure for all these plans — 4-laning of national highways (Rs. 2008 (Table 4.2 Motor Vehicles Adequacy of road infrastructure is also related to the availability of motor vehicles in the state. all totaling to Rs.14 crore in 2006-07. 308. This is indicative of the fact that the increase in road network was not commensurate with the increase in transport in the state. State Highways (Rs. 2008 Source : Department of Transport. The number increased from 80.

08 Percentage of Collection 83. has been speeded up by signing an inter-state transport agreement with Jharkhand and West Bengal.83 217. crore) 133.5 : Revenue Collected by Transport Department Target (Rs.60 57. 2009) Source : Department of transport.00 205. GOB A list of new initiatives taken by the Department to improve transport facilities in the state is presented in Appendix III.Table 4. particularly on inter-state routes.08 308.55 69.75 65. This is an addition to the available arrangements of fitness test by the Motor Vehicles Inspectors.00 350.60 79.09 Year 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 (upto Dec. Similar negotiations are in progress for entering into inter-state transport agreements with other neighbouring states.00 310.47 99. crore) 160. keeping in view the administrative.54 217.  Farmers using tractor/trailer for agricultural purpose have been provided with the scheme of one-time tax payment. In order to meet this requirement. In addition.00 375.19 Actual (Rs. Keeping in view the phenomenal increase in the motor vehicles.72 202.91 257.24 83.00 275. all the important corridors in the state are to be upgraded as four lanes under NHDP.6.00 314. 121 . 106 licenses have been granted to private enterprises to establish Fitness Testing Stations and Pollution Testing Stations. The list of such roads is presented in Table 4.10 177.  The process of granting and renewal of permit. economic and tourists needs.00 308. the following steps have been taken by the Department to retionalise certification of vehicles and revenue collection :  Pollution and fitness test have been made mandatory for certifying vehicles for registration.14 245.19 86.

00 (NH-85) 13.00 (NH-83) 255. Munger-Bhagalpur Bihta-Mahabalipur-Aurangabad (under Buddhist Circuit Development Bridges : During the rainy season most of the road networks in Bihar are submerged under water and get destroyed obstructing the regular flow of transport.00 (NH-31) 70.20 (NH-77) 67.00 (NH-19) 74. and (iii) Toll Collection. However. The Bihar Rajya Pul Nirman Nigam (BRPNN) was formed in 1975 as a state government company. It main objectives are : (i) Construction of Bridges and Roads.6 : Important Corridors to be Upgraded Corridors Mohania-Sasaram-Aurangabad-Dobhi.00 (NH-80) 100. This is one of the main reasons for the sluggish growth of the state.00 (NH-84) 125.Table 4. it showed an upward trend with net worth becoming Rs. (ii) Maintenance of Bridges.7 (NH-2-GT Road) 513. 57) 138.80 (NH-30) 92. The 122 . from 2006-07. The Corporation was working well initially. but in late nineties it almost became non-functional. Barhi under Golden Quadrilateral Part of DelhiCalcutta Raod Gopalganj-Muzaffarpur-Darbhanga-ArariaKishanganj part of East West Corridor Hajipur-Muzaffarpur-Sitamarhi-Sonbarsa Pipra Kothi-Motihari-Raxaul Patna-Hajipur-Chhapra Ara-Buxar Patna-Gaya-Dobhi Bakhtiarpur-Mokama Mokamah-Munger Bakhtiarpur-Fatuha-Patna-Ara Chhapra-Gopalganj Forbesganj-Jogbani Total Length (kms) 205. In 2002-03. 3.25 crore.17 crore and remained negative till 2005-06. the following important roads have been identified for four-laning :     Bakhtiarpur-Biharsarif-Nawada-Rajauli Gaya-Bodhgaya-Rajgir-Nalanda-Biharsarif Programme).00 (NH-57A) 1734 Besides. (-) 13.3 (NH-28. its net worth was reduced to Rs. The Bihar State Bridge Construction Corporation is responsible for construction of bridges in the state.00 (NH-28A) 80.

25 lakh are to be taken up by the district administration and the remaining 525 bridges by the Bihar State Bridge Construction Corporation. the Nigam is executing 517 schemes at a total cost of Rs. Table 4. 5. the Nigam is executing schemes worth Rs.00 crore. 352 crore have also been taken up.34 11.00 Year 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 (Estimated) Fixed Assets 2.99 42.19 crore in 2006-07. There is a target to complete 1844 schemes during the year 2008-09. Besides.82 -7. but it has only 4 bridges. The details are given in Table 4. 2007. 2810 crore. presently. Thus. In 2007-08 it set off all its accumulated loss and its profit is expected to increase to Rs. The Ganges flows through the state for about 400 kms. For maintaining the connectivity. Out of these. 39 major road bridges for an amount of Rs.43 2. 1319 bridges with a cost of upto Rs.17 crore have been completed. At a total cost of Rs.75 42. 11. 1132 crore under the Chief Minister Bridge Construction programmes in the state. the Bihar Rajya Pul 123 .67 3. under the Mukhya Mantri Setu Nirman Yojana. 8 railway over-bridges are also under construction.25 23.88 410.00 crore with a total turnover of Rs.17 -12. Out of these.34 crore in 2005-06 and doubled to Rs. 2700 crore.7. on of the important rivers in the state. there is a need of a bridge at a distance of every 50 kms.20 Net worth -13. 410. crore) Profit After Tax -2.00 (Rs.44 3. 113.25 Presently.02 5. Presently.19 23. which was almost negative upto 2004-05.62 0. Based on the achievements in the last two years. There is a proposal to construct 18 bridges on the important rivers of the state during the Eleventh Plan period at a total cost of Rs.38 95. 23. Turnover and Profit for BRPNN Turnover (work execution) 17. on the state highways and 3049 on the major district roads.83 2. became Rs. Besides.62 2.80 7. non-plan and Rashtriya Sam Vikas Yojana. bridges are proposed to be constructed on smaller rivers too. small and big.73 -12.53 0. the works on 169 bridges at a cost of Rs.62 57. 307 crore.7 : Fixed Assets. there are 1055 bridges. as many as 78 big bridges have been constructed by the Nigam under plan.profit after tax. Since November.

construction of office of Senior 124 .3 Bihar Police Building Construction Corporation The Bihar Police Building Construction Corporation was established in 1974 by the state government to cater to various needs of the Police department. the responsibility of maintenance of the police buildings was also vested with the Bihar Police Building Construction Corporation. the construction of new buildings for 36 Rural Police Stations (Grade-III). The Corporation was able to construct a number of police buildings. 9 Urban Police Stations (Grade-IV). the Corporation has been entrusted with the task of constructing one Model Police Station in each district. the state government has sanctioned adequate schemes and provided required funds for their execution. each with an estimated cost of Rs. 2007. 600 residential units for various staff. To inject further vitality into the organization. the offices of Junior Engineers and Assistant Engineers have been located in the respective District Police Offices. a number of old pending financial demands of the employees of the Corporation have been met. Also. with an increase in its professional efficiency. including a few most prestigious ones. Till date. As a result of efficient financial management. 1. In addition.67 crore for the construction of new police stations and other buildings. including residential accommodation. is expected to play a major role in development of infrastructure. In addition. the Corporation management has made a series of efforts to enhance its technical capacity on one hand and to streamline the general administration as well as financial administration on the other. augmenting the infrastructure facilities in training centres. the Corporation was revived on April 04. in order to ensure better coordination with the district police administration and to achieve impeccable quality of police buildings. 89. 4. 34 Model Police Stations. After remaining dormant for several years. In order to carry out the responsibility efficiently. 40 additional Junior Engineers have been appointed on contractual basis and have been posted in each district of the state to look after the construction work. thereby bringing the grassroot technical wing of the Corporation directly under the command and control of the district police administration. During 2008-09. The state government has provided Rs. The Nigam. and also for the repair and maintenance of old buildings.28 crore.Nirman Nigam may be termed as a success story.

4 Energy Sector The energy sector in India has exhibited impressive expansion and development since 1951.00 11. Besides. though with a very low installed capacity.46 lakh MW. The income and expenditure of the Corporation for 2007-08 and 2008-09 are presented in Table 4.8 : Expenditure and Income of the Bihar Police Building construction Corporation (Rs.9 : Installed Capacity of Power in India and Bihar (2008) Installed capacity (MW) Hydro India Bihar 36347.8. However.0 Total 145555 592. Table 4.35. of which thermal power constitutes around 64 percent and hydroelectric power about 25 percent. As compared to the all India scenario. wind/renewable energy and nuclear power plants are also there.9).6 540 Nuclear 4120 – Renewable Energy 12194. Installed Capacity : India as a whole has an installed capacity of 1.50.00 Particulars Total Expenditure of the Corporation Total Income of the Corporation Operational Income Non-Operational Income 2007-08 (Actual) 3. this sector remained far behind the national average in respect of all the indicators including per capita consumption of power.00 8.00 8.98.55.86 3.50.20 2008-09 (Estimated) 7.1 125 .58.85 55.5 5. in lalh) 2009-10 (Expected) 15. Table 4. the thermal power plants have the major share (91 percent) in capacity.25.92 3. The hydro and renewable energy constituted a negligible proportion each (8 percent and 1 percent respectively).75.25.7 47.00 4.65 3.1 Thermal 92892. With a total installed capacity of only 592 MW in the state.05.90. in Bihar. Bihar presents a very dismal picture (Table 4.92 5. Patna and that of the new Police Training College at Rajgir in near future will go a along way in creating substantial housing infrastructure for the state Police (details of schemes given in Appendix IV).Superintendent of Police.00 19.

71 33.0 47.0 1.The details of the installed capacity of hydro and thermal power is presented in Table 4.25 1457.00 35. (KBUNL) Source : Report of special task force on Bihar Power Sector. Bihar is entirely dependent on the centre for its power requirement.11 : Power from Central Power Stations for Bihar Name of Stations Farakka STPS Talcher STPS Kahalgaon STPS-I Kahalgaon STPS-II Tala HPS Chukha HPS Rangit HPS Teesta HPS Total Capacity (MW) 1600 1000 840 500 1020 270 60 510 5800 Bihar's share MW Percentage 393.63 21. 2007 Bihar's Share in Central Sector Power Stations : Consequent upon the bifurcation of the erstwhile state of Bihar. Table 4.65 + 4 x 1.38 21. Therefore.35 6.13 Source : Bihar State Electricity Board (BSEB) 126 .65) East Gandak Canal (3 x 5) Agnoor Dhelabagh Nasariganj Hydro Total Thermal Barauni (2 x 50 + 2 x 110) Muzaffarpur (2 x 110) Thermal Total 320 220 540 BSEB BSEB** 19.11.00 29.00 108.9 15 1.51 25.92 24.10 25.2 9. leaving 70 percent load with present Bihar.10.8) Sone E & W Canal (2 x 1.00 190.10 : Installed Capacity of Power Station in Bihar Name of Power Station Hydro Kosi (4 x 4. As shown in Table 4. 70 percent of the generating capacity was transferred to Jharkhand.50 80.62 370. Table 4. The state is now left with only 2 thermal power stations at Barauni and Muzaffarpur. ** Now transferred to new JV Kanti Bijlee Utpadan Nigam Ltd.67 260.76 22.00 37. around 25 percent of the capacity of 8 central power stations is made available Bihar. Government of India.0 1. which are in a dilapidated condition and generates almost no power.1 Installed Capacity (MW) Agency BSHPC* BSHPC BSHPC BSHPC BSHPC BSHPC BSHPC * BSEB transferred the project to BSHPC on 16th November 2003.

of which 540 MW is thermal and the remaining 47 MW is hydel and 5 MW is renewable energy. Bihar has only 592 MW of installed capacity. as well as implementation of the Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY). The situation in 2008-09 is expected to remain unaltered (Table 4. The annual per capita consumption of electricity in Bihar is only 76 units.There is severe power shortage in the state and only 41 percent of its villages and 10 percent of the households are electrified. generation from its own thermal power stations is negligible.49 percent) and it stepped upto 1471 MU (15. as against a national average of 612 units in 2005 (Table 4. and most of the power requirement is met by purchases from the central generating plants. causing a peak shortfall of 550 MW. As mentioned above. However. The National Electricity Policy aims to increase the average annual per capita consumption to 1. which results in widespread shortage in supply to all categories of consumers.000 units by 2012. Table 4. 127 .8 612 Bihar 41 10. the shortage was 1049 MU (11. The peak availability is about 950 MW.12 : Consumption of Power in Bihar and India (2005) India Villages electrified (%) Household electrification (%) Per Capita consumption (units) 84 55.31 percent) in the next year. In 2006-07. the aim is to electrify all villages by 2009 with the help of central government grants. there still remains a substantial energy shortage in the state. This is sought to be achieved by increasing generation to remove peak electricity shortfalls. Under RGGVY.13).3 76 Supply of Energy : Though the supply position from various sources has improved over the years.12).

the major category was domestic consumers (17. there were over 22.00 00.7 lakh).511 26.3 lakh) and commercial consumers (2.104 9126.503 villages were electrified upto 2006.895 4911.248 NA NA — Source : Bihar State Electricity Board (BSEB) During 2004-05.435 15.593 00.900 1048.00 8078.14 : Statement Showing Categorywise Number of Consumers Category of consumers Domestic or residential Commercial Industrial (a) Low and Medium Voltage (b) High Voltage Traction Irrigation Public Water Works and Sewage pumping Public Lighting Supplies in bulk to distributing licensees Total 88434 1710 16 274671 1391 6108 1 2299385 91216 1778 16 276953 1449 6108 1 2450445 70207 810 7 251180 1187 4069 1 1891798 62879 855 12 172086 1199 1478 1 1947230 62440 870 12 172141 1208 1480 1 2013663 68098 861 12 17498 1203 1500 1 2246522 Number of consumers as on 31st March 1999-00 1600631 326423 2000-01 1735982 336942 2001-02 1319096 245241 2002-03 1465290 243430 2003-04 1519806 255705 2004-05 1733195 266672 Rural Electrification : There are 39.49 2007-08 8004.14.Table 4.186 114.711 2.5 lakh consumers of different categories.000 1471. Out of these.353 20.851 2. The details of remaining categories of consumers are presented in Table 4.315 8141.563 66. This reveals that a little more than 50 percent villages were electrified in 128 .13 : Supply-Consumption Pattern of Energy in Bihar Energy in (MU) Drawal / Consumption Drawal from Central Sector BSEB Generation after Aux.015 villages in the state.796 11.31 2008-09 (up to Oct' 08) 4812. Table 4.94 28. out of which 20. Consumption KBUNL Generation to BSEB Sugar Mill to BSEB Demand Met Energy Requirement Energy Shortage Energy shortage (Percentage) 2006-07 8051.565 9613.

With a view to strengthen the sub-transmission and distribution system. Again.2006 as against only 41 percent in 2005.15). apart from being responsible for renewable energy based power in Bihar. GOI. 129 . has been made the nodal agency for the rural electrification in the state. Table 4.15 : Energy Requirement : Forecasts Year 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2016-17 2021-22 Peak Load (MW) 1570 1842 2177 2575 3046 3607 5598 9567 Energy Requirement (MU) 9629 11194 12874 14886 17213 19905 32857 58248 Source : Report of the Special Task Force on Bihar's Power Sector. The preparatory survey work of such villages has started. The Bihar Renewable Energy Development Authority (BREDA). out of 38 districts in the state. It will take up rural electrification work in those villages which are not easily inaccessible.17.16 and 4. a comprehensive scheme has been formulated to be implemented in phases as presented in Tables 4. 9 districts do not have a single electrified village. 2007 Transmission System : The supply of electricity in Bihar by the BSEB is organised through its seven area boards. It clearly indicates the widening gap between the peak load and energy requirement. Energy Requirement Forecasts : The Special Task Force on Bihar's Power Sector of the central government in its report in 2007 has made energy requirement forecasts upto the year 2021-22 (Table 4. The selected villages and households will be provided access to electricity under the Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) of the central government. These forecasts warrant an emphasis on increasing the peak load to more than six times by the year 2021-22 so as to equal the energy requirement.

86 409.Table 4. Crore) 552. GSS. BSEB Portion. BSEB portion Spillover work of Begusarai GSS.00 110. augmentation of 12 no. – Tender re-invited for R&M of 04.22 (Original) 1005.00 16. 2007 Amounts (Rs.66 393. GSS with associated transmission lines. crore) Description Phase-I Total Sanctioned Project Cost Fund Received Payment Released to Agency Available fund 552. Table 4. Restoration of Over Head Ganga Crossing etc. no. Sanctioned under Part-II of Phase-II Remarks Completed 629. PGCIL portion Construction of 9 no GSS with associated transmission lines. of Sub station with associated transmission lines.72 Phase-II Part-II 1240. BSEB Work under execution Part-II 1240.00 Implementation by agency PGCIL Phase Phase-I Phase-II Part-I Works status Construction of 18 Nos.72 (Revised) PGCIL Work under execution.86 PGCIL Portion. Completion of 16 no.40 552. augmentation of 22 nos GSS and stringing of second circuit etc – to be done by PGCIL.16 : Implementation of Bihar Sub-Transmission Scheme in Phases Approved Estimated Cost (Rs.17 : Financial Status of Sub-Transmission Scheme as on December 31. Tender under process. GSS etc.40 Phase-II Part-I 1005. GSS.40 442.66 130 . Begusarai – Purnea line and Renovation and Modernization of 8 no. reconductoring of old lines. – Tender under finalisation of Begusarai Purnea line and GSS. PGCIL BSEB Under implementati on Work awarded initial activity started Tender invited. GSS by BSEB – Work under execution at Begusarai GSS and R&M of 04 No. Spillover work of Hajipur GSS.

the peak demand for electricity is expected to surge as Bihar is a major beneficiary of the RGGVY scheme which will give new villages and households access to electricity. the state government has also adopted a state- 131 . 2006. The industrial demand for power is also expected to increase substantially in the wake of the state government's new Industrial Policy. The details of proposed power projects in the state are presented in Table 4. for which the central government has already been requested (Appendix V). a new power plant is being installed at Nabinagar in the district of Aurangabad.18. During the Eleventh Plan.Future Power Generation : The state government is concerned about the existing poor power position in the state and is making new efforts to ameliorate the situation. Kajra in Lakhisarai and Pirpainti in Bhagalpur. three thermal power stations are proposed to be set up under public and private sector at Chausa in Buxar. Again. The BSEB and BSHPC has proposed to set up 2 thermal power plants and 6 hydro plants with a total installed capacity of 4146 MW. In order to realise the objectives of the Eleventh Plan. Table 4. The Electricity Act. A nuclear power plant with a capacity of 2800 MW is also planned at Rajauli. 2003 and the National Electricity Policy provide an enabling framework for the power sector at the national level.18 : New Proposed Power Plants Installed Capacity (MW) 450 400 345 225 1600 126 3146 500 500 1000 4146 BSEB BSEB Name of Project Hydro Indrapuri Reservoir Telhar Kund PSS Sinafdar PSS Panchghotia PSS Hathiadah-Durgawati PSS Dagmara Barrage Sub Total Thermal Barauni Extention Muzaffarpur Extention Sub Total Total Agency BSHPC BSHPC BSHPC BSHPC BSHPC BSHPC Under the joint venture of BSEB and NTPC.

level power policy, keeping in mind its specific requirements. The state has also begun the process of unbundling state electricity services for improving the functioning of the BSEBs. Renewable Energy Sources : The generation of renewable energy has a significant role in Bihar, especially in the biomass and small hydro section. Given the predominantly agrarian nature of the economy, such energy is both sustainable and economically viable in Bihar. Further, since both the plateau and riverine belts in Bihar have sufficient wind speeds, the state is also suitable for wind power generation. The potential for wind energy in Bihar is shortly to be taken up for assessment under the sanction of the Ministry of Non-Conventional Energy Sources. To encourage local private participation in renewable power generation projects, the incentives are being worked out. These projects may also include solid waste management projects and decentralized distribution generation (DDG). Power Reforms In the power sector, the state government is planning a number of reforms. In particular, this includes : (i) To augment generation and distribution by encouraging private investment.

(ii) To bring down Average Transmission and Commercial losses (AT&C) by 5 percent p.a. in the next five years. (iii) To stop cross-subsidy and recover costs (iv) To reorganise SEB into 8 companies. The Power Finance Corporation has appointed consultants for the proposed reorganization. (v) State Regulatory Commission is in place and application has been filed for tariff revision. (vi) To appointment franchisee in all 11 KV distribution lines is to be completed for improving customer services and boosting revenue collection. Already 31 such lines have been handed over to private parties for maintenance, minor repairs, fuse calls, billing and revenue collection and revenue has increased substantially in most of them and in some nearly by 100 percent.

132

4.5 Irrigation Bihar's economy is primarily agricultural and, therefore, irrigation assumes great significance for its overall growth. Though the state lies in a humid zone with annual rainfall of around 1200 mm which is sufficient for kharif crops, its occurrence and spread are highly erratic and seasonal in character. Therefore, in order to save agriculture from the uncertainties of monsoon and facilitate multi-cropping, assured irrigation becomes a sine qua non for agricultural development. Against this backdrop, it becomes imperative to assess the ultimate irrigation potential existing in the state. Taking both the surface and groundwater sources, the ultimate irrigation potential of the state is estimated at 103 lakh hectares, which works out to 7.34 percent of India's 140 million hectares. Thus, the state has enough of irrigation potential to take care of a situation where the cropping intensity increases to 200 percent from the present 143 percent. Bihar has a total irrigation capacity of 98.38 lakh hectares, of which 53.53 lakh hectares are under major and medium irrigation and 49.56 lakh hectares are under minor irrigation. The sourcewise irrigated area under different sources is presented in Table 4.19. From the table, it may be discerned
Table 4.19 : Sourcewise Irrigated Area (`000 hectares) Minor Irrigation Year Major / Medium Tank Other Other (including Tube well Well Sources Aher & (Private (irrigation (L.I. & & State) Pyne Well) Barge L.I system) 29.22 332.56 2310.06 145.84 3.26 23.25 332.56 2308.71 145.79 3.56 28.69 332.56 2474.77 145.79 3.20 34.88 332.56 2650.38 145.79 1.95 17.56 431.21 2664.00 121.01 6.23 19.86 332.56 2643.21 145.79 28.23 29.34 332.56 2710.60 145.79 23.33 29.80 332.56 2701.19 145.79 15.12 Not updated, Final figure will be possible in April, 2009 Canal surface M.I

Total

2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09

1211.55 1082.03 1150.12 1170.36 1043.47 998.30 1086.79 1155.79 1263.43

2820.93 2813.87 2985.00 3165.56 3240.01 3169.65 3241.52 3224.45

Explanation : Canal Surface M.I. : Schemes of Weirs, Sluicegates, Dams of M.I. Sector Tank including Ahars & Pynes : Irrigation Tanks, Ahar & Pyne (Traditional Irrigation system under M.I. sector. Tubewell : It includes both State Tubewells beyond 70 m. depth having (150 mm. x 200 mm.) diameter and private tubewells having upto 70 m. depth and 100 mm. diameter. Other sources : It includes mostly surface Lift Irrigation Schemes with lifting arrangement on floating barges, stationary pump houses or stationary river pump sets.

133

that, while more than half the area gets irrigation through minor sources, around 98 percent of minor irrigation is through tubewells. Since state tubewells are less in number, it is the private tubewells which are very important as an irrigation source in Bihar. In 2006-07, 5130 state tubewells were operation, out of a total of 5556 state tubewells. Again, out of a total of 10.97 lakh private tubewells, 9.55 lakh were operational. It is also observed from the above table that the the area under major/medium sources of irrigation has fluctuated much over the years. Among the different components of minor irrigation, it is the area irrigated thorough tubewells that has registered a steady increase over the years. Interlinking of Rivers : The state suffers from the endemic problem of both floods and drought at the same time. While the entire north Bihar is prone to recurrent floods, southern portion is prone to acute droughts. Keeping these menaces in view, interlinking of rivers has been identified as a viable initiative for proper water management in the state. An Expert Committee constituted by the state government has recommended that the state should opt for intra-state linking of rivers, rather than the inter-state part of the scheme. In the light of the recommendations of the Expert Committee, 4 schemes have been identified in the flood sector and 9 in the irrigation sector by the state government and more are in the process of identification. The state government is planning to conduct the feasibility studies of the identified schemes of intra-state linking of rivers during the first half of Eleventh Plan period. After prioritising the schemes, their implementation will commence as an important component of the Eleventh Plan. The support of the central government will be sought for implementation of the scheme. Accelerated Irrigation Benefit Programme (AIBP) : The central government has brought significant changes in its Accelerated Irrigation Benefit Programme (AIBP) initiated in 1996-97. Under this programme, the loans given to the state governments is being treated as grant with effect from 2007-08. The list of schemes taken up under the programme so far alongwith their status presented in Table 4.20.

134

Table 4.20 : Status of AIBP Schemes in Bihar Name of Projects Western Kosi Canal Project Upper Kiul Reservoir Project Durgawati Reservoir Project Orni Reservoir Project Bilasi Reservoir Project Bansagar Reservoir Project Sone Canal Modernization Project Batane Reservoir Project Punpun Barrage Project Year of Inclusion 1996-97 1996-97 1996-97 1997-98 1997-98 1997-98 1998-99 2000-01 2007-08 Status Under Progress Completed Pending due to Forest Clearance Completed Completed Execution Under M.P. Government Under Progress Under Progress Under Progress

As may be observed, out of the above nine projects, three projects, namely, Bilasi Reservoir Project, Upper Kiul Reservoir Project and Orni Reservoir Project have been completed and the remaining six projects are under different stages of execution. The details of expenditure for ongoing projects under execution in Bihar under AIBP are presented in Table 4.21. It is discerned from the table above that, under these six projects, around 1973 thousand hectares of irrigation potential has been created by the end of 2007-08.
Table 4.21 : Details of Expenditure of On-going Projects under AIBP (Rs. crore) Potential Created upto 3/2008 in thousand hect. 150.000 16.020 890.000 7.380 Nil

Name of the Project

Total Estimated Cost / year 1383.02/06 529.38/02 745.54/05 63.00/04 199.41/05 263.74/98

CLA received upto 3/2008 212.968 65.09 163.749 3.335 11.25 83.500

Exp. on works upto 3/2008 627.78 268.115 498.209 66.501 38.97 219.562

Target date of completion June, 09 March, 09 Dec., 08 March, 09 March, 09 —

Ultimate Irrigation Potential 234.80 36.317 906.412 9.870 13.680

W Kosi Canal Project Durgawati Res Project Sone Canal Mod. Project Batane Res. Project Punpun Barrage Project Bansagar Res. (State Share) Project

Stabilization of 909.41 thousand hect. of Sone Canal

135

Minor Irrigation : To meet the irrigation needs, about 1.65 thousand hectare of additional potential will be created and 4 lakh hectares of lost potential will be restored through minor irrigation schemes. Such schemes will also include rennovation and restoration of Ahars and Pynes, which are traditional methods of irrigation. Under the Bharat Nirman Programme, the irrigation potential of 80 thousand hectares will be added by completing surface schemes under RIDF (Phase XII) through repair, rennovation and restoration during the first two years of the Eleventh Plan period. An additional 85,000 hectares of potential will be created under minor irrigation scheme during the next three years of the Plan. Under RSVY, about 8000 Ahars and Pynes will be repaired and renovated, thereby restoring about 4 lakh hectare of lost potential. The ultimate potential of groundwater resources for irrigation is 48.57 lakh hectares, of which 29 lakh hectares of potential has been created by 2006-07. Similarly, out of the irrigation potential of 15.44 lakh hectare under surface scheme including Ahars and Pynes, 7.27 lakh hectares potential has already been created. As may be seen from Table 4.22, out of a total minor irrigation potential of 64.01 lakh hectares, a potential of 36.26 lakh hectares has been realized and 31.70 lakh hectares have been utilised.
Table 4.22 : Potential and Utilisation of Minor Irrigation in Bihar (Area lakh hectare) Minor Irrigation Potential in Bihar Surface schemes including traditional ahar and pynes Groundwater utilisation schemes of open wells, shallow tube wells, deep tube wells Total Minor Irrigation Potential Realised Groundwater schemes Surface water schemes Total Irrigation Potential Utilised Surface water including lift and barge schemes Surface water ahar, pynes and traditional system State Tubewells Private tubewells and irrigation wells Total 15.44 48.57 64.01 28.99 7.27 36.26 0.49 3.32 0.25 27.64 31.70

Participatory Irrigation Management (PIM) : There is a growing acceptance of the fact that the maintenance and management of the irrigation system should be transferred to the beneficiaries themselves. The National Water Policy also subscribes to this view. The state government has made significant progress in this direction by transferring the operation, maintenance and upkeep of 32 distributaries aggregating a total command area of 1,10,549 hectares, to Water Users

136

Associations (WUAs) (Table 4.23). The overall strategy is to decentralise the delivery system of all the irrigation system to the WUAs by the end of the Eleventh Plan period.
Table 4.23 : Progress on Transfer of Maintenance to WUAs Number of systems transferred to WUA 32 Number of farmers societies registered 07 Number of societies who have applied for 38 registration Number of societies whose applications are 15 being formalised Number of societies in the process of being 518 formed

4.6 Airways Practically, airways in Bihar are yet to develop. Patna, being the capital of the state, is on the air route from Delhi to Kolkata. It is also connected with Mumbai by air. Regular air services from Patna are also available for Ranchi and Lucknow. Among the districts, Gaya has also an international airport connecting Bangkok for facilitating the visit of foreign tourists to Bodh Gaya. Other district headquarters, except the newly created ones, have airstrips with landing facilities for small aircrafts. Besides Indian Airlines, Jetlite, Kingfisher and Jet Airways also operate from Patna airport. During 2008, Indian Airlines ferried 1.23 lakh passengers to and from Patna, generating a revenue of Rs. 21.85 crore. The Kingfisher, which operates only on Patna-Delhi and Patna-Kolkata sectors, had a passenger traffic of 40 thousand, whereas Jetlite operating on four sectors, had a little over 27 thousand passengers during the period. Jet Airways operated only on Patna – Delhi sector and reported only 17.4 thousand passengers. The details are presented in Table 4.24. In order to attract tourists and investors to Bihar, it is necessary to develop the airports so that different airways may introduce their flights in various sectors with better connectivity.
Table 4.24 : Air Passenger Traffic from Patna (January – December, 2008) Indian Traffic Jetlite Kingfisher Jet Airlines Passenger Traffic (No.) Patna-Delhi Sector 51967 Delhi-Patna Sector 65098 Patna-Bombay Sector 2637 Patna-Kolkata Sector Patna-Lucknow Sector Patna-Ranchi Sector 3390 Revenue Generation (Rs. Crore) Patna-Delhi Sector 21.85 14222 9682 599 2519 28273 11757 17352 -

137

4.7 Telecommunication In the field of telecommunication, there are various players — BSNL, Reliance, Bharti Airtel, ABTL (IDEA), Vodaphone Essar and Dishnet wireless. The total number of GSM subscribers in November 2008 registered a phenomenal increase to 1.24 crore, compared to only 9.70 lakh subscribers in 2004-05. Among different operators, Bharati Airtel reported the highest number of subscribers (64.19 lakh). Among the major operators, each with more than 2 lakh subscribers, the growth in number of subscribers was the highest for Bharti Airtel and the lowest for BSNL (Table 4.25).
Table 4.25 : GSM Subscribers in Bihar CAGR (%) of (Base year) to 2007-08 73 57 175 2356 105

Operators Reliance Telecom BSNL Bharti Airtel Dishnet Wireless ABTL (IDEA) Vodafone Essar Total

2004-05 360755 405447 203782 969984

2005-06 510396 927557 907913 2345866

2006-07 1120530 1267858 2302105 27080 4717573

2007-08 1719183 1629977 4335371 664991 8349522

2008-09 2471519 2136482 6419357 1162312 149037 76349 12415056

As regards revenue collection, among the reporting operators, Bharti Airtel showed the highest collection in 2007-08 which was an account of more number of subscribers. Bharti Airtel also reported a little more than 100 percent growth between 2006-07 and 2007-08 (Table 4.26).
Table 4.26 : Companywise Revenue Collection in Bihar Operators Reliance Telecom Bharti Airtel Dishnet Wireless Total 2006-07 201.81 509.33 711.14 2007-08 306.53 1022.27 41.40 1370.20 2008-09 (Upto September) 186.73 706.66 40.32 933.71 CAGR (%) of 2004-05 to 2007-08 51.89 100.71 92.68

4.8 Postal Facilities Post offices have been playing the role of providing connectivity to the remotest places in rural areas. Upto March, 2008, there were as many as 9,057 post offices in the state, of which around 95 percent were in rural areas (Table 4.27). But the rural areas were mostly serviced by extradepartmental post offices (92 percent). Nearly all the post offices, either departmental or extra

138

There were only 6 night post offices and these were located in urban areas only. The term and recurring deposits attracted the highest amount of Rs. were granted permanent status.03.27 : Postal Facilities in Bihar Postal Facilities (Nos. Bihar Circle The total unregistered postal traffic in the state in the year 2007-08 was of the order of 9. whereas the number of the registered articles were 23 lakh only (Table 4.28). Table 4. 733 crore each. during the year 2007-08.) (As on 31. Table 4. followed by Monthly Income Scheme having deposit of Rs.29) 139 . there were 13. numbering 911.departmental. were operating only from urban areas.54 crore.26 lakh accounts of different categories in the post offices of the state with the total deposited amount of Rs. Bihar Circle Again. 2. In all.2008) Post Office Departmental Post Office Extra Departmental Post Office Permenant Post Office Temporary/Experimental Post Office Night Post Offices Letter Boxes Post Boxes Urban 432 397 35 411 23 6 2831 911 Rural 8625 646 7979 8528 92 0 22129 0 Total 9057 1043 8014 8939 115 6 24960 911 Source : Chief Postmaster General.600 crore. Post boxes.28 : Postal Traffic in Bihar 2006-07 Total Unregistered Articles of Letter Mail Total Registered Articles of Letter Mail 96725915 1939606 2007-08 95877483 2308012 Source : Chief Postmaster General. around 25 thousand letter boxes were there in the state in 2008. 522 crore (Table 4.

35 Total 2600.76 Monthly Income Scheme 522.Table 4. Bihar Circle 140 .86 Term Deposits 733.84 Senior Citizen's Account 423.73 Public Provident Fund 32.84 Source : Chief Postmaster General.29 : Post Office Accounts in Bihar Category of Accounts 2007-08 Savings 165.31 Recurring Deposits 722.

8 States / UTs Andhra Pradesh Arunachal Pradesh Assam Bihar Chhattisgarh Goa Gujarat Haryana Himachal Pradesh Jammu & Kashmir Jharkhand Karnataka Kerala Madhya Pradesh Maharashtra Manipur Meghalaya Mizoram Nagaland Orissa Punjab Rajasthan Sikkim Tamilnadu Tripura Uttar Pradesh Uttaranchal West Bengal A & N Islands Chandigarh D & N Haveli Daman & Diu Delhi Lakshadweep Pondicherry India Population 75727541 1091117 26638407 82878796 20795956 1343998 50596992 21082989 6077248 10069917 26909428 52733958 31838619 60385118 96752247 2388634 2306069 891058 1988636 36706920 24289296 56473122 540493 62110839 3191168 166052859 8479562 80221171 356265 900914 220451 150859 13782976 60595 973829 1027015247 141 .5 332.8 255.4 37. Per Lakh Population) 253.9 270.3 251.5 271.8 711.6 485.1 645.7 148.8 557.7 411.6 439. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Total Road length (in Kms) 192057 18362 87173 77478 33858 9563 137384 28158 29510 23301 10069 152453 150495 162370 261783 11434 9497 4970 21021 236993 61525 142010 1992 163111 14031 247248 31881 90245 1183 2025 564 414 25785 141 2587 2442671 Road density (Km.5 368.6 253.4 289.0 112.5 133.9 376. No.Appendix-I Statewise Road Density Sl.8 261.6 478.1 232.8 1057.2 93.5 162.1 224.7 265.6 1682.7 268.1 472.9 327.9 187.7 237.6 262.6 231.

46 490.45 351.51 180.30 109.75 49.90 137.33 328.00 85.23 84.57 12.33 404.00 52. Bihar 142 .56 90.83 99.00 102.72 42.00 123.00 133.74 125.07 394.43 127.00 379.00 146.35 128.00 0.40 177.70 43.40 208.83 118.30 95.25 93.10 132.80 369.40 359.40 208.70 137.00 Length (Km) SH MDR 175.63 106.02 914.90 87.41 316.00 90.00 65.89 207.21 38.00 316.60 181.64 33.70 203.50 96.20 112.10 150.51 47.20 52.62 464.60 68.33 337.94 52.00 167.00 221.82 749.95 276.75 220.16 514.40 42.08 789.Appendix-II Districtwise Road Length Sl.90 202.15 310. No.74 502.50 134.90 472.24 55.38 603.07 13.10 82.79 35.61 54.24 177.00 267.70 157.00 229.36 536.36 368.48 94.60 412.00 0.06 276.00 112.55 100.55 135.47 380.15 0.85 304.69 Source : Road Construction Department.00 142.91 465.42 199.84 31.95 95.89 84.47 107.20 22.54 474.77 152.35 387.28 703.00 184.16 523.80 117.30 80.23 119.31 502.80 249.94 234.16 54. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 District Banka Bhagalpur Jamui Lakhisarai Munger Sheikhpura Bhojpur Kaimur Buxar Rohtas Nalanda Patna Aurangabad Gaya Jehanabad & Arwal Nawada Begusarai Madhubani Darbhanga Samastipur Saran Gopalganj Vaishali Siwan West Champaran East Champaran Muzaffarpur Sheohar Sitamarhi Araria Katihar Kishanganj Purnea Khagaria Madhepura Supaul Saharsa NH 0.30 120.00 94.00 145.00 92.00 45.00 50.00 45.82 377.15 99.15 475.95 151.80 256.00 199.00 213.68 70.39 59.87 Total 303.05 226.75 362.64 351.02 354.60 285.00 103.00 168.00 85.20 305.65 527.57 282.46 78.67 234.55 58.14 459.15 461.

3. In addition. the department is collaborating with Administrative Reforms Mission on following works– (i) Tax reforms/ rationalisation in transport sector in Bihar-Policy Document.First Phase Report : Patna & Gaya RTAs. Now this will be implemented in other district also. For this purpose.Appendix . Government of Bihar has provided Rs. and Sone rivers in order to make them navigable. 6. RITES has been appointed as consultant to survey Kosi. The Transport Department intends to develop District Transport Office as a transport public service complex under the PPP model. Transport Department has plans to build building for the District Transport Offices in all the districts. This will facilitate transport department to enforce motor vehicle rules and check overloading. Transport Department has taken initiative to strengthen the RTAs/STAs to rationalise of tax structure and to strengthen the enforcement mechanism. the Transport Department is also installing 3 to 4 weight-bridges at different points at major cross roads.00 crore for computerisation of District Transport Offices. Each check-post will have 4 to 6 weigh-bridges. 5. To promote Inland Water Transport. Gandak. This is being done on the software 'Vahan and Sarathi' developed by NIC. Presently the driving license based on Smart-card is being issued by the District Transport Office.III New Initiatives Taken by Department of Transport 1. Patna since May 2008 on pilot basis. Integrated check-post are being built at six entry points in the State. (iii) Restructuring/ strengthening of enforcement framework of Transport Department. 3. 2.70 crore for computerisation. 143 . Infrastructure Development Authority has been requested to prepare the plan and implement the scheme for the new DTO buildings and service complexes. All 38 districts Transport Offices and 9 RTA Offices are being computerized. 4. Under the computerization plan driving license and vehicle registration are to be issued in Smart-card. (ii) Suggesting appropriate regulatory framework for strengthening/ restructuring RTAs/ STAs and devising a framework for route allocation and technology interventions. The Central Ministry of Road Transport & Highways has agreed to supply computer hardware amounting to nearly Rs.

7. 17. 8. of Schemes to be taken up against the fund to be received 5 Remarks Name of Schemes 2 Target 3 34 09 36 31 40 69 27 1452 622 24 - Taken up 4 34 08 35 30 39 65 27 1190 450 23 - 6 98 28 21 144 . 14. 4.S. District Communication Centre District Control Room State Plan 07-08 Training works L. 16.S.S. 18. 3. Grade III P. New Buildings Repairs RCC roof with Column Barrack with toilet Water supply system Solar light Compound wall Safety by Solar Light System 4 7 16 37 24 24 2 1 Model P. 12. 19.Appendix IV Details of Schemes – Under Execution by the Corporation Schemes against fund received Sl. 2.Qr (Upper Subordinate Quarter) Mahila Police Barrack Community Toilets No. 15. 13.Qr (Lower Subordinate Quarter) U. 10.. 1 1.S. 5. 11. 6. Grade IV P. 20. 9. No.S.

at Nabinagar. District – Aurangabad 3 x 660 MW BSEB 2 x 250 MW 2 x 250 MW BSEB BSEB Capacity Agency (C) Under Private / Public Sector through tariff based bidding (i) Buxar Thermal Power Station at Chausa. at Begusarai (iii) M/s Nalanda Power Company Ltd.. GOI vide resolution dated 19-01-2005 145 . at Pirpainti (E) Approved by SIPB (i) M/s Subhas Project & Marketing Ltd. Haryana. Kolkata (place not identified) (F) Nuclear Power Project (i) * NPCIL has been requested for installation of Nuclear Power Plant at Rajauli 4 x 700 MW BSEB BSEB has also initiated to procure 1200 MW power through competitive based bidding process under case-I as per guidelines of MOP. District-Buxar (ii) Lakhisarai Thermal Power Station at Kajra.. Kolkata. place not identified (iv) M/s Triton Energy Ltd. Patna at Banka. Ltd. New Delhi. Ltd.Appendix-V Upcoming Power Projects of Bihar Place (A) Under Public Sector BSEB (i) Extension of BTPS. Bhagalpur (iv) M/s Adhunik Power and Natural Resources Ltd. Kanti. New-Delhi (place not identified) (vi) M/s Cement Manufacturing Company. Kolkata at Lakhisarai 1200 MW 500 MW 1650 MW 1320 MW 1320 MW 500 MW BSEB BSEB BSEB BSEB BSEB BSEB (ii) M/s IL & FS... District – Begusarai (ii) Extension of MTPS.. District-Lakhisarai (iii) Pirpainti Thermal Power Station at Pirpainti. District-Muzaffarpur (B) Under Joint Venture (i) Installation of new Power Plant under JV of GOB / BSEB & NTPC at Nabinagar. at Motipur Block. Kolkata.. District-Bhagalpur (D) Under PP through MOU signed (i) M/s Jas Infrastructure Capital Pvt. Bhagalpur 3 x 660 MW 500 MW 2000 MW 1000 MW BSEB BSEB BSEB BSEB 2 x 660 MW 3 x 660 MW 2 x 660 MW BSEB BSEB BSEB (ii) M/s Vikas Metal and Power Ltd. Kolkata.. at Pirpainti. Aurangabad (v) M/s Krishak Bharti Co-operative Ltd. Muzaffarpur (iii) M/s India Power Corporation Ltd. Gurgaon.. Kolkata..

CHAPTER V SOCIAL SECTORS In terms of human development.5 percent and 29.2 percent. less than 20 146 . Patna is the only district in Bihar where 50 percent of the female population is literate.0 percent.3 percent respectively (Table 5. Thus. rural development and interventions for oppressed and marginalised groups.8 percent and 45.1).0 and 61. Bihar was at the lowest position among the major states in India in 1981.2 percent. The female literacy rate is the single most crucial indicator of social development of a region. as measured by the Planning Commission in its National Human Development Report. the quality of human life in the country as a whole compared to the rest of the world has not improved in the period of accelerated economic growth.77 percent in the last ten years. It must be noted that in the period since 1999. The same pattern is replete in its ranking with respect to Per Capita Income. The female literacy rate in Bihar in 2001 was much lower at 33. However. demography and health. the twin challenges of economic growth and human development are further accentuated by its high poverty ratios and low per capita income. emphasizing its various aspects like literacy and education. the gender gap in literacy in these two districts are the highest at 32.7 percent respectively. However.6 percent respectively. labour. The annual growth rate of Bihar’s per capita income has been 3. The distance from the national average in female literacy was 23 percentage points in Bihar. In Bihar. In Kishanganj. Thus. as against a national average of 54. as compared to the national average of 54. the female literacy rates in the two districts are 41. 5. employment and poverty. the rate of decline of poverty has been higher in Bihar compared to the national average. compared to the national average.1 Literacy and Education Literacy The overall literacy rate in India in 2001 was 65. its international ranking in HDI has slipped from 115 in 1999 (Human Development Report 2001) to 128 in 2005 (Human Development Report 2007/2008). a detailed overview of developments in social sector in Bihar has been presented. while India’s per capita GDP has increased very fast. 2001. 1991 and 2001.4 percent while in Bihar it was 47. In the following sections. For example.6 percent. Bhojpur and Rohtas are relatively high on the literacy indicator with literacy rates at 59.

40 7.20 24.80 20.50 24.9 and 17.percent of the women are literate.20 13.90 27.10 36.60 23.50 22.00 49.50 59.40 22.50 23.40 17.30 38.70 30.30 50.90 28.10 43.30 39. There is a 24 percentage point difference in literacy between males and females in Kishanganj.50 32.70 45.70 31.10 55. Table 5. Sheohar and Madhepura have the lowest literacy rate among SCs at 16.80 33.60 16.40 44.70 30.50 49.10 41.20 19. Champaran Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali 35.90 11.40 25.60 18.40 38.60 19.90 45.30 23.90 22.30 23.30 27.50 21.10 17.20 39. The male literacy rate is also the lowest in Kishanganj.60 30.30 31.80 43.00 21.00 24.20 23.60 35.60 20.60 12.70 17.10 15.00 22.30 45.90 30.00 48.30 43.60 7.80 44.30 31.50 28.40 Male 21.60 29.30 32.20 33.00 59.30 24.70 26.90 14.60 67.30 Female 22.60 51.50 15.60 34.70 22.90 27.00 56.60 13.30 17.10 51.10 32.10 33.20 16.50 19.60 9.30 22.00 36.50 26.10 22.60 28.60 6.50 9.40 31.30 39.90 29.90 18.80 23.30 16.90 23.40 71.90 5.50 15.40 27.80 25. Champaran Patna E.70 26.90 19.30 50.1 percent respectively.50 23.90 37.60 38.90 24.90 49.40 25.20 26.60 38.20 78.00 29.20 13.90 26.60 32.70 39.80 40.60 15.90 31.90 62.40 55.50 19.30 47.70 26.30 59.40 35.80 8.60 49.20 26.10 69.20 50.10 31.70 48.90 26.30 30.30 18.50 32.80 30.90 11.30 24.40 13.10 68.80 38.00 11.30 50.00 18.10 6.80 48.60 35.00 28.00 42.30 71.20 23.00 53.80 31.30 49.10 24.00 29.40 14.90 16.70 27.20 11.00 57.6 percent).30 55.80 36.90 19.60 39.00 17.30 23.70 63.90 Scheduled Castes Gender ScheduGeneral Gap SC led Female Tribe 7.70 15.60 28.70 57.60 40.90 20.20 25.40 47.30 51.60 20.80 36.00 25.60 18.30 36.50 22.70 32.20 74.30 25.90 59.40 60.90 11.80 37.10 37.20 17.30 18.40 5.40 29.30 20.30 17.70 18.40 35.90 22.00 21.50 43.70 60.90 20.10 23.60 31.80 36.50 45.50 18.20 26.20 42.50 41.50 32.90 21.50 48.30 14.50 25.80 24.70 35.10 41.70 13.80 10.50 22.20 28.00 57.60 30.10 37.10 73.80 42.40 7.50 30.50 25.60 Total 18.70 34.30 12.60 37.10 61.80 56.40 38.90 56.10 13.80 69.40 18.00 13.40 18.60 30.40 24.80 28.40 23.30 38.40 33.70 32.50 Male 46.70 10.30 52.10 45.40 67.80 30.30 63.40 26.30 61.10 18.50 20.60 10.60 24.50 42.10 70.20 46.60 26.90 35.60 31.00 22.70 35.70 10.90 33.80 38.90 147 .00 26.70 48.40 22.50 21.60 38.60 20.10 26.50 35.80 39.90 29.20 46.10 59.40 45.80 26.90 16.20 46.70 44.50 63.10 42.90 28.10 35.90 25.30 51.40 41.60 28.60 16. while the highest literacy rate for SC is in Munger (42.40 8.1 : Districtwise Literacy Rates in Bihar (2001) Overall District Total Araria Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga Gaya Gopalganj Jamui Jehanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada W.00 26.80 29.60 37.00 16.80 7.10 48.70 25.20 29.10 26.00 24.60 75.70 27.40 44.60 25.20 35.90 24.30 49.10 66.50 51.

the gender gap is also significantly lower at 8 percent. In Darbhanga in north Bihar. Bhojpur and Begusari have seen more than 50 percent overall increase in enrolment.7 percent increase for ST communities. The districtwise patterns of enrolment are stated in Appendix I. Thus. have also seen more than 100 percent increase in SC enrolment in the corresponding period.84 34. The gender gap among the SC population is 11 percent in Nawada.03 80. All the districts. For SCs.2 percent.1 also shows that. the gender gap in literacy among SCs is lower than it is for the overall population.5 percent and the lowest in Bhagalpur at 21.5 percent in this period. The enrolment has significantly improved in upper primary level with an overall increase of 72. Historically.43 126. the enrolment in upper primary has increased by 97. the SC population has been more concentrated in south Bihar. The overall enrolment at the primary and upper primary level has increased by 34.2 shows the number of children enrolled in primary and upper primary schools in Bihar between 2003-04 and 2006-07.66 97. Table 5.55 35. an overall emphasis on female literacy at the district level to close the gender gap is warranted.51 76. Primary and Secondary Education Table 5. There has been a 41.72 9732357 10917135 11233590 12527117 1482460 1630643 170731 1801374 129334 12240 141574 1936213 1803005 236506 2039511 122421 17037 139458 2163453 1819098 250377 2069475 149785 22101 171886 2562318 2212091 336970 2549061 228181 27666 255847 11214817 12853348 13397043 15089435 148 . The overall gender gap is the highest in Bhojpur (the district with the highest proportion of literate males) at 32. the gender gap in literacy is much lower than the average for the district.37 41.2 : Total Enrolment By Education Levels in Bihar 2003-04 All Primary (I-V) Upper Primary (VI-VIII) Total (I-VIII) SC Primary (1.0 percent.8 percent.72 72. Araria.V) Upper Primary (VI-VIII) Total (I-VIII) ST Primary ( I-V) Upper Primary (VI-VIII) Total (I-VIII) 2004-05 2005-06 2006-07 Percentage Increase in Four Years 28. Samastipur. except Begusarai. Purnea. in all the districts of Bihar. it has increased by 126. 9 percent in Gaya and 6 percent in Aurangabad.4 percent while.Table 5.5 percent increase in enrolment of children from SC communities and 80. for STs. In the four districts of south Bihar where SC population is more than 20 percent of the total.

The dropout rates in Bihar in primary education level have declined by 5 percentage points between 2004-05 and 2005-06.55 Girls 48.02 3776.57 4189.3 : Dropout Rates at Primary.59 46. Table 5.Table 5. as compared to girls.74 300.71 99 100 100 Budget 438. The expenditure is close to 100 percent or more of both budget and targets. At the secondary level. at upper primary level.37 Secondary 83. the enrolment figures from Table 5.25 Boys 53.77 594.69 73.58 4581. The decline has been higher in the case of boys.07 The state government has stepped up both its plan and non-plan expenditure in education as can be seen in Table 5.3 shows the dropout rates at various levels of school education in Bihar in 2004-05 and 2005-06.48 587.37 47.37 Upper Primary 74. The expenditure on education has been in keeping with the Twelfth Finance Commission recommendations since 2005-06. the position has deteriorated with a marginal increase of dropout rate by 0.2 for 2006-07 suggest a possibility of a larger decline in dropout rates in 2006-07.01 percent.4. Indeed.00 300.06 83. there was a very modest decline by just 1 percentage point. However. Table 5.62 45.65 4183.44 Percent 99 99 100 2005-06 2006-07 2007-08 149 . Upper Primary and Secondary Levels Primary Year Total 2004-05 2005-06 51.4 : Expenditure on Education (Rs crore) Non-Plan Year 12th FC Expenditure Percent Target 3822.44 Plan Expenditure 435.

The districts with 100 percent coverage are Gopalganj. Kaimur (26 percent). Unnayan scheme has been commenced to start residential centres for primary education of 50 children rescued from child labour in each block Free textbooks have been distributed among children of Class I to VIII from most backward castes and minority communities. Free vocational training for girls between 10-16 years from minority background under Hunar to attract them to education. up from 60 percent in 2006-07. Mukhya Mantri Balika Cycle Yojana has been extended to aided schools including minority schools. The total number of children covered under MDMS at the primary level is 99. Saharsa and Sheikhpura. based on the child’s right to enhancement of nutrition. 150 . Table 5. Nawada.     Mid-Day Meal Scheme (MDMS) The Mid Day Meal Scheme. Purnea (29 percent) and Darbhanga (35 percent). including learning centres. social equity and hygiene and sanitation. The MDMS was universalized in 2005 in Bihar covering all primary schools.63 lakh girls came under the scheme in 2007-08. but there is high variation among the districts. 1. Talimi Markaj scheme has been started to ensure primary education for disadvantaged sections in the minority community with targeted teaching facilities in their hamlets/villages. has been an important intervention in both increasing enrolment and retaining students at the primary level. Jamui.5 shows the total coverage of children under MDMS at the primary level (Class I-V). UTHAN KENDRA scheme has been implemented in their hamlets.Interventions in Primary and Secondary Education   For enrolment of 6-14 year olds among Mahadalit children and to ensure their regular attendance. Munger.83 lakh. Some of the low coverage districts are Sitamarhi and Supaul (25 percent each). The total coverage is 72 percent. educational advancement.

151 . The implementation has been far more uniform at this level in the various districts (Table 5. Champaran Total Total Enrolment 386949 357841 221394 472643 434422 389878 225681 750788 789410 550745 93034 282770 170063 104381 223257 465566 252450 236495 118077 281277 588133 146616 635214 303178 270183 559075 502555 329926 215914 641639 435439 87925 102547 378276 463359 371860 529560 501570 13870190 The scheme has been now extended to the upper primary level in all the districts of Bihar. The overall percentage of students covered under MDMS is 81 percent.5 : Districtwise Coverage of MDMS (Class I-V ) (2008-09) No of Children Coverage Covered under (Percentage) MDMS 309559 80 258349 72 218959 99 254729 54 416937 96 262363 67 187202 83 261397 35 681442 86 381951 69 93569 101 282770 100 133054 78 76593 73 57900 26 283103 61 289073 115 183596 78 118077 100 192132 68 430470 73 146616 100 600086 94 242526 80 280916 104 436563 78 147525 29 290637 88 215914 100 483305 75 347771 80 87925 100 43762 43 92775 25 385842 83 94583 25 351482 66 361625 72 9983078 72 District Araria Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga E. Champaran Gaya Gopalganj Jamui Jehanabad Jehanabad (Arwal) Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada Patna Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali W.6). The districts of Jamui.Table 5.

the only exception being Gaya which is at 76 percent. Champaran Gaya Gopalganj Jamui Jehanabad Jehanabad (Arwal) Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada Patna Purnea Rohtas Saharsa Samastipur Saran Sekhpura Sheohar Sitamarhi Siwan Supaul Vaishali W. Table 5. Champaran Total 152 .Jehanabad and Muzaffarpur have 100 percent coverage. All other districts have a coverage of 80 percent.6 : Districtwise Coverage of MDMS (Class VI-VIII) (2008-09) No of Children Covered under MDMS 57729 92772 48086 86854 74615 66298 55598 101010 171942 143390 109318 54255 41200 42968 63961 77122 50691 44791 31567 53367 134864 34849 132764 99494 100126 101554 80432 83520 91037 135998 185238 20839 17930 123894 145140 46261 81786 68646 3151907 District Total Enrolment 72161 115965 60107 108568 93269 82873 69498 126252 214927 189827 136648 54255 41200 42968 79951 96403 63364 55989 39459 66709 168580 43561 130276 124368 125158 126942 100540 104400 113796 169997 231547 26049 22413 154867 181425 57826 102233 85808 3880189 Coverage (Percentage) 80 80 80 80 80 80 80 80 80 76 80 100 100 100 80 80 80 80 80 80 80 80 102 80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 81 Araria Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga E.

