Preview only show first 10 pages with watermark. For full document please download

Kuala Namu Chart

REPUBLIC OF INDONESIA DIRECTORATE GENERAL OF CIVIL AVIATION DIRECTORATE OF AIR NAVIGATION SUB DIRECTORATE MANAGEMENT OF AERONAUTICAL INFORMATION Jl. Medan Merdeka Barat No. 8 Gedung Karya Lt. 7 Jakarta 10110 or P.O.Box 3109/JKT, Jakarta 10000 Email :[email protected], [email protected] Web : http://www.aimindonesia.info/ AIRAC AIP SUPPLEMENT Nr : 03 / 13 30 MAY 13 Phone/ Fax : 62 21 3507603 Telegraphic Address AFS : WRRRYNYX THE OPERATION OF NEW AERODROME KUALANAMU INTERNATIONAL AIRP

   EMBED


Share

Transcript

  Directorate General ofCivil Aviation, IndonesiaPublication Date:30MAY13Effective Date:25 JUL13Web :http://www.aimindonesia.info/ THE OPERATIONOF NEWAERODROMEKUALANAMU INTERNATIONAL AIRPORT-MEDANASSOCIATED WITHTHEATS AIRSPACE AND FLIGHT PROCEDURES1.Introduction New aerodrome Kualanamu International Airport are completelyconstructed by phase I with runway number designation 05/23, this newaerodromeis located 15 NMNorth East (NE)of Polonia Airport, thosecontiguous airports are impacted each other to these airports operation.When the new aerodrome Kualanamu be operated that Polonia airport isnot intended to closein hence thatthe flight procedures of Polonia Airportare revised and be published underseparate AIP Supplement publication. 2.ThisAIRACAIP Supplementis to supersedeand cancelthe AICnumber04/08dated17 September 2008, the other AIC coming for issuing information regarding another runway parallel development.3.The Operation Proceduresand changes 3.1 As from25July2013 at00.01UTC all incoming and outgoingaircraft to Medan will use Kualanamu International Airport,in order  REPUBLIC OF INDONESIA DIRECTORATE GENERAL OF CIVIL AVIATIONDIRECTORATE OF AIR NAVIGATIONSUB DIRECTORATEMANAGEMENT OF AERONAUTICAL INFORMATIONJl. Medan Merdeka Barat No. 8 Gedung Karya Lt. 7Jakarta 10110or P.O.Box 3109/JKT, Jakarta 10000Email :[email protected],[email protected] AIRACAIPSUPPLEMENT Phone/ Fax : 62 21 3507603Telegraphic Address  AFS : WRRRYNYX Nr :03/1330 MAY13   AIRAC AIP SUPPLEMENT04/13  Page 2 of 3 Directorate General ofCivil Aviation, IndonesiaPublication Date:30MAY13Effective Date :25 JUL13 to achieve safety and to maintain an orderly flow of air traffic,Polonia Airport Medan shall not be used for schedule andunschedule commercialand civilflight. Aircraft flight destinationPolonia-Medan which intend to remain over night at Polonia mustregulate the schedule and accord to the line of thePoloniaAirportoperation function as an air force base.3.2TheATS airspace boundary for Medan Terminal Area (TMA) is notchanged,anddue to geographically KualanamuInternational Airport and Polonia airport are contiguous,Medan Control Zone(CTR)is redefinedandwillbe centered at “DES” VOR/DME withradius 40 NMlateral limit from Surface (SFC) to FL120,AerodromeTraffic Zone (ATZ)boundariesofKualanamu andPolonia airport arenot defined.3.3The ATS Routes segmentation which use “MDN” VOR/DME arenotchanged andstill used for En Routeuntil any further realignment.3.4Kualanamu International Airportwill take over the functions of AMSSub Centre of Polonia airport and will use the location indicator WIMM as its AFTN address for receiving