Preview only show first 10 pages with watermark. For full document please download

Ms-cable Tray Installation

Sample Method Statement for Cable tray Installation

   EMBED


Share

Transcript

METHOD STATEMENT CABLE CABLE TRAY INSTA INSTALLAT LLATIO ION N CONTENTS 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 STAFF IN CHARGE 4.0 EQUIPMENT 5.0 MATERIAL FOR CABLE TRAY INSTALLATION 6.0 DESCRIPTION OF WORK METHOD .0 ORGANI!ATION OF MANPOWER  ".0 HEALTH AND SAFETY #.0 SUPPORTING DOCUMENTS 1.0 SCOPE This procedure outlines the methods to be followed for the installation of cable tray. 2.0 REFERENCE DOCUMENTS  Construction Quality Plan Doc ref………………… Doc ref. ………………  Field Materials Control Procedure  Field Inspection Test Plan for Elect. Doc ref. ………………….  perational Procedure !"cceptance# $tora%e# &andlin% and Preser'ation of Materials in the (ob site. Doc ref. …………………  perational Procedure !(ob $ite perations Mana%ement) Doc ref. ………………….. 3.0 STAFF IN CHARGE $ite Mana%er Construction Mana%er Material Control En%ineer Field En%ineer &$E Pro*ect+In+Char%e Mr !to be fill up) Mr !to be fill up) Mr !to be fill up) Mr !to be fill up) Mr !to be fill up) 4.0 EQUIPMENT In %eneral the main e,uipment to be used for the erection are listed below  o  o  o  o / / / / Crane 00T Capacity Trailer 1 2oom Truc3  4eldin% Machine Transpallet 5.0 MATERIAL CABLE TRAY INSTALLATION "s per attached Pro*ect $chedule and Pro*ect Drawin%s Pertainin% to the Electrical $cope. 6.0 DESCRIPTION OF WORK METHOD The wor3 method to install the abo'e mentioned Cable Tray shall be in the followin% se,uence. A. • • • • • • • • P$%&I'()*++*),-' C%/( 5erification of Cable Tray installation from rele'ant "ppro'ed for Construction Drawin%s. Chec3 if drawin%s are of current re'ised status. $ite released for Cable Tray Installation. Conform if area is ready for installation or wor3able. 6ayout of e7act location of cable tray installation should be determined. 8e'iew Construction Drawin%s for %eneral notes1details and familiari9e the installation method recommended by the Client. E7posed areas for erection shall be cordoned by means of ha9ard identifyin% tape 1  barricade. Confirm that all Tools : Tac3les re,uired for installation are a'ailable. "s a minimum the followin% shall be made a'ailable. $lin%s D+$hac3les Pulley 4eldin% Machine "brasi'e Cuttin% Machine Drill Machine ;rindin% Machine Electrician Tool2o7 • • 2. Chec3 ade,uate place for . ?. =. 0. @. A. Earin% protection# Ear Muff or Plu%s &elmet# &ard+&at &and ;lo'es !6eather or Cotton) Face $hield !for %rindin%1cuttin% acti'ities) Dust Mas3 respiratory protection. $afety ;lassses $afety $hoes B. 8eflectori9ed 5est !if re,uired) Items of personal use shall be inspected re%ularly and maintained in ser'iceable and sanitary condition and before reissuin% to another person or returned to stora%e shall be cleaned# disinfected# inspected# and repaired. Employees shall wear clothin% suitable for weather and wor3 conditions. #.0 SUPPORTING DOCUMENTS A. P$->%/) D$*,'<(    Electrical cable tray 6ayouts. Cable tray support Details. $pecifications and $tandards re,uired by Client. 2. T9,/*+ C$*'% P-(,),-' *' O&L-*,'< L-/*),-' C. W-$ P%$,)(  &ot 4or3 Permit D. P+*''% S/%+% - A/),?,),%(