7). In 2007-08.24 crores for external monitoring and evaluation could not be utilised leading to an overall utilization of 85 percent (Table 5. internal monitoring and evaluation.00 100 100 - 2. Supervision. management and supervision.86 100 Weighing Machines & Height Recorder Replacement/Repair/Maintenance of cooking devices.00 701.72 21. and internal monitoring and evaluation were utilised fully.11 383.53 82.66 0. the funds under the various components of school level expenses. Dsitrict & Block level SMCs Furniture. Table 5.53 82. Computer Hardware and consumables and other incidental expenses Capacity building and training of staff involved in MDM Preparation of relevant manuals for training and capacity building External Monitoring & Evaluation Total 383.54 10.54 10.46 0.00 123. However.00 241.00 0.11 100 0 0 - - 220.86 412. weighing machines etc.88 23. an allocation of Rs 1. lakh) (Rs.25 220. and external monitoring and evaluation. lakh) — Utilised (Rs.work related to State.50 100 2.66 0.99 100 100 100 100 21.91 717.20 crore in 2006-07 to Rs 8.16 3. utensils.7 : Fund Utilisation in MDMS 2006-07 School Level Expenses Sanctioned (Rs.50 2. management and supervision.91 717.46 0.25 100 100 100 241.00 100 12.00 2.86 100 0 85 153 .The funds sanctioned under MDMS increased from Rs 7. Training and Internal Monitoring & Evaluation Staff salary including salaries for MIS coordinators and data entry operators Transport & Contingencies Other incidental expenses (inc. training. Management.16 3.99 12.00 3. All funds sanctioned for MDMS in 2006-07 were utilized.86 825. lakh) — 2007-08 Percentage of Sanctioned Utilised Percentage Utilisation (Rs.30 crore in 2007-08 under three major components – school level expenses.88 23.00 3. lakh) of Utilisation — 412.

it still lags behind in the number of medical colleges (23) and engineering and technical colleges (7) (Table 5. Total 5. 154 .Higher Education With a Gross Enrolment Ratio (GER) in higher education at 6.71 percent in Bihar.65 percent). one open university and 504 colleges and 11 research institutes in Bihar for higher education. it is well below the national average of 9.10).20 Note : Figures includes enrolment in Polytechnics In keeping with the state government’s policy of affirmative action for marginalised and oppressed sections of society.9).70 9. Table 5. reservation for various social groups are guaranteed in universities and colleges (Table 5. community and gender based reservation.60 Girls 3.21 percent. While male GER is close to the national average. 3 percent of the seats are also reserved for the physically challenged within each category.50 10.50 percent) and the national average (7.9 : Percentage of Reserved Seats for Various Social Groups in Universities and Colleges in Bihar Category Schedule Caste Schedule Tribe Economical Backward Class Backward Class Minorities(If any) Women of Backward Classes Percentage of Reserved Seats 10 1 16 12 0 3 While there are 12 universities. This is also reflected in the low proportion of enrolment in medical and engineering/technology courses (Table 5.11-5.13). there is a huge gap once again in female GER between Bihar (3.8 : Gorss Enrolment Ratio in Higher Education (18-24 Years) Boys Bihar India 9.50 7. In addition to caste.70 Total 6. The low achievement for girl students accounts for Bihar’s gap with respect to the national average.

11 : Coursewise Enrolment is Higher Education in Bihar Enrolment (in '000) Courses Arts Boys Girls Total Commerce Boys Girls Total Science/Computer Science/ Application Boys Girls Total Engineering/ Technology Boys Girls Total Medical Boys Girls Total Education/Teacher Training Boys Girls Total Others Boys Girls Total Ph.10 : Institutions of Higher Education in Bihar Type of Institution Government Universities 12 Open Universities 1 Research Institutes 11 Total Number of Colleges/Institute 504 Government 255 Private (Aided) 4 Private (Unaided) 245 Education/Teacher Training 15 Medical Colleges 23 Engineering/technical College 7 Others 63 Table 5.D / M.Phil 896 610 1506 Post Graduate Bachelor Degree Degree Programmes Programmes 14186 1272 15458 5748 778 6526 179151 31614 210765 81575 19686 101261 Total 194233 33496 227729 87323 20464 107787 10923 948 11871 77076 25510 102586 5495 881 6376 5895 3858 9753 7805 1088 8893 28891 7151 36042 87999 26458 114457 5495 881 6376 5895 3858 9753 7805 1088 8893 28891 7151 36042 155 .Table 5.

Table 5.Phil Post Bachelor Graduate Degree Degree Programmes Programmes Total Arts Boys Girls Total Commerce Boys Girls Total Science/Computer Science/ Application Boys Girls Total Engineering/ Technology Boys Girls Total Medical Boys Girls Total Education/ Teacher Training Boys Girls Total Others Boys Girls Total 3572 935 4507 3572 935 4507 1303 22 1325 1303 22 1325 748 491 1239 748 491 1239 697 112 809 697 112 809 1023 196 1219 12073 1458 13531 13096 1654 14750 465 75 540 13180 995 14175 13645 1070 14715 100 5 105 1998 114 2112 18551 1527 20076 20649 1646 22293 156 .D / M.12 : Coursewise Enrolment of SC Students in Higher Education in Bihar Enrolment (in '000) Courses Ph.

it is much higher at 11-15 percent. The enrolment of female SC students among all female students in general streams like arts.13 : Coursewise Enrolment of ST Students in Higher Education in Bihar Enrolment (in '000) Post Graduate Bachelor Degree Degree Programmes Programmes 10 1 11 53 17 70 1319 692 2011 12 3 15 Courses Arts Boys Girls Total Commerce Boys Girls Total Science/ Computer Science/ Application Boys Girls Total Engineering/ Technology Boys Girls Total Medicine Boys Girls Total Education/ Teacher Training Boys Girls Total Others Boys Girls Total Ph. however.13 show the coursewise enrolment status in higher education in Bihar.D / M. the enrolments are the same for male and female SC students. Among ST students. for males.Table 5. male and female enrolment in percentage terms are almost equal in all courses measured within the same population cohorts. Thus. In medical and engineering.11 to 5. science and commerce is low at 5-6 percent. the percentage of ST 157 .Phil 14 5 19 Total 1343 698 2041 65 20 85 23 6 29 866 104 970 889 110 999 50 8 58 54 35 89 50 8 58 54 35 89 53 31 84 279 89 368 53 31 84 279 89 368 Table 5. In arts and commerce. the gender gap is very stark.

Nawada and Gaya have more than 20 percent SC population. Sheohar and Jehanabad. Bhagalpur. Patna. but very low both in engineering (13. Banka. Aurangabad. Katihar. 89.males among all males is lower than the percentage of ST females among all females. It is the highest in Gopalganj (1001) and Siwan (1031). while the proportion is less than 10 percent in Kishanganj and Katihar. All other districts have a rural population of over 80 percent.4 158 .7 percent. Interventions in Higher Education   Classes have started for the first batch of 60 students for Chandragupta Management Institute. The sex ratio is the lowest in Munger (872). making the state the least urbanized among all the major states in India. Patna (873) and Bhagalpur (876). Upgradation of all medical colleges and teaching hospitals have been undertaken.1 percent. predominantly due to high proportion of male migration.5 per cent live in rural area. Darbhanga and Vaishali are the most densely populated districts with density above 1300 while Kaimur and Jamui have a population density of less than 500. but it is more than 960 in 9 districts – Araria. Patna is the most urbanized district with a rural population of 58. Munger comes next at 72. Some of these distrtricts are districts with high shares of religious minority and scheduled caste population. but the child sex ratio in Bihar is higher than the national average at 942.  5. km. Overall. The child sex ration is lower than 920 in five districts – Saharsa. Gaya and Nawada. Education and teacher training is often assumed to be a ‘feminine occupation’. A bill to establish Aryabhatt Gyan Vishwavidyalaya has been prepared of accreditation/affiliation and development of all technical and management institutes in the state. the share of women in higher education is the highest in medicine (39. Darbhanga.0 million in 2001 implying a high population density of 880 persons per sq. Jamui.2 Demography and Health Bihar had a population of 83. Katihar and Kishanganj while it is the lowest in Lakhisarai at 4. Nalanda. The share of religious minorities is more than 35 percent in Purnea. The sex ratio in Bihar at 919 females per thousand males is slightly lower than the national ratio at 933. The total share of SC in the population is 15. female enrolment is the lowest in this stream at 12 percent. Gopalganj. Munger. however.6 percent). Of Bihar’s total population. with 7 districts having a rural population of over 95 percent.8 percent) and in general courses (between 15 and 20 percent). Kaimur. Purnea.4 percent. Araria. Vaishali.

4 0.4 17.1 0.4 90.2 9.5 10.0 85.0 0.5 0.3 18.5 13.1 90.5 12.6 92.1 89.7 96.6 4.0 90.8 91.5 72.3 67.1 9.5 12.9 93.1 0.0 19.3 7.8 84.8 17.5 21.9 1.4 11.9 7.1 15.8 11.9 91.0 3.0 29.6 23.1 36.4 17.1 2.4 10.5 13.9 0.7 85.4 81.6 12.1 16.5 16.3 10.5 10.7 0.4 11.1 92.4 14.1 0.8 10.6 96.5 95.8 5.3 4.2 17.6 86.5 15.1 0.0 0.percent (Table 5.1 12.1 14.3 15.3 0.7 0.5 6.3 93.5 10.2 11.0 1.5 7.7 11.6 96.5 21.4 0.5 12.4 9.7 13. Champaran 3043466 Bihar Density 880 751 607 533 1222 946 903 864 1442 991 699 1057 451 963 382 782 859 687 652 853 1020 800 1180 1006 726 1471 787 636 885 1175 1231 762 1161 1214 1221 724 1332 582 159 .8 919 913 934 908 912 876 902 899 914 897 938 1001 918 929 902 919 885 936 921 915 942 872 920 914 946 873 915 909 910 928 966 918 885 892 1031 920 920 901 942 963 943 965 946 966 940 925 915 937 968 964 963 917 940 966 932 947 951 927 939 914 928 942 978 923 967 951 912 938 949 955 916 924 934 925 937 953 15. Champaran 3939773 Gaya 3473428 Gopalganj 2152638 Jamui 1398796 Jehanabad 1514315 Kaimur (Bhabhua) 1289074 Katihar 2392638 Khagaria 1280354 Kishanganj 1296348 Lakhisarai 802225 Madhepura 1526646 Madhubani 3575281 Mungher 1137797 Muzaffarpur 3746714 Nalanda 2370528 Nawada 1809696 Patna 4718592 Purnea 2543942 Rohtas 2450748 Saharsha 1508182 Samastipur 3394793 Saran 3248701 Sheikhpura 525502 Sheohar 515961 Sitamarhi 2682720 Siwan 2714349 Supaul 1732578 Vaishali 2718421 W.7 14.2 0.9 20.1 13.14 : Districtwise Demographic Profile of Bihar Schedule Schedule Rural Minority Child Sex Caste of Tribe of Population Sex Ratio (%) of Ratio Population Population (%) Population (%) (%) 89. Table 5.1 4.9 94.9 92.3 0.6 0.0 24.5 94.1 15.3 86.34.3 94.4 17.2 4.9 22.8 0.3 0. The detailed break up of districtwise population by religion is available in Table 5.5 95.3 95.1 0.8 13.7 91.9 93.7 14.6 58.2 15.4 18.6 0.1 18.2 22.6 17.8 90.3 0.0 0.4 14.9 15.6 15.9 94.5 96.1 90.4 7.0 0.7 14.6 0.1 0.4 91.14).8 20.3 14.2 18.2 Population 82998509 Araria 2158608 Aurangabad 2013055 Banka 1608773 Begusarai 2349366 Bhagalpur 2423172 Bhojpur 2243144 Buxar 1402396 Darbhanga 3295789 E.2 8.7 19.5 11.2 8.3 6.6 41.1 2.5 93.6 0.5 42.0 0.1 1.4 1.3 86.

5 44.1 46.8 46.7 23.5 28.6 33.5 52.1 41.1 44.9 51.0 53.6 60.8 Female 18.9 50.0 47.1 67.4 35.3 41.5 35.4 44.4 45.1 35.1 63.7 36.0 17.8 42.9 48.7 48.4 33.1 31.4 12.4 13.5 The average rate of work participation is 32.6 44.1 0.2 47.5 Kishanganj 32.0 29.9 percent for Bihar.3 42. Vaishali.0 42.3 23.4 44.8 SCs Male 47.9 46.0 49.6 34.8 46.0 37.6 39.2 28.3 48.9 Siwan 26.9 10.3 43.7 48.3 13.7 45.4 31.6 51.4 52.8 44.3 Patna 30.7 25.3 36.6 27.5 50.2 36.9 40.3 Bhojpur 29.4 53.4 35.7 47.6 40.5 47.8 42.4 25.8 33.6 21.6 45.6 Saran 26.0 49.7 27.1 22.2 Sitamarhi 31.6 30.2 Purnea 37.3 42.1 Darbhanga 31.0 50.8 11.0 41.7 52.1 10.1 46.9 21.9 23.8 53.5 30.2 42.1 10.9 55.9 Supaul 42.7 0.9 54. The SC population has much higher WPR of 38.0 50.6 11.0 28. Buxar.0 42.3 37.6 51.5 41.0 50.1 47.9 26.4 48.5 Female 28.6 51.8 33.4 12.2 31.8 13.2 Lakhisarai 36.8 Rohtas 30.8 46.6 49.3 20.1 44.4 39.3 0.5 52.3 39.8 23.5 52.7 48.4 47.6 47.3 53.9 53.15 : Work Participation Rates in Bihar Person Bihar 32.2 percent with 17 districts 160 .6 46.6 33.8 53.3 41.1 42.5 35.7 23.7 12.6 Begusarai 31.1 13.1 51.3 STs Male 52.0 10.9 50.8 30.6 56.3 47.1 43.2 48.1 34.4 15.4 10.4 Kaimur 34.6 50.9 20.2 39.7 51.5 19.2 49.1 33.9 46.1 18.2 42.0 42.0 23.1 50.4 Saharsa 39.8 Gopalganj 29.8 39.0 25.5 0. Siwan.2 17.4 58.1 50.3 60.3 50.2 23.2 15. Saran.3 38.7 32.2 44.5 28.2 62.7 50.8 Bhagalpur 35.1 42. Jamui and Madhepura and higher than 35 percent in another 14 districts.7 44.7 47.8 Jamui 42.6 37.5 50.9 14.5 Madhepura 44.1 48.8 0.9 District All Male 46.4 40.6 30.0 9.4 61.6 39.6 46.9 38.1 Samastipur 31.4 25.3 48.9 51.2 48.1 46.8 35.7 47.3 50.8 42.9 54.8 71.1 Muzaffarpur 30.9 49.1 42.9 14.9 55.3 3.9 49.6 41.5 51.3 44.2 28.1 Buxar 29. Champaran 32.9 48.7 51.9 48.4 47.3 23. Munger.8 47.1 53.6 52.7 64.0 Banka 39.1 48.4 44.1 13.5 40.5 Khagaria 36.0 51.6 49.0 16.2 36.8 W.6 18.3 32.9 20.0 46.9 46.3 46.8 Madhubani 34.1 37.2 12.9 46.Table 5.0 Vaishali 28.6 44.3 52.0 47. Champaran 37.5 15.5 50.5 23. The WPR is higher than 40 percent in Supaul.7 53.1 22.0 48.7 41.0 47.0 35.1 38.2 24.2 47.1 39.0 50.5 38.5 38.8 27.4 32.6 Person 38.7 29.9 22.2 37.9 36. Bhojpur and Gopalganj have Work Participation Ratio (WPR) below 30 percent.8 47.3 35.7 26.9 50.1 46.7 52.0 35.5 53.7 21.1 36.1 53.9 30.5 Aurangabad 0.9 46.7 Female 36.0 41.7 Gaya 36.0 Sheohar 31.3 23.9 30.3 Munger 29.3 Person 45.7 48.0 26.3 48.3 20.0 29.9 Araria 39.5 Sheikhpura 37.1 42.6 51.8 43.2 29.2 51.0 45.2 17.4 Katihar 37.2 E.4 Nalanda 38.5 40.4 25.9 32.0 28.1 Nawada 37.9 48.8 45.7 Jehanabad 38.2 45.8 54.5 47.

The total number of referral hospitals in the state is 70. 69 urban PHCs. There are wide variations in coverage at the district level.2 percent while the male WPR is at 47. There are 17 districts where WPR for ST is above 40 percent and another 5 where it is above 50 percent.16. For every lakh of population. Apart from Goplaganj and Khagaria. it must be noted that since there is not such a wide variation for male WPR among different sections of the population. 415 are rural Primary Health Centres (PHCs). from 12 percent to 33 percent while there was only a 2 percent increase in the national average in the same period. For SC women. The gender gap is less among SCs with female WPR at 28. the remaining 10 have none. gender bias is a more important social issue in accounting for the differences in WPR.2 percent. while the difference in WPR among men is much less. WPR is much higher at 45. Among the ST population. Health Vaccination coverage increased in Bihar between 1998-99 and 2004-05. While poverty is relevant as an explanation.107 health centres of all types in Bihar. In 20 districts. Of these.having higher than 45 percent WPR and only 3 below 35 percent. For STs.3 percent. the female WPR is higher than 20 percent for the overall population. While Khagaria has 153 health centres and Gopalganj has 89 centres for every lakh of population. Health Infrastructure The status of health infrastructure in the state is summarised in Table 5.9 percent respectively. like literacy. Nawada has only 8. The gender gap is stark with the female WPR for the state at 18. the gap is even less at 36. Thus. Infant mortality in Bihar decreased from 72 to 68 per 1000 live births in the same period. 161 . gap in women’s WPR is much higher between the SC and ST communities and the rest of the population.5 percent.4 percent while the male WPR is 46. WPR is less than 20 percent in only 4 districts. no district has more than 19 centres for every lakh of population. Thus Work Participation Ration. there are 13 health centres. While 28 districts have atleast one rural referral hospital. There are 11. The WPR for ST women is higher than 30 percent in 20 districts. shows a profound gender bias in the general population as compared to SC and ST. 9588 sub-centres and 1035 Additional PHCs.9 and 52. This was mainly attributable to rise in institutional deliveries from 15 to 22 percent in the same period (Appendix VI and IX). It is higher than 30 percent in 16 districts. with two districts above 60 percent and only two districts below 30 percent.

Table 5. No. of CHC Hospital Div. of PHC Centre Health APHCs and Centre Sub(APHC) Centres Rural Urban 7 5 10 1 18 11 13 7 18 19 18 11 5 5 9 12 6 7 3 6 18 7 14 16 13 19 10 17 10 20 1 6 3 13 14 11 16 16 415 2 0 1 9 0 2 0 1 0 1 4 3 1 2 1 1 1 0 1 1 0 2 0 4 1 4 1 2 2 3 14 0 0 1 1 0 1 2 69 425 64 212 265 288 280 284 162 261 315 643 186 166 81 197 257 193 136 102 196 429 123 473 301 125 418 278 186 163 354 503 73 34 213 316 178 339 369 9588 23 21 57 15 27 41 10 15 36 46 37 22 22 27 19 25 14 8 12 17 57 8 43 17 21 60 34 32 15 31 43 16 17 38 24 19 36 30 1035 457 90 280 290 333 334 307 185 315 381 702 222 194 115 226 295 214 151 118 220 504 140 530 338 160 501 323 237 190 408 561 95 54 265 355 208 392 417 11107 Health Centre Coverage Per lakh of population 19 13 12 15 15 12 14 13 9 9 18 89 12 12 16 11 153 10 13 13 12 11 13 14 8 9 11 9 13 11 15 16 9 10 14 11 15 13 13 District 162 . of Referral Sub. Population Hosp. Champaran 3300000 Total 87291416 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 3 2 2 0 3 0 2 3 1 3 2 1 3 3 1 1 1 0 2 1 1 3 2 4 3 2 0 1 0 0 0 1 0 1 0 2 55 2 0 0 1 0 2 0 1 0 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 1 0 0 0 1 0 0 15 1 0 0 1 0 1 0 1 0 0 0 1 1 0 1 0 0 1 1 0 1 0 0 1 0 3 0 1 0 3 0 1 1 0 0 1 1 1 23 No. Rural Urban Rural Urban Araria 2400000 Arwal 666942 Augangabad 2351819 Banka 2000000 Begusarai 2254573 Bhagalpur 2700000 Bhojpur 2233415 Buxar 1400000 Darbhanga 3600000 E. of No. No. of Addition Total of Sub .Primary PHC. Champaran 4300000 Gaya 3800000 Gopalganj 250000 Jamui 1600000 Jehanabad 924000 Kaimur 1453379 Katihar 2690738 Khagaria 140000 Kishanganj 1584006 Lakhisarai 939776 Madhepura 1749637 Madhubani 4178606 Munger 1281149 Muzaffarpur 4148855 Nalanda 2368327 Nawada 2000000 Patna 5600000 Purnea 3000000 Rohtas 2700000 Saharsa 1427403 Samastipur 3700000 Saran 3700000 Sheikhpura 594144 Sheohar 600000 Sitamarhi 2669887 Siwan 2552994 Supaul 1900000 Vaishali 2531766 W.16 : Status of Health Infrastructure (as on December 2008) No.

pathological and radiological services. There are 16 ANMs working for every lakh of population in the state. 57. 58.7 percent of the contractual posts have been filled up. Except for Khagaria and Gopalganj. The situation is even more acute for staff nurses. Less than 137 ASHAs are posted in other districts for every lakh of population (Appendix V). At present. Except for Khagaria. While 49 doctors are available per lakh of population in Khagaria and 38 in Gopalganj. The appointment of ASHA workers have been much closer to target. While 41 Grade A nurses is working for every lakh of population in Khagaria. 5 doctors are in position and working for every lakh of population in the state. Free Drug Distribution and Indoor Treatment Speeding up appointments of medical and other staff in the health service Recruitment and training of ASHAs 163 . West Champaran and Sheohar. While 806 ASHAs.4 percent of the contractual posts have been filled up. the corresponding figure is less than one for Buxar. out of whom 747 are trained. The same pattern is replete in the availability of ANMs. no district has more than 18 doctors per lakh of population (Appendix II). There are districtwise differences in availability of doctors. no district has more than 8 Grade A nurses per lakh of population (Appendix III). the corresponding figures are 715 and 691 respectively for Khagaria. The power to transfer doctors has been delegated to the District Magistrate. For such nurses. There are 11251 regular and 10946 contractual posts sanctioned for ANMs in the state and 86.4 percent of the regular 41.8 percent of the contractual posts have been filled up. there is only 1 doctor available per lakh population in Arwal. are available per lakh of population in Gopalganj. There are only 2 Grade A staff nurses in position and working for every lakh of population. Except for Khagaria and Gopalganj. Interventions in Health Service Delivery     Involving Private Sector in Support Services for cleaning.4 percent of the regular 58.Human Resource There are 4643 regular and 2369 contractual posts sanctioned for doctors in the state.1 percent of the regular 26. no district has more than 29 ANMs per lakh of population (Appendix IV). About 92 percent of the 74350 positions have been filled and 87 percent of the workers have been trained.

95 percent of patients going to private doctors for treatment. The monthwise progress since 2006 in number of institutional deliveries is phenomenal (Chart 4. 164 .38. 2008. The number of institutional deliveries went up very rapidly and is estimated to be approximately 8.2). The districtwise monthly figures of institutional deliveries are provided in Appendix VI. there were low turnouts at Out Patient Departments (OPD) in rural Bihar.481 in 2007-08. In January 2006. only 39 patients visited government hospitals per day. In October. The payments of Rs 1400 in rural areas and Rs 1000 in urban areas to mothers of neonatals availing institutional delivery have acted as a strong incentive. 2006. Average Number of Patients Visiting Government Hospitals Sep May Jan 08 Month Sep May Jan 07 Sep May Jan 06 0 1000 2000 3000 Number 4000 5000 6000 Janani Evam Bal Suraksha Yojana (JBSY) Janani Evan Bal Suraksha Yojana was launched on July 1.The reforms in the health sector in Bihar since November 2005 have begun to be reflected in the outcome figures. In Januray 2007. Earlier. the figure went upto 2243 and further increased to 2522 in Januray 2008. the corresponding figure was as high as 4380.

5 crore in 2005-06 to Rs 68 crore in 2008-09.Monthwise Coparision of Institutional Delivery Over the Period 2006-07-08-09 144002 109563 160000 127335 140000 108168 120000 100000 65385 65196 60632 80000 60000 27865 40000 20000 0 April May June July Aug Septr Oct Nov Dec Jan Feb Mar 3200 34174 80255 108981 102886 130380 2006-07 78147 72733 74047 76411 2007-08 2008-09 52205 78665 22804 13936 12162 11042 7233 Free Drug Distribution Free drug distribution has been stepped up since 2005-06. 3716 3805 Total Expenditure in Drug Procurement (Rs Crore) 80 70 60 Rs. in Crores 50 40 30 20 10 0 2004-05 2005-06 2006-07 2007-08 2008-09 Total Expendit 3655 11686 165 10882 17730 18015 . The expenditure on procurement of drugs for free distribution went up from Rs 3.

Growth monitoring and promotion. It provides improved childcare.9 percent.  Enhance the capability of the mother to look after the normal health and nutritional needs of the child.17 220.17 crore. through proper health and nutrition education. Nutrition and Health Education) and Education (Early Childhood Care and Pre-School Education) for children in the age-group 3-6 years.  Lay the foundation for the proper psychological.14 24.9 percent in 2007-08. 166 . Although the utilization against approved budget is low. The utilisation against receipts has gone up from 31 percent in 2005-06 to 57 percent in 2007-08.76 GOB 51. utilization has already reached 62.22 571.80 57. and expectant and nursing mothers. the actual release went up from Rs 124.2 2005-06 2006-07 2007-08 2008-09 Total Integrated Child Development Scheme (ICDS) The ICDS programme is unique because of its integrated approach to early childhood development. health and nutrition. early stimulation and learning. which is implemented through trained community-based Anganwadi workers and helpers. and supportive community structures. Out of this.4 23. Referral Services and Treatment of minor illness).17 : Financial Overview of Health Expenditure (Rs crore) Fund Received Year Approved Budget 398.92 62. It is a targeted programme for young children.62 31.9 Percentage Percentage Utilization Total Total Utilization against against Received Expenditure Approved Receipts Budget 124.42 680.57 237.  Reduce the incidence of mortality. it has improved from 9.59 92.8 1271.48 46.48 1043.1 415.2 34. morbidity.21 2539.7 380.70 889.55 GOI (NRHM) 124. Health Check-ups. physical and social development of the child.75 240. It must be noted that for the first three quarters of 2008-09.66 589.7 perecnt in 2005-06 to 34.33 crore in 2005-06 to Rs 351.1 9.33 328.33 38.37 0.  Achieve effective coordination of policy and implementation among various departments to promote child development. malnutrition and school dropouts.Fund Utilization The total funds allocated for health to the State Health Society increased from Rs 398. This is done through a five point programme:  Improve the nutritional and health status of children below the age of six years.2 16.9 24.9 351.22 crore in 2005-06 to Rs 889.69 227. water and environmental sanitation. Table 5.20 350.21 crore in 2008-09.84 175. Nutrition (Supplementary feeding. The ICDS encompasses interventions in Health (Immunisation.

A total of 86237 AWCs are now operational in Bihar (Table 5. of ICDS Project Sanctioned Operational 19 19 21 21 21 21 10 10 11 11 13 13 15 15 9 9 7 7 15 15 17 17 11 11 10 10 6 6 6 6 10 10 18 18 7 7 544 544 By 2007-08.Table 5. In 2008-09.of Projects 532 5 7 0 544 No. Table 5. 5440 Anganwadi Centres (AWCs) and an equal number of mini-AWCs were added. Champaran 29 29 Vaishali 17 17 District District Darbanga Madhubani Samastipur Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Bhagalpur Banka Munger Sheikhpura Lakhisarai Jamui Bagusarai Khagaria Total No.of AWCs 60153 19516 1128 5440 86237 No. of ICDS Project Sanctioned Operational Patna 23 23 Nalanda 20 20 Rohatas 20 20 Kaimur 11 11 Buxar 10 10 Bhojpur 15 15 Gaya 25 25 Jahanabad 7 7 Arwal 5 5 Nawada 14 14 Aurandabad 11 11 Saran 21 21 Siwan 19 19 Gopalganj 14 14 Muzaffarpur 17 17 Sitamarhi 18 18 Sheohar 5 5 W.18 : ICDS – Districtwise Projects No.19 : ICDS – Number of Projects Year 2005-06 2006-07 2007-08 2008-09 Total No.20 : ICDS – Staffing Position Posts CDPO Lady Supervisor Anganwadi Worker Anganwadi Helper Sanction Actual Strength Strength 544 3288 80797 80797 485 274 80211 80211 Vacant 59 3014 586 586 167 .19). Champaran 17 17 E.of Mini AWCs — — — 5440 5440 Table 5. 544 ICDS projects were operational in Bihar covering all development blocks in all 38 districts (Table 5.18).

44. the staffing is adequate.2 15524.2 percent.3 67.3 18393.6 2005-06 43268. According to a survey done by the state government in 2003-04.303 in the state.21 ICDS — Resource Utilisation Items Total Budget for ICDS Bihar (Rs Lakhs) Total Amount of Funds Released to Bihar (Rs Lakhs) Total Expenditure Reported by Bihar (Rs Lakhs) Fund Released as Percentage of Budget Expenditure as Percentage of Fund Released Expenditure as Percentage of Budget 2004-05 23874.9 92.4 14234.6 72619.17 82. Breaking from the earlier pattern of low share of actual fund release.4 110.5 61. there is still shortage of supervisory staff.4 60688.The actual number of Anganwadi workers and helpers is 99.911 had been fully covered for potable water supply and sanitation.3 36238. out of the total habitations of 1.6 42. Table 5. Thus. at the level of the AWCs. Thus.21). 32. The shortage of supervisory personnel reported in last year’s survey has been addressed through appointment of Child Development Project Officers or CDPOs (the executive officers at the project level in the block).930 had been partially covered (PC) 168 . both overall allocation and utilization has increased in 2007-08 as compared to previous years. the state government has constituted a separate Directorate for ICDS.03 Both resource allocation and utilization has increased in ICDS Bihar (Table 5. The total budget has increased from Rs 238. with just 8. The expenditure as percentage of budget has increased to 77 percent in 2007-08 from 68 percent in 2006-07.05. The actual strength as a percentage for sanctioned strength has increased from 33.7 59.57 77. In keeping with importance accorded to ICDS. However.8 2006-07 60130.74 crore in 2004-05 to Rs 787.8 percent in 2006-07 to 89.85 crore in 2007-08.7 2007-08 78785. 92 percent of the budgeted funds were released in 2007-08 compared to a little over half in previous years. Public Health Water supply and sanitation are an integral part of public health.5 197 83.19).3 percent of the 3288 sanctioned posts for Lady Supervisors filled.3 percent of the sanctioned posts (Table 5.4 65 91.1 36931 40729.

Table 5.22 : Districtwise Coverage Achieved for NC and PC Habitations Name of District Patna Nalanda Gaya Jehanaba/ Arwal Nawada Aurangabad Rohtas Kaimur Bhojpur Buxar Muzaffarpur Vaishali Sitamarhi Sheohar Saran Siwan Gopalganj E.22. Champaran Darbhanga Samastipur Begusarai Madhubani Bhagalpur Banka Mungher Sheikhpura Lakhisarai Jamui Saharsa Supaul Khagaria Madhepura Purnea Kishanganj Araria Katihar Total NC 160 184 790 48 52 173 150 181 70 198 362 60 109 0 276 216 674 333 0 167 0 945 107 372 236 0 0 125 570 0 0 0 0 853 200 95 55 7761 2006-07 PC Total 134 294 184 368 419 1209 194 242 134 186 157 330 132 282 60 241 53 123 30 228 198 560 103 163 305 414 73 73 261 537 94 310 654 1328 384 717 43 43 342 509 405 405 0 945 218 325 161 533 172 408 22 22 35 35 65 190 125 695 599 599 954 954 0 0 301 301 208 1061 90 290 186 281 174 229 7669 15430 NC 0 3 19 0 5 25 0 23 0 121 34 10 14 0 5 395 342 130 0 0 0 200 15 139 0 0 0 29 75 0 0 0 0 134 804 77 4 2603 2007-08 PC 0 29 0 13 24 25 0 54 0 30 317 7 47 0 21 176 610 123 0 215 370 276 41 84 0 0 0 22 10 147 34 0 37 66 459 83 25 3345 Total 0 32 19 13 29 50 0 77 0 151 351 17 61 0 26 571 952 253 0 215 370 476 56 223 0 0 0 51 85 147 34 0 37 200 1263 160 29 5948 2008-09 (Upto November 2008) NC 102 170 420 33 63 130 108 20 22 250 124 305 71 0 78 377 6 190 0 95 0 127 167 212 125 0 0 160 162 0 0 0 0 259 124 40 28 3968 PC Total 300 402 240 410 205 625 167 200 153 216 126 256 202 310 150 170 268 290 54 304 131 255 348 653 304 375 50 50 560 638 82 459 465 471 544 734 248 248 584 679 558 558 97 224 487 654 164 376 138 263 73 73 46 46 34 194 108 270 310 310 406 406 0 0 392 392 197 456 55 179 298 338 203 231 8747 12715 Total Covered NC PC Total 262 434 696 357 453 810 1229 624 1853 81 374 455 120 311 431 328 308 636 258 334 592 224 264 488 92 321 413 569 114 683 520 646 1166 375 458 833 194 656 850 0 123 123 359 842 1201 988 352 1340 1022 1729 2751 653 1051 1704 0 291 291 262 1141 1403 0 1333 1333 1272 373 1645 289 746 1035 723 409 1132 361 310 671 0 95 95 0 81 81 314 121 435 807 243 1050 0 1056 1056 0 1394 1394 0 0 0 0 730 730 1246 471 1717 1128 604 1732 212 567 779 87 402 489 14332 19761 34093 169 .and 27.462 were not covered (NC) at all. The districtwise annual progress in coverage from 200607 to November 2008. is provided in Table 5. Champaran W.

7 39.2 52.3 Labour.8 38. also establishes this point.3 40.1 47. Interventions in Public Health    Lohia Swachchhata Yojana has been launched for achieving 100 percent coverage.4 52. 50 burning ghats are being upgraded under Muktidham scheme.23 : Poverty Ratios in Bihar and India Sector Rural Year 1983-84 1987-88 1993-94 1999-00 2004-05 Urban 1983-84 1987-88 1993-94 1999-00 2004-05 Combined 1983-84 1987-88 1993-94 1999-00 2004-05 Bihar 64.6 62.9 36.With 34.3 percent in the last three years. Nevertheless.3 42.6 percent during the same period.3 48.093 habitations covered till November 2008.3 percent to 34.23).7 percent). Estimates of poverty by the NSSO surveys.0 26.7 44.1 27.7 percent in 200405 (Table 5. Increase in achievement of Birth and Death Registration targets (Appendix VIII) 5.2 44.5 32.6 58. The incidence of rural poverty in Bihar has come down from a level of 64.4 23. the percentage of habitations under coverage have increased from 31.6 41.3 percent to 63.4 India 45.3 percent) and urban (25.5 170 . Table 5.6 25.1 37.5 38.3 27.1 55. the poverty ratio for 2004-05 is still quite high compared to the corresponding ratios at the national level — rural (28. Urban poverty has declined from 47.0 42.9 34.1 28.7 34. Employment and Poverty Incidence of poverty has been very high in Bihar compared to the national average for decades.4 percent in 1983-84 to 45.2 32.

the proportion of cultivators is very low for SC (7. 47 percent of the funds available for SGSY has been utilised at the state level. It is well known that less than 5 percent of the state’s cultivators own more than 10 acres of land each. Sitmarhi. While there is great inter-district variation in proportion of agricultural labourers for the entire population with a range between 32. food security and housing are integral to immediate basic needs.9 percent). Araria.3 percent.5 percent in Jamui and 63. For ST. The proportion of ST agricultural labourers show much wider variations due to the thin spread of the population in most districts.6 percent) and ST (62. Self. the corresponding figure is 21.120 were women SHGs (57. The same pattern can be seen in the broad classification of ‘other workers’.7 percent) while the overall WPR for the state is 33. Upto the month of December. West Champaran.4 perecent in Sheohar) with only 3 districts below 70 percent.7 percent (Appendix X). Thus.Help Groups (SHGs) and Swarnajayanti Grameen Swarozgar Yojana (SGSY) SGSY is a scheme to promote self-employment among the communities through SHGs as well as individual self-employment programmes. landlessness is directly associated with SC status (Appendix XI). The proportion of cultivators among various social groups is also further indicative of economic status. The Work Participation Ratio (WPR) is the highest among ST (45. Various programmes have been designed and implemented over the years to address these deprivations. The only exception is the household industry sector where the patterns are much less divergent. but this accounts for only 4 percent of main workers in the state (Appendix XI).036 SHGs were formed in 2007-08 under SGSY compared to 8. followed by SC (39. Of these new SHGs.5 percent) compared to the state average (48 percent). The employment pattern of different social groups is an indicator of the link between livelihood issues and poverty. But even within this. Income generation and employment. But it is over 70 percent in Saharsa. Purnea. Katihar and Kishanganj (Appendix XI).Poverty as a basic deprivation of basic human needs is related to lives and livelihoods issues in many ways. 171 . is very high among SC (77. Most cultivators are small or marginal farmers. whose lives are fraught with insecure and seasonal employment and landlessness. compared to 52 percent in the same period in the previous year. 2008.9 percent) compared to the state average of 29. A total of 14. The sectoral distribution of main workers further establishes that the share of agricultural labourers.3 percent.324 in the pervious year.2 percent).3 percent in Purnea. 8. Performance of some of the major programmes is discussed below. the proportion of SC agricultural labourers is uniformly high in all the districts (from 61 percent in Munger to 90.

1 59.of members of SHGs No.2 22.of Individual Swarojgaries assisted No.4 172 .6 51.8 27.of Members of SHGs assisted for Economic activities No.Table 5.7 District Total SC Women Araria 2185 253 2161 Arwal 250 108 93 Aurangabad 1665 1015 1601 Banka 920 215 872 Begusarai 2242 334 1608 Bhagalpur 2558 639 2065 Bhojpur 1852 584 800 Buxar 976 493 441 Darbhanga 479 196 479 East Champaran 6453 1796 4551 Gaya 1656 838 601 Gopalganj 1428 529 898 Jamui 236 85 236 Jehanabad 1284 650 448 Kaimur 390 170 100 Katihar 1980 170 198 Khagaria 2292 1146 917 Kishanganj 424 44 310 Lakhisarai 789 244 162 Madhepura 1938 715 702 Madhubani 5250 700 4140 Munger 1519 392 1086 Muzaffarpur 4303 2124 3678 Nalanda 2302 604 1182 Nawada 1994 917 1946 Patna 4889 1911 2983 Purnea 1993 698 640 Rohtas 1130 360 410 Saharsa 2748 974 1369 Samastipur 11510 6837 347 Saran 1260 810 806 Sheikhpura 498 170 297 Sheohar 1140 326 512 Sitamarhi 2690 231 855 Siwan 1937 974 1126 Supaul 1760 880 704 Vaishali 1804 913 944 West Champaran 4631 2038 1604 Total 85355 32083 43872 Percentage Shares 37.24 : SGSY – Physical and Financial Overview (2007-08) No.7 41.0 35.of Individual for Economic Trained swarozgaris Trained Activities Total SC Women Total SC Women Total SC Women 392 50 51 3627 297 3320 438 21 114 74 50 6 17 8 9 2 1 1 189 122 13 2261 1079 2174 0 0 0 218 43 19 2612 506 1357 0 0 0 519 221 184 2775 896 2389 17 5 10 395 117 0 2558 639 2065 0 0 0 166 72 23 550 332 370 87 34 6 139 71 57 944 485 286 531 263 165 17 5 3 290 110 290 0 0 0 1650 777 293 4788 1402 3064 80 26 29 3629 1725 1228 1656 838 601 3629 1725 1228 574 276 147 3059 800 1821 355 197 147 442 162 17 236 85 236 442 162 17 205 123 47 1248 650 448 205 123 47 111 45 10 300 150 50 0 0 0 244 51 61 602 59 61 0 0 0 145 72 58 2292 1146 917 0 0 0 0 0 0 424 44 310 0 0 0 161 51 28 789 244 162 0 0 0 167 62 35 1938 715 702 167 62 35 856 330 125 5250 700 4140 856 330 125 252 133 155 6895 2886 5421 0 0 0 335 77 76 6131 1763 5439 20 0 0 122 89 42 2485 790 809 651 0 0 497 228 43 2649 1081 2428 226 68 7 8 1 0 7697 3453 3809 3 3 3 671 130 141 2000 700 650 670 150 220 334 110 82 150 48 65 49 22 16 553 298 74 7847 2221 4146 276 101 53 334 185 11 4060 2250 122 0 0 0 598 386 127 3537 2261 2546 0 0 0 5 5 4 2336 896 1389 0 0 0 15 4 3 540 135 205 5 2 3 1148 26 20 5675 478 2715 0 0 0 1544 930 475 886 435 464 369 161 172 715 358 42 2000 1005 830 784 668 315 0 0 0 5727 3031 3471 0 0 0 781 302 307 1172 510 380 174 68 62 18205 7687 4007 100003 35128 59661 10036 4192 2775 42.

4 47.0 41.99 1102.85 32329.83 473.73 289.28 189.8 564 451 80.04 377.2 49.23 772.61 374.49 20.2 50.09 664.1 60.5 323 96 29.33 408.42 1401.99 1168.80 187.25 306.0 0 0 0 6 14036 8120 57.12 316.4 250 230 92.39 457.3 38.24 364.26 692.3 95.3 580 515 88.50 609.6 33.9 782 361 46.3 52.52 834.94 739.1 266 310 116.of No.2008 dec.25 : SGSY – Training and Economic Assistance (2007-08) Details of Funds Available/Utilised Fund (Rs Lakh) No.5 25 11 44.3 369 198 53.4 130 30 23.73 442.3 64.02 804.1 36.27 767.0 55.2 12.09 1210.30 247.0 406 17 4.89 242.7 784 313 39.1 46.3 49 37 75.79 260.89 160.65 466.8 33.56 535.55 321.79 638.8 68.10 362.19 879.3 300 175 58.39 302.1 21.61 657.4 79.3 38.7 45.4 74.4 55.0 64.98 1012.2 305 195 63.9 595 335 56.5 260 27 10.1 830 1218 146.9 305 305 100.4 52.0 75 10 13.5 27.5 51.90 381.2 111 71 64.48 1092.7 356 251 70.53 812.06 386.9 Physical Achievements District Available Utilised Rate of Utilisation Muzaffarpur Araria East Champaran Saharsa Gopalganj Vaishali Darbhanga Madhubani Patna Banka Samastipur Supaul Begusarai Munger Rohtas Bhojpur Sheohar Jamui Katihar Kaimur West Champaran Nawada Jehanabad Khagaria Nalanda Madhepura Aurangabad Buxar Purnea Siwan Saran Sheikhpura Gaya Kishanganj Sitamarhi Arwal Bhagalpur Lakhisarai Total 1841.2 710 475 66.85 1013.44 333.2 378 190 50.7 26.96 1677.1 141 112 79.84 461.4 65.91 1158.4 229 187 81.01 2699.67 284.9 173 .45 1578.0 194 68 35.4 46.0 236 86 36.2 53.43 500.75 844.9 48.80 1155.38 140.7 310 109 35.58 48.83 597.90 358.6 200 96 48.2 42.89 432.99 447.9 88.44 470.1 117 54 46.7 222 159 71.10 98.1 30.0 456 186 40.of women SHGs SHGs formed Women formed during during current year current year SHGs (%) upto upto dec.57 920.70 523.2008 2149 841 39.3 46.64 91.3 280 325 116.17 462.4 55.87 273.41 164.53 485.67 521.44 806.89 1518.20 366.Table 5.9 52.4 38.66 15173.14 221.51 260.02 166.14 885.0 301 70 23.8 448 0 0.

The corresponding figures for individual SC swarojgaris were 42 and 41 percent. 174 .205 individual swarojgaris were given assistance for economic activities under SGSY. At the other end.003 swarojgari members of SHGs and 10.748 of them (48. Out of these.5 percent last year.00.3 percent) were provided employment. The corresponding figures for individual women swarojgaris were 22 and 27 percent. National Rural Employment Guarantee Scheme (NREGS) The NREGS is a demand based guaranteed employment programme. Thus. there are two districts where no SHG has been formed — Bhagalpur and Lakhisarai. Similarly. Thus. and 39.4 percent of funds.24. followed by Araria (830). The women swarojgari members of SHGs accounted for 51 percent of total swarojgari members of SHGs who got economic assistance and 60 percent of those who got training. 1. as opposed to individual selfemployment efforts. The SC swarojgari members of SHGs accounted for 38 percent of total swarojgari members of SHGc who got economic assistance and 35 percent of those who got training.25. Patna saw a high utilisation of 95. Any applicant is entitled as a right to 100 days of employment under the programme. the access through SHGs has not been a better option for women's selfemployment. SHGs are seen to offer a better instrument for women’s access to self-employment. The highest number of SHGs were formed in Muzaffarpur (2149). repeating the pattern from last year with a fund utilisation of 48 and 30 percent respectively.945 households) of total number of households were provided with 100 days of employment in 2007-08.997 households in 2007-08 for this programme. The job cards were issued to 81. 48. East Champaran (784) and Saharsa (782). 45.3 percent (49.1 percent were SC households.355 swarojgari members of SHGs and 18. While the recently created Arwal district has utilised 12.036 individual swarojgaris were trained under the programme. Only 1. Among the card-holding households.3 percent had demanded employment in 2007-08. In 2007-08. for SCs again. a total of 85. both in terms of financial utilisation and physical achievements.A wide inter-district variation is seen in performance of SGSY. as stipulated in the NREG Act.9 percent of the funds available to it in 2007-08 compared to 7.

0 45.2 31.0 1.provid have Hhds issued employment cards upto ding wage empl. Champaran Aurangabad Arwal Lakhisarai Katihar Gaya Nawada Sheohar Darbhanga Patna Madhepura Rohtas Nalanda Araria Muzaffarpur Sitamarhi Saharsa Samastipur Supaul Siwan Kishanganj Gopalganj Vaishali Bhagalpur Purnea Buxar Sheikhpura Kaimur Madhubani Bihar 9980 4345 2 361 4572 108 1835 0 0 7675 445 2351 6 12546 1262 320 0.2 62.9 49945 1.9 15.6 0.0 0.4 1.5 0.4 43.8 48.3 4.9 54.1 39.3 52.1 45.which % of SC issued job Hhds.1 4.0 9.0 41.4 61.7 0.7 64.0 1.3 175 .1 15.7 57.7 63.2 59.8 0.9 29. Champaran W. (Total)employment provided Dec.1 85.7 49.0 45.6 58.0 29.1 30.1 0.1 District Khagaria Banka Jehanabad Begusarai Saran Jamui Munger Bhojpur E.8 15.9 39.1 60.9 80.3 40.6 60.7 52.5 17.4 1.0 24.Table 5.0 71.deman No.0 27.1 47.of completing No.of Hhds.2 52.0 36.5 4. 34849 33650 54714 110300 141160 65940 33297 74327 164762 131117 100599 23428 36205 39453 186118 100512 28294 195210 126439 110983 96594 141581 59692 205298 112639 137297 209311 33396 49927 29795 64815 215943 47178 137891 66872 27773 57636 179215 3664210 87093 124375 91188 249500 271231 146446 136614 169454 417656 331612 160735 40423 118664 232076 261104 153882 74640 325177 292660 187685 198124 291969 242540 342162 270535 246789 318208 220159 172989 199106 176725 408723 195889 352917 119232 61561 120755 314399 8124997 74596 106350 76480 201000 215134 102777 92451 109577 263878 207379 109887 25024 66176 127459 142046 81917 39206 170120 152948 93341 97356 133040 109902 136864 104600 94379 101501 69729 53764 59880 53018 122317 56874 82091 23120 11171 18452 150631 3926912 74596 105376 76480 201000 215134 102777 92451 109577 263878 207379 100230 25024 66176 127459 142046 81917 39165 170120 152948 93341 97356 133040 109887 136864 104600 94379 101501 69729 53764 59880 53018 122317 56874 82091 23120 11171 18452 150631 3925748 32 1289 40.5 83.4 18.1 48.7 85.among among Hhds cards upto ed empl.8 24.6 55.0 38.2 67.0 43.7 4.26 : Employment Generation under NREGS – 2007-08 Cumulative % of Hhds % of no.4 53.2 28.issued Dec.2 52.9 55.6 45.7 0.1 45.5 52.0 0.5 24.1 30.5 62.9 31.6 79.7 31.4 2.3 19.of Hhds 100 days of No.of Hhds No.9 0.8 54.9 60.5 62.0 9.3 49.8 48.0 44.3 37.0 30.4 39.3 65.3 0.0 9.1 56.5 0.0 23.deman ding issued job Hhds.7 38.3 1007 270 412 1127 1.of Hhds.3 70. (SC) 100 days jobcards employment empl. completed job card Hhds.6 65.

5 1517.9 33.1 65.39 7.4 61.41 1.60 0.09 5.1 35.04 4879.63 2225.92 3918.162 31.2 75.8 68.1 2932.0 13.54 1210.62 45.94 17.45 1773 2043.6 73.0 51.50 16.0 91.59 1391.3 22.4 25.76 25.8 22.47 3539.7 3044 1841.8 1605.619 35.66 12.1 15.7 70.4 1973.86 229.35 8.13 3210.46 5064.499 6.47 4.20 14.28 17.26 35.04 2151.5 3005.of Total Total Total Fund % of Land Fund Fund Persondays days Beneficiary Utilisation Workdays (in Lakh) work by reform/ Available Utilised Hhds ( %) by women women IAY (Rs Lakh) (Rs Lakh) 69729 142046 136864 263878 92451 102777 127459 170120 94379 207379 93341 81917 66176 53764 152948 109887 133040 122317 76480 100230 104600 23120 150631 215134 201000 101501 97356 39206 109577 56874 53018 105376 25024 18452 59880 82091 11171 74596 3863370 53.5 78.0 33.9 71.0 20.50 24.86 13.3 71.71 20.1 2410.3 71.3 1159.31 4.0 88.2 50.6 4287.2 11.0 33.10 1672.0 31.9 3.9 2938.9 76.49 21.4 3595.67 35.3 District Supaul Gaya Muzaffarpur East Champaran Munger Jamui Katihar Darbhanga Saharsa West Champaran Madhepura Nawada Lakhisarai Siwan Patna Araria Nalanda Vaishali Jehanabad Aurangabad Sitamarhi Buxar Madhubani Saran Begusarai Samastipur Rohtas Sheohar Bhojpur Bhagalpur Gopalganj Banka Arwal Kaimur Kishanganj Purnea Sheikhpura Khagaria Total 176 .30 47.44 7.72 1.55 5365 2627.66 17.63 11.48 3944.82 5313.48 6.0 91.80 2150 82000 359 7120 30245 108000 19690 12 832 3817 332 15 30820 4927 90 13041 1318 21185 20303 14967 1750 613 24729 7240 530 138589 4538 2018 2992 4286 864 253 1292 185300 14720 5068 756005 5100.7 28.0 82.18 5610.44 10.9 1362.36 10.2007-08 No.4 75.56 0.25 4739.8 30.57 4278.8 60.2 67.77 2.83 6440.09 7.72 8.55 9.59 24.80 0.1 2935 2932.6 4461.56 3.03 5.35 3941.85 1923.2 49.2 3615.58 29.0 32.86 2.7 14.4 4374.45 25.1 32.1 5.3 35.4 83.39 1.4 23.58 12.4 90.27 4.50 4.71 25.0 30.24 455.83 12.68 1725.2 820.47 6166.5 3413.1 74.5 34.60 3.99 4223.01 0.9 1930.486 31.4 2201.9 20.5 5884.5 85.3 93.0 20.6 72.07 4.37 26.35 4.08 9.6 33.25 11.66 2221.1 69.04 8.0 33.5 74.0 17.21 1.7 6298.98 31.27 4483.68 17.31 2781.3 1315 1010.37 20.57 5945.2 31.55 26.71 8074.31 5391.86 4956.5 3274.0 38.81 1.6 4709.of No.61 13.5 4465.1 11.1 51.61 2.2 1190.1 3820.2 15.6 67.66 24.82 12.2 21.83 0.17 3.3 21.5 55.2 27.5 4.4 1.2 74.98 4312.4 1303.51 10.5 3530.95 13.9 19.43 4774.95 3680.01 23.5 5036.Table 5.35 1.6 105335 91.94 147288 4641.86 840.0 78.14 1474.4 2345.8 30.0 23.9 33.6 61.87 464.0 91.64 10.8 1939.27 : NREGS – Physical and Financial Overview .

8 percent of the card-holding households were reported to be demanding employment. In Madhubani. the share of minorities was 8. other districts where less than 20 percent of card-holding households had demanded employment were Buxar. the fund utilization was close to 70 percent or more in Kishanganj and Purnea. In Siwan.27). Similarly. Purnea and Sheikhpura generated less than 10 lakh persondays of employment. Begusarai.4 percent respectively. Bhojpur and Vaishali also follow closely regarding the share of women in employment at 3. In Banka. The highest level of fund utilisation was 93. 15 percent to minorities and 3 percent to the handicapped. 55. only 4. against the stipulation of 15 percent (Table 5. the state government completed 73 percent of the physical target with a fund utilization of 72 percent. The share of SCs and STs in the total houses completed was 55 percent which was below the stipulated of at least 60 percent. Khagaria. In Supaul. At the other end. while it was 21 percent in Khagaria and 31 perecent in Sheikhpura.3 percent of workdays were for women. 177 . Of this. 27. It is mandatory under the scheme to provide housing to a minimum of 60 percent of SC and ST. Indira Awas Yojana (IAY) The Indira Awaz Yojana is an important intervention for affordable housing for people below the poverty line. The fund utilisation for the state as a whole in 2007-08 was 71. Kishanganj. Supaul. more than 80 percent of card-holding households had demanded for employment.63.4 percent in Munger.3 percent of workdays were for women.28).The district level variations remain high with respect to proportion of households demanding employment.26).5 percent (Table 5. Gaya and Muzaffarpur generated more than 40 lakh persondays of work with high fund utilization rates (close to 80 percent or above). the workdays for women were less than 2 percent of the total.5 percent. Khagaria and Jehanabad.2 and 4. Kaimur and Sheikhpura (Table 5.370 households in 2007-08. Along with Madhubani. In 2007-08. The inter-district variations are high in this programme and there is no correspondence between levels of fund utilization and employment generation in many districts. About 20 percent of households were also beneficiaries under IAY or Land Reforms. However. The programme has generated about 841 lakh persondays of employment for 38.

Table 5.3 771.594 204523.09 71.3 145715.70 49.5 3.107 7303.2 3598.708 141790.28 42.3 8.5 34.2 178 .12 72.8 IAY Components IAY New IAY Upgraded IAY Credit Cum Subsidy Total Total target Houses Completed Houses Completed (SC) Houses Completed (ST) Houses Completed (Minorities) Houses Completed (Others) Total funds Available (Rs Lakhs) Total Funds Utilized (Rs Lakhs) Percentage of Utilzation 377453 198417 12640 34251 132145 24740 12642 917 928 10253 2414 1129 186 19 1080 567171 404607 212188 13743 35198 143478 196448.409 326.28 : Overview of IAY Upto 2007-08 Percentage Share of different population categories in the scheme 51.