and sending messages,the status of location Indicator of Polonia Airport will changed as atributary address by using WIMK.a.Kualanamu International Airportwith specified units address asfollows: AerodromeAIS Unit: WIMMYOYW AerodromeControl Tower Unit: WIMMZTZW Approach Control Unit:WIMMZAZWMeteorological Station Unit:WIMMYMYW   AIRAC AIP SUPPLEMENT04/13  Page 3 of 3 Directorate General ofCivil Aviation, IndonesiaPublication Date:30MAY13Effective Date :25 JUL13 b.Polonia Airport with specified units address as follows: AerodromeAIS Unit: WIMKYOYW AerodromeControl Tower Unit: WIMKZTZWTerminal Control Unit: WIMKZLZWMeteorological Station Unit:WIMKYMYW 4.The new aerodrome dataand Charts related to Aerodrome layout,Ground Movement, Radar Minimum Altitudeand Flight Proceduresare depictedontheattachmentsof this AIRAC AIP Supplementasfollows: -Attachment A,Aerodrome Data(A1 to A36)-Attachment B,Aerodrome Chart;-Attachment C,AircraftParking/Docking Chart;-Attachment D1 to D4, Aerodrome Ground Movement Charts;-AttachmentE1 & E2, SID RWY 05& RWY 23;-AttachmentF1 & F2,STARRWY 05 &RWY 23;-Attachment G,Radar Minimum AltitudeChart–ICAO;-Attachment H1, IAP VOR/DME RWY 05;-AttachmentH2, IAP VOR/DME RWY 23;-AttachmentH3, IAP ILS RWY 05;-AttachmentH4, IAP ILS RWY 23;-Attachment I,Fuel Dumping ProcedureChart; 5.Any changestothe information content on thisAIRACAIPSupplement will be notified through NOTAM or superseded by other AIP Supplement. -----end-----   AIRAC AIP SUPPLEMENT03/13  Attachment “A1”  Directorate General ofCivil AviationPublicationDate:30 MAY13Effective Date :25 JUL13 WIMM AD 2.1 AERODROME LOCATION INDICATOR AND NAME WIMM–MEDAN /Kualanamu Internasional WIMM AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA  ARP Coordinates and Site at AD……….…….Direction and Distance From (City)…………..Elevation / Reference Temperature………….MAG VAR / Annual Change………………….. AD Administration……………………………… Address………………………………………….Telephone……………………………………….Telefax…………………………………………...Telex……………………………………………..E-mail............................................................ AFTN…………………………………………….Type of Traffic Permitted………………………Type of rwyRemarks…………………………………………03˚38’32”N098˚53’07”E23,78 km North East FromMedan City23ft/32º C1ºWestPT.Angkasa PuraII(Persero)KualanamuInternationalAirportKec.Beringin,LubukPakamPost Code20552(+62) 61 88880300(+62) 61 88880301ReservedReservedWIMMYOYWIFR and VFRInstrument rwy cat.IWebsite :Reserved WIMM AD 2.3 OPERATIONAL HOURS  AD Administration………………………………Custom and Immigration………………………Health and Sanitation…………………………. AIS Briefing Office…………………………….. ATS Reporting Office…………………………..MET Briefing Office……………………………. ATS………………………………………………Fuelling…………………………………………..Handling…………………………………………Security………………………………………….De-Icing………………………………………….Remarks…………………………………………MON–FRI:01.00–10.00H24H24H24H24H24H24H24H24H24NANA WIMM AD 2.4 HANDLING SERVICE AND FACILITIES Cargo Handling Facilities………………………Warehouse with advance storage, stacker material, pallet container handling system(PHCS),handlingservice areprovided by: - PT. Gapura Angkasa - PT. Jasa Angkasa Semesta - PT. NATS Nusantara - PT.Jasa Karya Semesta - PT. Dharma Bandar Mandala - PT. Raya Utama Logistik - PT. Prima Sakti Indo - PT. Prathita TitianNusantara