7 86.2 72.6 44.2 58.6 98.3 68.0 100.9 68.0 58.5 121.8 64.8 103.5 45.0 69.2 103.8 71.5 70.2 101.2 51.4 130.5 92. Champaran Gaya Gopalganj Jamui Jehanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada Patna Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali W.4 84.1 71.1 137.5 85.2 78.7 94.8 68.1 53.8 83.3 72.7 84.0 92.5 70.9 87.5 57.2 86.4 5.8 74.3 179 .2 56.8 64.5 40.0 45.0 56.8 92.6 84.9 65.7 52.2007-08 (New + Upgraded + Credit & Subsidy) Districts Araria Arwal Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga E.6 60.0 67.2 49.9 52.0 90.7 92.4 67.9 59.29 : IAY – Physical and Financial Overview .7 59.7 60.8 56.6 87.6 77.3 71. Champaran Total Annual target House completed 33812 1701 6422 4715 11766 9637 7174 4368 22106 34142 13384 15872 4646 2419 4188 23813 9992 13783 2331 21645 37122 3725 34884 6180 5533 9414 38196 6567 18126 23081 14077 1256 7773 23617 12701 26349 18980 31674 567171 20235 2344 3865 2505 9990 7146 2640 3089 10095 19281 11986 11460 4813 2202 2169 24271 515 7818 2402 21249 16651 3751 45507 3065 4538 8184 17497 2677 23462 12095 8424 1076 4512 16983 15381 22531 9108 19090 404607 Physical achievement as Percentage utilisation of percent of annual target available fund 59.4 36.9 43.1 99.1 74.4 59.1 51.2 70.3 86.3 56.0 89.2 82.3 129.4 85.0 91.Table 5.9 48.

600 homeless senior citizens with 6 kgs of wheat and 4kgs of rice free of cost.2 percent of the houses had been completed. Food Security and Public Distribution System The Public Distribution System (PDS) for essential commodities has been an important part of the measures to promote food security in the state.28. the programme had not only achieved the physical targets. Under Antyoday. At the other end lies Khagaria. Arwal and Jehanabad also more than 90 percent of the physical targets have been achieved with fund utilization varying from 65 to 91 percent. 24. In Madhepura. In Muzaffarpur. Munger. sugar and kerosene oil) are distributed through PDS outlets. Katihar.973 BPL households were being provided with 35 kgs of foodgrains per month (25 kgs of rice and 10 kgs of wheat). Under the PDS. Annapurna provides 1.523 BPL families are being provided with 35 kgs of foodgrains per month — 21 kgs of rice at the rate of Rs 2 per kg and 14 kgs of wheat at the rate of Rs 3 per kg.The districtwise implementation of IAY shows wide variations.66. The consumers are divided into Above Poverty Line (APL) and Below Poverty Line (BPL) categories based on the correction to the state government’s original survey carried out in 2006. 180 . rice. but only 5. but exceeded them with fund utilization between 85 and 93 percent. Saharsa. Four essential commodities (wheat. Lakhisari and Jamui.93. 39. where 70 percent of the funds had been utilized.

1 61.7 2.8 100.6 180.4 51.0 0.0 2.0 186.7 5.2 4.6 24.7 180.5 69.4 161.2 1.6 35.8 49.Champaran Darbhanga Madhubani Samastipur Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Munger Jamui Lakhisarai Sheikhpura Begusarai Khagaria Bhagalpur Banka Total 301.6 302.3 143.8 109.7 76.0 13.5 680.9 321.9 3.6 99.8 371.9 160.8 5.1 2.5 265.9 4.8 76.7 4.9 67.2 3.6 4.4 128.4 1.7 232.7 0.3 2.0 4.9 45.6 1.7 414.2 465.8 2.1 165.0 51.4 190.8 2.8 5.1 2.6 3.1 63.9 2.0 3.8 0.8 83.7 1.1 328.6 3.8 76.6 50.6 358.7 118.0 181 .0 36.9 392.8 255.1 1.2 58.Table 5.7 111.1 166.0 50.0 84.3 44.1 39.4 86.9 6.0 43.2 235.2 0.7 2.6 61.0 1.6 3.8 3.3 5.9 1.7 3.9 1.4 50.6 1.6 35.1 8.5 3.9 214.1 4.4 45.8 270.6 15.8 32.0 76.2 5.7 36.1 20.4 62.9 0.7 82.2 222.2 2.9 3.1 96.2 4.6 40.5 40.8 82.7 497.8 241.8 38.30 : Overview of Public Distribution System PDS Shops District Per lakh of Number (as population on Dec (Midyear 2008) 2008 estimates) 2646 1081 1335 756 1013 636 1973 517 294 1202 857 2460 1824 1104 2155 1371 1072 234 2194 1694 1344 1579 1438 682 717 619 1250 998 669 1056 664 724 293 266 1005 714 1407 937 42780 49.6 8.7 83.5 51.8 609.5 1714.2 11904.1 129.1 3.6 475.1 158.3 210.8 4.5 54.1 37.0 1.Champaran W.4 2.5 4.9 2.8 73.0 59.7 4.8 No of beneficiaries ('000) (as on October 2008) % of Total Population Share BPL Antyoday Annapurna Total Patna Nalanda Bhojpur Buxar Rohtas Kaimur Gaya Jehanabad Arwal Aurangabad Nawada Saran Siwan Gopalganj Muzaffarpur Vaishali Sitamarhi Sheohar E.9 0.9 137.0 3.7 3.0 2.5 503.6 0.5 2.8 2.0 3.4 481.0 36.2 242.7 2.0 273.3 5.2 2.6 43.8 72.0 4.6 1.3 3.5 345.9 43.9 3.6 79.0 1.2 46.0 2.6 4.9 133.7 3.1 316.9 381.5 40.4 220.5 5.5 55.5 1.4 6.2 3.3 418.9 241.7 167.5 146.9 306.4 1.1 358.1 52.8 311.3 3400.6 47.3 153.1 202.2 283.5 4.1 326.6 45.4 268.6 120.6 2.8 621.8 190.7 2.6 424.6 2.7 471.3 4.3 2.3 5.8 41.2 0.1 225.7 4.1 103.5 2.5 2.3 4.7 39.2 3.3 51.5 2.2 1.8 1.7 4.3 177.7 48.8 37.7 4.2 0.9 20.1 226.7 1.0 245.7 6.6 4.1 1.5 223.9 161.6 58.7 0.1 63.8 8337.1 3.3 40.7 460.0 31.9 100.6 2.8 184.9 2.3 2.8 108.9 122.8 117.2 2.5 2.2 237.1 321.7 2.6 185.6 207.0 48.0 5.9 65.7 4.9 44.9 344.3 52.

Banka.30). 182 . Sheohar (83). Saran (67 PDS shops per lakh of population) followed by East Champaran (64) and Aurangabad (53) are some of high coverage districts.30). and East Champaran (504).The districtwise share of beneficiaries is more or less in proportion to population shares of districts. Arwal (82) and Sheikhpura (65) (Table 5. The number of beneficiaries per thousand of population is highest in Madhubani (681). followed by Muzaffarpur (621). Munger. Lakhisarai has only 32 shops per lakh of population. There are ten other districts with less than 40 shops per lakh of population (Table 5. The number of PDS outlets per lakh of population varies from district to district. On the other extreme. Gaya and Arwal. Other districts having more than 50 PDS shops per lakh of population are Bhojpur. Less than 100 beneficiaries per thousand of population is observed in Lakhisarai (87). Muzaffarpur. West Champaran (610). Bhagalpur.

18 320.30 315.80 139.18 71.36 162.31 396.78 31.13 79.42 59.98 81.86 61.05 167.99 232.35 631.07 107.95 151.61 287.57 78.99 15.49 Rice Lifting 674.93 91.81 130.47 50.89 87.68 60.86 273.82 54.56 525.07 57.82 9991.64 139.98 63.39 166.28 92.72 88.53 99.75 91.17 180.30 49.60 46.93 173.80 62.46 675.96 282.35 92.90 46.14 88.48 72.33 65.46 560.17 170.03 222.15 70.90 41.62 67.Table 5.06 76.03 212.58 375.63 89.58 67.11 191.46 Allotment 685.55 164.29 37.35 302.10 449.05 72.67 388.21 86.61 89.21 47.57 101.57 189.74 151.65 323.10 493.62 135.31 : Allotment and Lifting of Rice and Wheat under PDS (2007-08) (’000 quintal) Wheat Allotment District Patna Nalanda Bhojpur Buxar Rohtas Kaimur Gaya Jehanabad Arwal Aurangabad Nawada Saran Siwan Gopalganj Muzaffarpur Vaishali Sitamarhi Sheohar E.03 695.15 96.09 Lifting Percentage 98.38 40.42 167.41 86.80 150.88 718.34 287.68 718.12 280.37 Lifting 374.10 53.36 36.37 273.81 203.37 266.76 91.38 44.40 51.11 618.05 Note: Patna shows 101.55 69.16 607.09 412.19 Lifting Percentage 101.04 277.16 654.58 93.47 percent lifting in wheat which is possibly an accounting error.85 349.80 73.20 78.98 137.43 522.89 657.35 262.37 80.27 162.49 63.42 248.05 57.Champaran W.92 228.20 914.06 246.10 282.17 53.23 56.25 78.69 92.86 8947.65 72.42 175.89 151.91 77.85 224.67 22.34 280.82 154.00 391. 183 .63 41.46 18147.60 148.64 92.15 129.96 116.60 157.34 267.50 218.40 67.00 69.70 101.Champaran Darbhanga Madhubani Samastipur Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Munger Jamui Lakhisarai Sheikhpura Begusarai Khagaria Bhagalpur Banka Total 369.09 205.07 485.72 343.93 138.67 90.35 84.23 1433.42 55.29 358.05 99.35 63.76 135.87 272.47 635.36 302.18 164.58 61.88 196.17 23.77 250.62 328.62 142.60 107.20 29.21 81.05 79.39 409.64 151.49 6483.84 175.17 271.91 139.61 349.06 233.42 314.52 89.58 169.58 307.52 536.79 267.27 817.40 80.22 57.15 72.46 112.61 38.86 755.22 78.42 189.60 95.06 179.19 343.83 52.59 675.33 161.85 200.02 458.21 73.42 342.64 35.35 59.66 279.50 44.69 320.14 159.25 90.62 63.15 332.86 80.74 108.02 49.35 264.74 87.04 597.40 238.16 586.36 136.01 72.51 311.85 80.76 413.86 332.43 38.43 150.80 37.48 45.

Lakhisarai has the lowest share of beneficiaries per thousand of population and also low lifting levels. Bhojpur. But Madhubani. it is only 16. Supaul.Amount of foodgrain lifted as a percentage of allotment is an important indicator of functioning of PDS. For the better working of the PDS which is the main source of food security for the poor. The Commission observed that out of the 22 scheduled castes in Bihar. but the lowest share of lifting in rice and very low levels of lifting in wheat. Siwan.31). East Champaran. It noted that populations belonging to these castes had not benefited from affirmative action meant exclusively for Scheduled Castes. it is less than 50 percent in 5 districts (Table 5. Bhojpur and Arwal with lifting being more tha 90 percent in the last two. and that for all scheduled castes is 28. Siwan. 184 . It is above 75 percent in Saharsa. Buxar. The Commission identified these 20 castes primarily on the basis of their literacy rate. Similarly. measures are needed for more effective and uniform patterns of lifting. Jehanabad. It must be noted that Madhubani has the highest share of beneficiaries per thousand of population. Lifting of rice is the highest in Patna at 98. distribution and coverage.5 percent. East Champaran. Gopalganj.4 Interventions for Marginalised Sections Mahadalit The state government formed the State Mahadalit Commission for the development of the most deprived amongst the Scheduled castes. Jamui. for wheat. Banka and Araria show very low lifting at less than 30 percent. 5. Gopalganj. Saharsa and Patna. While the total literacy rate of Bihar is 47 percent. while lifting is higher than 90 percent in Katihar. Jehanabad. economic. 20 are acutely deprived in terms of educational. socio-cultural and political status. Kaimur.43 percent.7 percent in case of Mahadalits. Khagaria. Arwal.

03 5.Table 5.02 0.03 1.10 4.26 0.37 0.22 0.64 0.01 16.78 0.41 0.01 0.21 100.94 0.01 0.40 0.00 Bantar Bauri Bhogta Bhuiya Bhumij Chamar Chaupal Dabgar Dhobi Dom Dushadh Ghasi Halalkhor Hari Kanjar Kurariar Lalbegi Mushahar Nat Pan Pasi Rajwar Turi Generic Caste Total 101223 2097 12659 568403 2333 4090070 100111 3590 647491 155383 4029411 674 3960 181748 1620 6566 809 2112136 38615 3653 711389 213795 33638 27234 13021374 52403 1074 6713 293027 1197 2122732 52021 1813 336880 80855 2107535 365 2069 94035 860 3366 445 1093077 19976 1959 370599 109831 17344 14500 6770176 48820 1023 5946 275376 1136 1967338 48090 1777 310611 74528 1921876 309 1891 87713 760 3200 364 1019059 18639 1694 340790 103964 16294 12734 6251198 Note : Mahadalit includes all scheduled castes.32 : Demographic Profile of Dalits Dalit Castes Person Male Female % of All Dalits 0.30 0.97 1.05 0.77 0.46 1. except Chamar and Dusadh 185 .03 4.19 30.02 31.

Table 5.33 : Districtwise Demographic Overview of Dalit Population District Araria Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga East Champaran Gaya Gopalganj Jamui Jehanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada Patna Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali West Champaran Total Total Population 2158608 2013055 1608773 2349366 2423172 2243144 1402396 3295789 3939773 3473428 2152638 1398796 1514315 1289074 2392638 1280354 1296348 802225 1526646 3575281 1137797 3746714 2370528 1809696 4718592 2543942 2450748 1508182 3394793 3248701 525502 515961 2682720 2714349 1732578 2718421 3043466 82998509 Total SCs Population 293488 472766 200059 341173 254686 343598 198014 511125 514119 1029675 267250 242710 286217 286291 208384 185122 85833 126575 260461 481922 150947 594577 473786 435975 729988 312088 444333 242612 628838 389933 103732 74391 315646 309013 256444 562123 434714 13048608 Dalit Population 293279 472227 198589 340872 252386 343428 196854 510392 513437 1028978 266241 241902 286126 285345 207541 184959 84477 126299 260211 481603 150620 593865 473758 435138 728896 310459 442965 242309 628397 388926 103712 74352 315087 306701 256165 561947 432931 13021374 186 .

Research Study. Mobile Public Distribution System.  District & Block Resource Centre for Training and ResearchThe Mission will establish a District and Block Resource Centre to provide scheme-related information to the Mahadalit Communities. Their problems should be carefully analyzed and by using Information. a favorable environment can be generated.On the recommendation of the Commission. The Vikas Mitra will be the link between Block Resource Centre and the Mahadalit Tolas. women in Bihar are disadvantaged socially with respect to literacy. Eradication of Scavenging System.Vikas Mitra is a very important concept of the Mission. the Mission has been established. a detailed survey of Mahadalit families is required. Mahadalit Welfare   Bihar Mahadalit Development Mission – For the implementation of the special schemes and to have focused approach. These centres can be used as training centres for those officials who are involved in the Mahadalit Development Mission.  Vikas Mitra . empower and assist women to lead a life based on hamlets will have 187 . Mahadalit Potable Water Scheme. Mukhyamantri Mahadalit Poshak Yojna. These centres will also function as data centres for the movement and channelizing of information. Mahadalit Toilet Construction Scheme. Advertisement.Under the awareness programme. Mahadalit Crèche. Mahadalit Community Radios. Innovative scheme – To understand the existing condition and problem of Mahadalit communities. education and work participation as has been observed in the previous sections. Women’s Empowerment With a sex ratio of 919. Mukhyamantri Jeevan Drishti Programme are the major schemes launched by the state government for welfare of Mahadalits. This programme aims to sensitize. Mahadalit Residential Land Scheme. Education and Communication (IEC). the state government has taken initiatives for the development of the 20 Mahadalit Scheduled castes. Special School or Hostel for Mahadalits.  Community Radio . The Women’s Development Corporation is implementing the Mukhya Mantri Nari Shakti Yojana in the state. Construction of Community Hall-cum-Workshade. Dashrath Manjhi Shramik Training Institute.  Survey. Mahadalit Basti Sampark Path Yojna. Mukhyamantri Nari Jyoti Scheme. Mahadalit Anganwadi. Mahadalit Awas Yojna. Dhanvantari Mobile Ayurvedic Chikitsha.

self-respect and confidence by strengthening their economic status through a collective endeavour. Working women hostel : It is proposed to extend boarding and lodging facilities to working women staying away from their homes as a support measure to encourage women in the service sector. 188 . economic and cultural empowerment of women. 7. Crèche : The crèche would provide care and support to children upto the age of 5 years of working mothers and provide nutritional food. puppet shows etc. Short stay home : Under the provisions of Immoral Traffic Prevention Act-1986 and Protection of Women against Domestic Violence Act-2005. Social Awareness : This programme proposes to create awareness amongst masses on various women related issues by promoting family schools and use of various traditional media as Nukkad-natak. game facilities. A brief description of the schemes is given below: Social Empowerment of Women 1. 3. Helpline : This is a crisis intervention centre for women in distress and will be set up in all the 38 districts of Bihar. The programme comprises schemes for social. 2. 4. short stay homes will be established for social and economic rehabilitation of women who are victims of trafficking or domestic violence. it would provide support for Information and Documentation Centres as well as innovations. Social Rehabilitation Fund : This is a fund which will provide medical. etc for the overall development of young children. Protection home : This would be a centre for providing shelter and rehabilitation support to the victims of trafficking. educational and other economic support to women in distress. 6. 5. Besides.

Awards would also be given to promote these art forms among women. 5. strategies and concepts aimed at social and economic empowerment of women.20.e. workshop and seminars/monitoring : various action researches will be undertaken for the purpose of economic empowerment of women and presented in workshop and seminars for replication and scaling up. 000 per SHG which will help them in on-lending to groups until bank loan is accessed. 189 . Infrastructure development and Livelihood promotion : Turn key projects will be supported for the economic empowerment of women through training and setting up production centers. Innovative Schemes Support fund would be given to promote new and innovative programmes related to processes. The objective is to help develop collective strength and leadership qualities among women so that they can manage and own their institutions i. 4. Monitoring activities will be also be undertaken under this sub-component. women and adolescent girls will be trained so they can earn a livelihood in the service sector such as housekeeping. computer operation. 3. SHGs & Federations.Economic Empowerment of Women 1. Initial capitalization fund : Grant support would be extended to women federations amounting to Rs. raise their awareness levels and help women to undertake various income generating activities. nurturing & capacity Building of Women SHGs : This programme will be implemented in all the districts to enable women to access services and schemes available. 2. Preparation of project proposals. Training in the Service Sector : Through this programme. Information and Documentation Centres : The centres will collate all data related to women in the state and serve as a Data centre to track progress of the various programmes. Organising. etc. Cultural Empowerment and Innovation Organizing cultural Melas : To promote traditional folk art & theatre as well as promote sales of handicrafts. melas would be organized from time to time.

the overall development of the backward and extremely backward sections are corner-stones for Bihar’s human development.Welfare of Backward and Extremely Backward Classes The backward classes constitute upto 60 percent of Bihar’s population. Educational Loans. 0. a stipend of Rs 10. More than 59 trades have been brought under various general schemes assisted by the Corporation. 81311 students were given stipends for higher secondary education in 2007-08 while 627921 students from primary to secondary levels availed of stipends. Welfare Measures for BC and EBC  The Bihar State Backward Classes Finance and Development Corporation has facilitated loans for Swarojgaris from the National Backward Classes Finance and Development Corporation by providing the Margin Money and Bank Guarantee. In 2008-09.       Minorities The religious minorities constitute 16. Swarnima Yojana is dedicated to the economic development of women from backward classes through provision of low interest (4 percent per annum) loans . Thus.71 percent of the population of Bihar with 16.and a society has been formed to develop these schools on the Navodaya pattern. Swayam Saksham loans upto Rs 5 lakh for professionals and Micro Finance schemes are other important measures.03 percent Christians and 0.has been started for EBC students who score a first division in secondary examinations. Buildings for 6 out of 12 Residential schools for BCs and EBCs are being constructed.53 percent Muslims. 190 .21 percent consisting of other religious minorities. A separate department for BC and EBC Welfare was set up by the state government in April 2007 to focus on scheme-based interventions for their educational and economic development .000/.

06 0.00 21.94 0.00 14.12 0.48 0.89 0.21 The largest population share of Muslims are in Araria (41.44 0.00 17.18 0.22 4.14 0.35 0.03 10.58 percent) while the lowest is in Lakhisarai (4.00 18.35 77.07 15.00 12.45 0.00 9.14 percent).09 0.00 11.60 86.21 0.06 0.34 0.77 0. Kishanganj and Katihar also have the largest share of Christians in the population.12 0.61 31.89 86.17 77.73 0.46 0.16 0.09 0.00 11.62 0.74 82.18 0.14 87.21 0.53 0.52 0.08 7.41 0.15 0.21 82.05 1.86 84.05 0.09 0.53 percent) and Kishanganj (67.42 89.74 0.16 0.86 95.11 0.57 93.Champaran Bihar Percentage share of Muslims Christians 41.68 84.76 0.00 19.33 78.40 0.71 91.76 percent).00 67.Champaran Gaya Gopalganj Jamui Jehanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada Patna Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali W.81 0. 191 .34 : Districtwise Composition of Population based on Religion District Araria Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga E.97 91.29 0.15 0.76 0.00 42.11 9.94 0.55 0.33 0.00 17.00 7.73 90.00 10.58 0.00 11.30 89. Purnea (36.55 90.07 0.20 0.32 0.10 15.07 0.71 81.00 7.Table 5.07 0.00 8.07 0.99 89.12 0.06 0.21 10.00 10.16 92.53 0.27 0.56 81.45 88.75 83.51 88.28 0.54 82.31 90.20 0.53 0.58 0.00 17.11 0.00 16.00 22.14 0.00 17.49 0.03 Hindu 58.09 0. Katihar (42.37 0.4 perecent).08 0.00 9.49 89.18 0.55 92.00 7.28 0.14 0.56 92.00 6.13 56.21 0.84 62.11 0.98 88.32 0.23 Others 0.08 0.03 0.47 0.41 80.65 91.00 7.06 0.30 0.73 85.19 36.25 0.00 11.00 21.00 13.

separately for boys and girls. 192 . Welfare Measures for Minorities            Construction of hostels for minority students. Mukhyamantri Shram Shakti Yojana for training of minority artisan and unemployed youth. the state government has launched several welfare schemes for their upliftment as targeted programmes. Mukhyamantri Alpsankhyak Vidyarthi Protsahan Yojana for encouraging minority students. Financial assistance to abandoned Muslim women. Coaching of minority students preparing for various competitive examinations.The state government is committed to the welfare of the minorities in Bihar. In view of the special socio-economic problems faced by the minorities. Computerization of Wakf property Grants for development and protection of Wakf property Merit cum means Scholarships for students in colleges. Minority community building cum Haj house Construction of monuments in memory of great personalities from the minority community Share capital provision of the state for the National Minority Development and Finance Corporation and the Bihar State Minority Financial Corporation.

Appendix I Districtwise Enrolement 2003-04 2003-04 SI.) 193 .V) (I-VIII) ( I-V) (I-VIII) (VI(VI-VIII) VIII) 21424 1577 23001 3068 275 3343 61394 7813 69207 513 271 784 20172 1445 21617 6613 446 7059 43913 3583 47496 2487 313 2800 31065 2810 33875 7732 960 8692 43567 5288 48855 919 164 1083 23251 3796 27047 647 209 856 56133 5603 61736 720 36 756 141368 11584 152952 203 101 304 39138 3687 42825 12 0 12 24592 1861 26453 7415 381 7796 38690 5166 43856 319 23 342 45947 6783 52730 6455 164 6619 24063 3123 27186 12809 1997 14806 19302 1344 20646 13 0 13 12288 1031 13319 4688 278 4966 10953 1998 12951 1093 245 1338 34971 2202 37173 1889 248 2137 68928 5782 74710 471 62 533 18514 2962 21476 2175 145 2320 95070 7958 103028 0 0 0 60966 7152 68118 607 31 638 41190 3129 44319 756 215 971 54902 3897 58799 15165 1384 16549 106928 10424 117352 2448 243 2691 66865 4572 71437 1573 283 1856 28476 2223 30699 10337 1070 11407 56717 11862 68579 3560 834 4394 26678 2157 28835 763 77 840 64581 7087 71668 2076 480 2556 48017 7991 56008 450 51 501 10531 1141 11672 241 6 247 9262 516 9778 36 0 36 37258 2797 40055 489 106 595 48102 7347 55449 1292 590 1882 29009 2810 31819 1773 202 1975 66418 8230 74648 27527 350 27877 1630643 170731 1801374 129334 12240 141574 (Contd. Champaran Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali Total Upper Total Primary (I-VIII) (VI-VIII) SC ST 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 184908 19635 204543 274660 46038 320698 175924 16630 192554 263717 31940 295657 262798 31734 294532 295868 43287 339155 179991 33324 213315 358063 51469 409532 467060 67152 534212 269874 34833 304707 159867 19207 179074 179983 34025 214008 186814 33098 219912 242474 38494 280968 160460 17077 177537 132612 11654 144266 84013 18212 102225 228403 22828 251231 476601 74376 550977 134595 30212 164807 516310 63695 580005 286527 51792 338319 167675 21476 189151 349140 39622 388762 471349 74082 545431 473206 52149 525355 261473 29865 291338 281861 89738 371599 180366 22895 203261 352598 57973 410571 396081 78429 474510 59891 9626 69517 62471 6329 68800 286694 41348 328042 342838 71530 414368 194493 29493 223986 330699 67193 397892 9732357 1482460 11214817 Upper Upper Primary Primary Total Primary Total Primary (1. ALL District Name Primary (I-V) Araria Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga Gaya Gopalganj Jamui Jehanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada W. Champaran Patna E. No.

Champaran Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali Total Upper Total Primary (I-VIII) (VI-VIII) SC ST 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 252204 35591 287795 290795 62972 353767 213535 19285 232820 321703 39040 360743 307649 38522 346171 314264 56326 370590 192408 40373 232781 382041 67188 449229 503491 90602 594093 294681 54471 349152 160627 23375 184002 201741 44788 246529 222779 49147 271926 258432 44691 303123 167800 23539 191339 144344 13052 157396 105939 29873 135812 219268 24821 244089 512501 91351 603852 135079 40057 175136 580411 92465 672876 321857 75007 396864 216783 64823 281606 385218 48673 433891 498777 92624 591401 542057 74944 617001 341291 35435 376726 314091 102031 416122 182364 25567 207931 434508 72556 507064 472381 97065 569446 65195 9511 74706 68013 7764 75777 295015 49139 344154 386699 86842 473541 243498 36932 280430 367696 75771 443467 10917135 1936213 12853348 Upper Upper Primary Primary Total Primary Total Primary (1.) 194 .) Districtwise Enrolement 2004-05 2004-05 SI. Champaran Patna E. ALL District Name Primary (I-V) Araria Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga Gaya Gopalganj Jamui Jehanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada W. No.V) (I-VIII) ( I-V) (I-VIII) (VI(VI-VIII) VIII) 25578 2363 27941 3161 338 3499 63289 9681 72970 461 159 620 22452 1751 24203 9266 781 4119 46258 4274 50532 1714 265 1979 39983 3832 43815 13008 2706 15714 48507 7416 55923 820 170 17693 25441 4385 29826 675 483 1158 61715 6806 68521 569 114 683 156797 17953 174750 2207 189 1841 42664 5732 48396 1 0 1 25486 2529 28015 7807 313 8120 41891 6290 48181 0 0 8121 54540 10611 65151 8791 631 9422 24516 4309 28825 14305 2366 16671 23427 2312 25739 214 0 26093 12793 1303 14096 5696 372 6068 15233 2793 18026 958 236 1194 34534 2323 36857 1932 175 7262 73664 7446 81110 1011 255 1266 17761 4207 21968 2720 456 3176 109220 11556 120776 0 0 4442 67567 9519 77086 181 22 203 50586 18591 69177 837 15 852 57590 5290 62880 19870 1881 1055 96609 8976 105585 2159 139 2298 74000 6751 80751 381 5 386 40433 2621 43054 6498 1179 2684 63871 15599 79470 3485 976 4461 26679 2178 28857 579 78 657 75945 8490 84435 2231 403 5118 60505 10646 71151 4232 833 5065 10710 1115 11825 734 188 922 9807 576 10383 0 0 5987 38858 3799 42657 291 37 328 52121 8578 60699 1003 512 1515 35648 3218 38866 3274 516 1843 76327 10687 87014 1350 244 1594 1803005 236506 2039511 122421 17037 139458 (Contd.Appendix I (Contd.

V) (I-VIII) ( I-V) (I-VIII) (VI(VI-VIII) VIII) 30905 3805 34710 4278 1400 5678 73311 11871 85182 1062 145 1207 25669 2537 28206 9685 856 6885 4345 44 4389 101 0 101 37414 4888 42302 10545 1542 12087 47250 8534 55784 433 80 12188 28957 6409 35366 605 262 867 59940 6239 66179 3158 402 3560 164187 20662 184849 259 38 4427 44309 6578 50887 2591 304 2895 29451 3412 32863 12154 1174 13328 45040 7259 52299 0 0 16223 54300 12977 67277 7293 1015 8308 26044 4571 30615 16984 2402 19386 21274 2599 23873 79 24 27694 13001 1499 14500 6634 521 7155 16184 2555 18739 744 34 778 35946 3489 39435 2390 508 7933 82373 8488 90861 824 122 946 16967 3923 20890 3192 1034 4226 107864 12898 120762 750 151 5172 66896 9537 76433 1015 185 1200 47803 5190 52993 2384 573 2957 61585 6847 68432 22266 2485 4157 108379 14510 122889 3736 708 4444 67211 7307 74518 3380 469 3849 38204 3692 41896 12813 1876 8293 66409 15891 82300 4851 746 5597 26419 2194 28613 1342 221 1563 81267 9481 90748 4693 557 7160 57791 9556 67347 3095 911 4006 12242 1458 13700 1168 290 1458 10083 848 10931 51 2 5464 42212 4495 46707 884 147 1031 48882 7624 56506 1902 579 2481 35528 3055 38583 1733 267 3512 83456 13455 96911 711 71 782 1819098 250377 2069475 149785 22101 171886 (Contd.) Districtwise Enrolement 2005-06 2005-06 SI. Champaran Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali Total Upper Total Primary (I-VIII) (VI-VIII) SC ST 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 262710 47001 309711 285849 66636 352485 196532 26069 222601 380444 49939 430383 315697 49551 365248 325939 72562 398501 189899 56167 246066 399964 77446 477410 518692 105990 624682 311862 67392 379254 178747 28804 207551 218612 52309 270921 224116 61412 285528 294107 51896 346003 150119 25120 175239 152852 17542 170394 110789 28806 139595 226199 31565 257764 567691 103530 671221 137224 41733 178957 598527 105100 703627 314811 72386 387197 194908 34539 229447 408947 57739 466686 510653 115646 626299 501873 77490 579363 359375 41214 400589 327699 107549 435248 186929 28886 215815 463475 82771 546246 459201 107733 566934 68273 11960 80233 68613 9254 77867 316415 55356 371771 367271 71019 438290 233466 34896 268362 405110 88445 493555 11233590 2163453 13397043 Upper Upper Primary Primary Total Primary Total Primary (1.Appendix I (Contd. Champaran Patna E. No.) 195 . ALL District Name Primary (I-V) Araria Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga Gaya Gopalganj Jamui Jehanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada W.

Appendix I (Contd.) Districtwise Enrolement 2006-07 2006-07 SI.V) (I-VIII) ( I-V) (I-VIII) (VI(VI-VIII) VIII) 65796 5892 71688 59130 5805 64935 78338 13959 92297 2200 709 2909 21739 3180 24919 9155 874 10029 52251 5703 57954 1278 198 1476 31073 3801 34874 9280 1181 10461 112967 23272 136239 501 16 517 41426 10814 52240 0 0 0 66113 8367 74480 3016 575 3591 182897 22362 205259 1824 144 1968 46850 8996 55846 772 827 1599 29723 4120 33843 8677 433 9110 44024 7651 51675 357 0 357 53644 13266 66910 6635 806 7441 56297 9312 65609 28880 3464 32344 24425 3075 27500 1953 546 2499 14172 1884 16056 6608 583 7191 16340 2452 18792 710 15 725 64771 8524 73295 1441 260 1701 77555 10889 88444 1526 81 1607 21580 4609 26189 3608 508 4116 97825 14962 112787 429 57 486 78855 16330 95185 1612 436 2048 60983 5783 66766 1041 133 1174 59641 7802 67443 26411 3628 30039 115050 17374 132424 1209 309 1518 73541 9719 83260 1198 135 1333 59778 6029 65807 31851 3442 35293 70881 16020 86901 4162 707 4869 27130 3215 30345 641 108 749 148023 20512 168535 7591 480 8071 62372 11949 74321 1202 466 1668 13040 1539 14579 448 30 478 11875 884 12759 293 3 296 48205 5164 53369 328 155 483 48669 10742 59411 348 192 540 39396 4165 43561 1377 302 1679 94846 12653 107499 489 58 547 2212091 336970 2549061 228181 27666 255847 (Concluded) 196 . Champaran Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali Total Upper Total Primary (I-VIII) (VI-VIII) SC ST 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 408060 36586 444646 308789 81808 390597 223117 37597 260714 405328 65635 470963 352016 45115 397131 462756 110813 573569 219882 66050 285932 424538 87489 512027 533684 100177 633861 320466 72303 392769 194143 33773 227916 215808 55172 270980 235704 67504 303208 352796 57535 410331 176828 33318 210146 157648 24231 181879 109686 27283 136969 253369 45129 298498 554057 123964 678021 164189 39723 203912 640827 130348 771175 368569 98536 467105 241003 39419 280422 426473 75961 502434 555109 137617 692726 563602 104218 667820 456595 57038 513633 318133 103915 422048 220160 42487 262647 648690 115609 764299 457116 115964 573080 66173 12533 78706 72744 10001 82745 360064 61963 422027 381068 109171 490239 249616 43982 293598 428311 92351 520662 12527117 2562318 15089435 Upper Upper Primary Primary Total Primary Total Primary (1. Champaran Patna E. No. ALL District Name Primary (I-V) Araria Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar Darbhanga Gaya Gopalganj Jamui Jehanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada W.

6 Sanction 34 69 49 40 33 30 44 95 60 75 95 19 94 71 54 92 45 89 45 89 47 52 49 72 38 128 106 83 94 78 70 64 67 48 36 67 28 20 2369 Contractual Working 29 42 34 34 14 30 26 58 41 68 70 12 53 49 23 69 23 47 24 44 35 35 28 65 27 74 62 46 36 34 59 35 8 19 14 8 4 13 1392 58.8 No of Doctors per Lakh of Vacant Population 5 49 27 38 15 18 6 11 19 8 0 8 18 7 37 7 19 6 7 6 25 6 7 6 41 6 22 5 31 5 23 5 22 5 42 5 21 5 45 5 12 5 17 4 21 4 7 4 11 4 54 4 44 4 37 4 58 4 44 4 11 3 29 3 59 3 29 3 22 3 59 3 24 2 7 1 977 5 41.4 Vacant 17 49 93 33 30 4 2 55 22 56 51 37 33 59 27 83 45 58 40 76 40 37 36 44 50 75 99 127 40 46 79 51 46 60 59 116 22 34 1931 41. Champaran Saran Katihar Muzaffarpur Purnea Madhepura Kaimur Araria Madhubani Kishangani Arwal Total Percentage of total sanctioned Regualar (Govt.2 197 .Appendix II Districtwise Status of Regular & Contractual Doctors Doctors Name of the District Khagaria Gopalganj Aurangabad Jehanabad Sheikhpura Lakhisarai Munger Nalanda Bhojpur Bhahalpur Samastipur Sheohar Begusarai Vaishali Buxar Patna Saharsa Siwan Nawada Rohtas Banka Sitamarhi Supaul Darbhanga Jamui E. Champaran Gaya W.) Sanction 56 101 176 98 64 46 63 153 119 149 192 59 107 139 74 294 92 134 111 158 95 121 90 132 91 179 191 208 145 113 165 116 96 89 111 213 52 51 4643 Working 39 52 83 65 34 42 61 98 97 93 141 22 74 80 47 211 47 76 71 82 55 84 54 88 41 104 92 81 105 67 86 65 50 29 52 97 30 17 2712 58.

'A' Nurse Staff Nurse Name of Districts Khagaria Gopalganj Jamui Sheikhpura Bhagalpur Nalanda Banka Begusarai Munger Saharsa Jahanabad Gaya Purnea Darbhanga Katihar Muzaffarpur Aurangabad Madhepura Kishanganj Sitamarhi Arwal Nawada Madhubani Saran Supaul E.4 Vacant 9 71 15 9 40 58 16 52 27 58 30 81 64 90 73 105 32 60 25 92 118 58 158 128 64 139 78 38 154 77 82 86 102 110 212 64 109 21 2805 73.Appendix III Districtwise Details of Grade. Champaran Sheohar Total Percentage of total sanctioned Regular Sanctioned In Position 11 7 10 4 18 33 11 23 20 21 5 17 20 4 17 17 10 18 6 13 0 16 28 1 17 10 9 20 10 11 8 6 9 28 2 3 1 464 57.1 Contractual Vacant Sanctioned 56 84 60 36 122 110 72 102 48 82 64 152 110 154 104 160 62 70 44 120 128 82 190 142 82 164 82 38 164 88 88 96 114 118 212 68 120 22 3810 In Position 47 13 45 27 82 52 56 50 21 24 34 71 46 64 31 55 30 10 19 28 10 24 32 14 18 25 4 0 10 11 6 10 12 8 0 4 11 1 1005 26. Champaran Kaimur Lakhisarai Samastipur Rohtas Bhojpur Araria Siwan Vaishali Patna Buxar W.6 A Grade Staff Nurse working per lakh of population 41 8 6 5 4 4 3 3 3 3 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 2 18 13 10 18 36 18 23 20 30 13 26 36 8 24 21 21 38 6 17 0 42 33 11 24 28 10 22 20 20 17 8 118 43 2 12 6 812 11 3 6 0 3 7 0 0 9 8 9 16 4 7 4 11 20 0 4 0 26 5 10 7 18 1 2 10 9 9 2 109 15 0 9 5 359 44.2 198 .

7 Vacant 50 146 21 98 165 21 93 86 223 28 70 281 305 173 109 212 31 130 113 205 396 40 89 118 278 285 0 124 239 399 380 399 256 228 121 29 176 136 6253 57.1 ANMs working per lakh of population 231 116 29 29 25 24 24 23 23 22 22 21 21 20 20 19 19 18 18 16 16 16 16 14 13 13 13 13 12 12 10 9 9 7 5 5 1 0 16 199 .4 Vacant 29 16 12 0 0 0 10 7 38 0 0 52 0 21 6 20 6 17 6 32 25 18 0 11 67 46 177 25 86 113 196 128 104 239 25 0 0 1532 13.N.Appendix IV District Wise Details of ANM Name of Districts Khagaria Gopalganj Sheikhpura Nalanda Begusarai Munger Bhagalpur Jahanabad Vaishali Lakhisarai Buxar Gaya Muzaffarpur Bhojpur Banka Samastipur Kaimur Jamui Rohtas Aurangabad Saran Arwal Patna Sitamarhi Katihar Purnea Siwan Saharsa Darbhanga W. Champaran Araria Supaul Nawada Sheohar Kishanganj Madhepara Total Percentage of total sanctioned A.M Regular In Sanctioned Position 209 180 266 250 122 110 405 405 370 370 167 167 394 384 156 149 419 381 131 131 212 212 583 531 583 583 366 345 242 236 456 436 147 141 230 213 286 280 338 306 512 487 87 69 545 545 300 289 362 295 356 310 370 193 180 155 351 265 457 344 561 365 419 291 274 170 347 108 48 0 11251 23 0 9719 86. Champaran Madhubani E.6 Contractual In Sanctioned Position 193 143 186 40 85 64 370 272 360 195 165 144 362 269 151 65 418 195 102 74 162 92 541 260 583 278 284 111 265 156 486 274 167 136 212 82 308 195 285 80 507 111 78 38 418 329 213 95 345 67 370 85 140 140 152 28 419 180 571 46 429 49 503 104 290 34 247 19 223 102 34 5 186 10 136 0 10946 4567 41.

Appendix V Districtwise Details of ASHA Workers Name of the District No. of ASHA Selection Target 2022 1204 1296 2532 2565 669 2242 3271 1247 2017 2026 2529 3028 1460 2734 1644 495 1552 1273 1671 2322 3398 444 2124 1931 3451 2950 1971 2174 2997 3689 1167 1842 820 684 1383 769 2757 74350 ASHA Selection till now. No. of ASH A Trained No. of District Level Trainer Trained 4 4 5 5 5 3 4 5 4 4 3 4 4 5 5 8 5 4 4 4 4 4 4 3 5 5 5 4 4 5 5 4 3 2 4 4 3 4 161 No. of Percentage Percentage No of No of Block of selection of trained Trained Asha per Candidate level Ashas per Lakh of Trainer lakh of Population Trained population 33 100 92 806 747 24 83 80 715 691 53 98 98 137 137 64 100 100 100 100 75 99 99 99 99 5 96 96 97 97 61 94 90 93 90 92 98 98 87 87 18 100 100 86 86 57 100 100 85 85 36 100 100 84 84 65 88 66 83 62 56 95 95 80 80 65 96 96 80 80 53 95 93 79 77 19 91 90 79 78 35 94 94 77 77 40 99 94 77 73 50 84 84 77 77 42 92 77 77 64 34 97 86 75 67 70 91 75 74 61 30 99 96 74 72 52 93 93 73 73 31 84 84 73 73 70 88 80 72 66 59 90 78 72 62 46 98 95 72 70 48 86 68 69 55 90 87 81 69 64 135 79 73 68 62 17 91 56 67 41 33 84 84 66 66 26 100 100 64 64 6 83 83 60 60 46 56 56 54 54 6 100 100 48 48 70 92 92 46 46 92 87 78 74 1812

Gopalganj Khagaria Jamui Vaishali Siwan Arwal Begusarai Samastipur Kaimur Nalanda Araria Sitamarhi Darbhanga Madhepura W. Champaran Supaul Sheohar Banka Buxar Nawada Purnea Muzaffarpur Sheikhpura Rohtas Bhojpur Madhubani Saran Bhagalpur Katihar Gaya E. Champaran Kishanganj Aurangabad Munger Lakhisarai Saharsa Jehanabad Patna Total

2015 1001 1270 2532 2538 644 2107 3214 1247 2017 2026 2223 2890 1403 2594 1492 464 1535 1074 1531 2263 3078 439 1972 1621 3024 2658 1936 1866 2613 2910 1064 1552 820 568 777 769 2549 68296

1868 967 1270 2532 2538 644 2018 3214 1247 2017 2026 1665 2890 1403 2550 1477 464 1455 1074 1284 2002 2544 426 1972 1621 2751 2289 1877 1486 2440 2686 648 1552 820 568 777 769 2549 64380

200

Appendix VI Districtwise Institutional Deliveries April-07 to March-08 Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Districts Araria Arwal Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar E. Champaran W. Champaran Darbhanga Gaya Gopalganj Jahanabad Jamui Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada Patna Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali Total Grand Total AugDec- Jan- Feb- MarApr- May- JunJul-07 Sep-07 Oct-07 Nov-07 07 07 07 07 07 08 08 08 680 650 762 1283 2196 2849 3274 3039 2198 1874 1803 1891 155 221 298 438 760 933 1030 1462 1483 846 718 626 926 1159 1265 1588 2244 3054 3662 3895 2384 1694 2315 2538 1023 1253 1375 1440 1952 2830 3807 2934 1379 1828 1763 1907 1069 1272 1762 2642 3535 3707 4004 3730 2732 3218 2786 3412 1161 1150 1483 2258 3489 4461 5625 4457 3225 3632 3084 3375 350 473 993 1404 2608 2811 2967 2967 2535 2287 1992 2391 188 254 478 889 1569 1721 1840 1567 109 899 1006 1051 563 742 958 1325 1801 2927 3351 2476 1891 2213 2205 2308 1012 905 1093 1746 916 4546 4474 4431 3891 3231 3062 3505 258 372 558 1143 1657 2330 2928 3291 2759 3148 2442 2601 253 546 711 1078 1546 2306 2510 2326 1519 1537 1224 1267 932 782 892 1195 2062 2610 2749 2642 2065 2677 2520 2588 89 179 385 715 1171 1551 1967 1932 1711 1399 1202 1065 239 236 629 663 1286 2072 2177 2016 1705 1564 1482 1149 552 592 506 1000 1919 2317 2324 2157 1545 1365 1239 1280 300 378 502 1764 2064 1626 1276 1579 118 516 631 742 541 815 1086 1502 1734 2269 2361 1353 1268 1786 1573 1747 347 179 410 291 3817 690 987 1025 1045 1245 1102 1019 282 505 534 859 1131 1373 1479 1379 821 926 772 811 242 434 590 1005 1565 2922 2345 2235 1816 1313 1251 1221 494 742 750 490 1181 2092 1993 2023 511 1236 1884 2030 337 432 533 1273 1874 2284 2835 1852 1458 1448 1523 1480 370 348 701 970 701 2699 2095 2284 1558 1309 952 1155 800 1119 994 1679 2972 3616 3494 2938 2472 2252 1994 2439 436 783 789 975 1389 1628 1612 1775 1423 1474 1258 1257 880 1233 1673 2299 3843 8457 4212 5899 5284 4646 3941 2916 1118 1409 1400 1854 3181 6968 4592 3762 2652 2693 2892 2980 255 371 582 1075 1756 2589 3758 3413 2807 2609 2745 2362 425 650 749 1302 1757 2105 2261 1966 760 1046 1368 890 3193 3714 3987 6007 6468 8019 8067 7491 5002 7030 6293 6091 428 753 772 1110 2117 2810 2739 3147 2343 2768 3160 4085 412 562 637 995 1399 1844 1890 1537 313 838 718 722 43 58 67 144 212 268 306 261 171 161 161 193 279 304 566 1068 1735 2687 3113 2511 935 1294 1222 1452 799 757 816 1571 2459 2815 2851 2319 1745 2243 2216 2048 821 832 1013 1185 1740 2684 3026 2539 1703 1574 1455 1475 552 701 875 1980 2859 3511 3582 4276 3397 4328 4093 4342 22804 27865 34174 52205 78665 108981 109563 102886 72733 78147 74047 76411 838481

201

Appendix VII Fund Disbursement to Distric Health Society upto 24.12.2008 SI. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 District Araria Arwal Aurangabad Banka Begusarai Bhagalpur Bhojpur Buxar E.Champaran W.Champaran Darbhanga Gaya Gopalganj Jamui Jehanabad Kaimur Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawada Patna Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali PMCH, Patna NMCH, Patna JLNMCH,BGP ANMCH,Gaya SKMCH,MUZ. DMCH,Darbhanga Rajvansi Nagar CDPO Vehicle Total NRHM-A 10939250 28749880 15464000 25999350 29504600 846000 39079200 12879300 56990000 44475300 22812700 28115900 41755300 13046000 8520800 17813100 31739750 26444400 15040900 10709600 23669600 25366000 13149550 21368000 38876700 16119600 29638400 64334600 38152700 25846100 79335000 10346100 12952100 3824000 13374000 38551900 30714400 59340900 6200000 1620000 576000 6056000 5500000 5900000 0 0 1051736980 NRHM-B 7167020 15283300 14283560 20221880 24102855 27633345 17502730 13485940 15852132 11311032 22885245 25338323 10732480 13067080 14782420 16873828 12094320 16275840 7739660 10217720 14306120 21717780 19191720 29960172 33865100 20119492 36832443 18802644 21265160 20165840 27005980 17113045 9338232 6589100 17746140 17064812 18720140 20088822 7610085 3117775 4297000 2639000 2639000 2639000 2000000 5120000 716805312 NRHM-C Others Total (upto 24.12.08) 20787054 61149568 39059997 54543830 69059432 43626743 68557876 32086187 92051787 71479984 66916864 74825577 63013850 32541121 40836811 41606515 58271148 51286972 29703297 25191896 51478034 71352488 40267448 73629015 103189066 45780673 98867709 99768677 70817439 59275589 129448808 40376908 31718080 13350632 44341074 71194739 67183055 92580502 13810085 4737775 4873000 8695000 8139000 8539000 2000000 5120000 2297130305

2408430 272354 9941264 7175124 8409410 903027 7604491 718109 14523345 928632 13990224 1157174 11065609 910337 5101133 619814 17871021 1338634 14369145 1324507 20445598 773321 20193640 1177714 9300694 1225376 5735312 692729 5463659 12069932 6420447 499140 13597756 839322 7942381 624351 6362247 560490 3741618 522958 9542770 3959544 23082044 1186664 7266677 659501 21326159 974684 10140343 20306923 8731432 810149 30458879 1937987 12231190 4400243 10316881 1082698 10275367 2988282 20789442 2318386 12008992 908771 3225762 6201986 2579660 357872 12457976 762958 14807799 770228 10927711 6820804 12202215 948565 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 436858723 91729290

202

Appendix VIII Percentage of Targets Achieved in Birth and Death Registration Name of District Patna Nalanda Bhojpur Buxar Rohtas Kaimur Gaya Jehanabad Arwal Nawada Aurangabad Saran Siwan Gopalganj Muzaffarpur E. Champaran W. Champaran Sitamarhi Sheohar Vaishali Darbhanga Madhubani Samastipur Munger Lakhisarai Sheikhpura Jamui Begusarai Khagaria Bhagalpur Banka Saharsha Supaul Madhepura Purnea Kishanganj Araria Katihar Total Birth 2005 23.39 16.55 24.74 7.80 18.70 12.84 14.24 28.93 4.73 10.87 15.19 17.98 15.98 14.38 25.12 4.34 16.96 3.83 3.69 16.76 10.41 9.94 15.61 41.26 2.40 5.12 28.37 15.06 30.82 19.38 20.04 8.51 3.97 12.69 25.87 18.75 8.25 29.39 16.23 Death 2005 54.46 24.09 29.34 15.25 29.39 27.46 17.19 31.66 9.52 12.09 15.98 13.71 24.15 22.24 20.88 10.51 19.70 6.53 9.30 22.73 18.03 16.38 19.50 40.30 10.77 9.20 51.93 21.71 29.94 25.93 21.16 8.54 4.67 16.38 25.67 25.73 9.64 23.80 21.73

2004 20.79 16.67 19.90 8.35 8.94 14.24 8.56 21.35 6.36 15.23 18.31 7.09 14.06 5.66 17.54 2.05 14.10 2.38 1.69 9.04 7.47 5.25 8.69 20.48 3.11 2.83 26.63 8.86 15.35 8.68 10.97 7.51 3.97 8.89 13.43 12.15 4.79 11.73 10.97

2006 35.23 12.49 24.43 11.91 17.46 13.52 17.02 23.99 10.03 19.46 11.55 12.02 14.94 13.82 33.03 6.90 20.63 7.58 9.04 30.35 14.52 14.55 20.78 45.75 9.91 19.26 18.46 15.94 33.56 22.38 14.91 14.96 5.72 16.79 24.55 18.77 9.97 33.23 18.97

2004 45.05 24.44 25.21 15.32 16.46 21.24 14.51 23.58 8.08 17.89 15.11 20.17 24.21 13.06 19.19 5.87 20.21 5.17 3.50 19.97 15.39 13.46 18.02 26.54 6.77 9.00 29.15 14.98 18.39 18.85 17.59 8.18 5.84 12.64 14.75 14.93 1.92 19.67 17.62

2006 63.37 17.80 28.25 16.21 24.90 26.10 23.64 26.34 15.30 19.72 10.66 13.30 24.54 27.37 24.92 14.97 20.19 9.98 9.72 27.39 19.62 18.10 24.07 45.65 15.77 25.68 26.63 19.33 29.74 32.96 17.35 16.56 7.04 20.18 22.54 25.38 7.43 19.16 23.17

203

Appendix IX Selected Health Indicators for Bihar Urban Rural Total Bihar India Bihar India Bihar India NFHS- NFHS- NFHS- NFHS- NFHS- NFHS- NFHS- NFHS- NFHS- NFHS- NFHS- NFHSII III II III II III II III II III II III 22 53 67 39 46 54 53 48 61 47 86 65 58 42 91 69 11 80 32 13 31 63 32 19 37 73 60 25 39 62 72 31 12 78 34 15 33 62 34 22 42 68 66 34 44 57 77 41

Indicator Trends in Vaccination Coverage (%) Trends in Infant Mortality (per 1000 live births) Trends in Any Antenatal Care (%) Trends in Institutional Deliveries (%)

204

Appendix X Districtwise Work Participation Ratio Share of Population Work Participation Ratio SC ST All SC ST 45.2 15.7 0.9 39.7 33.7 43.7 41.2 36.8 29.6 0.1 45.3 48 37.3 24.1 0.1 39.1 41 33.3 23.5 0.1 39.3 42.6 34.4 22.2 2.8 35.7 45.9 28.8 20.7 0.1 44.7 54.3 38.1 20 0 46.1 48.3 37 19.7 0 44.8 61 38.4 18.9 0.1 35.7 62.9 31.6 18.5 0.1 36.1 39.4 30.4 18.1 1 47.7 47.4 42.7 17.4 4.8 46.3 51.6 44.8 17.1 0.6 46.3 47.2 39.1 16.1 0.3 35.2 31.9 30.4 15.9 0.1 44.9 49.6 36.5 15.8 0.7 36.1 44.2 31.2 15.5 0 37.6 46.1 30.2 15.5 0.2 35.8 30.2 29.1 15.3 0.4 46.6 45.8 42 14.8 0.3 35.5 27.6 31.8 14.5 0.1 42.2 53 36.5 14.5 0 35 23.4 31.2 14.4 0 44.8 46.3 37.9 14.3 1.5 35.1 31.3 29.1 14.1 0.6 48.2 51.1 39.5 13.6 1.4 39.6 30.6 34.3 13.5 0 34 39.1 29.1 13.3 1.6 38.3 37.5 32.7 13 0.1 42.5 48.6 39.6 12.4 4.7 36.5 36 29.8 12.4 0.3 46.9 47.1 37.8 12.3 4.4 32.3 30.2 26.5 12 0.2 35.9 31.6 31.9 11.8 0.1 26.1 30.2 26.9 11.4 0.5 38.4 40.8 35.3 10.5 2.3 42.3 45.8 37.5 8.7 5.9 36.6 50 32.2 6.6 3.6

All Bihar Gaya Nawada Aurangabad Kaimur Vaishali Nalanda Sheikhpura Jehanabad Samastipur Rohtas Jamui Madhepura Saharsha Muzaffarpur Lakhisarai Darbhanga Patna Bhojpur Supaul Begusarai Khagaria Sheohar W. Champaran Buxar Araria Madhubani Mungher E. Champaran Banka Gopalganj Purnea Saran Sitamarhi Siwan Bhagalpur Katihar Kishanganj Arwal

205

Appendix XI Districtwise Sectoral Distribution of Workers SC - Sectoral Distribution of main Workers ST - Sectoral Distribution of main Workers Overall - Sectoral Distribution of main Workers

HouseAgrichold Cultiv- ultural Other CultivaIndustators LabouWorkers tors ry (%) (%) (%) rers Workers (%) (%)

HouseHousehol Agricultu AgricuOther Other hold d Cultiva- ral ltural Industry Workers Industry Workers tors(%) LabouLabouWorkers (%) Workers (%) rers (%) rers (%) (%) (%)

All Bihar Gaya Nawada Aurangabad Kaimur Vaishali Nalanda Sheikhpura Jehanabad Samastipur Rohtas Jamui Madhepura Saharsha Muzaffarpur Lakhisarai Darbhanga Patna Bhojpur Supaul Begusarai Khagaria Sheohar W. Champaran Buxar Araria Madhubani Mungher E. Champaran Banka Gopalganj Purnea Saran Sitamarhi Siwan Bhagalpur Katihar Kishanganj Arwal

7.9 11.8 11.5 13.5 11 5.7 8.7 9.4 7.7 4.6 11.1 11.4 6.4 7.8 6.3 8.2 5.2 5.2 7.1 9.9 4 6.4 2.9 4.7 10 6.3 5.5 5.3 6.1 13.8 13 4.7 8.8 4.2 14.2 6.6 5 5.8

77.6 78.1 77.6 73.9 78.3 75.9 78.2 76.6 81.2 78.9 71.8 58.8 88.1 83.1 74.8 76.6 77.9 70.4 77.5 83.7 72.1 81.4 90.4 85.7 74.9 87.2 84.7 61 83 74.3 74 87.3 72.2 82.1 67.5 68.2 79.9 70

3.3 2.2 2.9 2.6 2.2 3.9 3.3 2.5 2.9 3.2 2.9 17.1 1.4 2.1 3.2 3 3.6 2.7 2.7 2.3 5.8 2.3 2.5 2.5 2.5 2.2 2.9 4.5 2.4 4.7 2.7 2.1 3.3 3.5 3.8 5.3 3.4 5.6

11.2 8 8 10 8.5 14.5 9.7 11.5 8.2 13.3 14.2 12.7 4.1 6.9 15.7 12.2 13.2 21.7 12.7 4.2 18.2 9.9 4.3 7.1 12.6 4.4 6.9 29.2 8.4 7.2 10.3 6 15.6 10.1 14.4 20 11.8 18.7

21.3 18.2 16.7 3.7 33.5 7.3 4.7 0 4 4.2 15.4 31.8 35.2 18.9 11.5 14.2 6.2 0.7 9.6 27.8 1.9 13.1 6.7 13.2 5.3 24 34.3 10.5 17.2 31.3 20.5 21.2 19.2 5 22.9 19.6 19.4 12.5

62.5 36.2 50.8 23.6 40.3 16.3 25.6 2 20 44.7 56.7 34.6 53.4 72.2 35 62.8 38.2 4 54 68.4 12 17 33.3 79.4 51.3 71.5 38.2 54.8 60.4 58.8 34.7 72.1 37 70.1 43.5 68.9 72.7 83.6

4 7.8 7.4 7 3 7.2 8.2 16.7 3.9 0.7 5.4 18.4 5.7 0.6 3.3 2.6 0.3 3.6 6.2 0.9 0.5 0.6 0 1.2 5.6 1.7 5.7 4.7 2.6 5.7 1.8 1.5 2.4 3.5 4.8 1 1.7 0.5

12 38 25 66 23 69 62 81 72 50 23 15 5.6 8.4 50 20 55 92 30 3 86 69 60 6.2 38 2.9 22 30 20 4.3 43 5.2 41 21 29 11 6.1 3.4

29 34 40 37 34 31 36 38 36 27 35 30 33 32 26 32 23 22 35 34 19 26 26 21 36 25 31 16 27 34 41 23 36 24 41 20 22 26

48 43.8 40.3 42.2 48.6 41.6 42.1 42.2 44.7 47.4 38.9 32.5 56.3 52.5 45.5 43.6 51.1 32.9 39.5 54.8 47.9 54.4 61.3 62.3 40.1 62.3 52.8 41.6 54.8 51.7 40.1 63.3 37.5 55.3 33.7 48.2 61 57.6

3.9 4.1 3.7 4.2 3.5 4.2 4.6 3.2 3.7 4.4 3.9 20.8 1.8 2.1 3.5 2.9 4 3.9 3.9 1.9 6.9 2.5 2.3 2.6 3.9 2 3.4 4.5 2.8 4.6 2.6 1.7 4 3.4 3.6 7.4 2.5 2

19 18 16 17 14 23 18 17 16 21 23 16 8.7 14 25 21 22 41 22 9 26 17 11 14 20 10 13 38 15 9.9 16 12 23 17 22 25 14 14

206

in its Report on the Trends and Progress of Banking. As economic development and bank operations are closely intertwined. While the operations of the urban cooperative banks (UCBs) witnessed impressive growth during 2007-08.” The most severely affected sectors have been real estate. The RBI has noted that “Corporate earnings and credit quality eroded as input cost increased and demand subsided in an environment of higher inflation and lower growth.CHAPTER VI BANKING AND ALLIED SECTORS The Reserve bank of India (RBI). a measure of the capacity of the banking system to absorb losses’. The impact of this has been felt across the entire landscape of the financial sector in India and across the states by varying degrees. The capital adequacy ratio of FIs was higher than the prescribed norm of 9 percent. But the Primary Agricultural Credit Societies (PACS) and Primary Cooperative Agricultural and Rural Development Banks (PCARDB) showed sub-optimal performance and incurred overall losses in the country as a whole. The national scenario. each serving as an input to the growth of the other. The following analysis of the financial sector in Bihar takes into account three kinds of institutions functioning in the 207 . while the return on equity (RoE) declined and ‘the capital to riskweighted asset ratio of SCBs. The assistance sanctioned by Financial Institutions (FI) increased substantially during 2007-08. also performed well. improved. they were able to maintain their existing operating profits in relation to their total assets. As discussed later. due to a simultaneous decline in the operating expenses of banks. they acted as serious impediments to further expansion in the credit flow by the banks in Bihar. Bihar could not completely insulate itself against the overall impact of the global meltdown and national trends as described above. though the disbursements had slowed down during the year. the rural cooperative banking sector. Return on assets (RoA) of SCBs improved moderately. however. except State Cooperative Agricultural and Rural Development Banks (SCARDBs). 2007-08. as against a decline during the previous year. as analysed by the RBI. shows a decline in the net interest income of Scheduled Commercial Banks (SCB) in relation to their total assets due to a hardening of interest and deposit rates during 2007-08. banking and automobiles in India. after a sustained period of expansion. had entered into a phase of downturn on account of the global financial crisis. had noted that the global economy.

in any case. the analysis also includes the working of National Bank for Agriculture and Rural Development (NABARD) which plays a substantive role in providing credit for agriculture and rural development. the branches of SCBs in Bihar are also comparatively under-staffed. 208 .4 percent in 2003-04 to 17. the present analysis is based on nationalised banks alone. the database on which is satisfactory and.state: (i) Scheduled Commercial Banks (SCB). 6. plus the foreign banks.3. more than onethird of whom belong to the category of officers.58 percent of all the SCB branches in the country. took place in urban areas only. compared to the national average of about 15 thousand. 2007. Bihar accounts for only 3. average size of population served by a branch is more than 31 thousand in Bihar. there has been a small decrease in the number of branches of RRBs in both Bihar and India (Table 6.8 percent in semi-urban and the remaining 17. there was a sharp decline in 2007-08 and. whatever little expansion was there.698 bank employees as on March.3 percent in urban and metropolitan areas. The urban branches have of course consistently increasing their share in the total number of branches. it can further be seen that. it can be noted that Bihar accounts for only 4. 61. As regards growth in total number of branches. (ii) Regional Rural Banks (RRB) and (iii) Cooperative Banks.4). Although the SCBs include both nationalised and private commercial banks. apart from relatively less coverage.41 percent of all the SCB employees in India. From Table 6. the Regional Rural Banks and Cooperative Banks largely look after the requirements of agriculture sector. Over the years. While the Scheduled Commercial Banks provide finance to both industry and agriculture. from 12. the presence of other commercial banks is very marginal in Bihar. Thus.3 percent in 2007-08. From Table 6. with 30.2. Thus. At the end of 2007-08. In addition. far less than its population share of about 8 percent. 20.9 percent of a total of 3769 branches of commercial banks were located in rural areas.1 Banking Infrastructure Scheduled Commercial Banks (SCB) : Table 6. after attaining the peak growth rate of nearly 1 percent in 2006-07.1 shows the distribution of SCB branch offices in Bihar during 2003-04 to 2007-08 and their growth. Regional Rural Banks (RRB) : The total number of branches of RRBs in Bihar in 2006-07 was only 1465.

Cooperative Banks : The data for the number of branches of Cooperative Banks is shown in Table 6.5. It may noted from the table that there has been no growth in this sector during 2006-07.
Table 6.1 : Distribution of Branches of SCBs in Bihar Years (end Marh) 2004 2005 2006 2007 2008 Growth Rate (Percent) 0.25 0.77 0.80 0.92 0.32 Percentage Share in total Rural 68.7 68.0 63.6 63.0 61.9 Semiurban 18.9 18.9 20.6 20.7 20.8 Urban 12.4 13.1 15.8 16.3 17.3

Total

3618 3646 3678 3712 3769

Source : Statistical Tables Relating to Banks in India, 2007-08, RBI

Table 6.2 : Distribution of Branches of SCBs among States (2007-08) SemiUrban 23.27 20.83 21.76 20.12 19.84 65.29 23.16 17.58 17.35 28.01 24.00 29.04 17.33 11.52 22.70 Percentage Population Share per branch 7.98 4.85 5.49 2.63 7.32 5.18 4.96 9.46 3.33 4.08 4.93 7.36 12.03 6.45 100.00 13752 31301 13353 11387 10691 9077 24924 14403 15413 8505 16768 12146 22565 18087 15184

States Andhra Pradesh Bihar Gujarat Haryana Karnataka Kerala Madhya Pradesh Maharashtra Orissa Punjab Rajasthan Tamil Nadu Uttar Pradesh West Bengal All India

Rural 37.00 61.90 34.01 32.71 37.38 8.21 44.88 28.43 62.05 34.09 45.13 28.88 50.40 45.57 39.83

Urban 39.73 17.27 44.23 47.17 42.78 26.50 31.96 53.99 20.59 37.90 30.86 42.08 32.27 42.91 37.47

Total 6210 3769 4269 2048 5690 4030 3855 7355 2593 3174 3833 5727 9353 5017 77773

Source : Statistical Tables Relating to Banks in India, 2007-08, RBI

209

Table 6.3 : Distribution of Employees of SCBs as on March 31, 2007 Officers Region/State/ Union Territory Delhi Haryana Punjab Rajasthan Bihar Orissa West Bengal Jharkhand Chhattisgarh Madhya Pradesh Uttar Pradesh Uttaranchal Gujarat Maharashtra Andhra Pradesh Karnataka Kerala Tamil Nadu All India Number 22485 8693 14678 13619 11412 8462 22283 5720 4015 14264 32708 3436 18259 55376 25812 23297 15211 28212 347662 Share (per cent) 6.47 2.50 4.22 3.92 3.28 2.43 6.41 1.65 1.15 4.10 9.41 0.99 5.25 15.93 7.42 6.70 4.38 8.11 100.00 Clerks Number 17830 8396 14131 11904 11775 8576 32852 6099 3417 14028 33602 3406 22012 58498 22894 26108 19671 31504 366700 Share (per cent) 4.86 2.29 3.85 3.25 3.21 2.34 8.96 1.66 0.93 3.83 9.16 0.93 6.00 15.95 6.24 7.12 5.36 8.59 100.00 Sub-ordinates Number 7887 4668 7468 7790 7511 5145 16200 3484 2066 8156 19834 2357 11565 23171 12368 11794 8572 13335 185045 Share (per cent) 4.26 2.52 4.04 4.21 4.06 2.78 8.75 1.88 1.12 4.41 10.72 1.27 6.25 12.52 6.68 6.37 4.63 7.21 100.00 Total Number 48202 21757 36277 33313 30698 22183 71335 15303 9498 36448 86144 9199 51836 137045 61074 61199 43454 73051 899407 Share (per cent) 5.36 2.42 4.03 3.70 3.41 2.47 7.93 1.70 1.06 4.05 9.58 1.02 5.76 15.24 6.79 6.80 4.83 8.12 100.00

Source : Statistical Tables Relating to Banks in India, 2007-08, RBI

Table 6.4 : Number of Branches of RRBs 2003-04 All India Bihar Madhya Pradesh Maharashtra Rajasthan Uttar Pradesh West Bengal 14663 1489 1069 593 1032 2878 894 2004-05 14645 1487 1064 588 1027 2869 897 2005-06 14607 1476 1050 580 1026 2871 898 2006-07 14652 1465 1050 580 1033 2884 899

Source : Money and Banking, Sept 2008, CMIE

210

Table 6.5 : Number of Branches of State and District Central Cooperative Banks (As on March 31)

Region / State

State Cooperative Banks 2006 2007 13 19 13 14 14 46 5 22 30 2 1 53 26 31 20 45 923

District Central Cooperative Banks 2006 359 745 390 279 311 261 198 834 1277 198 1150 2704 570 583 612 724 11613 2007 359 742 392 279 311 260 198 834 1300 200 1144 3675 569 589 628 725 12802 2006

Total

2007 372 761 405 293 325 306 203 856 1330 202 1145 3728 595 620 648 770 13725

Haryana Punjab Rajasthan Bihar Orissa West Bengal Chattisgarh Madhya Pradesh Uttar Pradesh Uttarakhand Gujarat Maharashtra Andhra Pradesh Karnataka Kerala Tamil Nadu All-India

13 19 13 14 14 45 1 22 29 2 1 53 26 31 20 44 910

372 764 403 293 325 306 199 856 1306 200 1151 2757 596 614 632 768 12523

Source : Statistical Tables Relating to Banks in India, 2007-08, RBI

6.2 Deposits, Credits and Credit-Deposit Ratio Table 6.6 shows the deposits and credits of scheduled commercial banks in Bihar vis-à-vis other states and their shares in the total deposits and credits in the country. From this table, it is seen that while there has been significant growth in total deposits in Bihar in 2007-08 over the previous year by Rs 11,681 crore, the credit expanded by only Rs 3,712 crore. But Bihar’s share in the total credit of scheduled commercial banks has remained practically the same at 0.9 percent over the years. The per capita deposits and credits of scheduled commercial banks in these states are shown in Table 6.7. We note that in terms of both per capita deposit and credit, Bihar ranks the lowest

211

among the major Indian states. While the per capita deposit of Bihar has increased significantly in 2007-08, the increase in per capita credit has not been appreciable. The banks need to take more pro-active measures in increasing the credit flow by opening more branches in the unbanked areas. It has been noted earlier that the expansion of bank branches in Bihar in 2007-08 has been marginal.

Table 6.6 : Statewise Deposits and Credit of SCBs

Deposits State

Credits

Amount Percentage Amount Percentage Amount Percentage Amount Percentage (Rs. crore) share (Rs. crore) share (Rs. crore) share (Rs. crore) share 2007 2008 2.3 3.3 2.3 2.2 1.4 1.6 5.8 0.9 2.5 7.0 1.1 4.6 25.2 5.5 6.6 3.7 6.3 100.0 74367 101046 73020 68597 43565 53732 187610 30967 81502 213594 36337 152691 832063 177567 210349 109103 199949 3228819 2.3 3.1 2.3 2.1 1.3 1.7 5.8 1.0 2.5 6.6 1.1 4.7 25.8 5.5 6.5 3.4 6.2 100.0 2007 34951 52812 48656 17156 12629 26649 94142 12948 40737 81699 7911 76916 642170 124314 133177 60615 183161 1949568 1.8 2.7 2.5 0.9 0.6 1.4 4.8 0.7 2.1 4.2 0.4 3.9 32.9 6.4 6.8 3.1 9.4 100.0 2008 45048 66998 59904 20373 15313 30396 115255 16190 49177 95942 9680 99515 787840 162595 164110 71226 226830 2394566 1.9 2.8 2.5 0.9 0.6 1.3 4.8 0.7 2.1 4.0 0.4 4.2 32.9 6.8 6.9 3.0 9.5 100.0

Haryana Punjab Rajasthan Bihar Jharkhand Orissa West Bengal Chhattisgarh Madhya Pradesh Uttar Pradesh Uttarakhand Gujarat Maharashtra Andhra Pradesh Karnataka Kerala Tamil Nadu All India

60669 84621 58973 56916 37196 41638 150412 24427 65498 181006 29318 119224 655402 141966 171898 95282 163166 2598822

Source : Statistical Tables Relating to Banks in India, 2007-08, RBI

212

Table 6.7 : Statewise Per Capita Deposits and Credit of Scheduled Commercial Banks Per capita deposits (Rs.) 2007 Haryana Punjab Rajasthan Bihar Orissa West Bengal Madhya Pradesh Uttar Pradesh Gujarat Maharashtra Andhra Pradesh Karnataka Kerala Tamil Nadu All India 27432 33082 9699 5035 10901 17381 7265 9128 22399 66563 17416 30203 27616 24893 23382 2008 33101 39044 11789 5962 13939 21400 8884 10537 28312 83577 21556 36505 31333 30255 28610 Deposits per office (Rs. lakh) 2007 3339 2971 1667 1578 1752 3235 1853 2113 3116 9845 2528 3328 2594 3218 3675 2008 3769 3321 1977 1866 2148 3871 2214 2378 3780 12038 2964 3903 2844 3675 4344 Per capita credit (Rs.) 2007 15803 20647 8002 1518 6977 10879 4519 4120 14451 65219 15251 23400 17568 27943 17541 2008 20051 25888 9671 1771 7885 13147 5360 4733 18452 79135 19739 28480 20455 34322 21218 Credit per office (Rs. lakh) 2007 1924 1854 1376 476 1122 2025 1152 954 2010 9647 2214 2578 1650 3613 2757 2008 2283 2202 1622 554 1215 2378 1336 1068 2464 11398 2714 3045 1857 4169 3222

Source : Statistical Tables Relating to Banks in India, 2007-08, RBI

% Share of States in Total Deposits and Total Credits
35 30 25 20 15 10 5 0 Rajasthan Bihar West Bengal Uttar Pradesh Maharashtra Share in Total Deposits Share in Total Credits

213

The Credit-Deposit Ratios (CDR) of all banks in Bihar during the last 5 years, according to data released by the State Level Banker’s Committee (SLBC) were as under :
Mar 2004 26.81 Mar 2005 29.86 Mar 2006 32.10 Mar 2007 34.38 Mar 2008 32.35

The CD ratio of the banks depends mostly on the level of economic activity and the credit absorption capacity of a particular state and is an indicator of the involvement of the banks in the economic development of the state. Till the 1990s, CD ratio in Bihar was one of the lowest in the country and there was no increase in the CD ratio in the state. After 2000-01, however, there has been some improvement in the CD ratio, but even in 2007-08, it is still one of the lowest in the country. The CD ratio of Bihar currently stands at 32.35 percent, far below the national average of 72.4 percent, and way behind the CD ratios of states like Maharastra (102.2 percent), Rajasthan (82 percent), West Bengal (62.6 percent) and Madhya Pradesh (61.4 percent).

CDR of Bihar vis-a-vis Other States
120

100

80

60

40

20 Bihar UP 0 Mar-04 Mar-05 Mar-06 Mar-07 Mar-08 MP Maharastra Rajasthan West Bengal

In absolute terms, it means that if the current CD ratio of about 32 percent in the state were to increase to the national level of around 72 percent, investments in the state would go up by Rs. 27,000 crore, which is more than the current annual plan outlay of the state and would provide

214

the much-needed impetus to economic activities. Even a modest 50 percent CD ratio would boost investments by Rs. 12,000 crore. The low disbursement of credit also indicates that the credit requirements of the state are being met at higher rates of interest from private lending agencies, eating into the profitability of enterprises in the state. This naturally is a serious hindrance to industrial growth in the state. Further, this also indicates flight of capital away from the state. The poor CD ratio of the state can be attributed to a number of factors such as poor credit absorption capacity, poor basic infrastructure, apart from higher incidence of NPA (Non Performing Assets) accounts. If the CD ratio is to be increased to a reasonable 40 percent in near future, it would need huge investments which is possible only through Public-Private partnership, as the state government would not be able to mobilize the required resources on its own. Efforts to bring in large investments for infrastructure development such as urban development, transport, civil aviation and industries need to be accelerated. The banks, on their part, should also commit themselves to the task. The CD ratios in Bihar, separately for SCBs, RRBs and Cooperative Banks, are shown in Tables 6.8 and 6.9. The CD ratio in Bihar is the highest (82 percent) for the Cooperative banks, followed by Regional Rural Banks (42 percent), with the SCBs (29 percent) trailing far behind. It seems that an encouraging investment climate in the state still remains a far cry.
Table 6.8 : Deposits and Credits of Different Bank Groups by Branch Locations in Bihar (2007-08) (Rs. crore) Branch Locations Bank Groups Rural Deposit SCB RRB Cooperative Bank Total 13103 6329 — 19432 Credit 4755 2845 — 7600 Semi-Urban Deposit 15798 1730 — 17528 Credit 4511 574 — 5085 Urban/Metro Deposit 29673 761 851 31284 Credit 7936 258 698 8892 Total Deposit Deposit 58574 8819 851 68244 Credit Credit 17202 3678 698 21577

215

a comparatively lower CD ratio based on credit utilization would indicate the migration of credit. against a credit of Rs 22. there would be variation. particularly in the context of inter-state comparison of CD ratios where the CD ratio based on utilisation would be the more appropriate. The inequality with respect to these two types of ratios has narrowed down substantially in the recent years. The CD ratio is conventionally calculated on the basis of credit sanctions.077 crore. but within the states. This connotes the extent to which the banks employ the deposits mobilized in a state to meet the credit demands of the state.62 — 32.819 851 68.70 82.244 Credit (Rs. giving a CD ratio of 32.9 : Credit Deposit Ratio in Bihar for All Banks (2007-08) Bank SCB RRBs Cooperative Banks Total RIDF Grand Total Deposit (Rs. the CD ratio of Bihar used to be around 40 percent. crore) 17202 3. these two ratios would evidently be identical. we note that Bihar’s utilisation ratio has substantially improved over the past two years.10).37 41.077 CD Ratio 29. while a low CD ratio based on credit sanctions would indicate the migration of deposits from one state to another.244 crore. For the country as a whole.Table 6. because of the massive expansion of branches. Even before the process of liberalisation began in the early 1990s.244 — 68.02 31.577 500.678 698 21. 68. For the SCBs. indicating lesser migration of credit from the state compared to the earlier years (Table 6. the aggregate deposits of all banks in Bihar were Rs. up from a pitiable 26. crore) 58574 8.35 As on March 2008.35 percent. especially in rural areas and also due to the change in borrowers' attitude to seek credit from the banks located at the places of actual utilization. 216 . A comparison between these two types of ratios.8 percent in 2003-04. therefore assumes importance. However.00 22.

2 46.6 78. Among the Lead Banks.4 2006-07 As per Sanction 56.9 75.7 63.7 76.2 42.9 49.0 As per Utilisation 68.6 61.Table 6.2 94.4 30.5 75.5 57.2 66.8 77.3 30.5 41.6 102.8 45.9 74.5 31.5 72.8 63.6 64.1 88.3 44. Among others.6 68.4 56.3 86.7 27.8 87.5 94.5 67.8 55.8 52.2 99.5 91.7 35.4 52.4 32.6 82.9 75.9 65. 2007-08.3 76. UCO Bank has the highest CD ratio of nearly 38.6 50.4 58.0 31.2 Source : Statistical Tables Relating to Banks in India.3 75.3 80.4 65.5 60. like the Corporation Bank (6.1 68.3 CD Ratio of Different SCBs Table 6.8 118.7 29.9 24.1 56.3 64.3 46. the CD ratios were very low. 217 .3 45.2 93.0 40.3 43.9 26.9 83.6 61.7 91. down from 41.7 96.6 78.6 56.8 64.0 25.9 32.4 64.21 percent in the previous year.3 90.6 74.05 percent).3 31.95 percent) or the Indian Overseas Bank (12.78 percent.1 26.4 32.0 2005-06 As per Sanction 57.2 49. For some banks.7 37.4 As per Utilisation 69.9 61.3 113.4 76.3 86.3 82.6 54.5 105.3 109.9 114.10 : Credit Deposit Ratio of SCBs 2004-05 As per Sanction Haryana Punjab Rajasthan Bihar Jharkhand Orissa West Bengal Chhattisgarh Madhya Pradesh Uttar Pradesh Uttarakhand Gujarat Maharashtra Andhra Pradesh Karnataka Kerala Tamil Nadu All India 51.0 56.4 66.4 110.3 30.0 65. RBI 6.2 81.1 60.0 33.9 61.6 65.0 As per Utilisation 63.3 81.8 54.6 101.11 shows the CD ratios of different scheduled commercial banks in Bihar. Syndicate Bank has the highest CD ratio of nearly 53.0 29.8 49.6 75.3 60.7 61.3 72.4 50.2 29.7 56.0 61.4 52.4 74.3 72.2 66.3 60.8 73.80 percent.0 2007-08 As per Sanction 60.6 66.7 50.

37 37.12 depicts the CD ratios of all scheduled commercial banks as well as the Regional Rural Banks in different districts of Bihar during 2005-06 to 2007-08.75 2007-08 30.17 22. it is less than 25 percent in Bhojpur. it can be seen that.18 33.99 24.41 46. From the Table.78 30.19 30.87 28.07 20.42 52.4 CD Ratio of Different Districts Tables 6. from 20.66 percent in Siwan to 48.21 25.05 33.61 11.04 42.67 29.82 57.28 49.99 percent in neighbouring West Champaran to 55.50 33.58 27.25 16.56 19. 2007 Source : State Level Bankers' Committee 6.61 28.76 20.93 38. they do not necessarily reflect the banks’ willingness to increase the ground level credit flow.21 31.89 24. 218 . in 2007-08.62 25.33 32.27 38. Kishanganj.36 31.41 30.47 26.12 10.50 72.37 32.02 29.52 12.02 Note : For 2007-08.86 40.66 10.80 28.11 50.36 17.39 23.Table 6. Lakhisarai. Purnea and West Champaran.50 2006-07 27.06 32.19 38.63 34.94 47. However.31 33.73 23.93 45.20 39. the figures are as on December 31.1 32.07 46.76 55. Saran and Siwan.07 31.09 33.86 2005-06 29.78 30.97 20.24 49.29 33.53 32.17 33.19 52.45 06.74 32.11 : CD Ratio of Different Commercial Banks in Bihar Banks Lead Banks State Bank of India Central Bank of India Punjab National Bank Canara bank UCO Bank Bank of Baroda Union Bank of India Other Banks Bank of India Allahabad Bank Andhra Bank Bank of Maharastra Corporation Bank Dena Bank Indian Bank Indian Overseas bank Oriental Bank of Commerce Punjab and Sind Bank Syndicate Bank United Bank of India Vijaya Bank State Bank of B&J State Bank of Patiala State Average 2004-05 27.21 52.39 22.67 25. Munger.41 33.87 33.27 21.29 08.24 53. the CD ratios across the districts show wide variations.92 16.53 0 39.66 28.52 18.58 26.59 percent in Katihar.95 19. Katihar.88 41.37 21.61 23.74 13.93 23. the high CD ratios in many districts are related to high accumulated interests on previous loans.88 40.89 43.47 40. It is above 50 percent in Araria.

31 35. 219 .61 28. the figures are as on June 31.30 32.24 30.44 48.68 29.79 46.66 59.05 56. the differences were much smaller.05 43.39 35. the total involvement of the banks in the economic activities of a state is truly reflected not by the Credit-Deposit ratios alone. Bihar is seen to be a disadvantaged state.72 28.32 Note : For 2007-08.39 28.04 28.25 37.68 33.53 50.77 24.19 37.12 36.Table 6.13 depicts the investments of SCBs in securities and shares/ debentures/ bonds of associated bodies of the state government as on March 31.26 51.64 25.77 44.65 23.07 29.69 53. but by the Investment plus Credit to Deposit (ICD) ratios.61 29.46 25.31 38.64 26.17 24.12 : Districtwise CD Ratios in Bihar District Patna Nalanda Bhojpur Buxar Rohtas Kaimur Gaya Jehanabad Nawada Aurangabad Arwal Saran Siwan Gopalganj Muzaffarpur Vaishali Sitamarhi Sheohar West Champaran 2005-06 29. 2007 Source : State Level Bankers' Committee.84 44.38 28.85 32.65 26.88 27. whereas for the developed states.16 29. From Table 6.51 23.40 27.66 42.33 51.65 33.18 27.90 40.18 22.50 32.71 24.37 23.5 Investment Plus Credit to Deposit (ICD) Ratio The banks assist the economy not simply by giving credit.17 58.66 30.77 25.10 27.59 35.95 2007-08 42.21 31.06 28.34 44.34 26.04 28.16 26.38 42.95 31.69 2007-08 27.18 38.99 District East Champaran Darbhanga Samastipur Madhubani Saharsa Supaul Madhepura Purnea Araria Kishanganj Katihar Bhagalpur Banka Munger Lakhisarai Sheikhpura Jamui Khagaria Begusarai 2005-06 40.17 35.70 40.63 28.12 20.45 36.77 55.29 32. in shares.32 36.98 39.24 44.06 27.63 51.97 21. bonds etc. we see that.72 55. With a share of about 4 percent in the total investments.65 25.79 40.62 54. of corporations and undertakings of the state government.45 33.63 38. if the ICD ratio is taken into account. The ICD ratios in respect of the relatively less developed states were substantially higher than their respective CD ratios.23 26.72 2006-07 43.55 23.59 41.90 32.57 43.08 39. since it accounts for about 8 percent of the population.51 30.44 24.62 23.89 21.14.06 51.82 37.28 26. 2006 and 2007. Therefore.73 20.84 29.31 23.19 34.62 27. there is a narrowing down of the inter-state disparities in credit availability.05 30. Table 6.66 26.10 34. quasi-government bodies and joint-stock companies.35 24.85 2006-07 32.70 40.29 51.34 25. but also by investing a large part of their investible funds in State Government securities. GOB 6.99 23.99 40.

65 4.75 3.8 63.3 54.0 102.3 65.7 83.3 72.6 98.5 54.4 59.1 115.Table 6.13 : Statewise Distribution of Investments of SCBs State Andhra Pradesh Bihar Gujarat Haryana Karnataka Kerala Madhya Pradesh Maharashtra Orissa Punjab Rajasthan Tamil Nadu Uttar Pradesh West Bengal Total Total Investments (Rs.4 41.2 94.8 69.49 6.3 98. October 2008.4 78.5 57.65 6.0 104.00 2007 9.3 63.03 5.7 71.5 79.71 9.33 3.3 2006-07 As per As per Sanction Utilisation 61.28 5.8 57.6 79.14 8.1 116.30 5.6 78.2 71.0 62.1 42.09 8.9 67.3 34.4 39.9 51.2 99.8 Source : Report on Trend and Progress of Banking in India 2007-08.24 4.9 63.7 39.7 78.5 80.3 36.76 2. RBI 220 .46 6.4 76.2 33.7 80.8 69.4 82.50 12.7 50.4 94.3 75.4 72.00 Source : Reserve Bank of India Bulletin.77 3.3 78.4 70.24 100.7 123.14 : ICD Ratios of Scheduled Commercial Banks 2005-06 As per As per Sanction Utilisation Haryana Punjab Rajasthan Bihar Jharkhand Orissa West Bengal Chhattisgarh Madhya Pradesh Uttar Pradesh Uttarakhand Gujarat Maharashtra Andhra Pradesh Karnataka Kerala Tamil Nadu All India 63.2 71.21 6.6 56.28 4.5 95.9 37.92 6.70 13.1 92.54 5.8 74.3 103.5 95. crore) 2006 10726 5513 7724 3147 6573 6230 6304 10323 4653 4857 8242 8059 15755 11823 123930 2007 11465 4996 7150 2922 6143 6553 6383 10892 4074 5221 8020 8318 16479 11468 124141 Percentage Share 2006 8.3 82.02 5.4 90.7 79.7 119.8 73.7 71.8 96.54 100.1 36.9 70. Table 6.4 35.27 9.9 52.5 104.35 4.23 2.6 74.95 5.

In 2006-07.26 2005-06 62 51 53 59 57 56 2006-07 63 57 54 57 58 58 30/09/07 62 54 49 59 53 55 ID Ratio Source : State Level Bankers' Committee.15 shows the CD ratio and the ID (Investment: Deposit) ratios of these 5 banks and Table 6.04 52. Bihar had an ICD ratio of 57.57 40. Madhya Pradesh (74.83 47. Nevertheless. each serving a particular zone: Madhya Bihar Kshetriya Gramin Bank (sponsored by the Punjab National Bank).6 Regional Rural Banks (RRB) There are 5 Regional Rural Banks (RRB) in Bihar.94 35.24 40. Table 6. even the ICD ratio of Bihar is much lower as compared to that of states like Rajasthan (104. 2007.35 percent. Samastipur Kshetriya Gramin Bank (sponsored by the State bank of India).42 44.68 52. 6.5 percent).9 percent.4 percent) as well as the national average of 79. compared to its CD ratio of 32.56 39. Uttar Bihar Gramin Bank and Kosi Kshetriya Gramin Bank (both sponsored by the Central Bank of India) and Bihar Kshetriya Gramin Bank (sponsored by the United Commercial Bank).36 34.70 36. Among them. these banks employed a total of 6141 staff members in their 1487 branches.51 38. while the ID ratio is the highest for the Madhya Bihar KGB which also has the highest share of loans among all the 5 RRBs.As of March 2007. Their total accumulated losses ran into about Rs.26 30/09/07 39. agricultural as well as non-agricultural.15 : CD and ID Ratios of RRBs CD Ratio RRBs 2005-06 Madhya Bihar KGB Samastipur KGB Kosi KGB Uttar Bihar KGB Bihar KGB Total 32.4 percent) and Orissa (82.16 depicts the amount of loan given during 2005-06 to 2007-08. nearly 86 percent of which are located in rural areas. the Kosi KGB has the highest CD ratio of 52 percent.99 2006-07 39.80 48. Table 6.20 37. GOB 221 .8 percent. 583 crore as on March.84 34.51 42.

The inter-se distribution of credit among the different sectors showed only minor variations over the years indicating no structural changes in the pattern of credit flow within the state.5 2.6 100.7 Industry Share in Total Bank Credit Table 6.0 Total Bank Credit 100.0 Source : Money and Banking.8 21.5 33.6 0.9 12.8 percent) and trade (14.8 0. industry and manufacturing (22. Table 6.0 100.7 3.7 16.2 24.Table 6. Sept 2008.2 22.80 34.20 10.2 1.5 1.7 percent).5 14.17 : Sectoral Share in the Credit of Scheduled Commercial Banks in Bihar Sectors Agriculture Industry and Manufacturing Transport Operators Personal Loans Professional & Other services Trade Finance Miscellaneous Percentage share of credit 2002-03 2003-04 2004-05 20.8 9.2 2.88 100.5 2.00 Madhya Bihar KGB Samastipur KGB Kosi KGB Uttar Bihar KGB Bihar KGB Total Source : State Level Bankers' Committee 6.5 2005-06 2006-07 22.5 11.7 33.9 14.24 9.31 100.2 percent).1 31.8 1. crore) 2005-06 172 25 67 155 31 450 2006-07 359 38 99 256 38 790 2007-08 394 54 141 327 37 953 Percentage share 41.00 Agricultural loans (Rs.3 4.4 0.1 16. crore) RRBs 2005-06 247 49 102 264 77 739 2006-07 560 62 173 484 91 1370 2007-08 574 62 173 484 91 1370 Percentage share 66.6 5.0 100.9 14. It is to be noted that the highest share of credit was on account of personal loans that does not have much direct bearing on the level of economic activity within the state.17 shows the percentage share of different sectors of economy in the total credit of scheduled commercial banks in Bihar for the period between 2003-04 to 2006-07.34 5.31 3.67 14.9 19.43 4. finance and miscellaneous activities.0 100.3 3.0 0.82 9.7 18.16 : Loans Disbursed by RRBs Total loans (Rs.1 0. As on March 2007.4 27.8 percent) together account for 92.7 22.93 31.8 2.3 percent of the total credit.3 23.4 0. CMIE 222 .0 2. the rest being due to the loans to professionals and other services. Personal loans (31. agriculture (22.

18 : Outstanding Agricultural Advances Advances (Rs.02 — Source : State Level Bankers’ Committee Sectorial Share of Credit 100% 90% 80% Trade 70% 60% 50% 40% 30% 20% 10% 0% 2002-03 2003-04 2004-05 2005-06 2006-07 Personal Loans Industry and Manufacturing Agriculture Miscellaneous 223 .) Commercial banks 2580 3506 4257 5085 5153 RRBs 854 1195 1694 2249 2495 Cooperative 422 379 272 384 349 Total 3856 5080 6223 7718 7997 Growth (Percentage) 38. Table 6. This target has been achieved.20 31. as can be seen from the table. The progress achieved by the banks in Bihar in this regard is shown in the Tables 6.74 22.50 24.18. the credit flow to agriculture is to double over the three year period from 2004-05 to 2007-08.As per directions of the central government. crore) Year 2004-05 2005-06 2006-07 2007-08 2008-09 (till Sept.

57 87.37 82. Comm. ranging from 51.6. development of infrastructure in power and roadways would be necessary along with the revival of the Industrial Estates.2 percent for commercial banks.19 : ACP Achievement . crore) 4287 5041 6055 8738 10763 Achievement (percentage) 88. crore) 4842 6022 7334 10001 13100 Achievement (Rs.8 Advances under Annual Credit Plan (ACP) Under the ACP Plan of banks in Bihar.71 51. Banks RRBs Cooperative Banks Total Target Achievement Achievement (Rs. Overall achievement under the ACP was more than 82 percent. the total credit flow in Bihar has gone up from Rs.19 and 6.16 13100 10763 Source : State Level Bankers’ Committee Table 6. it is seen that there is wide variation in achievement percentage among the various bank groups. Table 6. 8738 crore in 2006-07 to Rs 10763 crore in 2007-08.16 Year 2003-04 2004-05 2005-06 2006-07 2007-08 Source : State Level Bankers’ Committee Table 6.20 72.20 : Agencywise Analysis of ACP Achievement (March 2008) Agencies Sch. of which agriculture accounted for nearly half the total priority sector advances and more than one third of the total advances within the state. For augmenting credit flow to this sector.21 presents the sectoral profile of credit deployment in 2006-07.82 82. 224 . It can be seen that the advances made to the small scale industries were very low. While the achievement has declined marginally in 2007-08. but it showed wide variations. The total credit flow in Bihar during the past four years is shown in the Tables 6.52 percent in the case of cooperative banks to 86.71 82. The priority sector advances constituted 62 percent of the total advances.53 83. crore) (Rs. crore) (percentage) 10240 2173 687 8827 1580 356 86.20.All Banks Target (Rs. registering a growth of 23 percent growth.

981 5.900 112.064 4.264 2.418 7.644 50.022 317.76 88.860 12.00 Sector Agriculture Small Scale Industries Other Priority Sector Advances Total Priority Sector Advances Non Priority Sector Advances Total Target Achievement Achievement (Rs.739 32.529 637.115 171.310 22.077 1.956 21.059 19.359 45.81 82.450 200.601 149.220 225. lakh) 423.328 2.340 Credit (Rs.127 9.899 53.929 7.154 29.820 18.816 13.750 State Haryana Punjab Rajasthan Bihar Orissa West Bengal Chhattisgarh Madhya Pradesh Uttarakhand Uttar Pradesh Gujarat Maharashtra Andhra Pradesh Karnataka Kerala Tamil Nadu India 225 .180 398. of PACS 571 3.9 Primary Agricultural Credit Societies Table 6.22 shows some selected indicators of functioning of Primary Agricultural Credit Societies (PACS) in different states.68 100.804 16.69 79.601 234.045 16.811 20.045 4.854 43.919 12.076 351.257 4.073 15.32 22.16 Source : State Level Bankers’ Committee 6.187 97.129 5.508 97.662 29.954 10.436 638.303 103.36 37.Table 6.89 5. Bihar is much behind the other states for obvious reasons.011 112170 1246529 249629 2.643 32.108 45.558.908 783.14 87.031 6.15 62.224 No.538 10.951 5.289 37.242 1.848 76. of villages covered 7.037 6. in terms of deposits and borrowings.168 Deposits (Rs.624.462 29. lakh) 29.098 43.93 62.404 938 8.925 6. Table 6.404 197.329 37. crore) (Rs.053 12.382 16.102 Ratio of villages to PACS 12 3 9 8 12 9 15 12 13 13 3 2 7 7 1 4 7 Total Staff 5. 2007) No.969 3. Though the ratio of villages to PACS in Bihar compares favourably with the national average.21 : Sectoral Share of Advances (2006-07) Share in Total Advances (Percentage) 34. crore) (Percentage) 4881 913 2688 8481 4619 13100 3755 573 2384 6712 4056 10763 76.115 228793 100.207 27.379 4.205 1.051 464.633 446 8.464 18.624 4.173 13.22 : Selected Indicators on Primary Agricultural Credit Societies (March 31.

15 50.94 4.33 73.05 57.16 Recovery as at endJune (Percent) 2006 99.35 -28.01 8.66 85.67 26. Table 6.09 23.96 21.29 1.85 16.15 71.01 315.50 5.51 6. The NPAs have increased from Rs 164 crore to Rs 267 crore between 2006 and 2007 and the recovery percentage has declined from 51.88 5.55 14.02 2007 25.45 133.71 10.93 868.51 48.47 92.24 21.57 2007 99.65 State 6.08 37.13 185.05 96.78 19.10 14.05 percent during the same period.77 42.31 94.80 6704.37 9.39 6.03 51.79 78.93 2007 5. there has been a phenomenal increase in the volume of Non-Performing Assets (NPAs) in Bihar during the last financial year.23 shows the working results of State Cooperative Banks in the major Indian states.84 99.71 98. There was also a similar increase in the volume of Non-Performing Assets (NPAs).43 2847. Here also.23 31.41 2.21 12.49 94.18 2367.82 267.9 percent.86 83.00 NPAs as percentage to Loans Outstanding 2006 0.15 86.29 93.99 10.46 16.0 percent.08 177.33 6.28 56. The recovery percentage in Bihar is very low and.39 17.38 30.23 97.74 242.26 55.63 23.07 6.18 1.70 27.13 123.62 2.27 99.77 287.47 21. crore) 2006 Haryana Punjab Rajasthan Bihar Orissa West Bengal Madhya Pradesh Uttar Pradesh Gujarat Maharashtra Andhra Pradesh Karnataka Kerala Tamil Nadu India 37.05 77.78 275.58 13.65 18.20 1134.35 to 36.30 15.71 85.11 66.71 6734.36 6. but even this marked a significant improvement over 2006-07.69 97.67 5.76 92.23 95.60 430.6.02 116.33 98.24 shows the working results of State Cooperative Agriculture and Rural Development Banks (SCARDB) in the major states in India.05 98.94 8.22 2. when the recovery percentage was only 1.11 State Cooperative Agricultural and Rural Development Banks (SCARDB) Table 6.84 2007 0.56 2.23 : Working Results of State Cooperative Banks Profit/Loss (Rs.31 30.79 21.85 164.68 5.31 87.22 58.28 -2. crore) 2006 5.87 percent.59 28.05 87.36 1.48 262.86 98.02 371.09 504.00 26.11 129.69 14.18 1. All these have caused substantial drop in the performance of the cooperative banks in Bihar.16 14. the recovery percentage in Bihar is a very low at 16.82 22.08 9. 226 .06 92.12 36.10 State Cooperative Banks Table 6. compared with the all India average of 43.25 Total NPAs (Rs.86 78.

14 52.28 23.1 Recovery as at end-June (Percent) 2006 69.49 1366.96 195.53 249. sublimits are also fixed at the discretion of lending banks. state cooperative banks.29 169. incorporating the name.65 26.64 304.45 178.41 13.3 State Profit/Loss (Rs. crore) 2006 -48. The scheme is being implemented in all the states by all commercial banks.25 252.67 40. introduced in 1998-99.93 43.99 99.8 2007 866.13 327.6 15.9 49.00 -0.21 16.38 330. RRBs.12 36.95 213. The production credit limits are fixed taking into account the entire production credit needs for a full year.39 0.76 90.87 50.25 41.87 16.9 6.24 : Working Results of SCARDBs (end March) Number of branches 2007 Haryana Punjab Rajasthan Bihar Orissa West Bengal Madhya Pradesh Uttar Pradesh Gujarat Maharashtra Karnataka Tamil Nadu India 0 0 7 151 5 2 7 342 181 23 18 868 NPAs as percentage to Loans Outstanding 2006 24.4 2007 96.24 0.29 211.61 15.69 99.95 89.6 36.45 88.12 1.00 3. borrowing limit and the validity period.43 30.03 53.06 0.26 15.12 Kisan Credit Cards (KCC) The KCC scheme. Crop loan and short-term credit are in the form of a revolving cash credit facility.72 430.58 0.89 12.7 2007 45.54 0 25.29 1144.35 1.52 0.68 Total NPAs (Rs.69 94.97 56.45 1.15 33. crore) 2006 504 0 378.73 22.62 69.41 68. central cooperative banks and primary agricultural cooperative societies.32 13.49 53.46 2067.15 -28.25 1.00 -3.67 15.29 485.35 25.53 32.5 65.21 5643. The KCC now covers short term loan for agriculture and allied activities as well as working capital requirements for cropping.93 27.01 46.88 30.14 206.Table 6.5 2007 -33.95 40.03 27.16 112.33 52.14 0.79 42.75 5778.23 13. involving any number of drawings and repayments within the limit fixed on the basis of operational landholding.44 38. plus ancillary activities relating to crop production.64 18.71 27. 227 .24 27.19 -119.01 10.46 31.13 89. Beneficiaries covered under the KCC are issued with a credit card and a passbook or a credit card-cum-passbook.69 892. aims at providing crop loans to farmers in a flexible and cost-effective manner.77 17. address and particulars of land.57 328.64 0.12 56.95 83.08 37. cropping pattern and scale of finance.

Overall.83 51.42 28.47 Target 46900 28617 52738 60918 64535 150500 129719 190000 228000 478571 1430498 RRBs Achieve ment 4591 13576 14256 24441 30864 76891 66332 140071 168529 107045 646596 Percentage 9. The cooperative banks.14 37.16 34.53 56. Table 6.50 15.78 112.49 81.03 40.76 53. the achievement figures were consistently high during the entire period.90 45. the RRBs have been showing higher performance of late.25.92 22.72 73.The number of KCCs issued by banks in Bihar during the period from 1999-00 through 2008-09 are shown in Table 6.98 90.79 52.03 78.44 27.28 41.12 47.08) Total Target 0 180000 277204 600000 425839 470350 293166 160000 160000 160000 2726559 Achieve ment 0 107094 42086 112580 229051 245907 120653 55374 75533 27422 1015700 Percentage 0. GOB 228 .90 64.09 51.16 13.07 percent of the target for the entire period.61 47. While for the commercial banks.11 42. are yet to gear up fully for the job.79 47. the achievement in the state has been only around 45.81 16.18 18. however.82 54.30 60.27 59.58 80.25 Target 146567 310118 440149 759098 595904 795700 566751 600000 688000 1500000 6402287 Total Achieve ment 47347 186420 186692 214564 355502 465744 318603 399380 466540 253517 2885271 Percentage 32.52 91.20 Cooperative Banks Year 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 (Sept.08) Total Target 99667 101501 110207 98180 105530 174850 143866 250000 300000 861429 2245230 Achieve ment 42756 65750 123465 77543 95587 140793 131618 203935 222478 119050 1222975 Percentage 42.22 66.56 67.07 Source: Directorate of Institutional Finance.21 17.57 74.66 58.00 59.14 73.25 : Number of Kisan Credit Card Issued by Banks Commercial Bank Year 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 (Sept.37 45.

6.0 Source : Report on Trends and Progress of Banking in India.30 15. NABARD had sanctioned 9.13 National Bank for Agriculture and Rural Development (NABARD) NABARD has a mandate for facilitating credit flow for development of agriculture.39 5733. of which as many as 7.50 4. cold storage chains and other rural infrastructure projects.11 Percentage 28.595 crore (61.20 12908.86 27.372 projects in the state under the RIDF. The fund is maintained by NABARD.86 Percentage 29. In addition. Till the end of 2007-08. The RIDF was set up by the government in 1995-96 for financing ongoing rural Infrastructure projects.54 12.37 9. Table 6.88 20271. village and cottage industries.28 28. soil conservation. The total credit disbursed by NABARD by 229 . 2007-08. Domestic commercial banks contribute to the fund to the extent of their shortfall in stipulated priority sector lending to agriculture. RBI Till December 2007. created to compensate for the shortfall in commercial banks’ lending to strengthen rural infrastructure and to provide loans to state governments for projects relating to irrigation. 74. The main objective of the fund is to provide loans to state governments and state-owned corporations to enable them to complete ongoing rural infrastructure projects. agroindustries.32 100. crore) Southern Region Western Region Northen Region Central Region Eastern Region North Eastern Region All India 21223.65 14.52 45594. out of which only Rs 45.57 1716.26. watershed management. as shown in Table 6. It also coordinates the operations of rural credit institutions by offering training and research facilities.66 6885. handicrafts and other rural crafts by providing refinance to lending institutions in rural areas.043 crore.76 100.26 : Cumulative Disbursements under RIDF till March 2008 Sanction Amount (Rs. it manages the Rural Infrastructure Development Fund (RIDF).55 percent) have been disbursed.71 3203.0 Disbursement Amount (Rs.58 3.31 9.36 11480.87 11007.29 4349. crore) 13463. drinking water supply.89 7423.951 are related to minor irrigation.53 16.63 74073. thirteen branches of RIDF have been released covering total cumulative sanctions for Rs.

9 0. rural health centres and primary schools. animal husbandry and modern abattoir. Such shortfall in disbursements of RIDF funds as compared to sanctions continues to remain a matter of concern in the implementation of RIDF. 230 .21 70. social sector investments (rural health. flood protection.19 69.23 23. The total disbursements made by NABARD under the various tranches of the RIDF in Bihar is shown in Table 6.28. rain water harvesting etc. seed/agriculture/ horticulture farms.52 30.08 1. 747 crore out of total sanctioned amount of Rs 2309 crore.55 0.64 3.22 55. drainage.99 0 5.49 0. etc.21 11.48 0 19.75 184.27.47 11.62 2. Other activities include rural market yards.27 5. mini hydel plants. community irrigation wells for irrigation purposes for the village as a whole.37 0 0 2.06 51. watershed development/ reclamation of waterlogged areas.62 10..84 1. details of which are given in Table 6.21 4. or 31.9 1. plantation and horticulture. Table 6.way of refinancing the banks amounted to Rs 184 crore during 2007-08.99 33. market yard/godown. apna mandi. rural connectivity (roads and bridges).08 117.86 3. leaving a huge shortfall between sanction and disbursement. crore) Purpose Minor Irrigation Farm Mechanisation Swarnjayanti Gramin Swarojgar Yojna Dairy SC/ST Action Plan Self Help Groups Pradhan Mantri Rojgar Yojana Rural Non–Farm Sector Others Total 2004-05 2005-06 2006-07 2007-08 96. grading and certifying mechanisms such as testing and certifying laboratories.05 The scope of RIDF has been widened to include activities in agriculture and allied sectors including irrigation projects.88 0.09 0.48 24.27 : Sectorwise Refinancing by NABARD in Bihar (Rs.45 Source : Data from NABARD 55. shishu shiksha kendras. soil and water conservation.8 8. rural haats and other marketing infrastructure. riverine fisheries. anganwadis and system improvement in the power sector.19 percent of the sanctioned amount have been disbursed till March 2008. fishing harbour/jetties.97 176. forest development. education and drinking water). Only Rs.91 10.22 15. cold storage.76 156.

Bihar is gradually catching up with other states in SHG-Bank Linkages. crore) 12.22 123. an impressive cumulative number of 141.02 198. have emerged as the major microfinance programme in the country.46 747. As on March 31. especially the kind of poverty caused by weak rural infrastructure.41 589. This is particularly true in Bihar where these programmes help only a fraction of the poverty-stricken population. microfinance is a potent alternative for poverty alleviation.91 459. To succeed. 2007-08.12 crore. 231 . implemented by commercial banks.14 Micro Finance Many third world countries are increasingly realizing that the conventional government run antipoverty programmes cannot make a serious dent on poverty.Table 6. However.377 SHGs were credit-linked to banks and the total credit flow to these SHGs was Rs. RBI 6.63 26. 2008 Sanction RIDF Tranche RIDF I RIDF III RIDF VII RIDF VIII RIDF IX RIDF X RIDF XI RIDF XII RIDF XIII Total Amount (Rs.17 57. creating adequate awareness among the potential beneficiaries for this is the first prerequisite for the success of any such programmes.29.06 118.68 2396. crore) 22.90 621.24 290. microfinance should combine an innovative credit delivery mechanism that ensures viable financial services for the needy with a realistic assessment of the micro-enterprise opportunities in the state. 2008.28 : Sanctions and Disbursements in Bihar under RIDF till March. The yearwise progress made in credit linking of SHGs is shown in Table 6. RRBs and cooperative banks.50 51.54 181.69 154.93 58. In this scenario.28 41.69 97.93 37. The Self Help Groups (SHGs) and the SHG-Bank Linkage Programme. 296.30 Source : Report on Trends and Progress of Banking in India.06 Disbursement Amount (Rs.

Table 6. loans upto Rs.20 2006-07 26417 82.12 Source : State Level Bankers’ Committee Year Major handicaps in the spread of SHG-Bank Linkage Programme include the absence of reputed NGOs and low awareness about SHG lending among the stakeholders. crore) Up to 2004 16246 51.54 2007-08 68739 93. It is expected that. but excluding direct agricultural operations 232 .164 RRBs Madhya Bihar KGB Samastipur KGB Kosi KGB Uttar Bihar KGB Bihar KGB Total Source : State Level Bankers’ Committee 6. for the sensitization programme. 1993 to provide sustainable self-employment opportunities to 1 million educated unemployed youth in the country during the Eighth Plan Period. Performance of RRBs in this area during 2007-08 shown in Table 6.15 Evaluation of Selected Government Schemes Pradhan Mantri Rojgar Yojana (PMRY) : The scheme was first launched on October 2.386 Amount of credit (Rs.00 lakh for business sector and Rs.14 Total 1.41. Under the scheme.30 : Microfinancing by RRBs (2007-08) Number of SHGs with banklinkage 15725 1502 8465 1610 4084 31. including agriculture and allied activities.00 lakh for other activities are to be provided by banks for all economically viable activities.42 2005-06 18206 31. of SHGs Amount of linked with credit bank (Rs. initiatives taken by NABARD and other implementing banks shall result in creating a favourable environment towards the SHGs movement in the state.30 Table 6. 1. 2. crore) 950 49 488 0 1677 3.29 : Microfinancing in Bihar No.82 2004-05 11769 37.377 296.

000 18. from which we can infer that the achievement of the state has at best been moderate. Under SGSY. basic infrastructure and marketing etc.204 9. training.31 : Target and Achievement under PMRY Year 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 Total Target (No. in coordination with the Department of Rural Development. loans.981 57.57 51.000 Achievement (No.06 58. technology.76 76. banks have been participating in the scheme in a substantial way.like raising crops.000 25. physical targets for both individuals and SHGs are allocated to banks. purchase of manure etc.74 68.31.618 Achievement (percentage) 45. in 1999.000 11. The prime objective of the scheme is to ensure uplifting of beneficiaries above the poverty line through persistent growth in their income for a long period of time. Consequently.671 7.33.400 15.63 117.) 8.900 67. The performance of banks under the SGSY is shown in Tables 6. apart from the financial targets.66 Source : State Level Bankers’ Committee Swarnjayanti Grameen Swarozgar Yojna (SGSY) : For the effective alleviation of poverty through providing self-employment to the poor of the country.100 14.119 14. the government has decided to restructure the self-employment programmes being implemented in the country. In case of SGSY scheme. Table 6. In Bihar. The Union Ministry of Finance has introduced a mechanism to evaluate the development outcome of all the major programmes by way of converting financial outlays into measurable and monitorable outcomes.400 16.191 8. The achievements under the scheme in Bihar during the last 6 years are given in the Table 6.) 18.24 56. one item that is measurable and of immense significance is the total number of Swarojgaris assisted (both the SHGs and the individuals).366 9. a new programme named Swarnjayanti Gram Swarojgar Yojna (SGSY) was launched. 233 . This is a comprehensive programme that includes all aspects of self-employment such as organizing the poor to form Self-Help Groups (SHG).13 63.812 10.32 and 6.

97 — — Target Proposals Received Proposal Sanctioned Proposal Disbursed Achievement in Percentage (Sanction/Target) Achievement in Percentage (Disbursement/Target) Proposal Returned/ Rejected Proposal Pending for Disbursement Source : State Level Bankers’ Committee Table 6.) Achievement (Percentage) 2006-07 9. there were huge shortfalls in respect of individuals.37.87 42.41 1.897 1.040 18. without which the achievement of physical/ financial targets does not necessarily translate into real uplifting of the poor households.32 : Performance of Banks Under SGSY: Individuals 2006-07 Amount Number (Rs.46 — — 2007-08 Amount Number (Rs.0 Source : State Level Bankers’ Committee In a recent meeting. not adequately addressed in the states.88.99 85. credit mobilization and disbursal under the SGSY. crore) 1.81 5509 3231 39.460 — 79.951 212.965 231.95 1.98 79.00 13.000 469.55 79. the Government of India has reiterated the importance of banks' roles on account of their responsibilities for sanction. crore) 1. Karnataka has successfully carried out an innovative experiment by establishing Rural Development and Self-Training Institutes (RUDSETIs) in each district for training the poor in income generating activities.499 123.01.720 187.04. Table 6.805 354.) Achievement (nos.893 281. The training and marketing support for rural products are two important elements.55 74.927 — 1.726 12230 126. The banks are to initiate steps to increase their outreach by expansion of their branches.13 40.19. for achievement of the target of complete elimination of poverty by 2015. 234 . especially in unbanked blocks.10 76.While physical targets were over-achieved in case of SHGs.33 : Performance of Banks Under SGSY (SHGs) Performance Target (nos.53 45. To address the training needs.0 2007-08 15.137 65.

Even other disadvantaged states like Uttar Pradesh. but the recovery of the priority sector advances was very low with more than half of the advances remaining unrecovered. the banking infrastructure in Bihar registered only marginal expansion. however the achieved targets do not reflect the changed economic scenario in the state. The priority sector advances made by the banks in the state constituted 62 percent of the total advances during 2007-08. 6. For SGSY and PMRY schemes.One of the problems plaguing the priority sector advances is the low rate of recovery of these advances.16 Summing Up During 2007-08. This also affects the financial viability of the banks. whether in respect of improving the investment climate or lifting a substantial number of the poor above the poverty line. which is a major source of worry for the banks. The per capita deposits and credits also remain one of the lowest in the country. 3 percent of total employees of scheduled commercial banks. The ICD ratios. Bihar remains one of the disadvantaged states in the country in banking. Achievement of the banks under the Annual Credit Plan was remarkable. though higher than the CD ratios. The CD ratio also remains one of the lowest at 32 percent and is way behind the national average of 72 percent. The recovery position in government sponsored schemes is even lower in comparison with priority sector advances. NABARD’s disbursement of loans under the RIDF was not even one-third of the total sanctioned amount. the non-performing assets of banks have increased substantially Among the national level financial institutions. and with only 2 percent share of total deposits and less than 1 percent share of the total bank credits in the country. The persistently low CD ratio is a cause for serious concern and needs urgent correction. Rajasthan and Madhya Pradesh had achieved far higher CD ratios. Microfinancing in the state 235 . The CD ratios across districts showed wide variations from as low as 21 percent to as high as 56 percent : there are five districts with CD ratios less than 25 percent. with agriculture sector alone claiming a share of 35 percent. A recovery rate of around 47 percent in 2006-07 in priority sector advances by the banks in Bihar implies large non-performing assets that seriously affect the viability of banks. Possibly due to a slowdown of the economy as a whole. still fall far short of the national average of 80 percent. The achievement of the Regional Rural Banks (RRBs) in this area was better than the scheduled commercial banks. With a share of less than 5 percent of the total number of bank branches in India. the recovery rates are only around 31 percent and 25 percent respectively in 2006-07.

Overall. In respect of the ACPs as well as the poverty alleviation schemes. Achievements made under anti-poverty schemes like PMRY and SGSY were annulled by the extremely low rate of recovery.has made good progress and there is immense scope for micro-finances to make significant inroads into the rural economy. At present. no such mechanism exists. there is urgent need for instituting a proper monitoring mechanism to ensure that the financial targets achieved actually translate into measurable and quantifiable improvement in the economic well-being of the beneficiaries. 236 . it appears that banking in Bihar is yet to start creating a real impact on improving the living standards of people and in ushering an investment climate in the state that alone can attract investments from the private sector and also from the other states. Banks can help immensely in creating the rural infrastructure for marketing and distribution and only then any meaningful public-private participation can emerge.

335 1.554 6.541 13.027 1.686 17.417 8.276 7.156 10.952 11.455 23.275 % ach Target 11 151 84 87 104 138 156 106 122 120 76 77 145 106 121 375 107 57 119 103 86 70 71 84 147 97 104 91 160 144 66 45 74 66 80 99 29 71 12 4.197 2.002 7.760 27.893 17.920 19.686 5.966 3.435 35.743 4.538 17.236 10.975 4.674 12.067 11.149 2.596 14.189 8.053 1.314 25.333 5 76 85 60 40 61 105 83 85 88 100 73 96 51 76 72 66 60 61 93 89 55 72 57 74 94 88 97 45 59 62 57 56 145 98 68 108 Small Scale Industries 6 375 533 1.286 38.431 181 1.184 4.201 27.725 7.383 33.643 12.991 17.380 487.632 12.864 32.649 268.192 6.657 8.875 16.019 9.035 11.757 2.332 4.670 4.401 5.721 10.066 636 1.372 10.037 661.916 7.664 4.493 16.697 18.534 10.990 2.658 8.161 1.574 683 537 353 488 2.260 7.840 358 325 1.821 10.503 2.785 22.738 16.899 19.) 237 .764 234.735 2.213 3.297 10.971 7.890 7.718 15.388 16.623 21.849 3.199 1.650 34.082 831 1.946 2.950 11.784 1.055 17.747 4.005 5.193 16.350 3.000 6.670 1.208 18.568 3.688 20.306 56.157 798 4.210 31.771 12.773 7.253 14.234 21.830 1.659 10.432 14.139 118 840 443 1.187 8 124 141 149 57 66 69 104 141 229 72 293 79 52 61 302 130 42 83 295 88 17 189 62 22 19 43 54 42 84 109 43 13 32 39 89 59 64 95 Other Priority Sector Achie 10 49.008 20.151 8.251 15.941 8.455 12.795 % ach 14 86 94 87 66 50 84 116 89 102 92 95 75 102 63 96 127 74 60 79 97 80 64 71 70 71 78 92 86 110 64 59 47 58 56 124 95 58 94 %ach Target Achie % ach Target 118 13.820 3.412 3.149 Achie 4 25.782 44.206 229 3.212 620 354 1.099 11.993 26.502 8.527 6.654 7.688 4.901 TOTAL Achie 13 91.494 6.595 11.993 2. Champaran Katihar Shiekhpura Banka Begusarai Bhagalpur Munger Sheohar Sitamarhi Khagaria Samastipur Total for Bihar Agriculture Target 3 21.505 7.477 18.673 4.967 370.303 69 106.628 96 13.962 25.764 26.250 15.977 6.909 751 120 1.780 2.037 3.498 3.042 14.301 768 1.960 12.760 8.518 11.422 688 1.931 18.284 1.454 9 71.427 4.009 848.557 10.952 4.738 6.794 5.274 23.909 546 2.714 8.012 16.622 21.348 13.445 27.043 9.020 9.825 11.669 4.422 3.926 6.724 1.000 4.839 31.146 8.678 10.878 4.570 7.147 4.253 7 528 792 990 1.762 16.383 7.160 30.966 91.003 667 2.116 1.028 5.076 8.242 346 2.987 1.529 8.098 2.875 21.892 1.336 6.050 14.119 19.895 2.796 9.342 17.080 3.472 2.924 132 1.977 1.705 10.425 5.608 5.194 1.857 15.431 7.216 25.272 4.298 4.437 7.796 8.595 4.Appendix Districtwise performance under annual credit plan (March.960 27.699 6.289 4.592 11. Champaran Gopalganj Madhubani Muzaffarpur Saran Siwan Vaishali W.120 2.703 10.775 15.738 16.908 1.979 7.514 12.057 4.112 (Contd.273 5.205 197 816 973 1.650 2.688 4.985 9.282 4.345 3.089 6. 2008) District Name 2 Patna Arwal Aurangabad Bhojpur Buxar Gaya Jehenabad Kaimur Lakhisarai Nalanda Nawada Rohtas Araria Jamui Kishanganj Madhepura Purnea Saharsa Supaul Darbhanga E.246 841 5.260 3.122 11.562 7.020 18.071 2.573 17.580 672 2.635 15.146 3.667 1.549 23.749 791 1.697 5.466 12.277 438 2.156 20.136 14.455 20.919 2.584 6.144 587 1.196 20.385 7.760 5.408 1.802 740 1.303 19.738 13.720 7.941 3.032 13.036 3.085 6.260 6.059 22.460 26.038 18.

732 12.051.513 9.683 12.091 20 64 98 92 70 61 96 118 96 86 86 105 86 104 75 106 135 80 76 106 99 87 75 81 76 80 86 94 99 100 61 75 61 71 55 125 122 67 100 3.765 29.834 33.172 34.620 19. Champaran Gopalganj Madhubani Muzaffarpur Saran Siwan Vaishali W.682 13.029 1.427 3.154 3.067 % ach 17 51 113 102 82 153 127 125 151 54 74 153 155 107 109 131 150 96 117 230 102 114 122 101 90 103 113 96 143 90 53 292 222 92 55 131 199 91 116 Target 18 294.094 5.879 22.222 10.887 10.648 10.Appendix : (Contd.050 38.368 12.145 5.155 4.546 4.793 9.190 2.661 67.444 15.032 12.349 25.635 5.049 16.271 32.642 35.045 7.676 9.669 30.963 390.549 4.515 11.995 4.880 12.916 3.232 51.717 11.070 40.310.701 14.285 34.327 17.037 9.848 15.663 35.022 20.423 11.988 17.167 5.525 6.386 8.131 570 5.178 29.962 24. Champaran Katihar Shiekhpura Banka Begusarai Bhagalpur Munger Sheohar Sitamarhi Khagaria Samastipur Total for Bihar Non Priority Sector Target 15 188.338 41.354 461.435 4.580 Achie 16 96.705 30.801 35.409 3.605 10.315 1.426 11.876 30.775 10.048 15.329 7.572 29.145 34.581 11.690 5.563 25.772 10.926 4.277 5.317 32.832 6.862 1.546 30.589 11.345 15.326 44.285 23.042 14.712 15.148 12.932 37.041 3.240 23.) District Name 2 Patna Arwal Aurangabad Bhojpur Buxar Gaya Jehenabad Kaimur Lakhisarai Nalanda Nawada Rohtas Araria Jamui Kishanganj Madhepura Purnea Saharsa Supaul Darbhanga E.743 15.087 8.634 2.877 7.568 27.139 3.786 4.301 14.421 10.101 7.824 22.088 38.641 16.228 8.000 238 .319 744 10.883 Grand total Achie % ach 19 187.518 17.351 27.560 7.866 1.047 6.987 43.236 1.730 2.508 16.289 8.586 989 3.030 6.105 14.390 32.114 23.608 18.813 24.183 9.170 15.279 29.112 8.846 4.484 40.282 5.572 35.174 12.547 44.647 10.410 2.512 5.507 14.607 1.454 15.425 41.995 35.689 10.546 38.315 6.752 2.558 4.007 33.969 3.

Finance is an all encompassing realm.CHAPTER VII PUBLIC FINANCE 7. At the same time. reducing cost of services and monitoring the outcome of all public expenditure are all essential functions of any government. it had also led to a number of pro-active steps beginning with the enactment of the FRBMA and achievement of fiscal targets indicated in the Act. All these require careful and valid measurement of the relevant parameters and aggregates. the process has slowed down a little towards the second half of the last fiscal. analysis. it is one of the ways of generating future optimism that includes a host of areas from strengthening government capacity for policy development and restructuring of administration to delivering the promised socio-economic deliverables. instead. especially in the social sectors of health and education. Due to the economic slowdown. a devastation from which the state is still recovering slowly.1 Introduction Public finance is not only about prudent fiscal management. it is also a theoretically consistent measurement of relevant parameters that is essential for proper examination. improving public sector performance. allocation of resources strictly according to economic and social priorities. during 2007-08. As a result. Last year had witnessed the devastation caused by the worst floods in the living memory. diagnosis and policy intervention in areas pertaining to state finances. the poor 239 . and developing physical and social infrastructure through which the state governmental can beget public goods in an efficient manner. The identification of the essential activities as well as the unproductive ones. It should be noted at the outset that the need for fiscal adjustment and continued fiscal consolidation by lowering borrowing requirements to meet the FRBMA targets had not only been recognized by the state government. the urgency is for an improvement of in the delivery of public services. The fiscal deficit no longer remains the key concern of the state government. As the catastrophe proved. and to improve the infrastructure of roads and electricity supply. but it did not affect the state finances and government’s policies in a significant manner. it also includes increasing accountability of the administrative machinery. the state government achieved significant fiscal correction due by the momentum given to the ongoing of reform process.

all loans raised by it by issue of treasury bills. share of central taxes assigned to the state. The state government’s resources alone are inadequate to create the infrastructure that should already have been in place in the state for accelerating the pace of growth. drinking water supply and sanitation etc. loans and grants from the central government. would suffice to build an effective insurance against any repetition of such calamity in future. Bihar today is facing the challenge of translating its outlays into measurable and quantifiable outcomes. It has enforced significant fiscal discipline in expenditure and enhanced its revenues to meet the requirements of enhancing social sector expenditure. the bottom line being that economic growth must be translated into human wellbeing. The constitution of the Thirteenth Finance Commission (TFC) and its deliberations have brought the focus on the vertical and horizontal imbalances afflicting the states. As per the provisions of the Article 266 of the Constitution. capital receipts. borrowings from the open market. and Bihar is particularly affected by such imbalances due to historical factors of backwardness. electricity.state of infrastructure needs to be improved urgently and no amount of increased budgetary allocation to the vital sectors like roads. The resources available to the state government consists of tax and non-tax revenues. loans or ways-and-means advances and all money received by it as repayment of loans are credited to the Consolidated Fund of the state government. No money can be spent out of the Consolidated Fund except with the approval 240 . Development can only be ensured through proper implementation and efficient usage of the allocated funds. not only among the states but also within different regions of the state to achieve a significant degree of equalization. These resources are utilized for either plan expenditure for development purposes or for non-plan expenditure on administration. all revenues received by the state government. irrigation and flood control. Being committed to fiscal responsibility and having substantially increased the capital outlays to create income generating capital assets in the economy. Only through a viable public-private partnerships in the field of infrastructure can the process of development and modernisation be carried forward expeditiously. payment of interests and servicing of its outstanding debt and also for providing grants and loans to local bodies. government companies and corporations. and collections from the Provident Fund and other deposits kept within the government account. The low buoyancy of the state’s taxes makes it imperative to link the transfers to existing disparities.

the analysis considers a set of ten major performance indicators relating to public finance and compares these indicators from Bihar with those of selected Indian states. Thereafter. from Rs 82 crore in 2005-06 to Rs 4647 crore in 2007-08. Flexibility and Vulnerability of State Finances. During the last 6 years.of the Legislature. and containing the interest payments.2. (vi) Expenditure on Salary and Pension. This has allowed the state government to increase its capital outlay threefold. the balance of which is not held separately. At the end. the state government had a deficit in its revenue account. but stands merged with the cash balance of the state government. the financial and fiscal performance of the state government have been analysed first by summarizing the receipt and expenditure of the state government. interest payment has always been well below Rs 4000 crore on an outstanding total liabilities of around Rs 47. 7. (ix) Per Capita Expenditure on Social and Economic Services and (x) Debt Management. (viii) Sectoral Expenditure. but in 2004-05. This is shown in Table 7. the state government projected to keep it at almost the same level. No legislative authorization is required to withdraw any money from the Public Account. All other money received by or on behalf of the state government are credited to the Public Account of the state under Article 266(2) of the Constitution. a Contingency Fund of the nature of an imprest with a fixed corpus that can be created by the Legislature under Article 267 of the Constitution to meet unforeseen expenditure. (v) Expenditure Management. pending their subsequent authorization by the Legislature. efficient debt management. (iii) Revenue Receipts and Expenditure. but by increasing the revenue (especially since 2005-06). Till 2003-04. there are two separate funds managed by the state government — first.649 crore as on March 2009. (iv) Resource Moblisation. efforts have been made for a micro level analysis of expenditure in respect of a few sectors. 241 . (vii) Quality of Expenditure. for the first time Bihar had a revenue surplus that was more than Rs 1000 crore. as shown in Table 7. (ii) Deficit Management. Other than this. In this chapter. This surplus has been increasing continuously. The state government finances will then be analysed with reference to (i) Sustainability.2 Overall Financial Position Table 7. This has been made possible not by squeezing the expenditure necessary for maintaining the pace of development.1. In the budget estimates of 2008-09 also.1 and the accompanying chart unravel the story of Bihar’s gradual financial turnaround. The gross fiscal deficit of the state government after borrowings on the Consolidated Fund is met by drawing down the balances in the Public Account.

compared to three times 4 years ago. again within the FRBMA target. besides on pension and interest payments. 242 . The increase in GFD in 2008-09 is primarily due to the increase in capital outlay by more than Rs 1500 crore. it was in 200506 that the state government enhanced its spending very substantially on social and economic services as also more than doubled the capital outlay. the GFD will be contained at 2. which is in keeping with the state’s reform agenda.62 percent. as of March 2008. even in the budget estimates of 2008-09. well within the FRBMA target of 3 percent. As a percentage of Gross State Domestic Product (GSDP). the non-plan expenditure was less than twice the plan expenditure.96 percent of the GSDP. The gap between plan and non-plan expenditure has also been closing since 2005-06. In fact.64 to 1.15 percent in 2007-08. The year 2005-06 also marks the beginning of a declining Gross Fiscal Deficit (GFD). At the same time. The state has achieved the FRBMA target of eliminating the revenue deficit far ahead of the target date of 2008-09. it came down from 4. from Rs 3700 crore in 2005-06 to Rs 1703 crore in 2007-08. 2005-06 marks a watershed in the finances of the state government signifying an earnest beginning of reforms in public finances. from Rs 5653 crore in 2003-04 to Rs 1612 crore in 2007-08. The state government has particularly focused on its debt management in recent years. while expenditure on general services was contained nearly at the existing level. the outlay for 2008-09 is projected to reach Rs 7635 crore as per budget estimates. discharge of high cost debt has caused the average interest rate on debt to come down from more than 9. the interest payments have also been contained at nearly the same level by reducing borrowings. There were only some increases on district administration. police and public works. as discussed later. While the total debt stock in the economy has not been allowed to increase.59 percent in 2004-05 to 7.from Rs 2084 crore in 2005-06 to Rs 6104 in 2007-08.

Table 7.1 : Receipts and Expenditure of the Bihar Government
Sl. No.

Rs. crore 1 Total Receipts Revenue Account a Tax Revenue b Non Tax Revenue c Grants in aid and contr. 2 Total Expenditure Revenue Account a General Services, of which Interest payments b Social Services c Economic Services 3 Revenue Deficit 4 Capital Receipts a Public Debt etc. b Recovery of Loan and Advances 5 Capital Expenditure, of which Capital Outlay 6 Total Expenditure a Plan Expenditure b Non Plan Expenditure 7 Gross Fiscal Deficit 8 Primary Deficit 9 Total Borrowings a Internal Debt Receipt b Loans from Central Government 10 Repayment of Public Debt 11 Debt Outstanding 12 GSDP 13 GDSP Growth (%) As percentage of GSDP 1 Total Receipts Revenue account a Tax Revenue b Non Tax Revenue c Grants in aid and contr. 2 Total Expenditure Revenue Account a General Services, of which Interest payments b Social Services c Economic Services 3 Revenue Deficit 4 Capital Receipts a Public Debt etc. b Recovery of Loan and Advances 5 Capital Expenditure, of which Capital Outlay 6 Total Expenditure a Plan Expenditure b Non Plan Expenditure 7 Gross Fiscal Deficit 8 Primary Deficit 9 Total Borrowing a Internal Debt Receipt b Loans from Central Government 10 Repayment of Public Debt 11 Debt Outstanding

2003-04 12456 10518 320 1618 12711 7175 3343 4033 1498 255 7930 7920 10 9771 1549 22482 5202 17280 4363 1020 7920 7100 820 5653 34401 66254 1.93 18.80 15.87 0.48 2.44 19.18 10.83 5.05 6.09 2.26 0.39 11.97 11.95 0.02 14.75 2.34 33.93 7.85 26.08 6.59 1.54 11.95 10.72 1.24 8.53 51.92

2004-05 15714 12465 418 2832 14638 7803 3474 4795 2036 -1076 7641 7626 15 5420 1205 20058 3476 16581 1242 -2232 7626 5972 1654 3087 39344 73221 10.52 21.46 17.02 0.57 3.87 19.99 10.66 4.74 6.55 2.78 -1.47 10.44 10.42 0.02 7.40 1.65 27.39 4.75 22.65 1.70 -3.05 10.42 8.16 2.26 4.22 53.73

2005-06 17838 13983 522 3333 17756 8523 3649 6862 2367 -82 3821 3770 51 4812 2084 22568 4899 17670 3700 51 3770 3769 2 981 42498 80157 9.47 22.25 17.44 0.65 4.16 22.15 10.63 4.55 8.56 2.95 -0.10 4.77 4.70 0.06 6.00 2.60 28.16 6.11 22.04 4.62 0.06 4.70 4.70 0.00 1.22 53.02

2006-07 23083 17325 511 5247 20585 8643 3416 7917 4021 -2498 2365 2358 7 6551 5211 27136 9397 17740 3021 -395 2358 2355 3 1025 44226 98957 23.45 23.33 17.51 0.52 5.30 20.80 8.73 3.45 8.00 4.06 -2.52 2.39 2.38 0.01 6.62 5.27 27.42 9.50 17.93 3.05 -0.40 2.38 2.38 0.00 1.04 44.69

2007-08 28210 21852 526 5832 23563 9252 3707 9868 4438 -4647 1638 1612 26 8008 6104 31571 10908 20664 1703 -2004 1612 1144 468 1632 44475 105148 6.26 26.83 20.78 0.50 5.55 22.41 8.80 3.53 9.38 4.22 -4.42 1.56 1.53 0.02 7.62 5.80 30.03 10.37 19.65 1.62 -1.91 1.53 1.09 0.45 1.55 42.30

2008-09 33551 24353 422 8776 28938 10901 3796 12689 5343 -4613 4522 4500 22 9636 7635 38574 15746 22828 3325 -471 4500 4493 8 1676 47649 112424 6.92 29.84 21.66 0.38 7.81 25.74 9.70 3.38 11.29 4.75 -4.10 4.02 4.00 0.02 8.57 6.79 34.31 14.01 20.31 2.96 -0.42 4.00 4.00 0.01 1.49 42.38

243

R e v e n u e a n d E x p e n d itu r e o f B ih a r G o v e r n m e n t ( R s C r o r e )
40000 35000 30000 25000 20000 15000 10000 5000 0 2 0 0 3 -0 4 2 0 0 4 -0 5 2 0 0 5 -0 6 2 0 0 6 -0 7 2 0 0 7 -0 8 2 0 0 8 -0 9

T o ta l R e c e ip ts R e v e n u e a c c o u n t T ax R evenue N on Tax R evenue G ra n ts in a id a n d c o n tr. T o ta l E x p e n d itu re R e v e n u e A c c o u n t

7.3 Fiscal Performance Revenue deficit and capital deficit represent the excess of expenditure over receipts under the revenue and capital accounts respectively. The conventional budget deficit is the algebraic sum of the revenue and capital deficits, but this does not actually show the total resource gap in the economy, as it includes the borrowings under the capital receipts. The overall resource gap is reflected by the Gross Fiscal Deficit (GFD) which is to be bridged by borrowings of one sort or another. For analyzing the fiscal performance of the state government, the present analysis has used the following eight indicators : (i) Ratio of Revenue Deficit to GFD.

(ii) Ratio of Capital Outlay to GFD. (iii) Ratio of Non-Development Expenditure to Aggregate Expenditure. (iv) Ratio of Interest Payment to Revenue Expenditure. (v) Ratio of State’s Tax Revenue to Revenue Expenditure. (vi) Ratio of State’s Non-Tax Revenue to Revenue Expenditure. (vii) Ratio of Gross Transfer from Central Government to Aggregate Expenditure. (viii) Ratio of Debt Servicing Expenditure to Gross Transfer from the Central Government.

244

A brief analysis of these ratios is presented in the succeeding paragraphs. (i) Ratio of Revenue Deficit to GFD : This ratio indicates the extent to which the Revenue Deficit contributes to GFD. Ideally, the revenue account should leave a surplus for creation of capital assets. As noted already, there were surpluses in the revenue account since 2004-05 that enabled the capital expenditure to be increased continuously, especially on state highways, rural roads, water supply and sanitation, urban development as well as on irrigation and flood control. Very few states have managed a substantial surplus for all these years; Rajasthan has a small working surplus whereas West Bengal and Kerala had deficits in their revenue accounts in all these years. Maharashtra had a large revenue deficit in 2007-08. (ii) Ratio of Capital Outlay to GFD : As an obvious consequence of the improvements in its revenue accounts, Bihar has increased Capital Outlay to GFD ratio to more than 100 percent during the last three years. Only a few other states like Rajasthan, Kerala, Tamil Nadu and Gujrat could repeat this feat. The situation in respect of Maharastra is a cause of concern owing to its high negative ratio in 2007-08. (iii) Ratio of Non-Development Expenditure to Aggregate Expenditure : The non-development expenditure is incurred mainly for administrative services, whereas development expenditure is incurred for social and economic services. The former should preferably be a small proportion of the total disbursements. In Bihar, non-developmental expenditure, mainly in the form of non-plan expenditure, constituted about 30 percent of the total expenditure during the period from 2006-07 to 2008-09. All the other states have also returned comparable figures. (iv) Ratio of Interest Payment to Revenue Expenditure : Historicaly, interest payments constituted a perennial burden on the finances of the state government, because of its heavy indebtedness. For Bihar, however, interest payments have been an ever decreasing proportion of the revenue expenditure since 2003-04. The budget estimates of 2008-09 reports it to be only 13 percent. A perceptible decrease in the ratio has taken place after 2005-06. Other states also show similar ratios excepting West Bengal, for which the ratio is substantially higher at around 30 percent. (v) and (vi) Ratio of State’s Own Tax and Non-Tax Revenue to Revenue Expenditure : These ratios obviously indicate the self-sufficiency of the state government vis-à-vis its revenue expenditure needs. For the period from 2003-04 to 2008-09, state government's own tax and nontax revenue receipts together barely covered one-fourth of its total revenue expenditure and in fact, this proportion has been on the decline. The position of almost every other state government is

245

better on this count; they raise more than 50 percent of their total revenue expenditure requirements from their own tax and non-tax receipts. The most notable case is Maharashtra, with close to 75 percent of its revenue expenditure being met from its own tax and non-tax sources. (vii) Ratio of Gross Transfers from Central Government to Aggregate Expenditure : This ratio brings out the state government's dependence on external resources viz., the central government. For Bihar, this dependency on central government for meeting its expenditure needs is very high. From around 40 percent in 2003-04, this ratio has increased steadily to as much as of 72 percent in last two years, indicating an overwhelming dependence of the state on the central government. None of the other states considered has such a high ratio. (viii) Ratio of Debt Servicing to Gross Transfers from Central Government : Till 2003-04, debt servicing used to consume a very substantial portion of the gross transfer from the central government. However, due to better debt management, this ratio has been brought down from more than 100 percent in 2003-04 to 22 percent in 2008-09. The performance of Bihar in this respect is significantly better compared to the other states. Gujarat, Kerala and West Bengal have ratios which are either close to or more than 100 percent, indicating that not only are fresh borrowings being used only for discharging the existing debt, but also that resources transferred from the central government as the states’ shares of central taxes are also being utilized for the purpose of servicing of the existing debt. This obviously makes the states starve of much needed funds for financing development projects. Andhra Pradesh, Rajasthan and Tamil Nadu also have very high ratios in respect of this fiscal indicator.
Table 7.2 : Major Fiscal Indicators (All figures in percent) State Bihar West Bengal Orissa MP Rajasthan Andhra Pradesh Kerala Tamil Nadu Maharashtra Gujarat A. Revenue Deficit : GFD 2006-07 2007-08 2008-09 -82.70 -272.78 -138.74 72.89 74.22 61.96 274.94 -150.99 -22.24 -405.35 -203.78 662.00 -33.97 -6.67 -41.45 -165.64 -7.53 76.38 68.97 67.29 59.85 116.29 -63.13 -1.46 -7.01 2478.36 -7.33 -31.29 -37.62 1.55 B. Capital Outlay: GFD 2006-07 2007-08 2008-09 172.50 358.31 229.63 17.67 17.84 30.51 -176.64 246.05 119.05 392.82 238.43 -216.78 155.48 147.30 141.03 250.77 96.96 -1.51 23.63 21.74 27.75 43.50 165.72 94.66 87.35 -2156.91 102.54 138.79 133.35 97.54

246

State Bihar West Bengal Orissa MP Rajasthan Andhra Pradesh Kerala Tamil Nadu Maharashtra Gujarat

C. Non-Dev Exp: Aggregate Disbursements 2006-07 31.85 39.48 38.78 31.24 34.77 33.00 38.98 33.91 16.46 30.90 2007-08 29.31 39.10 34.36 28.80 29.83 30.61 37.34 32.74 14.00 31.36 2008-09 28.26 39.32 36.13 30.07 32.20 25.98 36.44 31.65 22.76 31.71

D. Interest Payment: Revenue Expenditure 2006-07 16.32 31.84 20.21 18.01 26.95 18.08 20.12 11.90 19.84 23.71 2007-08 15.73 28.98 20.55 15.85 19.82 16.18 18.20 12.00 19.00 22.72 2008-09 13.12 28.52 18.99 14.23 20.25 13.39 18.17 10.74 16.45 21.34

State Bihar West Bengal Orissa MP Rajasthan Andhra Pradesh Kerala Tamil Nadu Maharashtra Gujarat

E. State’s Tax Rev : Rev Exp 2006-07 20.74 36.62 37.99 46.10 46.52 57.74 57.34 72.58 65.32 62.73 2007-08 21.58 34.14 34.08 44.18 42.97 56.40 53.54 64.14 70.38 65.36 2008-09 18.16 36.58 31.64 44.32 45.78 53.93 55.75 64.48 65.73 61.49

F. State’s Non-Tax Rev: Rev Exp 2006-07 1.65 3.66 16.41 11.89 13.75 15.65 4.50 8.94 12.25 16.93 2007-08 2.23 3.98 9.72 9.66 12.88 12.34 4.14 6.59 25.00 12.86 2008-09 1.46 4.08 9.40 9.56 11.29 12.63 4.57 6.37 8.50 11.21

State Bihar West Bengal Orissa MP Rajasthan Andhra Pradesh Kerala Tamil Nadu Maharashtra Gujarat

G. Gross Transfers: Aggregate Disbursements 2006-07 2007-08 2008-09 66.38 29.15 48.86 46.23 35.46 29.80 17.92 21.98 18.57 19.67 71.58 33.22 51.00 46.81 36.27 28.62 16.70 26.71 19.81 21.69 72.26 34.48 50.13 46.19 38.96 31.07 19.11 24.80 21.39 20.86

H. Debt servicing: Gross Transfers 2006-07 33.42 122.55 53.31 39.41 64.88 84.93 137.16 95.13 32.29 112.78 2007-08 27.23 104.44 48.79 38.21 54.82 78.41 151.14 63.24 27.55 101.50 2008-09 22.41 99.49 44.29 45.30 57.83 69.87 125.59 51.17 28.85 109.73

247

50 0 -50 -100 -150 -200 -250 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 -300
Revenue Deficit:GF D of Bihar

400 350 300 250 200 150 100 50 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 0
Capital Outlay: GFD of Bihar

45 40

30 25

35 30 25 20 15 10 Non-Dev Exp:Agg Disburse ments

20 15 10 5
Interest Payment: Revenue Expenditure

5

2003-04

2004-05

2005-06

2006-07

2007-08

25 20 15 10 5 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09

State's Tax Rev: Rev Exp

248

2008-09

2003-04

2004-05

2005-06

2006-07

2007-08

2008-09

0

0

3 2.5 2 1.5 1 0.5 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09
State's NonTax Rev: Rev Exp

80 70 60 50 40 30 20 10 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 0
Gross Transfers: Agg Dis.

120 100 80 60 40 20 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 0
Debt servicing: Gross Transfers

249

A positive BCR shows that the state government has surplus funds from its revenues for meeting plan expenditure. i. For Bihar. Bihar had a substantially positive BCR of Rs 5124 crore at the end of 2007-08. they meet the increased expenditure needs without substantially adding to the debt burden of the state. which is further projected to increase to Rs 5738 crore at the end of 2008-09. the ratio has touched a healthy figure of 220 percent.4 Sustainability. the ratio has fallen by more than half from more than 30 percent in 2003-04 to about 15 percent in 2008-09. Flexibility and Vulnerability of State Finances The analysis in the preceding section can be extended further to identify the factors that make a state government financially healthy and ensure its continued development. as that would indicate that capital receipts are utilized for revenue expenditure. plus share of Central Taxes. flexibility and vulnerability of the finances of the Bihar Government have been shown in Table 7. it can be broadly stated that non-plan expenditure represents the maintenance of the existing levels of activity. A higher ratio indicates a lower ability of the state government to service any fresh debt and meet its revenue expenditure from its revenue receipts. while plan expenditure entails expansion in the level of activity. It would then be necessary to know whether the means of financing these activities are sustainable. (ii) Interest Ratio : This is calculated as (Interest payment-Interest receipt) / (Total RevenueInterest receipt). The state governments increase their levels of activity primarily through the Five Year Plans which translate into annual development plans and are provided for in the state budgets.7. (i) Balance of Current Revenue (BCR) : This is calculated as state government's Own Revenue Receipts. It is. The positive trend was sustained and further enhanced in 2007-08 when it rose to 373 percent.e. For the first time in 2006-07. plus Non-Plan Grants. For development. Some of the factors which measure the sustainability.3 and are discussed in the succeeding paragraphs. however. it would be pertinent to examine the flexibility of the means of financing (increasing the revenue or by borrowing) and whether the expanded levels of activity expose the government to more risks and make it vulnerable to be influenced by the sources of funding. Thus. minus Non-Plan Revenue Expenditure. (iii) Capital Outlay/Capital Receipts : This ratio indicates to what extent the capital receipts are applied for capital formation. If the government wishes to expand the level of its activity. A ratio of less than 100 percent would not be sustainable in the long run. projected to come down to 169 percent in 2008-09 due to a substantially higher level of borrowings to pay for 250 . it is necessary that a government should try to expand the level of its activity..

the ratio of state government's Own Tax Receipt to GSDP remained the same at about 5 percent during the period from 2003-04 to 200809. as this ratio is very low. It must be mentioned that. (v) Public Debt/GSDP : This ratio indicates whether the state government has fallen into a debt trap from which it may not be able to come out on its own. amounting to nearly Rs 1500 crore.higher capital outlay. (iv) State Tax Receipts/GSDP : This is an important indicator of the gap between the state’s tax efforts and its tax potential. It can be noted here that the total debt which constituted about 40 percent of the GSDP in 2003-04 has now been successfully brought down to 34 percent in 2007-08. Bihar has a primary surplus. the state government falls into a debt trap. From 2006-07 onwards. the gap between this ratio and the ratio of Total Receipts/ GSDP indicate the extent to which the state government is dependent on the share of central taxes. the ratio used to remain below 20 percent. Further. A high ratio leaves little room for the state government for financial maneuvering and indicates lack of flexibility in its finances. A high debt-GSDP ratio takes away whatever little flexibility the state government has in respect of its finances and if it goes beyond a sustainable level. mostly due to the high debt service payments that used to consume most of the capital receipts. (vii) Financial Asset/Liability Ratio : This indicates the solvency of the state government and indicates its risk exposure and vulnerability. A low ratio also indicates low tax compliance and reliance on borrowings rather than taxation to meet the deficit. 251 . There has been substantial improvement in the ratio from 72 percent in 2003-04 to 96 percent in 2007-08. the ratio of Total Tax Receipts to GSDP increased from 19 percent in 2003-04 to 30 percent in 2008-09. prior to 2005-06. As already pointed out. This level is projected to be maintained in 2008-09 also. (vi) Primary Deficit : This is the GFD minus interest payments. For Bihar. However. It measures the impact of the current financial policies of the state government vis-a-vis the liabilities created in the past. Bihar is safe on this account. for which interest has to be paid now. which is again a positive indicator. The tax potential of Bihar clearly remains largely untapped. It cannot also be ignored that about one third of its revenue are always in arrears.

to that extent. though the tax potential remains substantially untapped and the tax efforts leave scope for improvement. the finances of the state government were on a much stronger footing than ever before in the past.(viii) Buoyancy of State’s Tax and Non-Tax Revenues : Tax receipts of the state government were highly buoyant in 2007-08 with respect to GSDP. This indicates that more than 60 percent of the capital receipts are actually going towards creation of income generating capital assets in the state. (ix) Capital Repayment / Capital Borrowings : This ratio indicates the extent to which the debt receipts meant for capital purposes could not be utilized for asset creation. the state government needs longer term measures to augment its own revenues including both tax and nontax revenues. higher resource mobilisation. These indicators continued to improve further in the succeeding years. the state government has been deprived of the scope of capital asset creation. However. as reflected by the parameters discussed above. It has given the finances of the state government an element of security against any future debt trap. turning around the fiscal position in 200708. though non-tax revenues showed no responsiveness to the increasing state income. But to improve financial security further. given the sudden and abrupt increase in buoyancy of the state’s own tax revenues in 2007-08. better expenditure management and. At the end of 2007-08. Tax revenues were buoyant. rather than increase in the income levels in the state. but the non-tax receipts showed no relation to GSDP. The contributing factors were substantial increases in the central grants and share of taxes. To summarise. For Bihar. The state government's finances had shown increased flexibility over the years it was in a much better position to direct its resources towards 252 . In fact. The sustainability parameters had improved significantly. the fiscal position of the state government had started showing significant improvements since 2005-06. it is more likely to be caused by factors like tax effort. All key fiscal indicators pointed to a marked improvement in the fiscal position of the state government. A higher ratio would indicate that a higher percentage of capital receipts has been utilised for capital repayment and. finally prudent debt management. it must be noted here that the growth of its revenue receipts (including the share of central taxes and grants) has been substantially outstripping the growth in outstanding liabilities since 2003-04. this ratio declined from more than 70 percent in 2003-04 to 37 percent in 2008-09.

20 53.51 2006-07 2999 18. Sustainability Balance from Current Revenue (Rs Crore) Interest Ratio Capital Outlay / Capital Receipts State's Own Tax Receipts / GSDP State's Own Non-Tax Receipts / GSDP Buoyancy of State’s Own Tax Receipts w.54 15. the state government still remains overwhelmingly dependent on the external resources.08 -82.66 -----42.04 4.74 ---------------- 253 .70 86.04 8.51 4.09 0.56 0.89 2004-05 -1076 1242 -2232 -179.15 44.15 42.35 220.92 2004-05 40.38 C.69 2.04 14.08 0.68 0.t.00 1345 32.21 2008-09 5738 15..07 0.50 4.49 -2.30 2008-09 37.00 1477 32.63 78.51 2007-08 -4647 1703 -2004 -117.02 13. i.89 0.r.48 2.65 0.37 26.00 ----------- 2008-09 -4613 3325 -471 -14.48 17.38 5.32 4.59 53.85 ----7.16 2005-06 685 24.3 : Fiscal and Financial Performance Indicators A.02 2006-07 43. GSDP Buoyancy of State’s Own Non-Tax Receipts w.21 80.00 51.24 20. Table 7.39 -2.75 -86.93 B.87 9.07 29.56 22.02 9.38 2.53 4.r.17 -138.62 4. Vulnerability Revenue Deficit (Rs Crore) Fiscal Deficit (Rs Crore) Primary Deficit (Rs Crore) Primary Deficit / Fiscal Deficit Revenue Deficit / Fiscal Deficit Financial Assets / Liabilities Arrears of Revenue (Rs Crore) Arrears of Revenue/ Total Own Revenue (%) 2003-04 255 4363 1020 23.41 2007-08 5124 15.38 0.44 0.04 7.77 13.52 0.01 17. GSDP Return on Investment (Rs Crore) Growth in outstanding liabilities Growth in total revenue receipts 2003-04 -638 30.44 8. however.25 21.56 2004-05 924 26.45 3.61 -272.70 19.47 17.41 0.e.00 1101 29.17 0.13 168.76 4.73 2005-06 26.84 0.38 15.78 96.57 1.improving the standards of social and economic services and infrastructure.94 2006-07 -2498 3021 -395 -13.45 13.28 2005-06 -82 3700 51 1.92 372.14 18. In terms of vulnerability. central funds.00 1357 41.19 0. Flexibility Capital Repayment / Capital Borrowings Total Tax Receipts / GSDP Average Interest Rate on Government Borrowing Debt Outstanding / GSDP 2003-04 71.78 7.56 -0.02 54.64 0.t.51 7.84 4. for meeting its own expenditure needs.69 2007-08 101.85 72.

the revenue deficit of Bihar was controlled effectively with the result that. crore) Conventional Deficit(+)/Surplus(-) 2006-07 1688 4105 -1019 -2803 -565 -9899 7387 -4735 12 472 2007-08 1724 174.4 shows the position in the revenue account as well as the combined position of the revenue and capital accounts of some major states for the years 2006-07 to 2008-09. from 2006-07 onwards. Andhra Pradesh and Madhya Pradesh have also consistently managed a surplus in the revenue account as well a surplus in their budgets. there was a growing surplus in the revenue account.37 297 -3435 -75 -17476 10833 -3098 -2986 -1413 2008-09 501 126 329 -5550 -1516 -22719 10296 -2022 -1638 646 State Bihar West Bengal Orissa MP Rajasthan Andhra Pradesh Kerala Tamil Nadu Maharashtra Gujarat 3000 2000 1000 0 -1000 -2000 -3000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 -4000 Convention al Deficit 2003-04 2004-05 2005-06 2006-07 2007-08 254 2008-09 500 0 -500 -1000 -1500 -2000 -2500 -3000 -3500 -4000 -4500 -5000 Revenue Deficit .7. Several other states like Rajasthan.4 : Deficit/Surplus position of States Revenue Deficit(+)/Surplus(-) 2006-07 -2498 8333 -2260 -3332 -638 -2806 2638 -2649 -810 -1769 2007-08 -4647 8138 -1682 -3346 -247 -451 4644 -976 -13631 -2034 2008-09 -4613 7370 -564 -2840 -1183 -708 3367 -85 -964 123 (Rs. due to this large surplus in the revenue account. the budget deficit could also be reduced from Rs 1724 crore in 2007-08 to only Rs 501 crore in the 2008-09. In the combined revenue and capital accounts of Bihar. Table 7. As noted earlier.5 Deficit Management Table 7.

However. from which one can find that capital outlay contributed most to GFD during the years 2003-04 through 2008-09. GSDP of Bihar (Rs Crore) 120000 100000 80000 60000 40000 20000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 GDP of Bihar (Rs Crore) 4500 4000 3500 3000 2500 2000 1500 1000 500 0 2003-04 2004-05 2005-06 2006-07 2007-08 255 2008-09 . it is projected to be within the FRBMA target of 3 percent.5 presents the GFD of a few major states.62 percent in 2007-08. Table 7. as it reflects the total resource gap in its economy. it came down from a peak of 6.As observed earlier. even in 2008-09.6 shows the decomposition of the GFD of Bihar.59 percent in 2003-04 to only 1. Table 7. but is again projected to go up to Rs 3300 crore in 2008-09. as a percentage of GSDP.5 : Gross Fiscal Deficit State Bihar West Bengal Orissa MP Rajasthan Andhra Pradesh Kerala Tamil Nadu Maharashtra Gujarat (Rs. especially during the recent years. crore) 2006-07 2007-08 2008-09 3021 11432 -822 822 1878 1694 3825 -2278 11553 5653 1703 10965 1114 1642 3704 5987 6901 1546 -550 5407 3325 11894 2536 -429 2854 -927 5626 5838 13159 7935 Table 7. Bihar’s GFD at around Rs 3000 crore in 2006-07 was sharply reduced to only Rs 1700 crore in the next year. GFD of a state government is a fairly sensitive indicator of its financial performance.

62 2008-09 -4613 7635 303 3325 112424 2.59 2004-05 -1076 1205 1113 1242 73221 1.Table 7.6 : Decomposition of Gross Fiscal Deficit of Bihar (Rs crore) 2003-04 Revenue Deficit Capital Outlay Net Lending GFD GSDP GFD: GSDP ratio(%) 255 1549 2558 4363 66254 6.70 2005-06 -82 2083 1697 3698 80157 4.05 2007-08 -4647 6104 247 1703 105148 1.62 2006-07 -2498 5211 308 3021 98957 3.96 D e c o m p o siti o n o f G F D o f B ih a r (R s C ro re ) 10000 8000 6000 4000 2000 0 2 0 0 3 -0 4 -2 0 0 0 -4 0 0 0 -6 0 0 0 Re v e n u e De f ic it Ca p ita l O u tla y Ne t L e n d in g 2 0 0 4 -0 5 2 0 0 5 -0 6 2 0 0 6 -0 7 2 0 0 7 -0 8 2 0 0 8 -0 9 GFD: GSDP ratio(%) 7 6 5 4 3 2 1 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 256 .

loans from the central government had no role in the financing of the GFD. provident funds etc. From 2005-06 onwards. Recovery of the loans and advances made by the state government again has always remained negligible.Table 7. The net borrowing mainly consisted of internal market borrowings made by the state government as well as the central loans. The internal market borrowings of the state government mainly financed its GFD.7 shows how the GFD was financed during all these years. less the recoveries of loans and advances made by the state government. Table 7.7 : Financing of Gross Fiscal Deficit of Bihar (Rs crore) 2003-04 Net Public Account Receipts Increase in Cash Balance Net Borrowing GFD 2278 -182 2267 4363 2004-05 -3974 676 4539 1242 2005-06 1209 -299 2790 3700 2006-07 1785 -97 1333 3021 2007-08 352 1372 -20 1703 2008-09 445 56 2824 3325 Financing of GFD of Bihar (Rs Crore) 6000 4000 2000 0 2003-04 -2000 2004-05 2005-06 2006-07 2007-08 2008-09 -4000 -6000 Net Public Account Opg CB-Clg CB Net Borrowing 257 . apart from the Public Account receipts from small savings.

some more parameters of the state government finance are considered through a comparison of the state governments' own tax and non-tax revenues respectively with its total tax and non-tax revenues.. the state government's own total revenue.6 Receipt and Expenditure of Bihar Government: Revenue Account The summary of revenue receipts and expenditure of Bihar is shown in Table 7. revenue receipts and expenditure grew at nearly the same rate. 3239 crore to Rs. and the rest has to come from its share of taxes and grants from the central government.8 : Revenue Account of Bihar (Rs crore) 2007-08 2008-09 28210 23563 -4647 5611 20 24 33551 28938 -4613 5678 17 20 2003-04 Revenue Receipt Revenue Expenditure Revenue Deficit State’s own tax + non-tax revenue State’s own revenue as % of total revenue State’s own revenue as % of revenue expenditure 12456 12711 255 3239 26 25 2004-05 15714 14638 -1076 3760 24 26 2005-06 17838 17756 -82 4083 23 23 2006-07 23083 20585 -2498 4543 20 22 258 . i. From 2003-04 to 2008-09.8. With receipt outgrowing the expenditure during the last 4 years. have grown at a much slower rate. The state government's own revenue. from Rs. mainly Income Tax and Union Excice Duties. Table 7. tax and non-tax combined. While the total revenue of the state government has grown nearly threefold during the period 2003-2009. The state government's total tax revenue consists of the its own revenues as well as its share from the divisible pool of central taxes. it has resulted in a revenue surplus. from Rs 12456 crore to Rs 33551 crore. Thus the state government remains overwhelmingly dependent on the central government and therefore vulnerable to the changes in its policy and attitudes. tax and non-tax combined. 5678 crore during the same period. The share of state government's own revenue in total revenue declined from 26 percent to 17 percent during the period.e. by 75 percent. while its own non-tax revenue remained nearly same during the period with some minor variations. barely meets 20 percent of its revenue expenditure needs. In Table 7.8.7.

9 shows the total expenditure of the state government for developmental and nondevelopmental as well as its plan and non-plan expenditure. however. Plan expenditure is mostly developmental. while non-plan expenditure is mostly non-developmental. This analysis of the expenditure. 259 2008-09 -5000 . is restricted to the conventional definition of the terms.Revenue Receipt of Bihar (Rs Cr) 40000 35000 30000 25000 20000 15000 10000 5000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Tax Revenues (Rs Crore) 25000 20000 15000 10000 5000 0 2003-04 2004-05 2005-06 2006-07 2007-08 -10000 Revenue Receipt Revenue Expenditure Revenue Deficit Total Tax Revenue Own Tax Revenue Table 7.9 : Expenditure of Bihar Government (Rs crore) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Developmental Expenditure Non-Developmental Expenditure Total Expenditure Dev Expenditure as % of Total Expenditure Plan Expenditure Non-Plan Expenditure Interest Payments 15303 7175 22482 68 5202 17280 3343 12250 7803 20058 61 3476 16581 3474 14041 8523 22568 62 4899 17670 3649 18489 8643 27136 68 9397 17740 3416 22314 9252 31571 71 10908 20664 3707 27669 10901 38574 72 15746 22828 3796 Table 7. but non-plan expenditure may have a developmental component. the distinction continues to remain ambiguous and sometimes irrational too. All expenditures under non-developmental heads is non-plan expenditure. In the absence of any clear guideline for classification of expenditure between plan and non-plan on a rational basis.

has increased at a slower rate. except for a marginal decline in 2004-05. it has nearly doubled over the years and. In absolute terms. Vs Non-Dev.2006. As already noted.Dev. the pace of growth has been very high.200804 05 06 07 08 09 Dev and Non-Dev Exp (%) 100% 80% 60% 40% 20% 0% 2003.2004.2007. The non-developmental expenditure. Nearly half of the non-plan 260 . after which the share of plan expenditure has increased steadily to about 40 percent in 2008-09.2005. about 20 percent of the total expenditure of the state government has been plan expenditure till 2005-06. In Bihar. on the other hand.9 and the related charts. one may note that the developmental expenditure in Bihar has constituted about 60 -70 percent of the total expenditure during all the years under consideration.2005.200804 05 06 07 08 09 Non-Developmental Expenditure Developmental Expenditure 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Plan and Non_Plan Exp (%) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2008-09 0 Plan Expenditure Non-Plan Expenditure Referring to Table 7.2006.2004.2007. Expenditure (Rs Cr) Developmental Expenditure Non-Developmental Expenditure 25000 Plan Vs Non-Plan Expenditure (Rs Cr) Plan Expenditure Non-Plan Expenditure Interest Payments 30000 25000 20000 15000 10000 5000 20000 15000 10000 5000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2003. plan expenditure is made for taking up new development projects in the state.

The interest receipts.99 -1424. we note that the capital outlay has substantially increased from very low (7 percent) in 2003-04 to nearly a quarter of the total expenditure in 2008-09. this increase is too small to offset the ever-widening gap between interest payments and interest receipts. it is seen from Table 7.48 298. and nearly a quarter is solely due to interest payment on outstanding loans and payments on account of pension and gratuity. interest payments consume about 20 percent of the total revenue expenditure of the state government.28 457.10 : Interest Payment and Receipt (Rs crore) 2003-04 Gross Interest Payment Net Interest Payment 3343. but it must be noted that while the revenue expenditure increased nearly thereefold during the period. The total plan expenditure increased by almost Rs 10. interest payments have now been contained at around Rs 3700 crore in 2008-09.04 3319.12. For many of these public enterprises. interest payments increased by only 13. From Table 7.03 3536.47 -1125. As regards the crucial component of interest payment. while the total non-plan expenditure increased by about Rs 5500 crore during the same period.11).58 -2400. Table 7. mainly from the investments of its cash balances (Table 7.85 2005-06 3648.28 3738. Thus. compared to about Rs 3300 crore in 2003-04.08 3240.500 crore during the period.88 97.29 -676.10 that the difference between the gross and net interest payments is only nominal due to the extremely poor recovery of interest on the loans and advances given by the state government to its public sector enterprises which are mostly loss-making and autonomous bodies. drawing from the substantial surplus in the revenue account.expenditure is non-developmental in nature. Nevertheless.35 2004-05 2005-06 2006-07 2007-08 2008-09 -747.89 3432.11 : Cash Balance of Bihar (Rs crore) 2003-04 Balance in Cash Investment Account Increase in Closing Cash Balance -930. As already noted.63 261 .96 2004-05 3473.09 2007-08 2008-09 3706. showed more than a nominal increase.99 3796.21 182.59 -1028.01 -1371.82 2006-07 3416. their accumulated losses have completely wiped out their equity bases including reserves several times over.9 3398. however.59 Table 7.6 percent.

except in 2007-08.Table 7.13 which shows the gross transfer of resources to Bihar during the period from 2003-04 to 2008-09. 262 .89 12465 3342 418 1205 6.2 21852 5085 526 6104 19. grants-in-aid from the centre. was almost nil. The gross transfer of resources to the state government increased steadily from 41 to 72 percent of the aggregate disbursements over the period. since the state government has not resorted to central loans for the last four years except in 2007-08. The contribution of such loans in recent years.12 : Other Parameters of Expenditure (Rs crore) 2003-04 2004-05 2005-06 Total Tax Revenue Own Tax Revenue Total non-tax Revenue Actual Capital Outlay Capital Outlay as % of Total Expenditure 10518 2919 320 1549 6. There is no real difference between the gross and net figures of resource transfer. Payment Net Interest Payment 3800 3700 3600 3500 3400 3300 3200 3100 3000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2900 Transfer of Resources from Centre 30000 25000 20000 15000 10000 5000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-0 Grants from Centre Share in Central Tax Gross Loans from Centre The exact nature of the state government's dependence on central resources can be seen from Table 7. About 70 percent of the gross transfers to the state government came from its share of central taxes and the rest from grants and loans. The gross transfer of resources includes the state’s share in central taxes.23 2006-07 2007-08 17325 4032 511 5211 19.01 13983 3561 522 2083 9.68 Interest Burden (Rs Cr) Gross Intt.33 2008-09 24353 5256 422 7635 24. as well as loans. excluding the central loans.

35. The major part of this huge debt (about 60 percent) is due to the internal loans raised by the state government from the market.Table 7. The total public debt.38 263 . which respectively depict the net amount of debt raised and discharged by the state government.14. one also needs to look at Tables 7. This large figure is the accumulated effect of past borrowings. was Rs. To understand the full import of the data presented in Table 7.5 percent since 2003-04.14. as a percentage of GSDP. growing at an average annual rate of about 5.045 at the end of 2007-08. and about 16 percent is from the central government. Table 7.14 : Outstanding Liabilities (Rs crore) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Internal Debt Central Loans Total Public Debt Public Account Total Liability Outstanding Liability as % of GSDP 16298 10106 26404 7997 34401 51.33 26829 8237 35065 9161 44226 51.106 crore in 2003-04 to Rs 7856 crore in 2008-09. This has resulted in gradual reduction of the debt to the central government from Rs 10.16.6 26769 8277 35045 9429 44475 42.38 21906 9037 30943 8401 39344 53.14 shows the outstanding fesical liabilities of the state government.13 : Transfer of Resources from Centre to Bihar (Rs crore) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Share in Central Tax Grants-in-Aid from Centre Gross Loans from Centre Gross transfer of Resources Net Loans from Centre Net Transfer of Resources 7599 1618 820 9216 -1560 7656 9122 2832 1654 11954 -1069 10885 10421 3333 2 13754 -486 13268 13293 5247 3 18543 -314 18229 16767 5832 468 23067 40 23107 19097 8776 8 27880 -421 27460 7.32 25182 8551 33733 8766 42498 53. as can be seen from Table 7.30 30014 7856 37870 9779 47649 42.15 and 7. which is 33 percent of the State’s GSDP. had decreased from 51 percent to 42 percent during the period from 2003-04 to 2008-09 and it reflects the state government's ability to contain the debt burden. One significant feature of the composition of outstanding debt is that the loans from centre has been continually discharged throughout the period without resorting to substantial fresh borrowing.7 Debt Management Table 7. The total outstanding liability of the state government.

2004.09 -2000 -4000 -6000 2003.99 8 4493 2696 7197 22 3796 57 2450 1030 14.31 Table 7.38 1654 5972 1198 8824 15 3474 75 3882 1558 17.15 : Net Debt Received (Rs crore) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Gross Central Loans Recd Internal Debt Recd PF Small Savings Total Debt Recd Recoveries of Loans and Advances Interest payments Interest Received Repayment of Debt Net Debt Recd Net Debt Received as %of Total Borrowing 820 7100 987 8907 10 3343 23 6522 -925 -10.200707 08 200809 264 .66 2 3769 1088 4858 51 3649 216 1703 -227 -4.200504 05 06 2006.Table 7.07 2007.08 2008.65 468 1144 1084 2696 26 3707 171 2447 -3262 -120.04 2004-05 2005-06 2006.68 3 2355 1012 3370 7 3416 176 1642 -1505 -44.16 : Repayment Liabilities (Rs crore) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Discharge of internal debt Repayment of loans to Centre Discharge of other liabilities Total Repayment Total Interest Payment 3273 2380 869 6522 3343 365 2723 795 3882 3474 493 488 723 1703 3649 708 317 617 1642 3416 1203 429 815 2447 3707 1248 429 774 2450 3796 Borrow ings of Bihar Govt (Rs Cr) 10000 9000 8000 7000 6000 5000 4000 3000 Net Debt Received (Rs Crore) 12000 10000 8000 PF Small Savings Internal Debt Recd Gross Central Loans Recd Total Borrow ing Total Debt Servicing Net Debt Received 6000 4000 2000 0 2000 1000 0 2003.

The state government has fully achieved these targets.17 gives a comparative statement of actual achievements against targets set under TFC and FCP. the Twelfth Finance Commission (TFC) had recommended norms and ceilings for some fiscal aggregates and also made normative projection for others.3 per cent every year beginning with 2006-07 if it is more 265 . The Act directs the state government to eliminate revenue deficit and contain fiscal deficit with efficient debt management and greater transparency in fiscal operations. The state government has also developed its own Fiscal Correction Path (FCP). To eliminate Revenue Deficit by 2008-09. than 3 percent. It can be seen from the table that the state government has achieved nearly all the FCP targets. otherwise.8 : FRBM Act and Fiscal Correction Path The state government had enacted the Fiscal Responsibility and Budget Management (FRBM) Act in 2006 making it responsible for prudent financial management and fiscal stability.1 percent every year beginning with 2006-07. indicating milestones of outcome indicators during the period 2004-10. to contain the ratio within 3 percent by 2008-09.30 25 20 15 10 5 20000 60000 Debt Buiden vis-a-vis Debt Servicing (Rs Cr) Debt Burden Debt Service Payments Intt Paym ent: Rev Exp of Bihar 50000 40000 30000 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 0 10000 0 200304 200405 200506 200607 200708 200809 7. (iii) To reduce GFD:GSDP ratio by 0. Earlier. The targets envisaged in the Act are : (i) (ii) To reduce Revenue Deficit / GFD ratio by 0. Table 7. As pointed out already.

266 .13 Per cent of GSDP) 7. The tax revenue of a state government consists of its own tax revenues and its share in the divisible pool of taxes and duties of the central government. goods and passengers. Similarly. Taxes on property and capital transactions which include land revenues. stamp and registration fees. turnover tax.Table 7.9 Resource Mobilisation The revenue receipt of the state government come from both tax and non-tax revenues. the non-tax revenues consist of the state government’s own non-tax revenue as well as central grants for plan and non-plan purposes.61 To be wiped out by 2008-09 To reduce to not more than 3 per cent of GSDP by 2008-09 31 per cent of GSDP by 200809 52122 Projection as per FCP 5020 353 23128 18665 5158 (+)1310 Actual 5086 526 23563 18759 6376 4647 Fiscal Deficit (-)/ Surplus (+) (-)1703 Consolidated Debt (including Guarantees) 51080 (51.17 : Targets and Achievement under Fiscal Correction path. state excise duty. 2007-08 (Rs crore) Fiscal forecasts Own Tax Revenue Own Non-Tax Revenue Revenue Expenditure Non Plan Revenue Expenditure Capital Expenditure Revenue Surplus (+) Projection in TFC 6430.39 1162. electricity duty.47 17005. The own tax revenues of the state government are classified into : (i) (ii) Taxes on income which include agricultural income tax. taxes on entertainment etc. taxes on urban immovable property. and (iii) Taxes on commodities and services which by far are the most important sources of the state government’s own tax revenue and include a variety of taxes like sales tax. taxes on trades. taxes on vehicles.

an increase of 168 percent in 6 years. dividends and profit from them. implying an annual growthrate of nearly 18 percent. the state government’s own share in the total revenue receipts has been steadily decreasing. the non-tax revenue has grown by 32 percent.18 shows the revenue receipts of the state government during 2003-04 to 2008-09. from Rs. there are separate grants for the state's own plan schemes.351 crore in 2008-09. The state government’s own total revenue (tax plus non-tax) has registered an increase of 75 percent during this period. social and fiscal) and from economic services. The non-tax revenue had increased to Rs 526 crore in 2007-08 before declining in the next year. The grants from central government are for both plan and non-plan purposes. about 80 percent of the total receipts of the state government came from the central government by way of grants-in-aid and state’s share of divisible pool of taxes. Within the plan grants. public sector undertakings and other bodies. 320 crore to Rs. The own non-tax revenues of the state government are classified into interest receipts from loans and advances to various government companies. From this table. central plan schemes and also for the centrally sponsored schemes. including all transfers from the central government. 12. In 2008-09.456 crore in 2003-04 to Rs. one can see that. Union Excise duty and additional excise in lieu of sales tax on certain commodities. 422 crore during the same period. it was only 17 percent. The non-plan grants include the statutory grants as well as relief on natural calamities and other public purpose grants. 267 . Economic services contribute much more significantly to the state exchequer than other services. as compared to 26 percent in 2003-04. 33. While the own tax revenue of the state government has grown by 80 percent from Rs 2919 crore in 2003-04 to Rs 5256 crore in 2008-09. However. Table 7. during all these years. The total revenue of the state government. increased from Rs.The share of central taxes consists mainly of the shares of Income tax. receipts from various services (general.

taxes and duties on electricity and taxes on vehicles. These five taxes together made up as much as 98 percent of the total tax receipts of the state government in 2008-09. Among the indirect taxes which are far more important than the direct taxes. stamp and registration fees.19 : Tax Revenue of Bihar Government (Rs crore) Sources of Revenue Taxes on Sales. taxes on goods and passengers and other taxes and duties on commodities and services. there are taxes on sales / trade. Table 7. Trade etc. Receipts from Centre a) Share of Divisible Taxes b) Grants-in-aid III.Table 7. Taxes on Vehicles. state excise. the last one being rather insignificant. The details of receipts from these taxes from 2003-04 to 2008-09 BE are shown in Table 7. Land Revenue and Taxes on Agricultural Income. Stamp and Registration Fees Taxes on Goods and Passengers State Excise Taxes on Vehicles Land Revenue Taxes & Duties on Electricity Other Taxes and Duties on Commodities and Services Taxes on Agricultural Income Total 2003-04 1637 418 306 240 210 34 18 57 0 2919 2004-05 1891 429 473 272 213 33 10 22 0 3342 2005-06 1734 505 613 319 302 55 18 15 0 3561 2006-07 2081 455 783 382 181 75 63 12 0 4032 2007-08 2535 654 938 525 273 82 64 14 0 5085 2008-09 2938 581 825 538 257 75 30 13 0 5256 An analysis of the tax receipts of the state government reveals that its major sources of taxes are sales tax.19.18 : Revenue Receipts of the State (Rs crore) Sources of Revenue I. Total Revenue Receipts State’s Own Revenue as % of Total Receipts 2003-04 3239 2919 320 9216 7599 1618 12456 26 2004-05 3760 3342 418 11954 9122 2832 15714 24 2005-06 4083 3561 522 13754 10421 3333 17838 23 2006-07 4543 4032 511 18540 13293 5247 23083 20 2007-08 5611 5085 526 22599 16767 5832 28210 20 2008-09 5678 5256 422 27873 19097 8776 33551 17 Among the direct taxes of the state government are included Stamp and Registration Fees. excise duty of the state. Of these. State’s Own Revenue a) Tax Revenue b) Non-Tax Revenue II. Taxes and Duties on Electricity. These taxes are highly buoyant and their yields increase automatically with the general increase in the income level as reflected by 268 . followed by Stamp and Registration Fees (16 percent). sales tax alone comprises 56 percent of the total tax receipts.

one can see that direct taxes contribute about 18 percent of the own total tax revenue of the state government.21. making the distribution even more skewed than in the previous year. Table 7. It also indicates that the process of fiscal reforms that the state government has initiated are yet to be reflected in the structure of taxation. there was a major drop between 2005-06 and 2006-07. -1 15 -8 20 22 16 79 Stamp and Registration Fees -1 14 17 -10 44 -11 39 Taxes on Goods and Passengers 20 3 18 28 20 -12 170 State Excise 18 2 42 20 38 2 124 Taxes on Vehicles 23 -46 89 -40 51 -6 22 Land Revenue -7 -1 65 36 10 -9 121 Taxes & Duties on Electricity 16 55 30 248 2 -53 72 Other Taxes and Duties on Commodities and Services 4 -62 -32 -19 17 -4 -77 Taxes on Agricultural Income 0 0 0 0 0 0 0 Total 5 15 7 13 26 3 80 269 .20 and their growth rates in Table 7.20 : Composition of Tax Revenue of Bihar Government (Figures in percentage) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Sources of Revenue Taxes on Sales. it has again picked up in the next year and remains at that level even in 2008-09. after registering an impressive growth of about 250 percent during 2006-07.22. Trade etc.the GSDP. However.21 : Growth of Tax Revenue of Bihar Government (Figures in percentage) Overall 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Growth Sources of Revenue 2003-09 Taxes on Sales. The composition of the state government's tax revenue is shown in Table 7. In case of taxes on vehicles. Taxes on Sales have been growing consistently though the rate of growth has slowed down in 2008-09. ‘Taxes & Duties on Electricity’ experienced a substantial drop by more than 50 percent during 2008-09. Barring 2005-06. Trade etc. From Table 7. indirect taxes contributing the rest 82 percent in 2008-09. 56 57 49 52 50 56 Stamp and Registration Fees 14 13 14 11 18 16 State Excise 8 8 9 9 13 11 Taxes on Vehicles 7 6 8 5 10 10 Taxes & Duties on Electricity 1 0 1 2 5 5 Land Revenue 1 1 2 2 2 1 Taxes on Goods and Passengers 10 14 17 19 1 1 Other Taxes and Duties on Commodities and Services 2 1 0 0 0 0 Taxes on Agricultural Income 0 0 0 0 0 0 Total 100 100 100 100 100 100 Table 7.

Other Taxes Sales Tax vs. Trade etc.22 : Structure of Taxation in Bihar 2003-04 Share of Direct Taxes in State’s Own Tax Revenue Share of Indirect Taxes in State’s Own Tax Revenue 23 77 2004-05 20 80 2005-06 25 75 2006-07 19 81 (Figures in percentage) 2007-08 2008-09 21 79 18 82 Com position of Major Revenues of Bihar (%) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Taxes on Vehicles Stamp and Registration Fees State Excise Taxes on Sales. Trade etc.Table 7. 5000 Total 4000 3000 2000 1000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 270 . Total Own Tax Revenue (Rs Cr) 6000 Taxes on Sales.

95 20.07 23.3 7.34 23.9 216.24 shows their composition and growth.05 421.26 26.57 320.00 58.72 100. Thereafter. the growth of non-tax revenues has been quite uncertain.25 13.33 525. The royalty from mines and minerals has grown steadily in the past.Table 7.65 170.75 18.99 13.47 17.79 27.34 79.41 522.79 271 .72 11.05 24.99 78.78 35.72 8.1 6 12.53 16.21 15. Overall.22 26.91 28.75 32. due to a substantial drop in the interest receipts.18 178.33 80.65 175.75 20.28 16. Arts and Culture Others Total 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 73.95 2.28 17.66 13.23 : Major Non-Tax Revenues of Bihar (Rs crore) Sources of Revenue Non-Ferrous Mining and Metallurgical Industries Interest Receipts Other Rural Development Programmes Major Irrigation Other Administrative Services Medical and Public Health Police Roads and Bridges Social Security and Welfare Education.07 10.08 21. the other important source being the interest receipts.17 13.88 68.05 14. The above analysis brings out the importance of sales tax in the tax revenue and royalty on mines and minerals in the non-tax revenue of the state government as shown in the accompanying charts.62 10.23 shows the major non-tax revenues of the state government and Table 7.98 12. down from more than 66 percent the year before.26 127. The steep increase in the interest receipts in 2005-06 was due to the investment of huge balance of idle cash in the Cash Balance Investment Account.42 8.31 2.85 10.11 41.81 8. The most important element of the state government’s non-tax revenue is the royalty from mines and minerals.67 0 107.59 4.22 80.36 511.16 1.51 10.57 80.74 7. The receipt from these two together was about 46 percent of the total non-tax receipts in 2008-09.09 75.62 34.49 417.8 1.47 63. but the yield from this had declined marginally in 2008-09. Table 7. Sports. there has been a steady drop in collections under this head.85 17.41 12 21.56 140.97 16.

68 5.72 100 33.82 6.99 32.24 : Composition of Non-Tax Revenues of Bihar Sources of Revenue Non-Ferrous Mining and Metallurgical Industries Interest Receipts Other Rural Development Programmes Major Irrigation Other Administrative Services Medical and Public Health Police Roads and Bridges Social Security and Welfare Education.31 2.31 1.38 3.28 3.89 1.4 25.55 2.97 5.81 3.39 15.01 4.84 30.74 -2.97 13.98 100 2004-05 19.31 6.43 2.03 100 2005-06 19.32 3. Sports.00 Composition of Non-Tax Revenue (% ) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2003-04 2004-05 2005-06 2006-07 Interest Receipts Roads and Bridges Others 2007-08 2008-09 Non-Ferrous Mining and Metallurgical Industries Police Education.7 0. Sports.95 -2.77 130.00 22.76 19.22 8.00 -21. Arts and Culture 272 .37 39.2 3.28 4.13 6.97 34.68 3. Arts and Culture Others Total Growth Rates (%) Growth rate of Total Non-Tax Revenues Growth rate of Non-Ferrous Mining and Metallurgical Industries Growth rate of Interest Receipts Growth rate of receipts from Major Irrigation 2003-04 22.32 15.96 3.46 2.74 5.06 3.03 -2.36 - 0.03 3.02 1.99 4.99 1.63 -65.00 33.97 3.01 100 (Figures in percentage) 2006-07 2007-08 2008-09 24.28 12.26 3.81 -19.28 2.19 25.56 - -16.26 149.55 20.19 13.91 0 25.9 7.47 3.42 0.95 100.Table 7.17 17.98 46.45 -64.64 8.12 2.37 1.39 0.52 3.88 587.51 6.51 -18.32 41.15 2.95 0.21 6.49 1.43 2.27 1.85 3.28 14.00 100.27 - 26.

But these rationalization measures ultimately paid off and the revenue has been increasing at faster rate in later years.99 -24.94 9.55 32. The VAT is more efficient than the sales tax. including all foodgrains due to which there was a drop in its yield in that year. the state government undertook a number of reform measures of the tax system.63 Tax Revenue Taxes on Sales.08 -9. the other important taxes are the taxes on property and capital transactions — stamp and registration fees. but there are many related issues that remains to be sorted relating to the building of an efficient database of the dealers/ distributors/ suppliers/ retailers etc. Table 7. State Excise Stamp and Registration Fees Taxes on Vehicles Taxes & Duties on Electricity Land Revenue Other Taxes and duties on Commodities and Services Taxes on Goods and Passengers Total Tax Non Tax Revenue Non-Ferrous Mining and Metallurgical Industries Forestry and Wildforestry Social Security and Welfare Total Non Tax Budget Estimates 2880 500 720 375 20 75 18 381 20001 103 5 10 396 Actual Receipts 2535 525 654 273 64 82 14 938 21852 179 7 3 526 273 .98 5.25 : Variation between the Estimated and Actual Realisation of Tax and Non-Tax Revenue (2007-08) (Rs crore) % Variation Excess (+).15 -27.25). Trade etc.29 9. taxes on vehicles and state excise duty. In 2005-06. Turning to the assessments of revenue.25 145. The high registration rates in Bihar were brought down substantially from 15.4 percent to 6 percent in rural areas in 2006-07 to improve compliance.80 -72. replacing sales taxes. though the overall realization from tax revenues were 9 percent more than the targets (Table 7.The state government has already shifted to a VAT regime from April 2005. In case of Non-Tax Receipts.15 225. The deviation in respect of individual taxes ranged between a maximum of 225 percent to a minimum of (-) 27 percent. The VAT rates were substantially reduced in respect of many items.26 73.4 percent to 8 percent in urban and from 8. Next to sales tax. one notes some variations between the budget estimates and the actual realisation of revenues in respect of the individual taxes in 2007-08.56 42. shortfall (-) -11. the collection exceeded the budget estimates by nearly 33 percent. taxes on goods and passengers.

It must be noted that while the own tax to GSDP ratio of Bihar was one of the lowest and much less than the average of the states considered.67 All India average cost of collection percentage for 2005-06 0.54 1733. while the total revenue including Central transfers and grants constitute about 30% of its GSDP as of 2008-09 BE.The cost of collection of different taxes is shown in Table 7.85 5.31 1. It is also to be noted that.78 18.59 381.14 22.27 shows the state government's own tax and non-tax revenues as percentage of GSDP which is a measure of a state’s capacity to raise further resources. the ratio between its total revenues and GSDP was much higher than that of any other state.32 2.86 34.02 3.38 273.73 16.4 Stamp Duty and Registration Fee 2.47 1.13 4.47 318.20 Expenditure on collection of revenue (Rs crore) 21.10 5.68 3.81 1.47 27. The tax and non-tax revenue of Bihar together constitute only about 5 percent of its GSDP which is too low.26 : Cost of Collection of Taxes Head of revenue receipts Taxes on Sales. except for Stamp and Registration Fees where it was more than 5 percent of total collection.93 525.45 8.44 181.46 25.64 4.02 22. Table 7.69 5.41 429.28 shows a comparison between the Tax: GSDP ratios of different states pertaining to the year 2007-08.79 272.30 42.91 Year 2004-05 2005-06 2006-07 2007-08 2004-05 2005-06 2006-07 2007-08 2004-05 2005-06 2006-07 2007-08 2004-05 2005-06 2006-07 2007-08 State Excise 3.31 22.02 654. Trade etc.09 6.03 5.14 1. Table 7.14 212.87 Taxes on Vehicles Table 7.60 2081.78 302. 274 . even at the existing level of poverty. The cost of collection was insignificant compared to the total collection for all major taxes. the cost in Bihar was much higher in respect of nearly all tax heads.48 36. Collection (Rs Crore) 1890.18 2.20 1.21 5. compared to the all-India averages.79 4.26.14 505.19 14.94 4.29 455.49 2534.95 Cost as percentage of Collection 1.

47 2006-07 4.82 7.43 6.65 22. taxes on goods and passengers.49 1.56 9.80 14.68 18.38 1. GSDP(Ratio) GSDP Growth (%) 2003-04 4.t.13 15.98 11.48 18.31 0.28 : Tax : GSDP Ratio of States (2007-08) State’s Own Tax: Revenue Receipts 0.52 2005-06 4.29 4.84 0. taxes on vehicles and state excise were far buoyant than the total tax revenues of the state government.49 1.52 23.43 0.25 1.64 17. it can be noted that.63 State Revenue Receipts State's Own Tax GSDP Total Revenue: GSDP 26.21 10.94 17.65 0.43 0.46 1.04 Bihar Maharashtra Kerala Orissa Rajasthan Madhya Pradesh Andhra Pradesh Gujarat West Bengal Tamil Nadu Average 28210 79860 21497 21381 30128 29840 56127 34673 31360 46577 5085 46611 13997 6713 12840 11704 31402 21334 13485 29248 105148 578839 148367 103376 166520 142481 312221 292640 309528 297864 Table 7.68 0.38 29.25 0.33 3. Thus.36 9.74 0. GSDP (Ratio) Buoyancy of State’s Own Taxes w.55 4.57 21.48 State's Own Tax: GSDP 4.50 26.80 2.05 9.84 8.44 0.39 0.49 6.49 20. 275 .62 0.38 6.56 0. sales tax.41 0. stamp and registration fees.56 0.27 : Tax and Non-tax Revenue as Percentage of GSDP Own Tax Revenue as % of GSDP Own Non-Tax Revenue as % of GSDP Total Revenue as % of GSDP Buoyancy of Total Revenue w.06 7.43 0.45 2007-08 4.58 0.83 2.29 gives the buoyancy ratios in respect of the state government's major tax and non tax revenues as well as of revenue expenditure.63 0.09 20.83 13.92 Table 7.71 8.26 2008-09 (BE) 4. the prospects of increasing yield from these taxes.85 10.07 0.29.r.84 2.18 0. From Table 7.49 7.17 23.t.Table 7. The major sources of non-tax revenues did not exhibit such buoyancy. given a growth rate of nearly 6 percent in the GSDP is high.r.75 2004-05 4. in 2007-08.69 10.

9000 crore in the budget estimates of 2008-09.30 -1.Table 7. Table 7.99 3.43 -0.36 0.79 0.42 1.49 Table 7.16 6. The total grants have increased five times between 2003-04 and 2008-09. while the grants for state plan schemes increased by more than double during the same year.19 1.74 0. Out of this.87 3.00 8.88 21. It is seen from the table that the total grants now stand at nearly Rs.62 -1.30 shows grants and contributions from the central government.13 -0.88 -7.13 -9.30 : Grants and Contributions from the Central Government (Rs.74 2.29 0.48 2.26 5.84 2.15 -4.59 3.45 9.85 -1. Stamp and Registration Fees Taxes on Goods and Passengers State Excise Taxes on Vehicles Taxes and Duties on Electricity Non-Ferrous Mining and Metallurgical Industries Interest Receipts Revenue Expenditure Total Tax Revenue 2004-05 2005-06 2006-07 2007-08 2008-09 1. crore) 2003-04 Total Grants Grants for State Plan Schemes Grants for Central Plan Schemes Grants for Centrally Sponsored Schemes Non-plan Grants 1618 1169 46 251 152 2004-05 2832 1643 10 495 684 2005-06 3333 1556 90 486 1201 2006-07 5247 2445 144 974 1683 2007-08 5832 2914 53 1360 1505 2008-09 8776 4565 198 2223 1790 276 . about 50 percent are grants for state plan schemes.29 : Buoyancy of Important Tax and Non-Tax Revenue Sources Major Sources of Tax and Non-Tax Revenues Taxes on Sales.31 6.18 0.57 1. followed by centrally sponsored schemes and non-plan grants.86 -0.62 -3.39 -0. Grants for the centrally sponsored schemes increased by more than Rs 800 crore during 2008-09.88 1.30 2.71 10.79 4.55 3.31 2.09 0.25 0.25 1.34 -0.43 2.44 1.74 19.14 1.47 0.41 1. Trade etc.68 3.48 6.

47 36.66 12.19 3.15 22.36 0.41 55.29 18.02 29.09 18.15 33.17 2.72 147. No.9 6.71 55.3 166.99 11.72 -8.77 4.26 1.47 126.58 23 -16.15 40.57 14.14 77.38 2.03 17.04 16.06 7.62 19.09 14.87 % growth 62.46 4.Table 7.49 -2.98 9.6 154.7 3.13 2.22 131.27 3. crore) 102.37 9.17 1.23 0.66 127.37 30.54 0.56 4.4 174.24 87.13 209.74 6.97 21.35 10.14 3.41 7.58 26.77 175 4.25 2.58 24.12 2.96 13.51 42.72 87.69 14.06 7.48 1.84 2.22 20.55 1.23 19.6 -5.03 3.22 199.36 45.87 0.83 27.42 15.31 142.07 0.35 17.49 96.7 8.38 -9.99 4.2 22.95 12.69 4.53 36.12 -4.38 29.64 4.6 1.92 54.98 0.51 62.55 14.85 20.23 13.87 27.69 14.41 52.75 3.02 57.42 19.59 0.77 64.07 17.89 3.31 5.43 28.7 30.64 4.85 10.32 3.77 29.24 18.25 0.2 84.02 6.02 494.01 164.07 5.06 109.13 0.76 122.79 8.58 2.14 3.66 5.29 2.63 70.77 17.75 44.67 33.83 113.03 14.92 0.81 5.44 32.98 Commodity 2 and 3 Wheelers (Automobiles) All Kinds of Furniture Auto Parts Battery Beverages Biscuits Bricks and Minerals Cement Coal Computer and Peripherals Consumer Durables Crockery Cutlery and Glassware Crude Oil Cycles Diesel Engine Electrical Goods Entertainment Essentials FMCG Fastfoods Fertilizers Firework Food grains Footwear Foreign Liquor(IMFL) Hardware Hide and Skins Hotel Insecticide and Seeds Iron and Steel Jewelry Jute Kerosene Oil Kirana and Agarbati LPG 2005-06 2006-07 2007-08 2005-06 2006-07 2007-08 2006-07 2007-08 277 . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 No.3 7.07 69.22 2.75 58.56 0.12 43.91 19.47 26.43 22.11 6.27 23.46 4.22 -31.69 5.05 17.19 12.30 A : Comparative Commoditywise Collection of Sales Tax Sl.14 6.64 146. of dealers 397 380 1140 224 138 337 1474 1455 65 311 381 163 13 350 408 1320 120 90 958 317 1670 76 2045 597 531 1291 32 324 309 542 1181 139 259 2027 298 354 360 1050 221 102 337 1639 1537 81 295 377 153 14 329 416 1247 122 76 953 265 1429 69 2134 549 314 1242 28 362 256 508 1241 78 270 2146 281 344 379 992 228 86 308 1718 1541 80 288 408 147 11 306 407 1270 102 58 996 227 629 68 2462 535 194 1227 33 306 175 511 1240 45 269 2225 282 Collection (Rs.29 26.64 -49.24 160.15 7.67 40.56 19.8 -55.79 6.08 6.78 27.36 42.81 45.07 -10.92 -45.85 50.04 44.

72 16. 1993 (ENT) (iv) Bihar Electricity Duty Act.74 13.51 1.29 8.13 2.25 16.71 23.99 -8.01 60.81 1091. 1981 (ADV) (vi) Hotel Luxury Tax Act.37 3.05 33.29 8 2.85 23.46 4.95 9.5 28.15 91. 2005 (VAT) Central Sales Tax Act.3 28.74 10.72 6.04 5.8 130.6 1247.07 3. viz.48 7.51 1.09 3.34 7.36 136.79 44. 1956 (CST) (iii) Entry Tax Act.25 -15.73 71.78 78.72 4.36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 Marble Mosaic and Stone Medicine Miscellaneous Moulded Luggage Mustard Oil PVC Paints Pan Masala Paper Petro Products Plastic Goods Plywood and Board Readymade and Hosiery Sanitary goods and fittings Tea and Coffee Timber Tires and tubes Tractor Utensils Vanaspati Works Contract 399 10587 13946 80 218 157 231 131 425 928 282 288 2038 228 183 798 255 308 311 87 53242 428 8311 12415 70 216 169 213 126 406 610 266 279 1948 230 177 766 186 312 311 110 31 48416 572 5019 10920 64 228 171 201 176 430 516 280 313 1981 260 170 748 196 328 288 108 56 1.27 7.14 20.18 1.2 -17.27 21.9 113.01 3636.10 Performance Analysis of State Tax Departments Commercial Taxes Department The Commercial Taxes Department collects revenue under seven Acts.58 137.7 2.15 -3.45 13.74 -44.66 29.67 28.61 48.45 2.63 45.82 29.83 22.91 5.04 24.52 13.77 14.26 17.61 174.87 2927.46 191 2.16 41.24 -113.81 0. 1988 (HLT) and (vii) Bihar Entertainment Tax Act.57 58.48 7.85 4.12 23.06 192.72 -46.43 22.43 3.37 24.44 47.22 4.82 1.59 14.87 3..4 14.9 2.47 2.55 23.21 19.55 2.88 19.03 13.18 5.23 2.17 9.75 3.25 27.13 43.3 2.84 2.92 244.83 10.19 3.49 13.26 90.02 86.16 26.05 25. (i) (ii) Bihar Value Added Tax Act.98 2950.24 2. 1948 (ED) (v) Bihar Advertisement Tax Act.13 Total Collection from other resources Grand Total 43127 2346.21 259.14 3633.48 1.72 4.36 23.44 2389.46 0.14 73.37 0.01 1089. 1948 (ET) 278 .76 37.62 986.

Taxes in total revenue 2919.20 24.15 2393.14 73.03 0.32 : Yearwise Percentage Share of Commercial Taxes in Total Revenue (Rs crore) 2008-09 2007-08 (Upto Nov.92 0.27 28.13 2006-07 4032. already negligible.79 481.00 0.48 2393.17 3633.07 1.03 25. is further coming down.24 2950.00 0.19 14. ED ADV HLT ET 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 (up to Nov.06 20. the Department has also undertaken several initiatives to check tax evasion.95 2003.56 84.16 At present scheme for reimbursement of a certain portion of the VAT payable by industrial units is being implemented through budgetary support as per Industrial Incentive Policy.79 NA Year BST/VAT CST ENT.53 NA Cost of collecti on (%) 1.01 0.20 Table 7.79 74.88 6.72 2522.32 9.31 and 7.00 0. Table 7.84 1.43 2346.93 1977.56 625.29 1814.94 1626.50 3.37 15.84 62.73 2004-05 3342. the cost of collection.48 63.60 2005-06 3561.79 1649.97 979.98 2950. As one can see from these tables.91 2.24 71. Filling of quarterly return by them has now 279 .45 17.32 show the taxes collected under these Act from 2003-04 to 2008-09 (till November 2008).15 54.36 1.41 71.) 5086.17 310. With the yield from taxes from each of the above acts increasing significantly.52 27.20 2003-04 Total Revenue of State Revenue from Commercial Taxes Percentage Share of Comm.Tables 7.08) 1560.22 14.24 2389.88 9.14 3633. The Commercial-Taxes Department has given reimbursement till date to the tune of Rs.01 0.80 2.30 2346.00 0.09 2390. 2006.05 0.30 71.02 1977.28 683.59 1.20 791.31 : Actwise Comparative Collection (2003-04 to 2008-09) (Rs crore) TOTAL Nonplan Expenditure 20.11 80. During the current fiscal.09 10. One of these has been the introduction of compulsory registration provision for transporters.4 67.97 9.79 1.2 crore to existing Industrial units and new Industrial units.15 67. commercial taxes now account for more than 70 percent of the total tax revenues of the state government and their growth rates have been impressive.

2546 dealers have been selected for detailed audit. Earlier. 2007. 2519 dealers have been selected and so far audit of 763 dealers has been done. For the financial year 2006-07. 2007-08. For the financial year 2005-06. promotion of officers and employees. necessary amendment has been made in the Bihar VAT Act and Bihar VAT Rules. the Excise Offices were established in these 10 districts and they are now fully functional. Simultaneously. This department has the responsibility to control the sale and distribution of spirit. the Excise and Prohibition Department has taken several 280 . Exemption from Entry Tax. there were 10 districts in the state where there were no Excise Offices. purchase of new vehicles and other measures were taken to strengthen the Excise Intelligence Bureau. Under Bihar Value Added Tax Act. the amount of penalty was enhanced for violation of different provisions and conditions of the licenses. 1915. After amendment in Section 42 and 68 of Bihar Excise Act. alcoholic beverage and molasses within the state. 2005. provision of VAT Audit has been made whereby upto ten percent of the total registered dealers can be selected for detailed audit for a financial year on the basis of a selection model. under which the settlement of all types of retail excise shops through lottery was started for the first time in the state. VAT and surcharge have been given to flood relief items such as rice and wheat given by the government of India. A new excise policy was introduced from July 1. In. In view of the unprecedented Kosi floods in some districts of Bihar. as well as to collect revenues from these sources. Further. For this. Excise and Prohibition Department The Department of Excise and Prohibition is one of the oldest departments of the state government and is one of the main sources of its revenue generation. fresh recruitment of Excise Inspectors. construction is going on in Patna to establish a modern Multipurpose Excise Complex. To enhance revenue resources. the Department made provisions for extension of Return Filing and Tax Payment date for the dealers of the flood affected districts. the application will have on-line connectivity with the Tax Information Exchange System (TINXSYS) to facilitate quick and faster information exchange between different states. Once functional.been made mandatory.

87 2006-07 206.18 383. After transfer of administration of stamps and registration duty to the Department from the Board of Revenue.97 0. (ii) Online Payment of Commercial-Taxes and (iii) On line application for registration. making a significant improvement in the quality of following e-services for tax payers — (i) Online filling of Returns.8 36.50 159.15 0.33 : Revenue from Excise (Rs crore) Sources of Revenue Country Liquor (Including Spice Country Liquor) Indian Made Foreign Liquor (IMFL) Commercial Denatured spirit Medicinal and Toilet Preparation Molasses Compounding Composite Shop Bihar State Beverages Corporation Others Total 10.65 2.05 4. all the circles would have online working arrangements.new initiatives. Table 7. Department of Registration The Department of Registration is again one of the oldest departments of the state government.55 535.02 198. In 2006.00 1.47 105. In terms of revenue collection. there has been continuous efforts by the department for increasing its resources.26 0.93 2007-08 170. followed by framing and implementing of Bihar Stamp (Prevention of Undervaluation of Instruments) Rules in 1995. In the 281 .29 1. Table 7.56 4. Inclusion of the concept of Market Value in the Stamp Act by an amendment in 1990. Country liquor and IMFL (Indian Made Foreign Liquor) are the two most important sources of revenue under this head. has proved an effective method for enhancement of revenue from stamp duty.33 shows the revenue from different sources of excise for two years 200607 and 2007-08.69 10.56 The Department of Commercial Taxes has also undertaken an ambitious programme of computerization and has already started online work in 36 of its 49 Circles. these were further amended and provision of yearly revision for urban property was made in the rules.36 6. it is only second to the Commercial Taxes Department. By end of this financial year.

56 101.00 334.04 111. Apart from various other measures to enhance the revenue resources.83 11.72 10. Table 7.56 176.89 694.67 0.66 308.79 195.29 479.01 12.23 1.5 5.38 1.04 crore to the state exchequer.34 : Revenue from Stamp Duty and Registration Fees (Rs crore) 2008-09 2006-07 2007-08 Till Nov.23 1.86 8. A liberal rate of stamp duty of 0.19 0 18.58 129. As a result.22 Source of Revenue Stamp Duty (i) From Printed Non-judicial stamps (ii) From Non-judicial stamp duty deposited through Bank challan (iii) Non-judicial adhesive stamps (iv) Non-judicial special adhesive stamp – through Franking machines (v) Revenue Stamps (vi) Judicial Stamps Sub-Total Registration Fee and Other Fees (i) Fees on registration of instruments (ii) Landlord’s Registration fee (iii) Landlord’s Process fee (iv) Fee from searches of records & Non-Encumbrances (v) Fee from certified copies Sub-Total Total 282 . 2008).same year. Table 7.24 520.95 1.64 2.94 7.79 410.34 shows the revenue from stamp and registration during the three years from 2006-07 to 2008-09 (till November.73 540. This has resulted in increased revenue collection. 2006 came into force.5 percent on lease of houses/buildings payable during the whole lease period has been fixed recently to promote registration of rent agreement of houses/flats. 11349 flats were registered in Patna which added Rs 95. a record number of promotions were also given to the officers and employees of the Registration Department during last year to boost their morale.34 223.05 22.89 14.04 9.47 118.4 percent to 6 percent. efforts were made to reduce the rate of stamp duty for instruments of conveyances from 8.24 1.77 4.92 150. the Registration Department had taken several initiatives to motivate the people for registration of their flats.08 184.83 112.07 173.23 0.58 2.81 13. After the Bihar Apartment Ownership Act.

11 Stamp Duty 62.09 4.96 3.72 9.72 1.17 2.57 5.15 10.58 378.53 5.69 0.57 15.72 0. more than three times that of any other district in Bihar.26 5.03 14.84 1.14 4.77 3.64 20.82 2.14 2.23 16.83 9.11 10.98 1.04 1.78 14.66 13.2 10.21 1.16 20.59 4.56 8.28 0.85 6.52 1.52 15.37 5.76 2.05 5.96 4.86 24.43 16.84 18.61 11.99 1.44 20.70 283 .29 9.35 : Districtwise Revenue from Stamp Duty and Registration Fees (Rs crore) Name of Distrioct Patna Muzaffarpur Vaishali Samastipur Begusarai Siwan East champaran Darbhanga Madhubani Sitamarhi Rohtas Gopalganj Bhagalpur Gaya Saran Bhojpur Purnea West champaran Katihar Nalanda Aurangabad Buxar Madhupura Supaul Saharsa Araria Khagaria Banka Kaimur Kishanganj Jamui Nawada Jahanabad Lakhisarai Munger Sheikhpura Sheohar Arwal Total Registration Fees 17.57 4.35 11.84 3.29 12.46 6.98 13.Table 7.13 18.87 15.78 4.56 12.23 13.51 3.68 4.24 12.80 3.83 4.84 6.63 133.34 7.94 1.03 3.54 1.17 15.39 14.87 7.35 shows the districtwise revenue from Stamp and Registration Fees in 2006-07.08 1.59 Total Received 79.09 13.02 17.88 5.18 12.81 16.68 11.16 1.70 2.06 11.55 4.93 6.57 3.18 8.02 5.12 3.31 6.03 15.12 14.14 4.79 5.15 7.79 1.85 9.9 4.18 5.18 5.22 511.81 3.61 7.42 6.54 13.76 2.15 5.67 4. It is seen that Patna district alone contributes 15 percent of the total revenue from this source. Table 7.35 3.24 3.48 2.72 4.13 1.09 6.68 18.

other areas of spending are capital outlay and repayment of loans and advances on the capital account and grants to local bodies. Public Debt.38 depicts the growth of expenditure under different heads. under the General Services. In addition.7. Public Debt. Loans 33% 284 . Table 7. Loans Capital Outlay Total Consolidated Fund 7175 4033 1498 4 9771 1549 22482 7803 4795 2036 4 5420 1205 20058 8523 6862 2367 4 4812 2083 22568 8643 7917 4021 4 6551 5211 27136 9252 9868 4438 5 8008 6104 31571 10901 12689 5343 4 9636 7635 38574 Expenditure from Consolidated Fund 2008-09 25% General Services 28% Social Services Economic Services 0% 14% Grants in Aid Capital. the revenue and capital expenditures are the two components of the state government’s total expenditure.37 shows the structure of expenditure in percentage terms. Social Services and Economic Services.36 presents the expenditure from Consolidated Fund of the state government and Table 7. commercial undertakings of the state government and government companies. It is to be noted that while the repayment of principal amounts of loans are made from the capital account.11 Expenditure Management As mentioned earlier. These three tables together give us an insight into the state government's expenditure patterns. autonomous institutions. interest payment is made from the revenue expenditure. Apart from these. The expenditures of the state governments are classified under three major categories — General Services.36 : Expenditure from Consolidated Fund (Rs crore) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 General Services Social Services Economic Services Grants in Aid Capital. Table 7. Table 7.

Loans Total Consolidated Fund 31.31 31.49 0.Expenditure from Consolidated Fund (Rs Cr) 14000 12000 10000 8000 6000 4000 2000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 General Services Social Services Economic Services The structure of expenditure of the state government.37 indicates that there has been a change in the structure of expenditure of the state government since 2007-08.37 : Structure of Expenditure from the Consolidated Fund Percentage of expenditure 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 General Services Social Services Economic Services Grants in Aid Capital.00 37.37 100. followed by Social Services and Economic Services. mostly incurred on running the day-to-day administration of the state government.85 29.01 24. Since 2007-08.15 0.98 100. Table 7.14 100.92 17.01 24. Now Social Services account for the bulk of the expenditure which reflects the state government’s changed priority.46 100.02 27. Public Debt.82 0.02 100. as shown in Table 7. the expenditure on General Services.00 285 .90 13.91 10.06 0.66 0. used to account for the bulk of expenditure from the Consolidated Fund.02 25. General Services no longer holds that predominant position.94 6.18 14.4 10.32 100.00 38.9 23.00 29. health and social development.02 43. Capital expenditure that has the potential of generating income and employment has also been accorded high priority and accounts for a quarter of the total expenditure of the state government.26 32.26 14.00 31.02 21. in view of the importance accorded to education.85 0.76 30. Prior to 2007-08.00 28.

mainly due to increased expenditure on police and district administration.22 43. the revenue expenditure on education. judiciary.00 20.83 28.25 16.38 392.88 13.11 16.00 -1. The expenditure on administrative services has also been growing steadily since 2003-04. interest payment etc. and the expenditure on those heads has been rising steadily.64 256.33 22. water supply and sanitation.53 -10.64 -11.34 17.61 44.00 22. there are certain items on which there is very little room for manoeuvre.75 18. tax departments and public works.15 3.05 24.59 200.37 69. like pension.64 10. However. Among the social services.52 1.59 20.Table 7.24 7.56 -44. as can be seen from Table 7.38. Capital outlay which was 286 .78 9.99 8.01 -15.88 35. health and family welfare. Public Debt. Loans Total Consolidated Fund 9.94 214.2 12.88 0.04 106.41 15. legislature.18 Overall 2003-09 51.37 25.00 36. and social welfare and nutrition have shown steady increases over the years. These are mostly items of charged expenditure.28 -1.14 20.38 : Growth of Expenditure from Consolidated Fund Growth rates of expenditure (Percentage) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 General Services Social Services Economic Services Grants in Aid Capital.40 -20.68 0. the growth in expenditure on social and economic services during the last 6 years has been far more impressive than the growth in expenditure on general services and the nearly fourfold growth of total expenditure from the Consolidated Fund of the state government has been mainly on this account.92 Expenduture from Consolidated Fund (Rs Cr) 45000 40000 35000 30000 25000 20000 15000 10000 5000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Capital Outlay Total Consolidated Fund Among the General Services.

increasing marginally from Rs 48 crore in 2003-04 to only Rs 81 crore in the 2008-09.39. and industry have registered significant increases over the years. It will be readily seen that.00 14. with a 75 percent share.39 : Expenditure on Repair and Maintenance of Buildings. roads and bridges.00 Irrigation 0. Another area where the state government was deficient is the repair and maintenance of building. the much needed infrastructure sector. power.00 0. one would expect the positive outcomes of the capital expenditures. as shown in Table 7. from the level of Rs 1500 crore in 2003-04.00 13. agriculture and allied sectors. Among the components of revenue expenditure.12 Revenue Expenditure Table 7.35 2. Table 7. Further.21 0.02 10. is now being given its due importance. so vital for any economic development of the state and so badly neglected in the past. rural development. This needs to be accorded much higher priority.stagnating prior to 2005-06. crore) Year 2003-04 2004-05 2005-06 2006-07 2007-08 Building 50.00 23. However.14 8. Roads and Bridges and Irrigation Facilities (Rs. Within a few years. especially in view of the devastating floods of 2008. however.64 Roads & Bridges 0. Revenue expenditure is incurred to maintain the present level of activities and payments and cannot thus make any addition to the existing infrastructure or services. has now been accorded the priority that it deserves.85 7. To maintain these assets. it has been raised to Rs 7600 crore in 2008-09. from a pitiable amount of less than Rs 1 crore to more than Rs 1000 crore and now remains above Rs 700 crore.64 0. and irrigation facilities. But the expenditure in this area has been almost negligible. non-plan component again consumes the bulk of expenditure (54 percent).23 7. roads and bridges.00 13. the expenditure on flood control has been stagnating at almost the same level.12 100. suitable amounts are required for their repair and maintenance.40 depicts the details of revenue expenditure of the state government during the period from 2003-04 to 2008-09. The revenue expenditure on power was increased substantially in 2006-07. revenue expenditure constitutes the bulk of total expenditure. the growth of plan revenue expenditure has been 287 . Among the Economic Services.

) Revenue A/c (PRE) (Rs.73 84.44 0.t.) Revenue A/c (NPRE) (Rs.33 1.) Capital Expenditure (CE) (Rs. both under plan and non-plan heads.) Rate of growth of NPRE (%) Rate of growth of PRE (%) RE/TE(%) NPRE/TE (%) TE/GSDP(%) NPRE/GSDP(%) Revenue Receipt (RR) / TE (%) NPRE/RR (%) Buoyancy of RE w.87 74. cr. cr. This is not because of any decrease in salary account.) Capital A/c (Rs.58 17756 4812 22568 17670 15020 2650 4899 2736 2163 18.75 3.45 1. but due to significant increases in revenue expenditure.4 93.30 1.68 66.68 0. however. cr.99 34.31 0.32 18. The salary expenses. cr.41.06 71.88 31.35 66.54 51.36 45.55 28.86 60.r.36 55.higher than the growth of non-plan revenue expenditure.85 79.18 17.28 85. as per cent of GSDP was almost constant at 7 per cent during the entire 6 year period from 2003-04 to 2008-09.) Total Expenditure (TE) (Rs.58 20585 6551 27136 17740 16520 1220 9397 4065 5332 9. cr.81 37.66 -19. The salary of the state government employees alone accounted for more than one quarter of the state government's revenue expenditure at 28 percent. cr.t.99 48.20 7.35 0.72 33. The total expenditure and the revenue expenditure respectively are at 34 percent and 19 percent of the GSDP of Bihar. The trends in expenditure on salaries.63 59. as well as expenditure on pension are presented in Table 7.38 14.25 1.07 78.03 14638 5420 20058 16581 12642 3939 3476 1996 1480 8.04 84.54 23563 8008 31571 18872 18759 113 10794 4804 5990 6.78 30.50 2.94 56.57 17.40 : Revenue Expenditure 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Revenue Expenditure (RE) (Rs.03 17. cr.02 53. this proportion has come down from 39 percent of revenue expenditure that existed in 2003-04.95 89. cr.) Plan Expenditure (Rs.57 75.r. but not faster than revenue receipts.) Non Plan Expenditure (Rs.44 61.34 80. during the last 6 years.31 18.13 72. RR (%) 12711 9771 22482 17280 11627 5653 5202 1084 4118 6. Table 7.66 19. it is seen that revenue expenditure is increasing much faster than GSDP.20 2. The salary 288 . cr.53 108.13 78.13 Expenditure on Salary and Pension Salary and pension constitute the two most important items of expenditure for all governments.) Capital A/c (Rs. From the buoyancy ratios.65 28938 9636 38574 20827 20718 109 15745 8219 7526 10.87 75.03 27.98 63.57 0. GSDP (%) Buoyancy of RE w.

) Salary as a percentage of GSDP Salary as a percentage of RR Salary as a percentage of RE Expenditure on Pensions (Rs. cr.41 : Expenditure on Salaries and Pensions Heads Expenditure on salaries of which (Rs. The increase in salary expenditure during the period was mainly due to enhancements in allowances of the state government employees. cr. Table 7. 7379 crore during the same period whereas. 552 crore to Rs.) Total as per cent of GSDP Total as per cent of RR Total as per cent of RE 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 5020 4468 552 7 40 39 2269 11 3 18 18 7289 10 59 57 5005 4564 441 7 32 34 2325 2 3 15 16 7330 10 47 50 5783 5153 631 7 32 33 2456 6 3 14 14 8239 10 46 46 6016 5539 478 7 26 29 2497 2 3 11 12 8513 10 37 41 6469 5915 555 6 23 27 2789 12 3 10 12 9258 9 33 39 7967 7379 588 7 24 28 3438 23 3 10 12 11405 10 34 40 Salary and Pension Expenditure of State Government (Rs Cr) 12000 10000 8000 6000 4000 2000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Expenditure on Pensions Expenditure on salaries Total expenditure on Salary and Pension 289 .468 crore to Rs. 4. cr. it has increased from Rs.) Non-Plan Head (Rs. under the plan head.) Plan Head (Rs. cr. 588 crore.) Rate of Growth (%) Pension as per cent of GSDP Pension as per cent of RR Pension as per cent of RE Total expenditure on Salary & Pension (Rs. cr.expenditure under non-plan head has increased from Rs.

as compared to the earlier period.438 crore in 2008-09. The state government has now implemented the new contributory pension scheme on the pattern of the central government scheme to reduce the long term liabilities on pension account which is applicable to the employees joining on or after September 1. it is clear that the quality of expenditure in Bihar has undergone significant improvement over these 5 years.269 crore in 2003-04 to Rs.14 Quality of Expenditure The quality of expenditure can be judged by the proportion of expenditure devoted to creation of income generating capital assets. quantum of developmental expenditure on social and economic services as opposed to non-developmental expenditure on general services. due to the two years’ moratorium on retirement coming to an end in March 2007. The pension and salary payments together constitute 10 percent of GSDP of the state and 40 percent of the state government's revenue expenditure.42 shows these ratios during the 5 year period 2003-08. 2. it increased from Rs. The higher the ratio of these components to total expenditure and GSDP. (3) the proportion of revenue expenditure on social and economic services and (4) ratio of plan and non-plan expenditure. The salary component of developmental revenue expenditure has declined from 54 percent to only 23 percent during this period. Going by all the parameters. (2) the ratio of capital outlay to GSDP.Salary and Pension as % of Rev Exp 70 60 50 40 30 20 10 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Salary as a percentage of RE Pension as percentage of RE Total as percentage of RE As regards pension payments. 2005. the better would be the quality of expenditure. Table 7. Both salary and pension expenditure grew at a higher rate after Marh 2007. and plan expenditure as opposed to non-plan expenditure. For example. as parameters of quality in expenditure. The remaining components of expenditure is accounted for by discharge of public debt and loans and advances made by the state government. whereas the non290 . Thus. while revenue expenditure has practically remained the same at 75 percent of total expenditure. 3. 7. the following ratios have been considered : (1) ratio of capital outlay to total expenditure. capital outlay has increased from a meager 7 percent to nearly a fifth of total expenditure.

providing better access to basic education. The Human Development Index is a more widely used means of measuring well being. from barely 2 percent of GSDP. housing etc.43 examines the efficacy of expenditure incurred by the state government in expanding and strengthening of social services during the 5 year period from 2003-04 to 2007-08.42 : Quality Parameters of Expenditure 2003-04 2004-05 2005-06 2006-07 2007-08 Parametres Capital Outlay (Rs cr) Revenue Expenditure (Rs cr) Of which Social and Economic Services with (i) Salary Component (Rs cr) Percentage of salary component (ii) Non salary component (Rs cr) Percentage of non-salary component Capital Outlay/ Total Expenditure (%) Revenue Expenditure / Total Expenditure (%) Revenue Expenditure /GSDP (%) Capital Outlay /GSDP (%) Plan Expenditure / Non-Plan Expenditure (%) Plan Expenditure / Total Expenditure (%) 1549 12711 7058 3824 54 3234 46 7 57 19 2 30 23 1205 14638 7968 3699 46 4269 54 6 73 20 2 21 17 4912 17756 11241 4304 38 6937 62 9 79 22 3 28 22 5211 20585 16994 4110 24 12884 76 19 76 24 6 53 35 6104 23563 20187 4577 23 15610 77 19 75 22 6 57 34 7. All these ratios reflect that the public finances in Bihar are moving in the right direction. health services. which takes into account the indicators of literacy rate and life expectancy. but human poverty goes beyond this. Allowing for the fact that investments take time to translate into actual developmental output.salary component has gone up from 46 percent to 77 percent of total developmental expenditure. sanitation. therefore. have now become more important components to establish a strong linkages to the welfare of the people and to eradicate human poverty. Poverty is measured in terms of the Physical Quality of Life Indices (PQLI). safe drinking water. The share of plan expenditure in total expenditure has also increased from 23 percent to 34 percent. meant to improve the HDI (Human Development Indices). 291 . The expenditure on social services is. Thus. In absolute terms. the results will follow in a few years. Table 7.15 Sectoral Expenditure Expenditure on Social Services Income poverty is conventionally measured in terms of the money that is spent on foodgrains. capital outlay has become nearly four fold during the period. it has now increased to more than 6 percent of GSDP. Table 7. which takes into account additional indicators like per capita income. along with life expectancy and literacy rate of a society.

866 crore in 2007-08 reflects the state government’s commitment to improve the standards of social services in the state.Table 7. Arts & Culture Total Expenditure (Rs crore) 2876 3160 Revenue Expenditure (Rs crore) 2822 3142 (a) Salary component (%) 75 68 (b) Non-salary component (%) 25 32 Capital Expenditure (Rs crore) 54 18 Capital Expenditure (%) 2 1 Health and Family Welfare Total Expenditure (Rs crore) 539 629 Revenue Expenditure (Rs Crore) 534 607 (a) Salary component (%) 89 76 (b) Non-salary component (%) 11 24 Capital Expenditure 5 22 Capital Expenditure (%) 1 3 Water Supply. Sanitation. Overall. cr) 29 28 Capital Expenditure (%) 6 3 Total Expenditure on Social Services Total Expenditure (Rs crore) 4197 4932 Revenue Expenditure (Rs crore) 4033 4795 (a) Salary component (%) 71 60 (b) Non-salary component (%) 29 40 Capital Expenditure (Rs. the total expenditure on social services was more than one third of the total expenditure and 48 percent of the total development expenditure. 4. the non-salary component of revenue expenditure worked out to 65 percent in the social services. Housing and Urban Development Total Expenditure (Rs crore) 276 321 Revenue Expenditure (Rs crore) 200 251 (a) Salary component (%) 36 29 (b) Non-salary component (%) 64 71 Capital Expenditure (Rs. 292 .197 crore in 2003-04 to Rs.43 : Expenditure on Social Services 2003-04 2004-05 2005-06 4423 4394 53 47 29 1 1015 877 71 29 138 14 532 407 20 80 124 23 1221 1184 28 72 37 3 7190 6862 49 51 328 5 2006-07 5359 5253 45 55 106 2 1153 985 60 40 168 15 766 514 18 82 253 33 1235 1166 14 86 69 6 8513 7917 40 60 596 7 2007-08 5553 5496 45 55 57 1 1387 1141 53 47 245 18 1052 713 16 84 339 32 2674 2517 8 92 157 6 10666 9867 35 65 799 7 Education. 10. Sports. cr) 76 70 Capital Expenditure (%) 28 22 Other Social Services Total Expenditure (Rs crore) 506 822 Revenue Expenditure (Rs crore) 477 794 (a) Salary component (%) 40 27 (b) Non-salary component (%) 60 73 Capital Expenditure (Rs. cr) 163 137 Capital Expenditure (%) 4 3 The increase in the overall allocation to social sector from Rs. In 2007-08.

34 120. The achievement against these targets is shown in Table 7.90 281. Sanitation. it was 55 percent.48 880. it stood at 47 percent and in respect of Education. the Twelfth Finance Commission had recommended that the non-plan salary expenditure under education and health and family welfare should increase only by 5-6 per cent while the non-salary expenditure under non-plan heads should increase by at least 30 per cent per annum. The task before the state government is now to increase capital expenditure in Education.07 790. Art and Culture.97 111.02 4741.52 223. Housing and Urban Development.14 Expenditure on Economic Services Table 7.29 1011. Also as much as 78 percent of the total revenue expenditure was incurred on non-salary components. In Water supply.36 349. Energy and Transport accounted for more than 60 per cent of the expenditure on Economic Services.87 216.76 982. The expenditure on Economic Services in 2007-08 accounted for 14 per cent of the total expenditure and more than one third of the total developmental expenditure incurred by the state government. Irrigation and Flood Control.12 258.44 and it is seen that nearly all targets have been achieved by the state government.44 : Achievements against TFC Projections in respect of Non-Plan Revenue Expenditure (Rs. Table 7.58 4189. Arts and Culture. Sports. crore) Education Health Building Road & Bridges TFC Actual TFC Actual TFC Actual TFC Actual 2005-06 3820. More than half of the total expenditure on economic services was on capital account.18 410.12 758. For improving the quality of education and health services.26 202.98 849.78 403.85 2007-08 4581. 293 . capital expenditure amounted to as much as 32 percent of the total expenditure.62 3777.76 362. it was only 1 percent in Education.45 shows the analysis of expenditure on Economic Services. Though overall capital expenditure increased from 4 percent to 7 percent of total expenditure during the five year period 2003-08. especially in transport (85 percent) and Irrigation and Flood control (61 percent). Sports.though in Health and Family Welfare.86 2006-07 4183. Agriculture and Allied Activities.91 180. and the non-salary component was also high at 84 percent of revenue expenditure. The expenditure on economic services is meant to create productive capacity in the economy.

03 303 1 0 100 302 99.36 28 2 0 100 27 96.96 3763 2005 14 86 1758 2862 1498 53 47 48 1.09 4051 2367 34 66 42 1.38 294 . cr) Capital Expenditure (%) Total (Economic Services) Total Expenditure (Rs crore) Revenue Expenditure (Rs crore) (a) Salary component (%) (b) Non-salary component (%) Capital Expenditure (Rs.02 302 1 0 100 300 99. cr) Capital Expenditure (%) Transport Total Expenditure (Rs crore) Revenue Expenditure (Rs crore) (a) Salary component (%) (b) Non-salary component (%) Capital Expenditure (Rs.24 841 726 0 100 115 13.45 : Expenditure on Economic Services 2003-04 Agriculture and Allied Activities Total Expenditure (Rs crore) Revenue Expenditure (Rs crore) (a) Salary component (%) (b) Non-salary component (%) Capital Expenditure (%) Irrigation and Flood Control Total Expenditure (Rs crore) Revenue Expenditure (Rs crore) (a) Salary component (%) (b) Non-salary component (%) Capital Expenditure (Rs.04 8481 4021 23 77 53 0.62 9520 4438 22 78 5082 53.06 3227 3227 19 81 1722 2007-08 759 737 31 69 22 1450 562 63 37 888 61.68 3035 2036 34 66 33 1.31 1199 1199 39 61 475 2004-05 407 397 44 56 10 916 473 51 49 443 48.67 560 285 38 62 275 49. cr) Capital Expenditure (%) Energy and Power Total Expenditure (Rs crore) Revenue Expenditure (Rs crore) (a) Salary component (%) (b) Non-salary component (%) Capital Expenditure (Rs.43 369 225 37 63 144 39. cr) Capital Expenditure (%) Other Economic Services Total Expenditure (Rs crore) Revenue Expenditure (Rs crore) (a) Salary component (%) (b) Non-salary component (%) Capital Expenditure (Rs.67 2707 407 29 71 2300 84.23 1514 1081 0 100 434 28.Table 7. cr) Capital Expenditure (%) 254 249 70 30 6 840 319 78 22 521 62.02 1316 1316 21 79 376 2005-06 504 410 47 53 93 1074 483 55 45 591 55.11 1609 1609 21 79 422 2006-07 596 585 39 61 11 1067 435 68 32 632 59.34 266 205 42 58 62 23.67 2076 414 25 75 1662 80.

However.46 : Per Capita Expenditure on Social and Economic Services 2003-04 Population (crore) Total Expenditure (Rs crore) General education Medical and Public Health Water Supply and Sanitation Social Services Economic Services Capital Outlay General Services Per Capita Expenditure (Rs) General education Medical and Public Health Water Supply and Sanitation Social Services Economic Services Capital Outlay General Services 320 45 14 484 330 178 829 348 57 16 555 342 136 886 467 82 31 812 686 224 942 548 89 24 896 893 549 926 565 128 64 1097 979 628 975 726 143 97 1374 1193 770 1120 2778 388 125 4197 2862 1549 7198 3092 504 142 4932 3035 1205 7871 4337 760 292 7541 6369 2084 8753 5204 848 230 8513 8481 5211 8798 5493 1242 622 10667 9520 6104 9474 7206 1415 966 13626 11834 7635 11109 8. primary..46 shows the per capita expenditure on social and economic services.5 2007-08 9.29 2006-07 9.e. Table 7.92 295 . secondary and higher education) increased from 2004-05 and stood at Rs 726 at the end of 2008-09. however. computed on the basis of estimated population of Bihar for the years 2003-04 to 2008-09.72 2008-09 9. note that the figures for per capita expenditure on each of these sectors conceal the larger inter-district disparity in government expenditure on different services which will be analysed later. the low level of per capita expenditure on medical and public health as well as drinking water supply and sanitation are matters of concern.88 2005-06 9.68 2004-05 8.7. One should. The per capita expenditure on general education (i.16 Per Capita Expenditure on Social and Economic Services Table 7. These areas are the state government’s priorities now. compared to only Rs 143 for medical and public health and only Rs 97 for water supply and sanitation. The per capita capital outlay has continuously been rising since 2005-06 and now stands at Rs 770 compared to the per capita expenditure on social services at Rs 1374 and that on economic services at Rs 1193.

Per Capita Expenditure on Social and Economic Services and per capita capital outlay (Rs) 1600 1400 1200 1000 800 600 400 200 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 Social Services Economic Services Capital Outlay Per capita expenditure on Education. Health and Water supply and sanitation (Rs) 800 700 600 500 400 300 200 100 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 General education Medical and Public Health Water Supply and Sanitation 296 .

6370 crore in 2007-08 to Rs.48. In this section. As regards expenditure. In the budget estimates of 2008-09. there was an actual surplus of Rs. The trend of higher expenditure in social services compared to that in economic services. The revenue surplus in 2008-09 budget is projected to decrease marginally. 4647 crore in 2007-08 to Rs. In the capital account. presented in Table 7. The structures of receipts and expenditure are presented in Table 7. in place of an actual deficit of Rs. one can see that there is a deficit of only Rs. is maintained and the expenditure in social service this year is projected to increase by more than Rs 2800 crore compared to about Rs 900 crore for economic services. resulting ultimately in decreasing the cash balance of the state government by Rs 56 crore. From the summary of the budget for 2008-09. the net effect being an increase in the cash balance of the state government by Rs 1372 crore. that of economic service remains the same. however.7. However. from Rs. however. The revenue expenditure is projected to increase by Rs 5375 crore during 2008-09. there has not been any structural shift in the receipts. 501 crore in the Consolidated Fund is partially offset by an a surplus of Rs 445 crore in the Public Account. From this table. The trend of increasing capital outlay has also been continued this year and the share of capital outlay in the total 297 . the deficit of Rs. While the share of social services in expenditure has increased marginally at the cost of general services. it can be seen that the tax revenue as a percentage of receipts in the Consolidated Fund is projected to decrease by 9 percent during 2008-09.17 State Budget for 2008-09 The budget for 2008-09 has attempted to add further momentum to the development and reform process that was embarked upon by the state government since 2005-06. The shortfall on this account. the earlier trend of rising revenue expenditure continues. 501 crore in the Consolidated Fund. is proposed to be met by a corresponding increase in the Public Debt receipts by 7 percent along with an increase in the grants and contributions from the central government by 3 percent. 445 crore in the Public Account in 2007-08. 1723 crore in the previous year. a characteristic of the state finance in the earlier years.47. Except for these. 5114 crore in 2008-09 budget. 4613 crore in 2008-09. budget for 2008-09 has been analysed. This has been made possible by a marginal decrease in the discharge of public debt obligations by 1 percent. the deficit is projected to decrease from Rs.

372 1124 167 2793 815 436 2785 75446 6069 85552 774 167 2698 4084 -445 56 3640 298 .848 10901 12689 5343 4 28938 -4.008 6. Deficit +) (Rs.647 29. Table 7.852 525.7 4. 1500 crore over the level of the previous year.expenditure has increased from 19 percent to 20 percent. crore) 2007-08 2008-09 1612 26 4500 22 Revenue Account Receipts Tax revenues Non-Tax Revenues 2007-08 21.485 73. Reserve Funds Deposits and Advances Suspense and Misc.563 -4.638 4522 Expenditure General Services Social Services Economic Services Grants and Contributions Total Revenue Expenditure Deficit Revenue A/c Consolidated Fund Receipts Net Consolidated Fund Contingency Fund Income Contingency Fund Total 9.252 9. PF etc.832 28. PF etc. Reserve Funds Deposits and Advances Suspense and Misc.114 38.084 391.370 31.903 -352 1. Remittances Total Receipts Net Results Public Account Net Result (All Accounts) 1. Remittances Total Disbursements 0 0 0 0 Public Account Receipts Small Savings.256 6.868 4.613 38.073 6104 1632 273 7635 1676 325 8.47 : Summary of Budget.571 9636 5.57 2008-09 24353 422 Capital Account Receipts Public Debt Recovery of Loans and Advances Total Capital Receipts Expenditure Capital Outlay Public Debt Loans and advances Total Capital Expenditure Deficit Capital Account Consolidated Fund Expenditure Grants and Contributions Total Revenue Receipts 5.210 8776 33551 1.723 0 0 501 0 0 Expenditure Contingency Fund Total Public Account Disbursements Small Savings.687 85.438 5 23. capital outlay has increased by more than Rs.574 1. In absolute terms. 2008-09 (Surplus -.

48 : Structure of Receipts and Expenditure of Consolidated Fund (Figures in percentages) Receipts Revenue Account Tax Revenue Non-Tax Revenue Grants-in-Aid and Contributions Capital Account Public Debt Recovery of Loans and Advances Total 5 0 100 12 0 100 2007-08 73 2 20 2008-09 64 1 23 Expenditure General Services Social Services Economic Services Discharge of Public Debt Loans and Advances Capital Outlay Total 2007-08 29 31 14 5 1 19 100 2008-09 28 33 14 4 1 20 100 Receipts in 2008-08 Budget (percent) Public Debt 12% Grants-in-Aid and Contributions 23% Tax Revenue 64% Non-Tax Revenue 1% 299 .Table 7.

300 . we have estimated the funds that have been transferred to autonomous bodies from the central government in 200708. The relevant data has been procured from the following three major societies to which central government funds are directly transferred : (a) (b) (c) Bihar Education Project (BEP) for Sarva Shikshya Abhiyan (SSA) State Health Society for all components of National Rural Health Mission (NRHM) District Rural Development Authority (DRDA) for National Rural Employment Guarantee Programme (NREGP). Swarnjayanti Grameen Swarozgar Yojana (SGSY). Indira Awas Yojana (IAY). In Table 7.Expenditure of Bihar Govt (percent) Capital Outlay 19% Loans 1% Discharge of Public Debt 5% General Services 29% Economic Services 14% Social Services 32% 7. Drought Prone Area Programme (DPAP). the number of centrally sponsored schemes for social sector development has increased substantially and an increasing amount of funds from the central government is being transferred directly to the autonomous state societies and District Rural Development Authorities (DRDAs) which are executing agencies for these programmes. Sampoorna Grameen Rozgar Yojana (SGRY). Provision of Urban Amenities to Rural Areas (PURA).49.18 Central Funds Bypassing the State Budget In recent years. Member of Parliament Local Area Development Scheme (MPLADS). Integrated Wasteland Development Project (IWDP) and funds for DRDA Administration.

Moreover.17 Total (NRHM) 305.90 10.5141 1.46 105.Table 7. the plan grants of the state government for State Plan Schemes.91 crore was routed directly to autonomous societies in 2007-08.27 43.8 ------1054.48 Total NRHM-A 207.67 Percentage of Central Funds bypassing the State Budget (Receipt) 11.42 IAY (Credit Cum Subsidy) 0 0 IAY (Flood Affected) 0 0 IAY (5%) 0.87 1721.1 NPEGEL 55.38 Total (SSA+NPEGL+KGBV) 1098.56 0 IAY (Kala Azar Affected) 12.99 76.49. This accounts for 11.98 229.42 3327.84 51.57 1377.12 IAY (New) 585.70 4326. crore) GOI Share bypassing state budget Name of Centrally Sponsored Programme 2006-07 2007-08 (Actual (Estimated Releases) Releases) SSA 1026.69 NRHM-D 14.54 percent of its expenditure.81 544. it is to be noted that a total of Rs.69 IAY (Upgradation) 146.29 1326.36 57.89 DRDA (Admin) 11.21 SGRY 127.15 percent of the receipts of the state government and 10.18 MPLADS 36.62 11.91 Receipts of GOB 25448 29848 Expenditure of GOB 27136 31571 Total Plan Grants (State Plan+ Centrally Sponsored Plan +Central Plan) 3563.03451 3.23 9.23 Total of GOI funds bypassing State Budget 2957.07 From Table 7.44 0 KGBV 16.94 71.5141 0 IWDP 9.49 : Details of Central Funds Bypassing the State Budget (2006-07 and 2007-08) (Rs.41 Total (DRDA) 1552.63 Haryali (DPAP) 9.67 Total Central Grants (Plan+Non-Plan) 5247.04 1.15 Percentage of Central Funds bypassing the State Budget (Expenditure) 10.54 Central Funds bypassing GOB budget as a percentage of Total Central Plan Grants (State Plan+ Central Plan +Centrally Sponsored Plan) 82.55 105.17 Total NRHM-B 27. Central Plan and Centrally Sponsored Schemes (CSS) for 301 .17 Total NRHM-C 56.6268 PURA 3.11 5831.2 NREGP 485.79 SGSY 124.39974 10.92 Central Funds bypassing GOB budget as a percentage of Total Central Grants 56. 3327.

This has an adverse effect on centre-state financial relations in particular and fiscal accountability in general due to the following reasons : (i) The state government has no direct control over the process of fund utilisation as the bulk of these funds do not pass through its accounts. The expenditure shown under works/ forest 302 . the nature of the schemes dictate the tying of funds to specific components. As pointed out earlier.50.908 crore and Rs 20. Thus its status as a monitoring authority has no financial backing.19 Plan and Non-Plan Expenditure in Districts Table 7. 4326. In an overall framework of decentralization. Bypassing the state government goes against the spirit of devolution and actually leads to centralization of financial management at the all India level leading to inefficient use of resources. Thus. This accounts for 57 percent of the total central government grants of Rs.67 crore and 77 percent of the total Central Plan funds that is not routed through the state budget. these are not captured in the Finance Accounts as is the case with every other expenditure made from the Consolidated Fund. This centralized framework limits the possibilities of adapting the expenditure to state-specific goals.50 shows the expenditure incurred under Non-Plan (NP). This is why the difference is arising in the first place.2007-08 was Rs. The plan and non-plan expenditure during 200708 as reported in the Finance Accounts are Rs 10. 7. since a significant part of the plan expenditure bypasses the state budget. in spite of an increasing share of state expenditure on these schemes. 5831. Indeed. adding to a total expenditure of Rs 31571 crore compared to Rs 29720 crore as shown in Table 7. Further. (ii) Apart from the fact that the funds are being transferred outside the state budget.664 crore respectively. it fails to create a synergy between the components of the state plan and the targets laid down by the central government. Central Plan Schemes (CPS) and Centrally Sponsored Scheme (CSS) in the districts during 2007-08. The figures are at variance with those reported in the Finance Accounts for the entire state as the process of reconciliation is yet to be completed. fiscal devolution should work from the central government to the state government and from the state government to district and panchayat levels.67 crore. the transfers from the central government bypassing the state budget is by no means a negligible amount. State Plan (SP). especially those relating to the Centrally Sponsored Schemes. low utilisation of funds in CSS has been a major issue for Bihar though it had been argued that funds transferred to autonomous societies bypassing the state budget would lead to higher and more efficient utilisation.

52 9.24 0.02 0.01 0.00 0.00 53. crore) Works/ Total Forest 53.27 266.62 11.01 3953.26 47.22 7.03 0.00 0.33 432.57 485.36 12.04 9.78 290.99 55.75 0.90 213. It is seen that Patna district accounts for about 43 percent of the total expenditure.71 72.01 0.35 49. Table 7.06 49.64 427.19 15.93 9.42 126.76 540.42 70.24 373.17 770.14 21.75 389.67 186.84 5.95 212.05 2.74 572.53 117.58 684.03 0.74 11389.24 432.44 76.96 27.76 432.70 222.56 362.04 0.32 71.77 71.89 105.02 0.54 270.61 72.05 0.37 575.15 327.91 142.63 112.06 76.10 119.48 26.51 1453.90 131.34 136.02 1.89 235.76 19.65 477.87 67.00 0.02 0.12 17.16 47.79 23.13 6.56 177.99 364.56 19058.71 752.72 12.00 554.03 0.75 32.34 491.03 0.63 0.02 0.25 736.13 4.01 85.06 0.04 0.63 119.06 497.69 77.92 247.04 0.04 119.02 137.56 5773.06 297.24 351.18 107.03 0.29 214.54 95.50 117.09 0.91 85.88 13.09 62.93 391.34 1064.52 625.88 95.36 0.43 526.50 44.26 38.39 81.19 SP 72.69 284.82 14.79 43.05 60.59 184.59 47.60 7.04 70.13 62.05 9.30 925.75 49.28 382. The per capita Central Plan assiatance was only Rs 1 compared to per capita Centrally Sponsored Plan funds of Rs 95.67 18.27 0.41 201.37 952.07 57.18 408.01 0.83 182.01 0.88 965.02 259.34 198.48 787.42 58.29 96.19 707.02 366.82 90.49 8172.41 2759.62 23.65 SubTotal 247.22 367.07 27.12 52.50 37.84 570.25 245.98 343.18 467.98 10. Table 7.93 259.26 13.11 49.49 317.43 333.88 392.79 (Rs.45 62.26 374.73 618.52 584.55 162.57 39.02 0.15 383.61 14.06 9.25 159.99 111.50 : Districtwise Expenditure (2007-08) NP Araria Arwal Aurangabad Banka Begusarai Bhabhua Bhagalpur Bhojpur Buxar Darbhanga East Champaran Gaya Gopalganj Jamui Jehanabad Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawadah Patna Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali West Champaran Total 164.22 300.16 10.48 303 .49 16.69 73.03 71.61 444.03 6.20 211.98 85.03 12842.99 502.02 0.79 93.55 286.51 shows the percapita plan and non-plan expenditure made in the various districts during 2007-08.99 3.65 73.01 467.71 19.67 67.03 0.77 89.20 144.73 67. The per capita annual expenditure amounted to Rs 3055 in 2007-08 while the per capita non-plan expenditure was Rs 1959.12 6.mostly are plan expenditure and are reflected in the Finance Accounts.50 653.21 1.20 659.81 294.03 0.45 25766.24 48.56 207.40 282.10 107.37 9.39 49.49 93.56 616.92 301.51 16.80 CSS 10.48 342.51 195.36 164.15 122.04 0.52 87.15 CPS 0.85 822.70 69.68 227.63 436.48 25.30 30.26 33.72 23.42 529.55 536.77 693.63 691.26 8.79 281.02 0.55 162.20 45.03 0.22 18.03 0.15 20.85 73.35 104.37 251.04 39.38 286.30 10.19 275.69 29720.55 520.10 600.43 514.81 451.23 448.04 0.75 14.

47 360.94 2181.48 223.48 313.40 1248.11 SP 286.56 254.74 259.61 39.51 287.76 2635.70 1543.92 2279.58 2499.02 2146.51 1369.45 686.10 2627.49 1301.08 1.18 0.66 416.69 997.89 41.26 0.33 2371.00 0.29 0.56 1355.71 1812.42 0.03 2442.28 0.90 1937.32 328.22 0.61 323.91 1142.61 300.56 54.39 0.56 1316.98 499.00 0.17 174.18 183.66 416.53 1140.46 1407.59 170.30 0.06 317.39 190.38 1374.13 155.10 590.29 1984.06 0.17 2015.28 917.47 53.15 0.25 0.30 1872.31 0.52 1256.87 396.93 47.87 0.26 CPS 0.36 19.41 48.10 1091.81 112.50 337.43 101.19 0.13 0.35 290.16 0.25 0.82 1083.18 0.76 2097.46 G.56 60.28 0.90 203.14 1928.81 1310.02 1007.97 298.13 1360.89 1645.95 2130.23 257.29 50.09 4.69 1676.05 149.07 0.50 223.20 0.16 49.49 46.83 36.83 973.15 0.32 0.41 4989.75 23223.63 51.08 0.56 255.28 0.96 50.28 1331.12 717.50 519.51 1298.72 154.94 323.67 1320.83 998.86 1503.54 1279.36 568.12 1506.08 1437.82 981.64 59.59 920.10 0.08 593.28 0.40 0.16 0.28 1718.83 780.15 189.26 58.65 955.37 369.26 313.53 433.49 1124.86 688.45 271.15 1891.03 1175.96 1933.31 0.90 249.56 1721.40 49.83 1415.88 1959.54 255.46 9.95 42.94 Works/ Forest 213.33 2096.63 380.Table 7.67 1021.84 379.65 69.13 95.06 0.00 1204.42 1326.23 0.56 1647.26 400.30 173.17 2648.96 815.15 54.25 713. Total 1191.29 1168.24 0.09 0.01 2169.84 1586.20 0.99 0.65 20596.08 0.49 0.07 1161.14 3055.73 NP 651.49 359.59 2614.34 164.99 227.17 300.21 51.09 0.35 1097.15 1700.11 0.17 0.92 1870.13 0.05 0.48 379.84 347.80 1602.95 63.06 0.64 355.94 1639.37 51.68 1555.02 1731.69 1737.08 431.16 0.05 0.41 0.57 1334.40 304 .71 600.48 2714.30 1315.27 253.46 61.46 76.12 1359.15 0.61 793.26 1147.06 0.16 0.51: Districtwise Per Capita Expenditure (2007-08) (Rupees) Population Araria Arwal Aurangabad Banka Begusarai Kaimur Bhagalpur Bhojpur Buxar Darbhanga East Champaran Gaya Gopalganj Jamui Jehanabad Katihar Khagaria Kishanganj Lakhisarai Madhepura Madhubani Munger Muzaffarpur Nalanda Nawadah Patna Purnea Rohtas Saharsa Samastipur Saran Sheikhpura Sheohar Sitamarhi Siwan Supaul Vaishali West Champaran Total 0.91 63.41 0.23 0.22 65.90 1812.93 2809.10 0.55 0.17 383.88 728.03 1511.06 0.43 2425.10 43.97 1147.18 0.11 421.77 1854.76 56.05 193.79 1549.05 867.20 0.63 369.28 0.18 1551.02 1361.97 406.12 12.15 0.32 0.44 1660.43 255.25 1879.09 1951.66 50.63 506.72 355.68 1066.13 2252.00 1734.25 0.29 1223.21 0.56 Total 978.61 975.64 1786.06 155.24 136.07 0.16 14778.01 CSS 40.55 60.77 1456.23 1092.05 2250.63 880.03 260.39 33.78 57.37 209.06 0.38 0.36 0.02 265.55 1909.61 153.00 0.71 33.44 0.14 0.46 51.02 251.06 0.07 3.19 1490.70 1257.80 40.

15 16. as in the previous year.23 KGBV 4.50 79.59 1886.37 52.62 5.10 NPEGEL 0.23 9.50 816. for the gender specific components.37 3. crore) Year Approved AWP & B 67.10 18.38 11. A componentwise break up shows that utilisation was 88 percent for the general component of the SSA.01 District Rural Development Authority (DRDA) The DRDAs in the state are responsible for implementation of most of the flagship programmes for poverty alleviation.47 264.1 percent of funds released were 305 .71 55.45 6.44 0.62 58.00 11. It should be noted here that although a substantial part of the funds (88 percent) released were utilised.83 842. From Table 7.38 129.61 2001-2002 2002-2003 2003-2004 20C4-2005 2005-2006 2006-2007* 2007-2008* 2004-2005 2005-2006 2006-2007* 2007-2008* 2005-2006 2006-2007* 2007-2008* SSA 33.68 9.13 15.30 1549.00 28.15 194.06 17. i.46 15.96 99.05 11.33 1564.92 246.03 44.35 764.93 48.21 98.61 22.76 25.51 9.71 13.05 351.70 138.85 12.00 8. One reason for high fund utilisation under SSA is that the implementing authority (Bihar Education Project) has existed as a functioning institution for several years.52 shows the financial performance under SSA scheme in Bhar from 2001-02 through 2007-08.22 59.05 52.77 835.00 57. However.00 1026. the gender specific component is a small percent of the total planned allocation.32 382.50 64.38 GOB 5.66 26. Fund utilisation in Bihar was quite high during 2007-08 under SSA.23 64.68 32.15 3161.79 2142.20 31. In 2007-08.29 1326.65 259.49 49.28 45.72 66.93 24. Table 7.89 376.49 302.17 12.50 107. one finds that 69.03 88.77 12.02 70.e. However.74 Fund Releasses GOI 28.97 45.38 17. the position with respect to releasing of funds itself was not satisfactory.00 121.78 33.44 2..49 41. providing a ready institutional infrastructure for the programme.66 69.00 95.53.50 444.70 13.90 50.00 18.33 73.97 12.84 51.33 538. more than twice the released funds for National Programme for Education of Girls at Elementary Level and 71 percent.83 80.7.74 2340. for Kasturba Gandhi Balika Vidyalaya.05 69.00 423.00 302.20 Centrally Sponsored Schemes Sarva Shiksha Abhiyan (SSA) Table 7.52 : Financial Performance under SSA (Rs.00 TOTAL Total Expenditure Utilisation (Percentage with respect to) Fund Fund released Approved 26.56 104.42 87. only 58 percent of the approved funds were released.80 29. the utilisation was 264 percent.

93 60.92 1054.89 1053.9 35. 17 are working and 34 are non-working companies.18 Share of GOB (Releas ed) 74.17 2.18 NREGP SGSY IAY (New) IAY (Upgradation) IAY (Credit Cum Subsidy) IAY (Flood Affected) IAY (5%) IAY (Kala Azar Affected) Haryali (DPAP) Total 284. but low in respect of SGSY and remaining components of IAY.22 7. The total investment including long term loans of the state government in the 17 working companies stood at Rs.55 1702.75 0 0 0 0 0. This has further slowed down the efficacy of the programmes.41 7. This process has proved to be cumbersome and prone to disputes. The relevant reasons concerned both planning and implementation of the programmes.84 1417.26 52.63 1.12 369.21 percent) and long term loans for Rs 8008. The total investment in public sector as on March 2006 was Rs 8631.79 percent). ion (Percen tage) 71.63 18.00 100.8 0 1964.00 36.93 100.18 49. most of these programmes are based on targeted identification of beneficiaries.62 crore (92. The sector wise break-up of the public sector is presented in Table 7.57 489.57 1472. Further.53: Financial Performance of : Schemes under DRDA (2007-08) Schemes under DRDA Financi al Target Spillov er from 200708 795.39 1706.74 3965.32 crore.05 19.77 1708. Table 7.70 crore (7.72 82.97 69.06 323.97 149.26 42. Of the 51 government companies.35 2. The Fund utilisation was high in some components of IAY and NREGP.11 0 0 0 0 0.53 2743.75 2196.21 State Public Sector Undertakings and Corporations Government Investments in Public Sector The public sector in Bihar comprises 51 government companies and 4 statutory corporations as on March 2008.22 21.52 46.04 7. 7638.18 44.96 0 0 0 0 2.35 171. Thus.65 crore till March 2006. 306 .94 72.1 151.74 1417.43 1423.04 7.63 18. even though they were all administered by the same authority. the capacity of fund utilisation varied among the programmes.17 2.54.17 1.53 2. crore) Total Utilisat Exp. comprising equity of Rs 622.72 82.4 Other Funds Total Funds Availa ble (Rs.93 - 58.23 63.79 105.47 540.22 73.21 0 0 0 0 1.98 3.47 Total (GOI and GOB) 618.29 Share of GOI (Releas ed) 544.utilized by DRDAs in 2007-08.54 0.29 73.63 16.

55.00 7721.51) 1848.18) N.03 4.48 28. N. 2007-08 results are not available. Nil Investment by Government in Share Capital Turnover of all PSUs Profit (Loss) Capital employed Return on capital employed Return on capital employed (%) PSUs Total Debt . Table 7.51 (1682. Nil (Rs. 55 : Consolidated Financial Results of Public Sector in Bihar (2005-06 and 2006-07) 2005-06 514.23 ( 145. It can be seen that the rate of return is negligible and that the accumulated losses of the all the companies have eroded their total equity base several times over.07 8008.99) N.61 7228.A.84 74.A.82 1253.31 (1582.42 ( 233. of which Government.Table 7. nor did they receive any grants or subsidy from the state government.70 1388.A. crore) 2006-07 514. N.14) 2641.86 6968.38 1.A. Their combined turnover has increased marginally between these two years.54 : Sectorwise State Government Companies and Corporations Number of Corporati ons Sector Agriculture Industry Power Electronics Transport Construction Drugs and Chemicals Mining Forest Financing Sugar Engineering Textile Public Distribution Handloom and Handicraft Others Total Number of Companies 8 14 1 4 1 3 3 1 1 1 1 1 1 1 1 11 51 1 1 4 The summarised financial results for the years 2005-06 and 2006-07 are shown in Table 7. Neither did they pay any dividend to the state government. Loan Accumulated profit (Loss) Dividend paid during year Grant received during the year Subsidy received during the year 307 .

It is seen that accumulated loss of BSEB has been increasing steeply and stands at more than Rs 1500 crore at the end of 2006-07. The total of state government loan due from the corporation stood at more than Rs 6200 crore as on March 2007.60 2005-06 1132.30) 1666.56 presents the financial results of BSEB during the three years from 2004-05 to 2006-07.30 crore in 2004-05 which increased to Rs.18 (670.93 ( 854.81 Negative 6204.79 (1524. 854.56 : Financial Results of BSEB (Rs.53 Negative 6433.71) Nil 720. Bihar State Road Transport Corporation (BSRTC). 54. The return on investment has been negative and the state government has paid a subsidy of more than Rs 2300 crore during the three years from 2004-05 to 2006-07. of which Government Loan Accumulated profit (Loss) Dividend paid during year (No. Table 7.43 ( 429. of Cos.48 (54. The Board had suffered a loss of Rs.42) 2225.00 2004-05 Turnover Profit ( Loss) Capital employed Return on capital employed Total Debt. five of these have not prepared any accounts ever since their inception. All the four corporations are functional.49 (240. Bihar State Financial Corporation (BSFC) and Bihar State Warehousing Corporation (BSWC). 561 crore. besides some of these companies have not prepared any accounts for as long as 20 years or even more.61 crore in 2006-07.61) 3087. in the 34 non-working state government companies. Table 7. comprising paid up capital of Rs.53 Negative 5500. The financial indicators of these companies cannot be analysed meaningfully as these are in various stages of liquidation.Non-Working Companies The state government has invested a total amount of Rs 720 crore till March 2007.06 4731.00 The problems which continue to seriously hamper power generation by the Board are : 308 . crore) 2006-07 1275.) Grant / subsidy received during the year 1000. Statutory Corporations The four statutory corporations of the state government are: Bihar State Electricity Board (BSEB). The most important among them in terms of operations is the BSEB.67) Nil 803. 159 crore and outstanding loans of Rs. In fact.39 4976.10) Nil 844.14 3943.

all companies are statutorily required to finalise their accounts within 6 months of the closure of the financial year. As per provisions of the Companies Act. 309 . 33 others have not finalised their accounts for more than last 15 years. In fact. It can be seen that none of them have prepared up-to date accounts and most of them have been defaulting for years together.57 gives the summarised results of the public sector corporations and state government companies for the year in which they have prepared their last accounts. etc. Lower plant availability due to frequent breakdowns/ interruptions in various equipment and auxiliaries. Low productivity of generating units due to design deficiency. The yearly accounts are the primary instrument of accountability and control of any organization. the state government is considering all options for restructuring of the Board. Abnormally long shut downs of generating units for capital maintenance. poor quality of coal. Summarised Results of Public Sector Table 7. these Companies continue to accumulate losses year after year at the cost of the public exchequer. Since the accounts are not up-to-date. 5 of these companies have not drawn up their accounts ever since their inception. the state public sector presents a picture of lack of accountability. The Board meetings of most of the companies were not held regularly. return on the investment cannot be calculated. Poor maintenance of units. The accountability of the government companies is ensured by the submission of accounts to the legislature. In the absence of this. For increasing efficiecy. None of these 51 companies could finalise their accounts for the current year. Failure to observe these statutory provisions relating to timely finalisation of accounts would normally attract penal provisions under the Companies Act.      High T&D Losses of more than 40 percent. mismanagement and mounting losses. The audited accounts are required to be laid before the legislature within 9 months of the closure of the financial year. Overdue renovation/ modernisation of the systems and substations/lines. As mentioned before.

85 (-)624.43 (-)437. Bihar State Film Development and Finance Corporation Ltd. Bihar State Food and Civil Supplies Corporation Ltd. Bihar State Backward Classes Finance and Development Corporation.83 2001-02 2005-06 2003-04 310 .94 4.00 1995-96 1992-93 1998-99 2000-01 2000-01 1989-90 1995-96 2001-02 1997-98 1987-88 1995-96 1995-96 1993-94 2001-02 1996-97 1991-92 --1978-79 1991-92 Investment Accumulated Year of (till March Profit (+) / Account 2007) Loss (-) 5969. Bihar State Text Book Publishing Corporation Ltd.18 (-)1.40 10. the state government may either improve the performance of these companies or consider their disinvestment.00 287.45 1.53 3. Bihar State Financial Corporation. Bihar Rajya Matsya Vikas Nigam Ltd.97 0.59 6. Government Companies Bihar Rajya Beej Nigam Ltd. The restoration of sugar mills under Public-Private cooperation is also under active consideration of the state government.49 1.38 0. In the absence of finalised accounts.34 73.Most of these companies do not hold their Board meetings regularly.48 (-)38. Bihar State Credit and Investment Corporation Ltd.50 34. Bihar State Water Development Corporation Ltd. Bihar State Beverages Corporation Ltd. Bihar State Hydro Electric Power Corporation Ltd.30 377. 30.53 (-)25.57 : Summarised Results of Public Sector in Bihar as per Their Latest Accounts Public Sector Units Statutory Corporations Bihar State Electricity Board. Bihar Rajya Pul Nirman Nigam Ltd. Bihar State Road Transport Corporation. Tenughat Vidyut Nigam Ltd.53 (-)10. The state government has already decided to wind up 5 working and 12 non-working companies. Table 7.15 5 59. Bihar State Forest Development Corporation Ltd.73 (-)1.48 (-) 1524.68 8.90 0.85 5. Bihar State Minorities Finance Corporation Ltd.04 (-)1.48 -(-)126.20 (-)9.92 (-) 10. In view of poor turnover and continuous losses. Bihar State Tourism Development Corporation Ltd.62 (-)0.32 7.15 125.12 --(-)11. Bihar Police Building Construction Corporation Ltd.03 7. Bihar State Electronics Development Corporation Ltd. Bihar State Mineral Development Corporation Ltd.33 1.71 2004-05 182.41 750.93 32. Bihar State Dairy Corporation Ltd. Bihar State Ware-housing Corporation.29 9.53 3. the return on investment and various other performance parameters of these companies remain unknown.01 2.85 (-)5.

Beltron Video System Ltd.49 10.16 342.06 (-)0.91 … (-)0.67 (-)0.95 0. The treasurywise data were analysed to ascertain accurately the expenditure incurred by the state government in the districts under social sector heads.13 (-)1.13 (-)0.31 (-)2. Bihar State Glazed Tiles and Ceramics Industries Ltd. Bihar Scooters Ltd. Jhanjharpur Paper Industries Ltd.22 Disparity in Government Expenditure on Social Sectors across the Districts The last Economic Survey had pointed out the disparities that existed between the districts in the state in respect of the state government expenditure on health and educational sectors.02 5.16 (-)0.31 …. Bihar State Construction Corporation Ltd.56 2.28 7.36 0.61 (-)0. Synthetic Resins (Eastern) Ltd. Bihar Fruit and Vegetables Development Corpn.44 (-)72.79 (-)8.47 0.28 0.95 -2968. Bihar State Handloom and Handicrafts Corporation Ltd.8 9.49 ….01 (-)0. Bihar State Cement Corporation Ltd.11 19. Bihar Paper Mills Ltd.62 11.13 80. Bihar Solvent and Chemical Ltd.54 3. (-)0. Bihar Panchayati Raj Financial Corporation Ltd. Ltd. Kumardhubi Metal Casting and Engineering Ltd.72 18. Bhawani Active Carbon Ltd. Bihar State Small Industries Corporation Ltd.Table 7. Total 18. 311 . Bihar State Export Corporation Ltd.09 24.92 (-)2. This year the analysis has been extended into more sectors. Bihar State Agro Industries Development Corpn. (-)0.56 (-)22. Bihar State Industiral Development Corporation Ltd.17 3.01 (-)2.) Bihar Hill Area Lift Irrigation Corporation Ltd.07 3.73 … (-)0.86 (-)14. Bihar State Pharmaceuticals and Chemicals Development Corporation Ltd. Beltron Mining System Ltd. Magadh Minerals Ltd.81 1.03 19.03 (-) 0.02 (-)0.41 83. Bihar Insecticides Ltd.16 (-)0.22 2.32 (-)0. Ltd.32 (-) 0.57 : (Contd.55 20.97 1.03 (-)16. 1987-88 1983-84 1984-85 1985-86 1983-84 1985-86 1984-85 1991-92 7.16 (-)5.71 1. Bihar Maize Products Ltd.48 0. Bihar State Tannin Extracts Ltd.96 1.28 1.51 (-)0.22 8703.05 8. Bihar State Finished Leather Corporation Ltd.24 7.81 1982-83 1986-87 1991-92 1986-87 1990-91 1986-87 … 1985-86 1983-84 1985-86 1984-85 1985-86 1988-89 1986-87 1983-84 … 1985-86 1982-83 1986-87 1994-95 1987-88 1989-90 …. Bihar State Textile Corporation Ltd. Bihar State Sugar Corporation Ltd. Vishwamitra Paper Industries Ltd.74 (-)0. Bihar State Leather Industries Development Corporation Ltd.65 4.22 (-)0. Bihar Drugs and Chemicals Ltd. Beltron Informatics Ltd..

secondary and higher education across all the districts of Bihar as well as for health and supply of drinking water. followed by 30 percent on urban areas and 10 percent on medical training and research and the rest 6 percent on public health. as compared to 46 percent last year. This again reflects the state government’s priorities in the sphere of healthcare in favour of rural areas where adequate facilities do not exist.59 in descending order and the maximum and minimum expenditure can be readily compared with the average expenditure that has been worked out for each sub-major head of accounts. The extent of disparity between the per capita expenditure in Patna and in the other districts of Bihar is found to be very large in all these areas. Table 7. Table 7. in 2007-08. and it has not been reduced compared to the last year. The data have been arranged in Table 7. This signifies the priorities the state government places upon primary education.59 and the accompanying charts show the districtwise per capita expenditure in 2007-08 on the sub-major heads of primary.58 : Government Revenue Expenditure on Education and Health General Education Primary Secondary Higher Education and Others Others (Adult Education etc) Medical and Public Health Urban Rural Public Health Medical Research and Training 2005-06 100 64 16 18 1 100 37 49 4 10 2006-07 100 63 20 16 1 100 38 46 6 10 2007-08 100 67 17 14 2 100 40 50 2 8 Table 7. 50 percent of the total expenditure were made on rural areas.From Table 7.61 shows the per capita amounts for the same.60 shows the districtwise expenditure in respect of a few other heads and Table 7.58. All these are key components of the expenditure on social sector. In medical and public health. worked out on the estimated mid-year population for 2007-08. 67 percent of the total state government revenue expenditure on education were made on primary education. These tables and the accompanying chart also show that the extent of disparity remains equally conspicuous in respect of these heads. 312 . followed by 17 percent in secondary education and 14 percent on university and higher education. we can see that.

93 42.89 10.93 0.59 48.63 213.45 7.58 58.85 0.94 87.34 188.41 8.53 1.10 55.47 0.49 145.39 62.00 0.23 0.79 Drinking Water Primary Supply Education District Patna Munger Bhagalpur Muzaffarpur Saharsa Aurangabad Saran Samastipur Bhojpur Nalanda Rohtas Jehanabad Kishanganj Madhepura Purnia Vaishali Supaul Katihar Gopalganj Khagaria Nawada Buxar Jamui Pashchim Champaran Madhubani Purba Champaran Siwan Sitamarhi Banka Darbhanga Begusarai Arwal Sheohar Araria Lakhisarai Sheikhpura Kaimur (Bhabua) Gaya State Average Per capita Expenditure 1532.59 : Per capita Expenditure on Social Sectors (Rs).47 98.52 0.39 51.04 39.08 44.15 99.52 33.14 46.09 85.84 30.57 181.37 180.41 2.48 17.68 399.82 48.36 178.94 111.62 76.03 43.31 10.00 164.09 170.65 153.80 61.76 2.16 33.95 51.86 8.58 8.02 42.72 173.49 0.77 36.74 25.51 13.41 0.76 66.83 9.44 92.65 0.32 34.57 44.15 36.28 1.92 12.04 56.63 199.00 0.00 0.64 23.06 50.98 2.79 77.51 13.18 14.13 2.17 211.93 46.16 6.31 204.69 95.47 60.33 43.45 46.85 1.54 194.00 31.73 85.18 288.78 56.10 217.90 34.23 7.01 80.88 265.48 86.67 57.76 25.16 79.73 59.00 210.28 93.34 106.00 0.04 73.35 169. 2007-08 Primary Education District Patna Munger Nalanda Jehanabad Madhepura Vaishali Aurangabad Khagaria Bhojpur Bhagalpur Rohtas Saharsa Muzaffarpur Begusarai Saran Lakhisarai West Champaran Buxar Banka Samastipur Madhubani Darbhanga Purnea Katihar Nawada Siwan Sheohar Sheikhpura Gopalganj East Champaran Supaul Sitamarhi Arwal Araria Gaya Kishanganj Jamui Kaimur State Average Secondary Education Per capita Expenditure 3867.67 48.57 42.80 61.55 57.95 7.61 42.87 13.77 56.81 229.36 40.28 55.15 160.27 7.39 51.46 55.88 211.36 151.08 127.66 164.91 54.24 179.10 68.49 12.98 170.35 0.50 8.78 51.54 3.66 1.79 200.31 51.75 36.85 7.93 0.93 87.25 67.19 0.45 0.00 0.79 194.61 6.23 145.33 165.43 209.44 38.00 0.52 194.65 0.25 Secondary Education District Patna Darbhanga Bhagalpur Jehanabad Gaya Munger Muzaffarpur Sheikhpura Nalanda Gopalganj Aurangabad Bhojpur Begusarai Lakhisarai Nawada Samastipur Saharsa Khagaria Banka Rohtas Purnia Vaishali Pashchim Champaran Madhubani Jamui Katihar Purba Champaran Sitamarhi Saran Buxar Siwan Arwal Kishanganj Madhepura Sheohar Araria Kaimur (Bhabua) Supaul State Average Higher Education Per capita Expenditure 927.95 34.45 47.82 221.78 45.76 4.86 124.14 212.28 37.26 20.30 31.91 2.01 1.57 29.37 40.60 1.28 33.59 31.37 182.52 0.08 2.70 69.24 38.31 3.06 District Patna Bhagalpur Munger Darbhanga Muzaffarpur Sheikhpura Rohtas Purnia Gaya Saran Bhojpur Jehanabad Nalanda Saharsa Aurangabad Banka Buxar Kaimur (Bhabua) Nawada Jamui Sitamarhi Vaishali Purba Champaran Khagaria Samastipur Gopalganj Begusarai Katihar Pashchim Champaran Madhepura Madhubani Araria Siwan Lakhisarai Kishanganj Sheohar Supaul Arwal State Average 313 .20 30.26 0.34 91.18 5.54 Medical Drinking Water Supply Per capita Expenditure 170.22 191.34 0.00 88.47 60.82 1.72 Higher Education District Patna Munger Buxar Jehanabad Bhojpur Bhagalpur Nalanda Arwal Saran Rohtas Lakhisarai Sheikhpura Siwan Gopalganj Muzaffarpur Aurangabad Begusarai Samastipur Vaishali Gaya Nawada Madhubani Darbhanga Saharsa Banka Khagaria Madhepura Sitamarhi Katihar Pashchim Champaran Supaul Jamui Kaimur (Bhabua) Sheohar Purba Champaran Purnia Kishanganj Araria State Average Medical Per capita Expenditure 625.88 0.18 0.16 107.20 1.89 221.Table 7.

A r rw al ) N al an da R oh Sh ta s ei kh pu G r op a Au alg a ra nj ng ab Sa ad m as ti p ur G a M ad ya hu ba Sa ni ha rs Kh a ag Pa ar sh ia c h Si t am im a C ha rhi m pa ra n Ja m Sh ui eo ha r Pu rn ia Ar ar ia Pa t Na na la n Va da is Kh h ali a Bh ga r ag ia a Sa lpur h Be ar s Pa gu a sh sa ch ra im i Ch Sa a m ra n pa ra Ba n M ad nka hu ba n Pu i rn Na ia wa Sh d a e G oh op ar al ga Su n j pa ul Ki Ara Ka im sha r ia ur ng (B an ha j bu a) .100 200 300 400 500 600 700 1000 1500 2000 2500 3000 3500 4000 4500 500 0 0 Je ha na ba d Per capita Expenditure on Primary Education (Rs) Per capita Expenditure in Districts on Secondary Education (Rs) 314 Pa tn a Bu (i n xa cl .

1000 1200 1400 1600 1800 200 400 600 800 0 1000 100 200 300 400 500 600 700 800 900 0 Pa Bh t na ag al p Sa u r ha rs a Per Capita District Expenditure on Higher Education (Rs) Per capita Expenditure on Medical in Districts (Rs) 315 Pa Bh t na Je ag ha al pu na r ba M d un (i n ge cl .A r rw a N l) al an Au d ra ng a a Be bad gu sa ra N aw i ad Sa a ha rs a Ba Pa nk sh a ch Pu im rn C ia ha m pa ra Pu n rb Ja a m C ha u m i pa ra n Sa ra n Si w M an ad he pu ra Ar ar ia Su pa ul Sa ra n Bh oj pu r R oh t M ad as he pu r Va a is ha li Je Ka ha t ih na Kh ar ba ag d (i n ar i cl .A a rw al ) Ja m M ui ad hu ba ni Si w an Ba nk Be a gu sa ra i Ar ar Sh e i ia kh pu ra G ay a .

100 120 140 160 180 20 40 60 80 0 Per Capita District Expenditure on Drinking Water Supply (Rs) 316 Pa tn a M un M u z ger af fa rp ur R oh ta s G ay Bh a oj pu r Sa ha Au rs ra a ng ab ad Bu xa r N aw ad Pu Si rb ta a m a ar C ha hi m pa Sa ra n m as Pa tip sh u ch Be gu r im sa C ra ha i m pa ra M n ad hu ba ni Si w Ki sh an an ga n Su j pa ul .

55 7.47 9.20 10.31 1.90 4.93 10.21 2.25 9.11 2.28 12. ST.58 3.67 8.06 0.66 3.09 0.32 0.69 8.25 0.14 6.48 1.73 Welfare of SC.55 6.22 8.11 0.36 2.97 8.61 8.44 0.22 9.01 2.22 7.89 8.05 6.29 13.61 1.57 2.72 2.70 7.83 18.29 0.60 3.02 5.54 0.13 2.27 0.44 1.36 1.00 11.02 16.40 6.15 0.66 248.70 0.28 0.50 6.01 7. Champaran Khagaria Madhubani W.59 4.12 10.85 10.10 6.30 5. OBC 54.Table 7.21 3.25 0.00 195.24 12.Crore) Population (Crore) Patna Darbhanga Samastipur Muzaffarpur Sitamarhi E.15 2.08 5.41 0.78 14.20 0.16 0.69 2.36 9.06 7.55 0.58 0.12 12.80 11.17 8.80 10.28 0.78 7.85 0.15 6.11 10.16 12.05 0.43 21.21 6.40 0.20 352.74 0.46 5.93 3.03 13.26 0.28 0.00 2.11 4.50 13.01 10.07 6.68 10.30 0.07 4.64 9.82 9.62 3. Champaran Begusarai Vaishali Nalanda Gaya Bhagalpur Katihar Siwan Supoul Sheohar Saran Gopalgunj Purnea Rohtas Bhojpur Madhepura Saharsa Araria Aurangabad Bhabua Nawadah Buxar Banka Jahanabad Jamui Kishanganj Munger Lakhisarai Sheikhpura Arwal Total 0.89 14.91 6.66 Public Works 117.97 1.34 4.90 9.58 2.39 9.49 9.48 4.69 6.86 5.36 10.73 8.24 3.24 0.60 0.09 5.90 7.78 5.55 16.16 0.40 7.48 4.75 2.89 3.31 0.21 4.41 7.21 0.49 0.27 383.79 1.34 18.90 9.91 4.97 2.49 3.00 403.15 5.58 4.64 1.07 317 .43 0.22 7.99 12.36 0.55 0.12 11.83 4.88 2.96 14.78 6.13 3.32 0.97 4.64 2.32 18.28 0.44 6.15 0.19 0.40 0.09 6.09 3.69 10.57 5.45 4.67 1.21 1.20 10.42 2.18 0.19 0.81 8.81 0.46 1.42 0.85 8.32 1.30 10.81 9.53 12.31 6.85 7.97 2.02 Social Security & Welfare 144.74 7.18 5.71 20.51 Nutrition 14.47 5.46 0.18 0.03 5.66 4.07 9.97 3.13 0.83 1.70 7.38 3.63 6.89 2.98 Roads & Bridges 82.32 0.39 0.06 0.30 2.60 : District wise expenditure on Some Other Social Sectors during 2007-2008 (Rs.64 1.28 10.27 1.78 4.38 0.15 0.11 3.91 7.54 3.86 10.45 3.16 7.74 0.95 4.12 14.87 5.52 3.

99 23.66 17.88 10.92 12.55 20. Champaran Begusarai Madhubani Supaul Nalanda Vaishali Jahanabad Bhagalpur Katihar Madhepura Kaimur Saharsa Siwan Gopalgunj W. ST.02 45.60 27.56 9.31 8.59 24.20 43.25 21.64 16.80 8.24 34.80 27.52 52.91 27.21 19.92 16.54 19.61 : Districtwise Per Capita Expenditure during 2007-08 (Rupees) Welfare of SC.11 32.20 37.98 15.93 5.68 34.09 28.09 58.11 28.26 36.87 45.48 17.69 32.33 26.47 30.13 16.39 33.60 4.09 9.44 26.11 32.33 23.64 47.80 70.07 45.70 38.35 36.76 22.67 3.65 22.21 28.06 4.84 32.43 7.53 20.34 37.80 23.45 37.37 5.34 19.94 4.44 13.14 21.88 47.23 9.84 40.27 7.41 11.65 9.98 52.49 7.44 0.61 34.Table 7.17 5.07 27.07 28.66 47.79 38.27 23.66 32.16 106.71 16.22 30.79 1.82 17.81 23.42 24.79 24.59 31.59 30.19 8.59 40.83 0.57 22.99 39.55 67.03 3.89 5.20 27.22 41.56 17.37 40.65 45.82 44.47 District Name Patna Sheohar Darbhanga Khagaria Sitamarhi Samastipur Muzaffarpur E.11 37.36 12.62 22.39 36.47 30.11 36.87 10.22 42.55 15.67 22.08 24.66 17.63 24.75 13.18 10.23 13.49 25.29 31.51 9.50 Public Works 212.76 23.04 34.94 13.63 25.89 57.85 24.90 14.53 13.58 39.30 22.10 18.15 16.16 33.30 19.42 39.99 8.64 33.72 4.83 22.27 6.27 36.83 6.80 24.26 21.72 3.20 34.34 35.45 33.98 36.08 24.38 25.55 37.29 40.67 41. OBC 97.83 33.77 25.29 33.15 16.39 9.10 318 .31 17.26 44.86 35.52 3.88 36.02 24.44 20.50 Social Security &Welfare 260.63 1.54 40.76 22.07 30.00 20.90 24.44 30.24 35.42 32.00 41.81 32.81 22.31 25.21 33.19 Roads & Bridges 148.19 38.96 29.77 30.58 19.06 12.09 28. Champaran Buxar Gaya Munger Purnea Sheikhpura Jamui Bhojpur Kishanganj Rohtas Nawada Banka Aurangabad Araria Saran Lakhisarai Arwal State Nutrition 27.91 5.

D 319 .Disparity in Per Capita Government Expenditure under Different Expenditure Heads (Rs) 300 Welfare of SC. SSA. In the above analysis.62. Health etc. OBC 250 Social Security &Welfare Nutrition 200 Roads & Bridges Public Works 150 100 50 0 ar bh an ga Si ta m ar M hi uz af fa rp ur Be gu sa ra i Su po ul Va is ha li Bh ag al pu M r ad he pu ra Sa ha rs a G op al gu nj Bu xa r M un ge Sh r ei kh pu ra Bh oj pu r R oh ta s La kh is ar ai Pa tn a Ba nk a Ar ar ia Patna district of course accounted for the maximum expenditure for each of these heads. if at all. as shown below in table 7. have not been considered. SGSY etc. but that would affect the pattern of disparity as shown in the above analysis only marginally. expenditure made on various Centrally Sponsored social sector programmes like NRHM. located mostly at Patna have not been allocated among the districts which would perhaps reduce the disparity level to a small extent. but the difference between the maximum and minimum expenditure was large enough to be cause of serious concern. ST. Also the expenditure made on the headquarters of various State Government Departments like Education.

531 Panchayat Samitis (PSs) and 8471 Gram Panchayats (GPs) in Bihar.61 Minimum Expenditure (Rs.18 625.68 30.16 0.04 148.06 25.23 : Panchayati Raj Institutions The Bihar Panchayati Raj Act was enacted in 1993 and was substituted by the Bihar Panchayat Raj Act.Table 7. The Panchayat Samities and Gram Panchayats are yet to raise revenue from their own sources and the state government had not yet taken the necessary action by way of notifying the rates of taxes. Panchayat Samiti and Gram Panchayat) started functioning from 2001-02. PRIs are financed by grants from the central government.34 0. Gaya Supaul Arwal Arwal West Champaran Arwal Arwal Arwal Average expenditure for the State (Rs.62 : Per Capita Minimum and Maximum District Expenditure during 2007-08 Maximum Expenditure (Patna district) (Rs.54 31. Kaimur. OBC Social Security & Welfare Nutrition Roads & Bridges Public Works 927. 320 . besides recurring and non-recurring grants released by the state government and its own sources of revenue.) 66. tolls.38 19.94 1532.23 170. The financial assistance to PRIs and Urban Local Bodies (ULB) during the last 6 years is shown in Table 7. though the processs of transfer of functions.25 Head of Account Primary Education Secondary Education Higher Education Medical Drinking Water Supply Welfare of SC. Araraia. by 2005.63.72 91. The list of such departments can be found at Appendix I.50 39.02 17.11 0. The total population covered by these is about 7.10 7.88 14.00 9. as per the recommendation of the second State Finance Commission (SFC).00 107.47 36. Lakhiserai. Sheohar. to be imposed by them. The Panchayat Raj Department (PRD) of the state government coordinates the functioning of the PRIs. functionaries and funds to PRIs by these departments is yet to be completed. the state government had devolved several functions of 20 departments to PRIs.34 212.19 41. Sheikhpura.79 88.75 260.) 399. 2006.00 0. As required under Article 243G of the Constitution.00 District registering minimum per capita Expenditure Kaimur Araria Arwal.59 27. A three-tier system of Panchayat Raj (Zila Parishad.) 3867.86 97.50 20. fees etc.43 crore. ST. There are 38 Zila Parishads (ZPs).

III and IV give the position of receipts and expenditure of 12 Zila Parishads (199697 to 2005-06). rent of Dak Bunglow/ Inspection Bungalow.13 NA 4.63 : Financial Assistance to PRIs and ULBs (Rs crore) 2002-03 ULBs: Municipal Corporation and Municipalities PRIs: Zila Parishads and Other PR Institution 67.49 2004-05 38.16 PRIs 12 ZP (out 0f 38) 65 PS (out 0f 531) 195 GPs (out 8471) Total Own Receipts 33.96 Nil Nil Total Receipts 419.90 34.28 The Zila Parishads are authorised to raise a small amount of revenues from its own resources like rent of shops.17 110. Bihar for the period from 1996-97 to 2005-06.72 90.28 2003-04 42. The Zila Parishads naturally were unable to meet their establishment and other recurring charges from their own sources and had to be financed by the state government by way of grants and loans amounting to Rs 834 crore in 2007-08.14 46. 2006 pertaining to civic amenities in rural areas. In the absence of this.22 2006-07 122.45 379.45 NA 20.22 69.95 153. It can be seen that about 14 percent of the total funds received could not be utilised by the PRIs. the financial reporting system with the PRIs remains generally weak.60 321 . bullock cart registration fee and other miscellaneous fees.37 834. PSs and GPs for activities specified under Section 22. Compared to this.72 2005-06 139. The PRIs were yet to maintain any account of the funds received.64. settlement of ponds/ghats/ferries/road side land and trees.01 42. 47 and 73 of the Panchayat Raj Act. The funds released by the central and state governments are utilized by the ZPs.76 Total Expenditure 361. Finances of the Panchayat Raj Institutions Appendices II. The summary of receipts and expenditure of these institutions is given in Table 7. Table 7.64 : Receipts and Expenditure of PRIs till 2005-06 (Rs crore) Total Savings = EstablishReceipts ment Expenditure Expenditure 27.Table 7. they clearly lack the accounting expertise necessary for this purpose. the total assistance given to the ULBs amounted to Rs 278 crore in 2007-08.87 522. 65 Panchayat Samities (2001-02 to 2005-06) and 195 Gram Panchayats (2001-02 to 2005-06) which were audited by the Examiner of Local Accounts.39 57.25 2007-08 278.

The third SFC was constituted in June 2004 and it submitted its report the same year incorporating all interim recommendations of the previous Commissions. of works undertaken 12 ZP (out 0f 38) 65 PS (out 0f 531) 195 GPs (out 8471) 7047 8703 12113 Total no.65 shows the summary of the total works executed by these PRIs in Bihar till 2006-07.93 Advance Involved in Incomplete Schemes (Rs Cr) 39. Eleventh and Twelfth Central Finance Commissions are shown in Appendices II to IV. Panchayat Samitis and Zila Parishads in the ratio of 93:6:1 respectively. The state government had accepted the above recommendations. The grants received by the above PRIs under recommendations of the Tenth. The rules regarding constitution of the committee. 1993. of works completed 3837 5154 9756 No of Incomplete Schemes 3210 3549 2357 As per Section 134 of the Bihar Panchayat Raj Act. The second State Finance Commission. functions and jurisdictions were notified by the state government in January 2007.Table 7. the first State Finance Commission (SFC) constituted in 1994 did not make any recommendation.96 Total no. Table 7.65 : Summary of Total Works executed by PRIs till 2005-06 Estimated Cost of Incomplete Schemes (Rs Cr) 28. the state government is to constitute a District Planning Committee in every district to consolidate the plans prepared by the PRIs and ULBs in the district and to prepare a draft development plan for the district as a whole.05 crore. It can be seen that about 33 percent of the total number of works remain incomplete as on March 2007.71 7. Central and State Finance Commission Grants The central grants to PRIs are given under recommendations of the successive Central Finance Commissions and the state government grants under recommendations of the successive State Finance Commissions (SFC).32 11. The 'Population ratio' was also recommended as criteria for distribution among Panchayat Samitis and Zila Parishads. 322 .86 44. its powers. involving a total advance of Rs 74. constituted in June 1999. As regards the SFC transfers. The District Planning Committees are being constituted in all districts.38 26. submitted five interim reports mainly on the distribution of Tenth FC and Eleventh FC grants to Gram Panchayats.

(v) The local bodies need to create some revenue generating assets in respect of their future needs. The commission suggests that the PRIs and the ULBs may seek financial help from the financial institutions without any Government guarantee to promote the revenue generating projects such as market complex. slaughter house. There shall be 20 percent tapering each year. shops. (iv) The Zila Parishad concerned shall make a further devolution from the matching contribution so received to the rural local bodies within its jurisdiction in the same manner as the resources raised are calculated for that particular financial year. (vii) The Commission also recommended a one time grant to these bodies for developing their database. For the purpose of this clause the resources raised by a Zila Parishad shall include the resources raised by the Panchayat Samitis and Gram Panchayats within its local jurisdiction. Current liability shall not include arrears of salary. In case the resources raised by the local bodies exceed the amount of 3 percent above referred then every local body shall get a proportionate share only weighted by the resources raised by itself within the 3 percent limit. high level bridges. bus stops etc. (ii) The State Government will distribute this amount among the local bodies as a matching contribution to the total resources raised by the said urban local bodies and the Zila Parishads in the immediately preceding financial year from its own sources and will be based on actual collection. (iii) The matching contribution mentioned above shall be limited to an amount equal to the resources raised by the urban local bodies and Zila Parishads as referred to above. (vi) The actual salary requirements of regular employees working against sanctioned posts should be borne by the state government. if any. 323 . tanneries.Its major recommendations were as follows : (i) An amount not exceeding 3 percent of the State’s total tax revenue from its own taxes net of the collection costs shall be set apart in the annual budget for providing matching share to each urban local body and Zila Parishads among the rural local bodies. For this purpose the current annual salary liability of the local body in the financial year immediately preceding the year in which the report of the Commission is implemented should be taken as the base year and the base amount.

68 for the period from 199697 to 2005-06. No.66 : Grants for 12 Zila Parishads (1996-97 to 2005-06) (Rs crore) Sl.17 361.52 59. Bihar is attempting top build a database gradually based on their audit results of few Panchayats every year and the information in respect of 12 Zila Parishads. Table 7.22 7.76 33. On the basis of information published by him in his latest report for 2006-07.73 113.09 27. but also directly from the central government for various Centrally Sponsored Schemes which are not routed through the state government budget.Grants for Centrally Sponsored Schemes The PRI institutions receive grants not only through the central and state Finance Commissions recommendations.96 Expenditure 19.66.39 Balance 0.39 3.33 29.84 115.11 1. repair and maintenance of roads. Since there is no comprehensive database for the PRIs in Bihar developed so far.67 6. grant and loan and own receipt for establishment expenses. The Examiner of Local Accounts. 1 2 3 4 5 6 7 8 Fund Particulars 10th FC 11th FC 12th FC EAS/SGRY NREGP/SREGP MP/MLA/MLC Other non-recurring grants Govt. 867 and 7. besides additional central assistance for construction of Gram Panchayat buildings.57 419.62 26.05 1.45 The other non-recurring grants received were from the state government.35 93.29 2. 65 Panchayat Samities and 195 Gram Panchayats are available from this database.38 100.72 57.60 11.71 3. 324 . we have no source from where to gather information about the total amount of grants flowing to them for the Centrally Sponsored schemes. from the state Education Department for construction of Primary School buildings and providing water and toilet facilities in Primary/Middle Schools as also from the Agriculture Department for Macromode schemes and from the Revenue Department as road cess.83 34. The state government grants included those from the Panchayati Raj Department for repair/renovation of Inspection bunglows/Dak bunglows.68 5.60 107. the information about the grants received by the PRIs under the various Finance Commission grants and under the Centrally Sponsored Schemes are presented in Table 7. Total Receipt including Outstanding Balance 19.65 13.

11 1.05 11. No.13 Table 7. 1 2 3 4 5 6 Particulars of grants 10th FC 11th FC 12th FC EAS/SGRY NREGP PHED/Shiksha Mitra/ Lok Shiksha/MLA etc.59 Balance 0. This is largely due to the lack of any training and accounting infrastructure and lack of awareness.26 11.14 Utilisation Balance 0. Despite the best efforts of the state government.74 1.68 : Grants for 195 Gram Panchayats : 2001-02 to 2005-06 (Rs crore) Sl.58 0.53 24.54 0.06 0.76 Expenditure 2.11 110.53 46.90 0.34 84.67 : Grants for 65 Panchayat Samities (2001-02 to 2005-06) (Rs crore) Sl.05 2.34 4.05 0.93 0.23 101.74 1.01 0. 325 .53 0.21 0. 1 2 3 4 5 6 Nature of grant 10th FC 11th FC 12th FC EAS/SGRY NREGP OTHERS Total Receipt including Outstanding Balance 0.95 3. No.19 42.89 5.20 0.89 17.27 26.01 20.78 4.59 0.69 0. Total Receipt including OB 2.52 0.77 Nil 2.Table 7. these inherent constraints are making the task of building such a database extremely difficult.16 The major constraints faced in respect of PRIs is the absence of any reliable and comprehensive database regarding the physical and financial assets of these institutions.06 0.10 90.05 2.

Culvert etc. No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Agriculture Revenue and Land Development Water Resources (Minor Irrigation) Animal Husbandry and Fishery Forest and Environment Industry Public Health Engineering Rural Development Rural Engineering (Road.Appendix I : Details of function devolved by 20 Departments to PRI Sl. Bridge.) Energy Primary Education Adult Education Literacy Cultural Activities Medical Family Welfare Social Welfare Welfare of Handicapped Public Distribution System Relief and Rehabilitation Total Number of functions transferred to Activity GPs 4 10 8 10 5 6 3 3 1 3 9 1 1 3 1 1 5 2 2 1 79 PSs 6 1 3 3 5 6 3 2 1 3 8 1 1 2 1 1 5 4 3 1 60 ZPs 6 Nil 2 8 5 6 4 1 2 3 7 1 1 3 Nil Nil 5 4 3 Nil 61 326 .

21 7.66 0.38 8.74 27.01 0.6 26.77 12.76 3.25 Nil 0.33 93.54 3.74 23.45 5.05 9.85 1.95 2.82 14.3 1.45 40.57 9.84 XIth FC 4.57 2.82 Nil 0.7 16.02 39.56 4.65 2.8 NA 0.79 49.86 42.39 0.68 NREGP nil 3.86 14.4 0.97 3.62 1 2 3 4 5 6 7 8 9 10 11 12 327 .87 12.05 9.95 Nil 0.01 1.04 19.5 4.26 2.65 0.61 0.06 3.14 2.05 1 Nil Nil Nil Nil 1 Nil 0.09 0.56 115.52 12.68 Nil 13.73 XIth FC 4.82 3.26 1.98 0.64 6.7 2.25 11.26 55.21 1.6 Nil Nil 5.26 1.83 Nil 1.44 3.17 1 2 3 4 5 6 7 8 9 10 11 12 Jahanabad Arwal Nalanda Saran Supaul Siwan Darbhanga Rohtas Kaimur Sheikhpura Lakhisarai Madhubani Total Appendix II : (Contd.78 2.3 3.38 SGRY 5.69 2.7 0.44 17.) Savings Establis Total = hment Expen.48 3.33 11.27 1.98 Nil 2.54 5.65 0.23 9. Name of ZP Xth FC Jahanabad Arwal Nalanda Saran Supaul Siwan Darbhanga Rohtas Kaimur Sheikhpura Lakhisarai Madhubani Total 0.52 XIIth FC 3.95 0.48 1.59 1.93 9.47 0.76 9.96 Total Receipt s 18.34 12.02 3.56 2.19 1.66 9.02 3.75 1.77 3.69 2.09 0.6 EAS/ JRY/ SGRY 6.65 MP/ MLA/ MLC 0.2 33.24 38.48 18.53 7.09 3.04 19.17 14.09 7.83 1.07 15.6 59.01 29.39 NREGP Nil 3 Nil Nil Nil Nil Nil Nil Nil 0.35 0.21 7. No.94 2.25 3.39 17.33 8.06 5.56 107.32 1.18 11.93 7.52 5.44 100.25 1.76 13.6 0 0.29 4 2.76 17.09 1.24 32.15 2.62 2.07 15.59 33.42 10.72 1.97 34.59 13.21 2.77 12.28 419.81 2.72 0.33 Other scheme 1.02 0.39 9.31 11.92 20.75 5.52 4.37 Nil 11.48 1.6 3.64 53.73 5.ReceiptExpendi diture ExpendOther ture iture scheme 1.39 45.2 29.67 2.2 4.33 1.4 1.39 9.79 12.72 6.95 11.57 3.64 18.33 113.89 17.24 8.26 12.27 12.85 12.45 Expenditure Sl.2 4.32 1.6 MP/ MLA 0.74 2.59 0.6 Nil Nil 3.62 1.49 57.01 2.6 0.82 1.82 5.76 Own receipt 1. No.79 361.26 2.69 0.25 3.78 12.67 17.69 3.23 8.88 1.5 3. Name of ZP Xth FC 0.39 5.44 16.05 6.35 XIIth FC 3.67 0.47 0.51 16.82 0.31 4.62 6.27 8.18 0.02 0.75 0.64 59.09 9.32 1.Appendix II : Receipts and Expenditure of Zila Parishads (Rs crore) Receipts Sl.

50 26.25 6.48 105.26 25.37 0.60 3.16 0.02 3.33 1.43 15.28 234.11 91.10 237.16 89.57 1.05 110.93 150.76 135.38 3.92 1.72 79.68 59.79 144.97 0.82 2.68 100.94 0.82 9.63 0.24 7.08 123.03 1.31 1.45 1.99 56.25 1.00 109.05 107.98 1.33 35.86 2.32 13.94 0.85 XIth FC 7.73 123.66 Nil 1.69 0.24 3.50 143.86 1.43 113.61 146.80 14.25 153. Name of P.68 15.65 128.75 8.22 0.86 1.11 121.14 Nil 16.56 171.86 119.14 4.70 Receipt Sl.43 2.44 9.69 104.45 134.63 0.07 3.96 146.46 2.90 4.12 25.54 8.85 9.60 129.68 13.78 2.47 113.S.71 118.02 5.54 1.74 Nil Nil 6.25 1.11 176.62 1.92 19.88 141.03 18.21 15.24 14.Appendix III : Receipt and Expenditure of Panchayat Samities (2001-02 to 2005-06) (Rs lakh) Savings = ReceiptTotal Expenditure 132.45 80.81 1.33 178.05 1.75 2.80 1.80 0.89 98.01 11.08 1.24 4.93 255.74 94.53 96.41 4.92 SGRY 115.19 12.20 156.92 34.13 2.91 189.52 99.74 66.94 171.73 23.14 2.16 1.85 3.41 9.07 2.19 6.09 0.70 133.14 151.60 11.59 NA 1.96 0.64 5.55 134.20 204.04 107.13 0.70 20.71 30.25 116.61 1.09 137.61 2. No.01 5.65 8.72 0.40 2.53 NREP 5.34 0.73 XIIth FC 2.45 1.33 1.08 7.38 36.54 251.66 Nil 4.58 1.76 4.37 0.93 144.50 11.26 25.94 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 19.97 6.04 73.65 5.40 1.44 6.53 0.93 0.94 72.82 0.73 2.42 141.04 2.17 139. District Xth FC 1.04 6.38 204.96 26.37 187.24 1.19 25.35 Nil Other Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Siwan Mairwa Maharajganj Hussainganj Siswan Pachrukkhi Daraunda Darauli Basantpur Lakri Naviganj Barhariya Guthani Ander Goriyakothi Raghunath pur Bhagwanpur Hat Mohania Chand Durgawati Nuawn Chainpur Bhabhua Ramgarh Adhaura Rampur Kudara Bhagwanpur Jehanabad Hulasganj Ratni Faridpur Madanganj Siwan Siwan Siwan Siwan Siwan Siwan Siwan Siwan Siwan Siwan Siwan Siwan Siwan Siwan Siwan Siwan Kaimur Kaimur Kaimur Kaimur Kaimur Kaimur Kaimur Kaimur Kaimur Kaimur Kaimur Jehanabad Jehanabad Jehanabad Jehanabad 328 .90 2.55 31.24 0.85 4.05 114.42 11.66 2.23 18.37 137.

19 155.19 193.74 6.82 32.62 0.45 188.28 431.79 565.76 285.90 4.28 2.71 20.26 3.61 1.34 2.07 62.75 121.46 2.05 0.43 1.76 2.94 286.26 15.00 3.06 273.73 2.84 37.69 6.50 144.07 266.80 8.60 249.41 298.28 141.74 3.42 129.41 156.66 9.85 1.51 2.31 5.34 12.84 277.78 119.30 329 .63 1.06 1.07 4.07 6.32 8.69 39.28 2.01 6.53 454.35 Nil 2.61 2.37 10.41 12.93 230.62 173.77 1.85 1.07 3.03 1.32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 Ghoshi Makdumpur Kako Pratapganj Nirmali Raghopur Saraigarh Kishanpur Pipara Triveniganj Supaul Marauna Chhatapur Basantpur Pandaul Rahika Khajauli Jainagar Basopatti Madhwapur Harlakhi Bisfi Phulparas Laukhi Jhanjharpur Lakhnaur Babubarhi Rajnagar Madhepur Ladaniya Andhrathari Ghoghardiha Khutauna Benipatti Total Jehanabad Jehanabad Jehanabad Supaul Supaul Supaul Supaul Supaul Supaul Supaul Supaul Supaul Supaul Supaul Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani Madhubani 1.72 NA 1.07 1.19 80.73 0.50 84.92 1.04 44.53 112.16 201.73 9.80 4.53 1.57 51.95 12.85 1.29 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 126.16 169.99 92.67 1.21 88.43 479.53 114.90 42.48 4.05 0.85 1.48 2.74 36.29 11014.25 7.59 10.46 162.74 18.21 19.06 2.82 126.10 28.07 9.80 146.43 5.99 3.42 180.46 8.39 220.33 1.77 25.12 197.48 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 11.98 9.24 250.42 1.91 12.54 179.94 108.06 122.87 113.05 43.85 23.37 8.12 1.49 211.78 2.19 126.80 14.33 2013.57 3.87 2.49 18.71 233.65 122.93 150.11 1.19 88.40 166.49 1.87 2.36 270.13 50.56 116.25 4.19 447.31 4.29 72.18 574.22 54.05 1.98 1.53 184.90 11.73 130.48 91.88 1.86 4.87 NA 3.52 155.14 NA 2.10 1.74 7.17 2.25 68.60 34.13 2.48 1.70 2.04 2.43 123.04 3.07 132.39 27.03 238.53 2.91 124.20 155.75 107.61 193.40 5.53 547.50 35.16 1.59 99.01 1.04 1.96 120.38 86.33 90.09 42.99 10.26 7.83 1.24 4.82 1.18 121.48 0.13 1.86 10158.11 21.64 NA 2.15 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 58.77 81.13 6.20 119.44 14.91 48.79 142.

00 1.53 0.78 2.80 0.02 10.92 1.S.14 2.52 93.55 94.80 1.09 48.06 89.86 3.57 115.02 67.66 94.37 158.46 2.33 1.06 179. Siwan Mairwa Maharajganj Hussainganj Siswan Pachrukkhi Daraunda Darauli Basantpur Lakri Naviganj Barhariya Guthani Ander Goriyakothi Raghunath pur Bhagwanpur Hat Mohania Chand Durgawati Nuawn Chainpur Bhabhua Ramgarh Adhaura Rampur Kudara Bhagwanpur Jehanabad Hulasganj Ratni Faridpur Modanganj Ghoshi Xth F.48 14.76 86.44 91.93 2.99 61.27 0.Appendix III : (Contd.63 0.15 Nil Nil 1.37 92.94 NREP Nil Nil 1.60 92.10 0.61 1.63 210.79 25.16 155.23 116.27 3.90 147.98 1.23 0. 1.22 99.88 122.46 5.34 0.06 26.96 5.30 5.63 Sl.57 137.26 3.49 1.74 132.60 107.43 0.95 Nil 1.70 125.63 64.45 89.80 1.33 Nil Nil Nil 0.22 238.34 92.91 118.42 166.28 0.06 114. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 330 .99 0.45 103.67 XIIth F.74 4.09 1.07 Nil Nil Other Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Total 113.49 8.91 88.93 0. No.) Expenditure Name of P.91 121.26 224.81 1.00 6.81 0.18 2.02 XIth F.15 Nil Nil Nil 1.95 134.63 105.12 99.04 1.07 4.52 Nil Nil NA Nil Nil Nil Nil Nil Nil Nil SGRY 104.19 0.02 93.94 179.20 1.86 88.33 122.C 6.63 176.42 0.44 2.94 0.46 7.81 146.82 0.68 146.10 84.88 119.13 0.50 5.92 1.44 89.66 118.48 65.71 2.15 1.55 14.48 45.11 130.72 0.15 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 3.63 Nil Nil Nil 1.14 3.97 229.04 28.97 0.31 50.87 0.20 96.60 10.69 143.40 106.83 10.C 1.62 2.69 70.00 168.52 135.96 1.90 0.66 102.C.71 9.81 0.98 119.73 2.32 0.05 3.

71 159.85 1.32 58.97 4.77 11.04 143.23 1.55 34.40 29.39 12.70 375.46 419.66 NA 1.21 48.59 6.72 NA Nil Nil Nil Nil Nil Nil 0.85 5.00 203.30 2.08 187.61 0.85 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 10.60 157.54 6.63 179.66 97.72 168.94 379.81 83.00 192.92 153.57 0.45 150.99 65.85 107.86 Nil Nil Nil Nil Nil 1.91 12.03 3.24 3.35 Nil Nil Nil Nil 0.44 0.18 3.94 49.42 129.92 Nil 0.66 0.68 94.39 89.33 98.69 119.32 5.13 6.17 5.84 92.75 0.51 149.27 77.85 5.61 1.02 133.00 Nil Nil Nil 3.51 Nil 3.20 0.80 118.49 137.94 1.38 194.54 6.03 5.29 30.85 1.85 65.27 2.29 1.29 452.55 NA 0.39 1.69 11.41 1.77 .76 1.89 9001.93 2.23 1.02 227.73 5.47 473.50 91.60 64.47 122.95 8453.73 3.91 0.46 1.91 78.92 1.18 Nil 1.61 66.28 6.73 13.71 160.99 1.42 1.34 169.81 2.81 NA 13.90 0.93 77.29 480.28 2.29 7.43 71.62 99.33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 Makdumpur Kako Pratapganj Nirmali Raghopur Saraigarh Kishanpur Pipara Triveniganj Supaul Marauna Chaatapur Basantpur Pandaul Rahika Khajauli Jainagar Basopatti Madhwapur Harlakhi Bisfi Phulparas Laukhi Jhanjharpur Lakhnaur Babubarhi Rajnagar Madhepur Ladaniya Andhrathari Ghoghardiha Khutauna Benipatti 1.70 87.31 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 10.82 1.30 129.36 127.93 200.34 254.67 261.92 0.70 Nil 0.64 87.80 Nil NA 2.03 331 .40 152.31 235.79 0.45 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil 5.43 14.97 5.77 78.54 100.70 123.01 0.30 3.08 176.31 85.53 1.39 182.26 1.06 471.25 1.00 58.

76 1.87 5.86 9.76 1.77 1.84 5.03 20.76 1.60 18.76 1.91 5.59 5.18 6.06 1.96 15.01 5.35 9.Ps. Madhopur Patedha Jigrawan Dipha Muriyari Chotka Manjha Rampali Makariyar Nathuchhap Chainpur Mubarakpur Bhikpur Naya Gaon Chanp Harihas (West) Machkana Makhanpur Sambhopur Phalpura Rajanpura Karsant Madsara Harnahar Sarna Amarpur Bahadurpur Hariharpur Lalgarh Pakari Sonhua East Guthni Balua Bhopatpur Khawaspur Dumra Asawan Narendrapur Khendain Majhwalia Barhoga Parsotim Hariharpur Brahmsthan Gopalpur Bhikampur Wasaun Rajapur Wajuwar hotra Chainpura Barban Kala Sadaki Receipt Name of P.07 5.05 1.14 8.23 6.96 1.01 11.76 1.44 Total 18.04 1.46 16.11 30.76 1.56 9.76 1.39 38.04 1.95 0.76 1.96 5.93 1.90 0.87 0.04 1.76 1.96 22.96 6.14 20.77 1.71 0.23 0.79 6.76 1.04 1.91 5.04 1.04 1.76 1.23 2.61 18.76 1.76 1.04 1.29 21.01 8.04 1.Ss.04 1.71 6.46 0.04 1.73 19.83 5.88 0.21 19.53 0.76 1.76 1.96 5.94 11.48 20.61 5.76 18.73 5.04 1.18 9.04 1.63 20.80 33.76 1.01 8.04 1.00 NREGP 0.20 7.11 5.36 10.37 19.00 17.89 6.06 14.92 18.16 16.55 18.49 10.96 6.76 1.21 20.80 8.84 0.71 16.91 9.87 5.76 1.76 1.94 6.30 12.38 0.76 1.95 5.76 1.56 0.16 9.04 1.04 1.81 0.76 1.23 8.42 20.18 9.04 1.68 5.76 1.24 20.97 5.76 1.30 10.04 5.53 9.05 1.58 10.77 0.95 0.98 0.05 9.24 17.78 SGRY 10.02 5.81 6.17 18.46 4.76 1.99 5.63 5.04 1.19 10.83 0.45 -Others 0.04 1.04 1.62 1.00 0.88 11.05 1.67 5.04 1.04 6.86 5.37 18.77 1.04 1.39 0.04 1.56 11.99 10.52 16.86 5.41 20.14 0.04 5.36 6.99 6.29 15.27 20.94 0.76 1.83 10.81 5.04 5.86 5.52 18.63 17. Maharaj ganj -do-doMairwa -do-doSiwan -do-doSiswan -do-doHussain ganj -do-doPachrukhi -do-doDaraunda -do-doDarauli -do-doBarharia -do-doGuthni -do-doLakri Naviganj -do-doAnder -do-doGoriya Kothi -do-doBhagwanpur Hat -do-doBasantpur -do-doAdhora -do-doXth FC XIth FC 1.86 0.76 1.02 9.46 0.68 6.91 10.57 XIIth FC 1.76 1.76 1.08 19.95 0.47 11.19 18.99 5.40 18.41 8.96 2.76 1.72 22.04 1.04 1.76 1.76 1.99 0.32 21.04 1.10 9.86 5.59 17.04 1.91 5.99 19.04 1.40 10.78 8.04 1.87 1. No.36 10.82 18.26 0.83 1.72 0.04 1.76 1.04 1.76 1.77 19.76 1.76 1.34 8.04 1.04 1.04 1.78 19.65 10.77 7.74 9.90 6.98 0.98 0.04 1.05 0.56 0.33 5.02 0.52 17.76 1.96 0.04 1.15 5.76 1.04 1.02 21.77 0.05 1.96 18.44 18.76 1.76 1.77 5.77 1.53 10.59 17.81 5.04 1.71 332 .76 1.91 5. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Name of G.69 0.30 9.Appendix IV : Position of Finances of Gram Panchayats for the period 2001-02 to 2005-06 (Rs lakh) Sl.89 6.79 0.17 7.20 5.04 1.

42 2.75 1.99 6.76 1.80 15.64 1.76 1.76 1.31 15.04 6.00 3.34 35.88 25.95 33.30 2.05 1.07 21.78 5.00 6.76 1.50 4.78 1.98 6.69 6.11 2.23 30.28 6.04 1.60 16.77 17.83 25 28.04 6.43 17.05 1.04 1.87 3.84 23.34 5.90 22.76 1.97 6.76 1.27 2.76 1.08 5.45 1.86 35.76 1.91 5.65 21.82 32.76 1.83 7.57 12.51 5.77 1.16 32.87 24.00 5.93 6.97 6.41 2.76 1.76 1.24 5.07 6.45 27.88 35.05 1.76 1.93 6.91 5.76 1.66 1.09 19.64 19.91 5.76 1.17 4.76 1.94 14.04 1.94 5.66 19.04 1.76 1.98 18.40 32.85 6.04 1.74 27.77 21.76 1.06 4.04 5.16 6.01 22.83 1.76 1.50 3.52 4.25 1.90 6.76 1.04 1.64 1.23 9.76 1.76 1.76 1.28 25.04 1.12 22.66 3.76 19.76 1.76 1.13 18.04 1.00 4.98 4.60 12.71 27.47 14.50 21.05 1.76 1.30 20.02 5.30 20.16 6.12 30.91 5.04 1.95 23.87 15.04 1.04 1.40 19.76 1.49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 Jalalpur Pasai Kudari Sasna Salathua Siswar Todi Bhagwanpur Saraiya Bahmaur Khas Bharkhar Dadawan Dulhi Shivrampur Parhi Karnpura Khajura Chanu Akhini Dunduna Nuon Ramgarh Barhauna Merh Dumdum Sikthi Sonhan Sahadullahpur Darwan Aahiwas Mahuwar Sevnan Manday bigha Amain Kaur Bouri Tira Kansua Pandaul Uchita Devra Gandhar Jayatipur Kurua Shahpur Uber Parwan Kohra Solhanda Bela-bira North Serthu Bhawanipur South Majhari Rampur -do-doKudra -do-doBhagwanpur -do-doMohania -do-doChand -do-doDurgawati -do-doNuon -do-doChainpur -do-doBhabhua -doBhabhua Ramgarh -do-doJehanabad -do-doHulasganj -do-doRatni Faridpur -do-doModanganj -do-doGhoshi -do-doMakhdum pur -do-doKako Pratapganj Nirmali 1.12 4.76 1.57 13.05 1.76 1.80 34.04 1.36 4.58 3.76 1.15 - 34.55 2.24 13.92 5.05 1.68 19.22 17.58 19.39 27.53 29.43 17.38 33.61 - 6.96 7.71 18.76 1.15 34.23 3.04 1.86 17.17 28.04 1.04 1.07 8.91 4.97 22.04 1.45 23.77 1.88 30.09 6.93 3.90 21.35 17.04 1.91 5.42 26.38 36.77 13.95 5.04 1.77 1.76 1.04 1.76 1.59 14.06 22.04 1.02 23.16 6.54 15.04 1.88 4.76 1.76 1.01 3.59 26.09 25.85 5.12 28.91 8.76 1.04 1.19 27.86 6.43 30.04 1.19 35.72 11.8 40.04 1.04 1.24 5.76 1.99 23.78 28.32 4.04 6.22 6.99 17.96 5.11 31.77 1.05 1.04 1.76 1.04 1.04 1.63 30.15 29.92 2.45 26.76 1.76 24.05 2.04 1.85 4.97 5.76 1.79 30.85 12.82 3.05 16.24 333 .04 6.92 5.76 1.04 1.20 30.06 5.25 1.64 27.96 7.01 4.09 1.05 1.76 1.76 1.04 1.27 6.60 5.70 3.76 1.04 1.14 5.34 30.38 6.04 1.94 1.05 12.04 1.95 4.07 1.05 1.76 1.24 17.38 16.10 16.98 35.16 18.

71 16.05 5.47 8.42 23.95 6.26 25.20 8.43 0.04 1.79 1.09 5.44 21.05 1.04 1.80 1.72 20.15 6.92 34.01 19.04 1.76 1.88 8.05 Nil 1.76 1.70 18.77 1.76 1.78 29.01 8.59 24.05 1.05 1.76 1.02 10.76 1.00 5.82 45.41 6.20 5.76 1.88 17.83 13.32 25.71 31.13 0.76 1.76 1.48 43.06 1.04 1.07 1.91 7.89 33.100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 Dighia Bela Singermoti Boraha Karjain Piprahi Pipra Khurd Zilla Dumari Hanuman nagar Kathhara Kadampura Dubiyahi Bouraha Ramnagar Thumba Maheshpur Manganj West Hariharpatti Pulwaha Kariho Lokha Bairiya Kadmaha Sarojabela Ghogharia Bhagwanpur Basantpur Parmanand pur Mohammad ganj Chhatapur Gwalpara Sagarpur Bolahi Meghoul Sanor Kakraul Sapta Khajauli Datuwar Bhakua Selra Dodwar Belhi (South) Kataiya Rajfet Bassopatti (West) Salempur Uttra Balia Kauna Barhi Chahuta Khairibanka Balha Mahthour Khurd Bathnaha -doNirmali Raghopur -do-doSaraigarh -do-doKisanpur -do-doPipra -do-doTriveniganj -do-doSupaul -do-doMarauna -do-doBasantpur -do-doChhatapur Chhatapur -doPandaul -do-doRahika -do-doKhajauli -do-doJaynagar -do-doBassopatti -do-doMadhwapur -do-doHarlakhi Bisfi -do-doPhulparas -do- 1.76 1.87 18.04 1.83 6.04 1.05 6.19 5.14 0.94 8.61 8.07 1.76 1.02 6.13 24.91 5.04 1.95 8.76 1.04 11.15 21.74 9.04 1.75 14.75 11.76 5.09 8.48 0.04 1.06 12.76 1.93 5.63 8.04 1.04 1.71 8.76 1.67 2.18 16.52 0.17 8.76 1.05 1.46 21.09 6.68 17.10 1.76 1.19 50.92 5.02 5.97 4.88 28.04 1.77 36.95 5.71 1.91 14.69 5.51 22.76 1.00 5.34 50.00 9.16 29.12 0.76 1.76 - 22.17 25.77 1.76 1.60 0.77 13.91 5.77 1.04 1.84 0.97 0.76 1.28 24.70 14.77 1.04 1.76 1.79 19.28 17.82 0.67 35.35 5.80 18.87 1.83 19.91 8.69 0.06 1.65 36.04 1.91 6.76 1.52 7.17 17.09 0.93 5.61 5.12 0.99 6.05 1.04 1.76 1.91 5.10 35.76 1.37 7.17 11.90 38.76 1.61 34.53 16.36 19.04 1.76 1.27 16.00 1.44 - 31.04 1.90 5.76 1.76 1.77 1.05 - 5.30 5.07 6.53 24.70 14.37 7.07 7.01 0.94 37.86 10.99 1.00 5.90 7.99 - 0.98 21.76 Nil 1.63 40.20 36.41 27.07 5.04 1.88 8.04 1.65 1.04 1.85 5.94 17.79 17.04 1.04 1.07 1.04 1.76 1.04 1.76 1.17 25.95 5.04 1.21 26.00 14.76 1.04 1.91 34.62 7.78 0.88 8.43 28.04 1.70 6.14 0.76 1.55 1.39 10.76 1.52 25.54 7.22 0.04 Nil 1.02 5.98 6.00 25.12 7.98 26.76 1.76 1.04 1.10 0.05 1.87 20.62 30.04 1.33 17.76 1.04 1.05 1.85 16.91 6.65 26.61 0.42 8.60 28.05 7.48 41.08 6.80 22.05 41.88 1.76 1.25 19.04 1.88 5.04 1.94 7.77 1.92 6.54 334 .12 0.04 1.87 27.37 12.89 19.13 0.04 1.04 1.76 1.

86 1.76 9.15 1.06 6.94 1.09 3.76 7.38 0.03 1.41 1.21 1.77 2.11 0.04 5.05 1.76 6.14 18.76 14.50 1.97 1.34 1.76 5.16 18.06 1.16 1.06 5.86 1.18 16.76 11.78 1.54 9.36 1.97 1.63 1.76 9.93 1.20 0.75 18.60 0.76 4.78 1.67 0.17 1.02 15.88 1.88 1.76 9.07 4.12 327.76 7.08 1.21 4.16 1.76 13.64 1.04 6.31 0.82 5.76 14.03 335 .95 1.28 1.73 1.05 6.95 23.36 4.12 1.10 1.98 1.77 6.93 1.56 1.07 7.04 11.04 5.76 12.96 16.27 8.69 1.76 19.60 1194.15 35.76 10.81 1.05 6.71 20.78 0.94 1.76 14.92 17.05 5.76 11.04 6.52 19.04 6.7 0.80 0.07 28.06 23.27 19.00 1.76 5.81 22.06 6.81 15.05 5.04 5.07 1.92 1.14 28.04 6.10 21.94 15.92 0.16 1.95 1.95 1.23 2669.15 15.87 14.48 1.48 1.50 24.12 16.90 1.74 5.37 1.08 1.02 1.76 9.04 1.76 5.16 1.76 11.04 1.76 6.32 25.97 1.90 19.99 1.07 0.82 1.76 12.04 6.70 1.80 3.84 0.10 7.04 5.93 1.37 1.95 2.24 1.71 0.11 14.91 20.08 6.06 6.70 1.95 1.02 1.04 1.07 1.86 1.21 5.76 8.77 12.04 6.07 106 6.95 1.34 4676.04 6.16 23.77 6.72 0.98 1.04 1.07 6.05 5.99 1.43 1.89 0.04 5.09 1.50 1.04 6.04 6.63 253.89 1.78 5.23 11.77 4.74 1.76 8.04 5.76 8.04 1.13 1.30 1.05 226.76 11.06 6.79 9.04 6.05 5.31 1.91 7.24 1.86 1.76 9.11 0.81 1.94 0.98 1.32 25.04 6.00 1.08 6.22 22.153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 Dairawan Narhia North Narhia South Laukahi Balni Mehanth Lohna (North) Raiyam East Dwip West Tamuria Kaithinia Basha Chhorhi Murhaddi Pariharpur Chichari Kanoongo Patwara South Raj Madhepur East Matras Sunder Virajeet Padma Dalokhar Gidhwas Andhrathri South Nanaur Shiwa Chhajana Parsa North Sangi Lalmania Siktiyahi Karmagh Tyonth Parkauli Arer Dairwan Sakari Maura Barahara Marauna South Marauna North Madhopur Majhaura Persahi (East) Total -doLaukahi -do-doJhanjharpur -do-doLakhnaur -do-doBabubarhi -do-doRajnagar -do-doMadhepur -do-doLadania -do-doAndhra thari -do-do-do-do-doKhutauna -do-doBenipatti -do-doKudra -do-doMarauna -do-doKhutauna -do-do- 1.76 16.76 8.38 17.65 20.44 19.07 5.76 11.61 20.93 1.97 1.75 1.04 6.03 1.91 1.10 17.50 1.04 6.94 1.59 1.04 5.05 6.76 12.96 21.15 20.76 10.80 1.02 1.77 1.22 22.97 19.30 19.94 1.16 31.07 7.62 19.11 1.24 17.49 1.59 1.

18 5.04 1.72 0.30 1.36 9.45 1.11 5.84 10.39 1.32 1.40 0.91 0.03 1.58 8.91 5.73 1.92 5.78 18.98 2.19 19.) Expenditure Savings = Receipts – Expenditure 6.89 9.28 16.72 5.65 5.74 Nil 1.76 1.31 1.09 17.62 1.05 1.02 1.46 17.51 1.79 5.76 20.84 5.04 0.37 0.03 1.62 17.56 0.92 14.75 1.45 0.72 0.98 0.27 21.91 1.72 Nil 1.04 1.86 5.95 1.69 5.05 19.02 1.31 1.35 8.04 1.75 1.35 8.03 1.59 0.66 14.81 11.31 14.02 1.97 1.77 1.44 18.02 1.69 0.69 1.35 1.98 0.80 0.52 7.44 3.77 5.05 19.68 8.04 1.04 1.58 1.05 1.07 5.63 5.77 0.89 5.46 9.02 1.71 5.22 336 .04 2.75 1.54 1.04 0.04 1.72 1.03 1.80 0.82 5.84 6.97 0.87 0.87 8.55 0.79 0.23 18.44 8.65 1.41 5.77 15.69 8.90 0.62 5.86 18.57 7.81 4.79 0.17 9.68 0.76 6.08 1.76 1.34 8.22 - 0.33 18.70 2.85 1.81 0.80 0.98 5.04 1.27 6.04 1.03 1.23 9.50 0.64 2.46 16.21 16.32 0.75 1.09 21.65 4.47 13.71 1.02 1.46 2.52 1.41 1.03 1.16 15.51 0.96 0.03 12.52 0.04 1.61 5.69 1.63 15.26 9.00 0.65 1.00 0.58 19.73 1.02 1.98 9.10 Sl.62 0.08 4.40 9.83 5.80 9.15 7.28 18.Ps.97 1.04 1.94 17.70 17.19 5.93 0.89 11.80 0.44 1.23 1.22 10.96 4.70 1.61 6.92 11.93 5.12 17.83 1.34 14.22 9.89 0.12 3.21 3.75 1.78 15. Xth FC XIth FC XIIth FC SGRY NREGP Others Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Madhopur Patedha Jigrawan Dipha Muriyari Chotka Manjha Rampali Makariyar Nathuchhap Chainpur Mubarakpur Bhikpur Naya Gaon Chanp Harihas (West) Machkana Makhanpur Sambhopur Phalpura Rajanpura Karsant Madsara Harnahar Sarna Amarpur Bahadurpur Hariharpur Lalgarh Pakari Sonhua East Guthni Balua Bhopatpur Khawaspur Dumra Asawan Narendrapur Khendain Majhwalia Barhoga Parsotim Hariharpur Brahmsthan Gopalpur Bhikampur Wasaun 1.99 1.Appendix IV : (Contd.02 0.38 17.04 1.65 6.60 9.05 8.09 2.76 Nil 0.88 0.62 6.01 6.30 9.90 5.43 7.95 16.04 1.86 0.07 5.54 5.14 16.04 1.60 1.04 1.41 3.83 0.35 0.04 1.13 0.10 17.7 6.01 1.75 1.27 6.09 0.16 1.12 0.77 10.65 5.90 6.74 5.60 16.64 1.91 10.81 8.02 1.42 5.04 1.43 5.14 16.55 5.65 1.04 7.74 0.78 0.12 0.14 17.15 1.08 1.09 3.65 0.95 18.00 1.82 8.04 8.60 0.04 1.00 0.86 4.10 21.30 0.25 18.04 1.70 1.85 0.46 5.04 1.58 5.24 9. No Name of G.22 5.32 18.

04 1.52 24.93 0.13 - 0.98 17.03 1.89 0.74 3.63 5.55 24.04 1.09 6.00 2.33 3.98 19.33 0.64 32.68 29.13 14.16 1.84 21.64 1.58 5.82 1.20 13.86 6.94 20.69 18.05 1.92 5.95 2.84 1.63 0.11 30.04 1.90 18.40 1.27 1.05 5.49 1.59 1.04 1.29 19.56 Nil 1.02 1.42 16.37 1.93 5.87 4.05 1.50 5.42 32.13 0.60 8.40 6.52 1.51 2.36 0.97 6.80 1.50 1.30 1.55 2.96 Nil 1.39 1.16 25.88 6.88 5.83 28.98 35.02 0.31 5.04 1.95 5.57 5.09 17.15 1.08 2.46 1.35 5.50 0.62 2.12 1.47 1.92 14.89 30.03 1.35 1.01 29.24 4.97 1.17 5.05 34.46 1.91 23.04 1.45 24.24 27.98 4.52 1.40 11.75 1.21 1.79 2.76 1.44 35.14 0.23 13.81 5.24 0.27 22.93 4.80 33.75 18.96 3.68 3.98 5.63 25.64 24.03 1.59 19.82 0.31 4.94 21.02 1.04 1.91 3.26 24.07 13.12 3.40 5.25 1.04 1.17 28.04 4.89 5.67 32.87 3.57 19.76 17.04 1.71 1.90 5.34 16.03 5.56 2.52 28.92 28.69 1.61 1.97 1.39 1.93 1.14 0.46 19.01 1.93 20.48 6.09 5.47 3.16 1.90 29.62 5.03 6.60 1.20 2.29 5.60 1.04 1.13 5.99 1.76 1.90 6.96 7.63 17.72 10.78 2.90 27.98 1.10 3.01 1.65 1.88 23.18 15.86 5.15 0.47 0.23 19.03 5.01 0.65 18.96 5.21 20.59 2.02 1.60 1.30 0.86 6.47 1.05 1.56 0.95 2.80 0.75 0.83 1.70 1.96 0.60 21.34 8.14 5.26 25.11 17.65 1.50 26.71 19.03 17.82 1.51 22.59 2.57 1.88 25.02 1.31 3.13 2.04 1.03 16.40 - 19.10 1.27 1.25 16.74 13.08 6.12 0.13 3.99 5.03 5.17 11.79 15.89 4.80 28.30 17.90 4.02 1.49 24.04 1.83 21.69 2.46 3.14 1.84 3.13 34.35 2.55 1.37 5.72 34.76 20.19 3.93 1.66 34.01 0.10 16.89 5.20 1.75 1.33 0.99 3.05 8.66 0.21 1.52 0.76 1.49 21.52 21.59 0.18 27.58 2.67 5.60 12.32 5.05 12.89 0.33 1.67 34.31 0.05 1.09 6.34 7.73 1.08 6.72 1.42 0.15 4.02 0.40 4.15 0.04 1.03 1.04 1.13 7.12 10.95 0.35 32.91 0.64 1.98 0.72 5.54 0.72 16.99 23.52 14.19 6.71 2.64 0.80 14.70 1.54 20.74 5.02 1.76 1.64 1.04 5.79 3.46 1.18 1.64 1.12 15.92 26.43 1.21 1.08 17.49 28.44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 Rajapur Wajuwar hotra Chainpura Barban Kala Sadaki Jalalpur Pasai Kudari Sasna Salathua Siswar Todi Bhagwanpur Saraiya Bahmaur Khas Bharkhar Dadawan Dulhi Shivrampur Parhi Karnpura Khajura Chanu Akhini Dunduna Nuon Ramgarh Barhauna Merh Dumdum Sikthi Sonhan Sahadullahpur Darwan Aahiwas Mahuwar Sevnan Manday bigha Amain Kaur Bouri Tira Kansua Pandaul Uchita Devra Gandhar Jayatipur Kurua Shahpur Uber Parwan Kohra Solhanda Bela-bira 1.60 0.09 0.91 26.58 5.96 2.33 6.73 25.96 5.05 0.86 2.76 1.52 337 .04 1.45 1.69 4.78 1.98 2.66 38.04 1.71 1.81 26.60 1.18 30.10 16.95 5.56 1.

40 25.03 1.26 6.08 1.02 1.02 17.15 0.69 5.04 1.25 7.73 4.07 5.04 1.15 20.08 16.65 1.99 1.40 17.27 22.92 1.94 24.91 5.04 2.57 3.86 2.02 0.77 5.84 5.36 44.76 1.97 7.88 7.06 29.50 20.74 19.61 7.71 7.04 1.89 6.50 1.29 42.56 7.76 2.76 0.01 10.99 1.60 Nil 1.63 32.99 0.21 1.01 1.37 5.04 4.14 0.10 2.67 0.69 1.49 41.41 19.71 5.91 2.09 0.27 8.15 1.60 16.58 1.24 0.12 0.74 7.04 1.25 3.32 7.60 2.74 0.90 29.43 0.63 15.51 28.78 6.53 0.97 1.47 - 13.48 2.31 23.77 5.30 15.36 4.75 1.46 1.68 1.29 0.76 3.36 1.70 Nil 1.70 5.58 5.75 0.92 0.73 0.25 13.29 0.85 5.33 5.11 8.56 16.03 5.89 38.02 20.72 13.01 1.69 1.43 8.03 1.87 0.86 0.58 0.06 1.03 1.65 10.68 5.91 22.70 6.83 19.92 0.94 11.86 1.87 6.62 0.76 1.04 Nil 0.76 0.68 1.62 14.89 24.40 5.07 Nil Nil 0.85 0.97 1.93 24.66 27.77 0.11 5.90 5.15 Nil 1.26 11.31 5.82 0.44 1.38 6.53 1.37 6.90 8.94 - 0.03 1.04 1.52 15.76 1.31 15.10 0.00 0.73 1.59 6.73 14.89 16.04 1.00 1.63 5.03 0.45 0.89 5.73 338 .11 18.17 0.03 4.28 31.12 0.80 25.46 29.21 0.99 24.83 6.84 8.32 27.99 Nil 1.68 0.14 16.87 1.87 6.99 5.64 1.65 5.05 25.85 14.29 34.65 23.56 32.84 15.77 13.31 45.32 0.60 39.76 0.61 7.77 5.31 6.41 0.90 34.86 4.74 1.95 4.42 Nil 7.09 12.76 1.64 14.65 1.26 1.92 5.62 4.66 20.04 1.27 3.24 41.89 15.73 5.96 0.12 0.91 1.88 17.53 1.77 8.06 31.75 1.93 0.18 26.14 25.59 7.14 18.22 13.66 1.38 5.75 5.55 25.30 0.40 1.75 2.92 5.9 7.86 35.76 0.37 6.67 1.12 0.11 Nil 1.58 17.04 0.59 Nil 1.14 0.14 14.18 16.13 0.07 1.28 34.99 0.07 3.87 3.01 Nil Nil Nil 0.05 1.25 1.67 18.22 26.26 1.33 0.01 0.47 1.05 5.73 25.18 24.63 2.09 0.48 1.75 0.99 Nil Nil 0.64 0.27 3.19 39.79 1.82 0.46 22.73 1.85 14.00 10.99 099 0.13 5.93 5.06 1.49 4.73 9.38 0.29 24.95 19.18 0.31 5.21 0.63 Nil 1.34 8.66 0.04 1.56 4.44 5.53 5.48 7.60 1.34 5.54 2.25 7.16 5.99 2.03 1.92 1.10 13.97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 North Serthu Bhawanipur South Majhari Dighia Bela Singermoti Boraha Karjain Piprahi Pipra Khurd Zilla Dumari Hanuman nagar Kathhara Kadampura Dubiyahi Bouraha Ramnagar Thumba Maheshpur Manganj West Hariharpatti Pulwaha Kariho Lokha Bairiya Kadmaha Sarojabela Ghogharia Bhagwanpur Basantpur Parmanand pur Mohammad ganj Chhatapur Gwalpara Sagarpur Bolahi Meghoul Sanor Kakraul Sapta Khajauli Datuwar Bhakua Selra Dodwar Belhi (South) Kataiya Rajfet Bassopatti (West) Salempur Uttra Balia Kauna Barhi Chahuta Khairibanka 1.65 0.63 9.74 1.04 1.03 16.

00 1.61 19.89 20.82 13.25 1.18 0.06 1.42 5.70 2.32 8.04 0.96 14.38 0.12 0.75 1.32 13.81 1.90 1.81 0.53 1.63 5.73 2476.04 0.74 1.31 15.50 21.78 5.75 1.03 1.68 8.70 0.49 4259.51 15.78 0.05 15.00 15.87 0.05 12.95 6.89 5.05 0.11 13.96 5.18 7.47 1.76 1.49 0.80 4.21 13.03 1.75 1.39 19.14 10.03 2.00 14.31 32.86 6.56 1.91 5.43 5.11 1.49 1.14 24.14 0.47 10.33 3.01 1.03 1.89 1.03 1.02 0.84 0.60 1.09 1.91 5.99 3.79 3.69 1.04 1.22 0.20 1.48 1.51 17.35 6.18 0.61 13.94 5.06 1.68 1.03 0.38 1.41 0.69 1.01 5.13 1.70 2.11 4.74 1.50 1.07 1.45 4.03 6.02 1.85 0.84 1.89 1.01 4.39 15.76 Nil 2.70 1.66 13.29 5.48 4.03 8.34 5.82 7.03 15.29 8.44 19.93 1.38 1.44 0.66 5.70 0.04 0.96 1.43 27.80 20.98 1.99 6.72 0.06 17.70 1.03 0.85 4.20 4.27 3.79 1.47 5.70 1.15 2.06 18.80 5.44 6.17 1.47 17.26 0.99 0.06 0.05 1.47 2.75 1.30 4.95 4.31 0.04 1.74 9.76 5.48 13.20 1.51 16.09 5.59 1.93 1.39 4.86 6.54 2.85 18.39 0.69 1.63 1.05 1.03 1.96 5.74 5.51 22.71 1.89 3.05 1.79 5.44 4.02 Nil 0.46 0.21 17.83 1.02 0.81 1.35 3.95 1.04 1.01 1.50 1.45 339 .49 3.11 0.21 2.87 5.07 1.68 19.45 9.11 1.48 13.00 1.53 1.10 11.72 18.31 15.99 1.85 1.00 0.94 6.15 1.93 16.43 7.98 6.80 0.50 24.36 7.08 5.90 23.03 1105.20 252.15 5.51 13.77 3.53 3.58 1.68 1.03 0.12 1.16 7.93 205.33 1.52 1.62 10.85 5.60 219.76 9.10 5.75 6.09 0.23 5.67 8.75 0.17 18.89 0.87 Nil 1.03 1.88 6.57 12.50 16.82 0.19 3.65 7.73 1.73 1.80 2.05 1.07 6.01 6.77 1.54 11.75 1.39 0.94 16.07 0.70 5.99 8.93 5.89 5.03 1.74 1.81 5.74 6.84 24.04 1.34 9.37 12.18 15.79 12.03 10.62 15.58 1.82 0.98 9.58 19.06 5.91 5.20 8.46 8.150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 Balha Mahthour Khurd Bathnaha Dairawan Narhia North Narhia South Laukahi Balni Mehanth Lohna (North) Raiyam East Dwip West Tamuria Kaithinia Basha Chhorhi Murhaddi Pariharpur Chichari Kanoongo Patwara South Raj Madhepur East Matras Sunder Virajeet Padma Dalokhar Gidhwas Andhrathri South Nanaur Shiwa Chhajana Parsa North Sangi Lalmania Siktiyahi Karmagh Tyonth Parkauli Arer Dairwan Sakari Maura Barahara Marauna South Marauna North Madhopur Majhaura Persahi (East) 1.04 2.30 6.58 1.44 10.98 4.45 0.47 6.43 17.67 5.03 1.12 1.32 17.73 1.14 416.99 8.29 3.73 0.96 5.26 0.19 1.57 4.29 0.00 1.76 1.

05 0.30 567.44 40.18 182.22 46.71 0.79 88.16 706.63 98.51 0.07 0.00 4.56 0.56 152. Customs Duty (Cess) on HSD Addl.53 108.30 0..03 4.48 199.84 195. XXX 340 . crore) 2008-09 (upto Dec. Duty of Customs Addl.03 0. the figures are of net taxes collected after deducting refunds.61 7.51 136.03 0.46 0. 2008) 2724.62 92.04 0.00 2.17 608.00 0.63 65.61 2.29 3.90 4.44 0.06 Note : For 2007-08 and 2008-09.00 0.12 0.04 121.Appendix V : Details of Central Taxes Collected in Bihar (Rs.80 152.55 3.88 156.00 0.00 0.88 0.01 0.58 2007-08 3769.42 4.71 Customs Duty 0.23 44.17 730.10 438.00 0.90 0.70 10 Cess on Secondary and Higher Education 11 Others 12 Total Export Duty 13 Total Cess on Export 14 Total Other Receipts 15 Total Gross Revenue (1 to 14) 16 Refunds 17 Drawback (Customs) 18 Total Net Revenue (15-16-17) 1.33 153.42 0.20 461.14 Tax Heads Central Excise Service Tax Direct Tax 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 Corporate Tax Income Tax Fringe Benefit Tax Securities Transaction Tax Banking Cash Transaction Tax Hotel Receipt / State Duty Tax Interest / Expenditure Tax Wealth / Gift Tax Total Total Basic Duty Total Additional Duty of Customs (CVD) Total Special CVD Total Special Addl.31 5.25 2.73 162.18 0.97 0.00 2.31 3.01 3.60 368.26 0.06 0.72 0.48 95.02 3.00 0. Customs Duty (Cess) on MS Surcharge on Petroleum Goods on MS National Calamity Contingent Duty (N C Duty) Education Cess 2005-06 3271.65 4.43 2006-07 3398.40 37.40 629.01 0.58 83.57 117.